final height of 240 m (787 ft), it will be 1,300 m (4,265 ft) long. The dam will hold 570,000,000 metric tons (560,997,721 long tons; 628,317,447 short tons) of tailings and the mine is expected to produce 546,000,000 metric tons (537,376,764 long tons; 601,861,976 short tons). Upstream of the dam, a series of channels and embankments divert water from the Ayash River from entering the reservoir. This helps the environment and protects the stability of the dam. The reservoir is lined with a
29:
45:
277:. By April 2003, the dam was raised from its original elevation of 4,010 m (13,156 ft) above sea level to 4,045 m (13,271 ft). The dam will continually be raised until it reaches 240 m (787 ft) tall at an elevation of 4,125 m (13,533 ft) and length of 1.3 km (0.8 mi). Currently the dam is undergoing its fourth raising to 215 m (705 ft) in height.
52:
285:
As a base for the dam, a 130 m (427 ft) concrete-face rock-fill dam was constructed. From there, the dam is being raised with rock-fill with the upstream side being protected by a concrete slab. The original starter dam was 1,050 m (3,445 ft) in length and when the dam reaches its
272:
The dam was designed by Golder
Associates, Burnaby, B.C. and Ingetec SA between 1998 and 1999. Construction on the 130 m (427 ft) high concrete-face rock-fill starter dam began in 2000 was complete in April 2001. A 15,000,000 m (12,161 acre⋅ft) reservoir was filled behind the dam
290:
which controls seepage of tailings into the environment. Water released into the environment is purified to meet standards and discharges from the dam are maintained at at least 150 liters per second.
439:
312:
424:
91:
364:
338:
44:
434:
264:, Burnaby, B.C. was awarded the 2002 Canadian Consulting Engineering Award for its innovative design of the dam.
429:
419:
316:
414:
261:
28:
371:
274:
170:
408:
257:
253:
287:
245:
187:
256:
of Peru. The purpose of the dam is to store tailings processed at the nearby
106:
93:
399:
230:
570,000,000 metric tons (560,997,721 long tons; 628,317,447 short tons)
249:
79:
248:
located in the
Huincush Ravine 55 km (34 mi) east of
182:
365:"Operation at the Antamina Copper-Zinc Mine in Central Peru"
215:
Concrete-face rock-fill: 1,050 m (3,445 ft)
226:
221:
211:
201:
193:
181:
176:
166:
148:
130:
122:
85:
75:
67:
21:
205:Concrete-face rock-fill: 130 m (427 ft)
363:Eldridge, T.; K. Moffitt; S. Botts; C. Dechert.
217:Rock-fill raising: 1,300 m (4,265 ft)
341:. Canadian Consulting Engineer. 1 October 2002
51:
8:
339:"Award of Merit: Antamina Tailings Facility"
207:Rock-fill raising: 215 m (705 ft)
33:The tailings pond with the dam to the left
27:
18:
440:Buildings and structures in Ancash Region
59:Location of Antamina Tailings Dam in Peru
358:
356:
299:
242:Antamina Tailings Impoundment Facility
307:
305:
303:
7:
14:
50:
43:
1:
425:Concrete-face rock-fill dams
370:. Info Mine. Archived from
154:; 23 years ago
136:; 24 years ago
456:
315:. Antamina. Archived from
38:
26:
131:Construction began
435:Dams completed in 2001
238:Antamina Tailings Dam
183:Type of dam
22:Antamina Tailings Dam
281:Design and operation
240:, also known as the
126:In use, being raised
107:9.54056°S 77.03139°W
227:Total capacity
112:-9.54056; -77.03139
103: /
262:Golder Associates
234:
233:
177:Dam and spillways
149:Opening date
447:
400:Official website
387:
386:
384:
382:
376:
369:
360:
351:
350:
348:
346:
335:
329:
328:
326:
324:
309:
162:
160:
155:
144:
142:
137:
118:
117:
115:
114:
113:
108:
104:
101:
100:
99:
96:
54:
53:
47:
31:
19:
455:
454:
450:
449:
448:
446:
445:
444:
405:
404:
396:
391:
390:
380:
378:
377:on 5 April 2012
374:
367:
362:
361:
354:
344:
342:
337:
336:
332:
322:
320:
311:
310:
301:
296:
283:
270:
216:
206:
158:
156:
153:
140:
138:
135:
111:
109:
105:
102:
97:
94:
92:
90:
89:
63:
62:
61:
60:
57:
56:
55:
34:
17:
12:
11:
5:
453:
451:
443:
442:
437:
432:
430:Mining in Peru
427:
422:
417:
407:
406:
403:
402:
395:
394:External links
392:
389:
388:
352:
330:
319:on 7 July 2011
313:"Tailings Dam"
298:
297:
295:
292:
282:
279:
269:
266:
232:
231:
228:
224:
223:
219:
218:
213:
209:
208:
203:
199:
198:
195:
191:
190:
185:
179:
178:
174:
173:
171:Teck Resources
168:
164:
163:
150:
146:
145:
132:
128:
127:
124:
120:
119:
87:
83:
82:
77:
73:
72:
69:
65:
64:
58:
49:
48:
42:
41:
40:
39:
36:
35:
32:
24:
23:
15:
13:
10:
9:
6:
4:
3:
2:
452:
441:
438:
436:
433:
431:
428:
426:
423:
421:
420:Tailings dams
418:
416:
413:
412:
410:
401:
398:
397:
393:
373:
366:
359:
357:
353:
340:
334:
331:
318:
314:
308:
306:
304:
300:
293:
291:
289:
280:
278:
276:
267:
265:
263:
259:
258:Antamina mine
255:
254:Ancash Region
251:
247:
243:
239:
229:
225:
220:
214:
210:
204:
200:
196:
192:
189:
186:
184:
180:
175:
172:
169:
165:
151:
147:
133:
129:
125:
121:
116:
88:
84:
81:
78:
74:
70:
66:
46:
37:
30:
25:
20:
16:Dam in Huaraz
415:Dams in Peru
379:. Retrieved
372:the original
343:. Retrieved
333:
321:. Retrieved
317:the original
284:
275:concentrater
271:
246:tailings dam
241:
237:
235:
188:Tailings dam
288:geomembrane
273:assist the
260:. In 2003,
197:Ayash River
110: /
86:Coordinates
409:Categories
294:References
268:Background
98:77°01′53″W
95:09°32′26″S
222:Reservoir
381:8 August
345:8 August
323:8 August
194:Impounds
167:Owner(s)
76:Location
252:in the
244:, is a
157: (
139: (
68:Country
250:Huaraz
212:Length
202:Height
123:Status
80:Huaraz
375:(PDF)
368:(PDF)
383:2011
347:2011
325:2011
236:The
159:2001
152:2001
141:2000
134:2000
71:Peru
411::
355:^
302:^
385:.
349:.
327:.
161:)
143:)
Text is available under the Creative Commons Attribution-ShareAlike License. Additional terms may apply.