Ain Beni Mathar Integrated Thermo Solar Combined Cycle Power Plant

Source 📝

26: 445: 431: 394:
The solar radiation can contribute to up to 20 Mwe of the power plant output. It is understood that the solar field does not increase the total power, but simply lowers the specific consumption (from 6912.5 kJ/kW·h, at full power, to 6588.8 kJ/kW·h at full solar power).
390:
The solar energy collected at the parabolic troughs can increase the flow of steam produced in the recovery boilers. The steam produced in the two recovery boilers is expanded in the three body steam turbine (High, Medium and Low Pressure).
321:
The plant site, which has a total area of 160 hectares (395 acres), is characterized by a very large solar field, covering about 88 hectares (217 acres). The total capacity of the plant is 472 
73: 523: 513: 533: 387:
field, a solar heat exchanger, and two heat recovery exchangers (recovery boilers), one for each gas turbine. The recovery boiler recovers the gas turbine waste heat.
543: 518: 538: 460: 360: 144: 25: 291: 356: 352: 528: 348: 159: 414:
Solar field input temperature is 292 °C (558 °F), output temperature is 392 °C (738 °F).
332:
may be delivered from solar energy, and can generate an average annual energy production of about 3,538 
450: 121: 398:
The energy produced is transferred to the interconnection of Oujda and Bourdim via three 225 kV lines.
465: 405: 307: 225: 61: 384: 340:
as fuel. It is connected via a 12.6 km long pipe to the Maghreb-Europe (GME) pipeline.
169: 344: 303: 57: 436: 401:
Condenser cooling is via an air condenser, and a water consumption of 850,000 m3/year.
299: 238: 191: 53: 507: 380: 495: 484: 376: 444: 337: 184: 426: 88: 75: 359:(GEF) through a grant of $ 43.2 million, with the balance being provided by 313:
Construction began in March 2008 and the facility was commissioned in 2011.
268: 231: 383:, a 183,200 m (1,972,000 sq ft) collector surface solar 333: 295: 43: 372: 218: 280:
Ain Beni Mathar Integrated Thermo Solar Combined Cycle Power Plant
19:
Ain Beni Mathar Integrated Thermo Solar Combined Cycle Power Plant
485:
CENTRALE THERMO-SOLAIRE À CYCLE COMBINE INTEGRE D’AIN BENI MATHAR
411:
Specific consumption of the GT13E gas turbine is 10080 kJ/kW·h.
322: 244: 379:
fueled by natural gas, a 172 Mwe Alstom DKYZ2-1N41B
259: 347:, ($ 554 million), the project was funded by the 408:
and the Solar Field has a 95% availability factor.
255: 250: 237: 224: 201: 190: 180: 175: 165: 155: 150: 140: 120: 112: 104: 67: 49: 39: 18: 524:Buildings and structures in Oriental (Morocco) 8: 417:One collector is 150 m long and 5.7 m wide. 514:Natural gas-fired power stations in Morocco 496:Integrated Solar Energy Generation Project 371:The plant consists of two 150.28 Mwe 15: 361:L'Office National de l'Électricité (ONE) 145:L'Office National de l'Électricité (ONE) 534:Energy infrastructure completed in 2011 477: 404:The Combined Cycle component has a 93% 294:power generation plant in northeastern 7: 544:21st-century architecture in Morocco 461:List of solar thermal power stations 353:Official Credit Institute of Spain 298:. It is located in the commune of 14: 343:With a total cost of 4.6 billion 443: 429: 176:Thermal power station 24: 519:Solar power stations in Morocco 292:integrated solar combined cycle 539:2011 establishments in Morocco 1: 357:Global Environment Facility 239:Annual net output 128:; 13 years ago 560: 328:of which up to 20 MW 265: 210: 206: 35: 23: 349:African Development Bank 215:Make and model 451:Renewable energy portal 226:Nameplate capacity 113:Construction began 202:Power generation 466:Solar thermal energy 288:Aïn Beni Mathar ISCC 284:ISCC Ain Beni Mathar 122:Commission date 89:34.06833°N 2.10472°W 406:availability factor 251:External links 192:Combined cycle 166:CSP technology 85: /  94:34.06833; -2.10472 336:. The plant uses 276: 275: 181:Primary fuel 551: 498: 493: 487: 482: 453: 448: 447: 439: 434: 433: 432: 385:parabolic trough 269:edit on Wikidata 170:Parabolic trough 151:Solar farm 136: 134: 129: 100: 99: 97: 96: 95: 90: 86: 83: 82: 81: 78: 30:The ISCC in 2010 28: 16: 559: 558: 554: 553: 552: 550: 549: 548: 529:Jerada Province 504: 503: 502: 501: 494: 490: 483: 479: 474: 457: 456: 449: 442: 435: 430: 428: 423: 369: 331: 326: 319: 308:Oriental Region 304:Jerada Province 282:(also known as 272: 132: 130: 127: 93: 91: 87: 84: 79: 76: 74: 72: 71: 62:Oriental Region 60: 58:Jerada Province 56: 31: 12: 11: 5: 557: 555: 547: 546: 541: 536: 531: 526: 521: 516: 506: 505: 500: 499: 488: 476: 475: 473: 470: 469: 468: 463: 455: 454: 440: 437:Morocco portal 425: 424: 422: 419: 368: 367:Specifications 365: 355:(ICO) and the 329: 324: 318: 315: 300:Ain Bni Mathar 274: 273: 266: 263: 262: 260:www.one.org.ma 257: 253: 252: 248: 247: 241: 235: 234: 228: 222: 221: 216: 212: 211: 208: 207: 204: 203: 199: 198: 195: 188: 187: 182: 178: 177: 173: 172: 167: 163: 162: 157: 153: 152: 148: 147: 142: 138: 137: 124: 118: 117: 114: 110: 109: 106: 102: 101: 69: 65: 64: 54:Ain Bni Mathar 51: 47: 46: 41: 37: 36: 33: 32: 29: 21: 20: 13: 10: 9: 6: 4: 3: 2: 556: 545: 542: 540: 537: 535: 532: 530: 527: 525: 522: 520: 517: 515: 512: 511: 509: 497: 492: 489: 486: 481: 478: 471: 467: 464: 462: 459: 458: 452: 446: 441: 438: 427: 420: 418: 415: 412: 409: 407: 402: 399: 396: 392: 388: 386: 382: 381:steam turbine 378: 374: 366: 364: 362: 358: 354: 350: 346: 341: 339: 335: 327: 316: 314: 311: 309: 305: 301: 297: 293: 289: 285: 281: 270: 264: 261: 258: 254: 249: 246: 242: 240: 236: 233: 229: 227: 223: 220: 217: 214: 213: 209: 205: 200: 196: 193: 189: 186: 183: 179: 174: 171: 168: 164: 161: 158: 154: 149: 146: 143: 139: 125: 123: 119: 115: 111: 107: 103: 98: 70: 66: 63: 59: 55: 52: 48: 45: 42: 38: 34: 27: 22: 17: 491: 480: 416: 413: 410: 403: 400: 397: 393: 389: 377:gas turbines 370: 351:(AfBD), the 342: 320: 312: 287: 283: 279: 277: 338:natural gas 317:Description 185:Natural gas 141:Operator(s) 108:Operational 92: / 68:Coordinates 508:Categories 472:References 306:, in the 421:See also 290:) is an 80:2°6′17″W 77:34°4′6″N 50:Location 345:dirhams 302:within 296:Morocco 256:Website 131: ( 44:Morocco 40:Country 375:GT13E 373:Alstom 243:3,538 219:Alstom 105:Status 267:[ 230:472 334:GW·h 278:The 156:Type 133:2011 126:2011 116:2008 286:or 245:GWh 197:Yes 160:CSP 510:: 363:. 323:MW 310:. 232:MW 330:e 325:e 271:] 194:? 135:)

Index


Morocco
Ain Bni Mathar
Jerada Province
Oriental Region
34°4′6″N 2°6′17″W / 34.06833°N 2.10472°W / 34.06833; -2.10472
Commission date
L'Office National de l'Électricité (ONE)
CSP
Parabolic trough
Natural gas
Combined cycle
Alstom
Nameplate capacity
MW
Annual net output
GWh
www.one.org.ma
edit on Wikidata
integrated solar combined cycle
Morocco
Ain Bni Mathar
Jerada Province
Oriental Region
MWe
GW·h
natural gas
dirhams
African Development Bank
Official Credit Institute of Spain

Text is available under the Creative Commons Attribution-ShareAlike License. Additional terms may apply.