Knowledge (XXG)

Aorangi railway station

Source 📝

37: 345:
A siding for the Oroua Freezing works was put in during its construction in 1915. West Coast Meat & Produce Co Ltd had the works formally opened by Prime Minister, Bill Massey, on 17 April 1916. Later that year the company changed its name to Feilding Farmers’ Freezing Company Ltd. They sold the
309:
By 1959 there was still a shelter, platform and Borthwicks' private siding, which was the only source of local rail traffic after closure of the station on 10 August 1959. A 1949 aerial photo seems to show a shelter, where the 1967 photo (to the right) shows a white mark at the foot of the photo. In
326:
between Aorangi and Feilding on Aorangi Bridge, which was rebuilt in 1930-31, when the curve was eased from a radius of 14 chains (920 ft; 280 m) to 20 ch (1,300 ft; 400 m). It has ten 20 ch (1,300 ft; 400 m) 60 feet (18 m) spans, with a total length of
305:
By July 1876 the rails were in place, linking Palmerston North and Feilding, and ballasting was finished in September. The formal opening of the railway was on 19 October 1876. Charles Bull had a sawmill at Aorangi until about 1886. It had a private siding 4 chains (260 ft; 80 m) on the
688:"A Reconstructed Railway Bridge — Views of the new railway bridge recently constructed over the Oroua River (on the Auckland-Wellington Main Trunk Line, between Wellington and Marton), and of the men who carried out the work | NZETC" 347: 350:
in 1931, who had a small shunting locomotive at Aorangi from 1931 to 1973. Rail traffic was reduced in 1944 by allowing road haulage for up to 20 mi (32 km) parallel with the railway. The works became part of
306:
Feilding side of Aorangi from 1878, but there was a complaint about trains not stopping for passengers in 1883. By 1896 there was a shelter shed and passenger platform and also a cart approach by 1911.
1119: 1134: 1129: 426: 293:
The station was opened in 1878; and closed on 10 August 1959 for passengers and 2 November 1987 for goods traffic. There is now only a single line through the station site.
1061: 1109: 1114: 65: 476: 503:"THE FIELDING SETTLEMENT (REPORT ON THE PROGRESS AND PRESENT CONDITION OF). APPENDIX TO THE JOURNALS OF THE HOUSE OF REPRESENTATIVES, 1877" 586: 395: 985: 687: 648: 330:
A footbridge over the river was built in 1883. The first road bridge opened on 21 March 1893. It was replaced by a
128: 451: 217: 856: 283: 233: 118: 41:
Aorangi in 1967, showing the bridge over the Oroua, meat works, sidings and possible site of station shelter
247: 502: 1078: 959: 933: 907: 881: 804: 778: 738: 622: 1124: 1062:"Meat Processing Plant Discharge Consents Application and Assessment of Environmental Effects" 1010: 830: 712: 553: 527: 391: 662: 355:
from May 1992, after re-building in September 1991. The works is no longer rail connected.
597: 1036: 352: 331: 477:"PUBLIC WORKS STATEMENT, BY THE MINISTER FOR PUBLIC WORKS, THE HON. EDWARD RICHARDSON" 1103: 311: 337:
The road and railway bridges were partly swept away in a flood on 17 April 1897.
452:"Feilding to Palmerston North — NZ Walking Access Commission Ara Hīkoi Aotearoa" 323: 287: 36: 80: 67: 294: 413:
Names & Opening & Closing Dates of Railway Stations in New Zealand
238: 108: 986:"New Zealand Rolling Stock Register - Internal Combustion section" 767:(First ed.). Quail Map Co. 1965. pp. 3 & 4. 375:(First ed.). Quail Map Co. 1965. pp. 3 & 4. 934:"Feilding Farmers' Freezing Company. MANAWATU TIMES" 190: 178: 163: 148: 143: 135: 124: 114: 104: 96: 59: 51: 46: 23: 390:. Wellington: A.H&A.W Reed. pp. 289–290. 649:"Retrolens Survey Number: SN543 Photo Number: 32" 297:long distance walkway passes the station site. 1135:Railway stations in New Zealand closed in 1987 1130:Railway stations in New Zealand opened in 1878 1120:Buildings and structures in Manawatū-Whanganui 805:"Opening of the Aorangi Bridge FEILDING STAR" 8: 960:"FEILDING FREEZING WORKS. MANAWATU STANDARD" 348:Thomas Borthwick and Sons (Australasia) Ltd 35: 20: 1079:"Basemaps | Land Information New Zealand" 1011:"CARTAGE OF FAT LAMBS. MANAWATU STANDARD" 581: 579: 577: 575: 196: 1110:Defunct railway stations in New Zealand 739:"NEW RAILWAY BRIDGE. MANAWATU STANDARD" 528:"LOCAL AND GENERAL. WANGANUI CHRONICLE" 364: 908:"Oroua Freezing Works. MANAWATU TIMES" 554:"Local and General News FEILDING STAR" 16:Defunct railway station in New Zealand 882:"OROUA FREEZING WORKS. FEILDING STAR" 779:"Our Feilding Letter. MANAWATU TIMES" 765:New Zealand Railway and Tramway Atlas 373:New Zealand Railway and Tramway Atlas 7: 1115:Rail transport in Manawatū-Whanganui 713:"LOCAL AND GENERAL. MANAWATU HERALD" 623:"LOCAL AND GENERAL. FEILDING STAR" 14: 857:"Oroua River flood - 1897 37-12" 663:"Oroua River, Manawatu-Wanganui" 1: 131:150.9 km (93.8 mi) 282:was a small station on the 256:3.17 km (1.97 mi) 226:2.05 km (1.27 mi) 1151: 327:183 m (600 ft). 1015:paperspast.natlib.govt.nz 964:paperspast.natlib.govt.nz 938:paperspast.natlib.govt.nz 912:paperspast.natlib.govt.nz 886:paperspast.natlib.govt.nz 835:paperspast.natlib.govt.nz 809:paperspast.natlib.govt.nz 783:paperspast.natlib.govt.nz 743:paperspast.natlib.govt.nz 717:paperspast.natlib.govt.nz 627:paperspast.natlib.govt.nz 558:paperspast.natlib.govt.nz 532:paperspast.natlib.govt.nz 507:paperspast.natlib.govt.nz 481:paperspast.natlib.govt.nz 456:www.walkingaccess.govt.nz 273: 269: 265: 246: 232: 216: 195: 186: 167:2 November 1987 34: 322:The railway crosses the 182:25 kV 50 Hz AC June 1988 152:1 October 1876 81:40.243305°S 175.585032°E 861:www.feildingheritage.nz 594:NZR Rolling Stock Lists 411:Scoble, Juliet (2012). 388:North Island Main Trunk 310:1989 there was still a 284:North Island Main Trunk 280:Aorangi railway station 234:North Island Main Trunk 119:North Island Main Trunk 100:70 m (230 ft) 27:Aorangi railway station 86:-40.243305; 175.585032 1083:basemaps.linz.govt.nz 386:Pierre, Bill (1981). 1037:"AFFCO Manawatu MBP" 692:nzetc.victoria.ac.nz 314:and private siding. 206:Historical railways 940:. 13 September 1916 785:. 17 September 1883 77: /  47:General information 1017:. 26 December 1944 966:. 3 September 1931 603:on 8 February 2013 212:Following station 200:Preceding station 831:"MANAWATU HERALD" 560:. 14 October 1886 534:. 20 October 1876 427:"Te Araroa Trail" 277: 276: 261: 260: 257: 241: 227: 1142: 1094: 1093: 1091: 1089: 1075: 1069: 1068: 1066: 1058: 1052: 1051: 1049: 1047: 1033: 1027: 1026: 1024: 1022: 1007: 1001: 1000: 998: 996: 982: 976: 975: 973: 971: 956: 950: 949: 947: 945: 930: 924: 923: 921: 919: 904: 898: 897: 895: 893: 878: 872: 871: 869: 867: 853: 847: 846: 844: 842: 827: 821: 820: 818: 816: 801: 795: 794: 792: 790: 775: 769: 768: 761: 755: 754: 752: 750: 745:. 28 August 1929 735: 729: 728: 726: 724: 709: 703: 702: 700: 698: 684: 678: 677: 675: 673: 659: 653: 652: 645: 639: 638: 636: 634: 619: 613: 612: 610: 608: 602: 596:. Archived from 591: 583: 570: 569: 567: 565: 550: 544: 543: 541: 539: 524: 518: 517: 515: 513: 499: 493: 492: 490: 488: 473: 467: 466: 464: 462: 448: 442: 441: 439: 437: 423: 417: 416: 408: 402: 401: 383: 377: 376: 369: 334:bridge in 1930. 251: 237: 221: 197: 174: 172: 159: 157: 92: 91: 89: 88: 87: 82: 78: 75: 74: 73: 70: 39: 21: 1150: 1149: 1145: 1144: 1143: 1141: 1140: 1139: 1100: 1099: 1098: 1097: 1087: 1085: 1077: 1076: 1072: 1064: 1060: 1059: 1055: 1045: 1043: 1041:www.affco.co.nz 1035: 1034: 1030: 1020: 1018: 1009: 1008: 1004: 994: 992: 990:www.nzrsr.co.nz 984: 983: 979: 969: 967: 958: 957: 953: 943: 941: 932: 931: 927: 917: 915: 914:. 17 April 1916 906: 905: 901: 891: 889: 880: 879: 875: 865: 863: 855: 854: 850: 840: 838: 829: 828: 824: 814: 812: 811:. 23 March 1893 803: 802: 798: 788: 786: 777: 776: 772: 763: 762: 758: 748: 746: 737: 736: 732: 722: 720: 719:. 17 March 1931 711: 710: 706: 696: 694: 686: 685: 681: 671: 669: 661: 660: 656: 647: 646: 642: 632: 630: 621: 620: 616: 606: 604: 600: 589: 585: 584: 573: 563: 561: 552: 551: 547: 537: 535: 526: 525: 521: 511: 509: 501: 500: 496: 486: 484: 475: 474: 470: 460: 458: 450: 449: 445: 435: 433: 425: 424: 420: 410: 409: 405: 398: 385: 384: 380: 371: 370: 366: 361: 343: 320: 303: 255: 253: 250: 236: 225: 223: 220: 170: 168: 155: 153: 85: 83: 79: 76: 71: 68: 66: 64: 63: 42: 30: 29: 28: 17: 12: 11: 5: 1148: 1146: 1138: 1137: 1132: 1127: 1122: 1117: 1112: 1102: 1101: 1096: 1095: 1070: 1053: 1028: 1002: 977: 951: 925: 899: 888:. 9 April 1915 873: 848: 837:. 1 March 1930 822: 796: 770: 756: 730: 704: 679: 654: 651:. 23 May 1949. 640: 629:. 7 April 1883 614: 571: 545: 519: 494: 483:. 25 July 1876 468: 443: 418: 403: 396: 378: 363: 362: 360: 357: 342: 341:Freezing works 339: 332:ferro-concrete 319: 318:Aorangi Bridge 316: 302: 299: 275: 274: 271: 270: 267: 266: 263: 262: 259: 258: 254:station closed 245: 242: 231: 228: 224:station closed 214: 213: 210: 207: 204: 201: 193: 192: 188: 187: 184: 183: 180: 176: 175: 165: 161: 160: 150: 146: 145: 141: 140: 137: 133: 132: 126: 122: 121: 116: 112: 111: 106: 102: 101: 98: 94: 93: 61: 57: 56: 53: 49: 48: 44: 43: 40: 32: 31: 26: 25: 24: 15: 13: 10: 9: 6: 4: 3: 2: 1147: 1136: 1133: 1131: 1128: 1126: 1123: 1121: 1118: 1116: 1113: 1111: 1108: 1107: 1105: 1084: 1080: 1074: 1071: 1067:. March 2015. 1063: 1057: 1054: 1042: 1038: 1032: 1029: 1016: 1012: 1006: 1003: 991: 987: 981: 978: 965: 961: 955: 952: 939: 935: 929: 926: 913: 909: 903: 900: 887: 883: 877: 874: 862: 858: 852: 849: 836: 832: 826: 823: 810: 806: 800: 797: 784: 780: 774: 771: 766: 760: 757: 744: 740: 734: 731: 718: 714: 708: 705: 693: 689: 683: 680: 668: 664: 658: 655: 650: 644: 641: 628: 624: 618: 615: 599: 595: 588: 582: 580: 578: 576: 572: 559: 555: 549: 546: 533: 529: 523: 520: 508: 504: 498: 495: 482: 478: 472: 469: 457: 453: 447: 444: 432: 428: 422: 419: 414: 407: 404: 399: 393: 389: 382: 379: 374: 368: 365: 358: 356: 354: 349: 340: 338: 335: 333: 328: 325: 317: 315: 313: 307: 300: 298: 296: 291: 289: 285: 281: 272: 268: 264: 249: 243: 240: 235: 229: 219: 215: 211: 208: 205: 202: 199: 198: 194: 189: 185: 181: 177: 166: 162: 151: 147: 142: 138: 134: 130: 127: 123: 120: 117: 113: 110: 107: 103: 99: 95: 90: 62: 58: 54: 50: 45: 38: 33: 22: 19: 1086:. Retrieved 1082: 1073: 1056: 1044:. Retrieved 1040: 1031: 1019:. Retrieved 1014: 1005: 993:. Retrieved 989: 980: 968:. Retrieved 963: 954: 942:. Retrieved 937: 928: 916:. Retrieved 911: 902: 890:. Retrieved 885: 876: 864:. Retrieved 860: 851: 839:. Retrieved 834: 825: 813:. Retrieved 808: 799: 787:. Retrieved 782: 773: 764: 759: 747:. Retrieved 742: 733: 721:. Retrieved 716: 707: 695:. Retrieved 691: 682: 670:. Retrieved 666: 657: 643: 631:. Retrieved 626: 617: 605:. Retrieved 598:the original 593: 562:. Retrieved 557: 548: 536:. Retrieved 531: 522: 510:. Retrieved 506: 497: 485:. Retrieved 480: 471: 459:. Retrieved 455: 446: 434:. Retrieved 430: 421: 412: 406: 387: 381: 372: 367: 344: 336: 329: 321: 312:passing loop 308: 304: 292: 279: 278: 18: 667:NZ Topo Map 431:Google Maps 324:Oroua River 288:New Zealand 179:Electrified 84: / 72:175°35′06″E 60:Coordinates 55:New Zealand 1104:Categories 749:21 January 723:21 January 697:20 January 672:20 January 587:"Stations" 512:21 January 487:21 January 397:0589013165 359:References 252:Line open, 222:Line open, 171:1987-11-02 156:1876-10-01 129:Wellington 69:40°14′36″S 607:10 August 346:works to 295:Te Araroa 136:Platforms 97:Elevation 1125:Feilding 239:KiwiRail 218:Feilding 191:Services 125:Distance 109:KiwiRail 105:Owned by 52:Location 1088:5 March 1046:5 March 1021:5 March 995:5 March 970:5 March 944:5 March 918:5 March 892:5 March 866:5 March 841:5 March 815:5 March 789:5 March 633:5 March 564:6 March 538:5 March 461:7 March 436:4 March 301:History 244:  230:  209:  203:  169: ( 154: ( 144:History 115:Line(s) 394:  248:Taonui 164:Closed 149:Opened 1065:(PDF) 601:(PDF) 590:(PDF) 353:AFFCO 1090:2021 1048:2021 1023:2021 997:2021 972:2021 946:2021 920:2021 894:2021 868:2021 843:2021 817:2021 791:2021 751:2021 725:2021 699:2021 674:2021 635:2021 609:2020 566:2021 540:2021 514:2021 489:2021 463:2021 438:2021 392:ISBN 286:in 1106:: 1081:. 1039:. 1013:. 988:. 962:. 936:. 910:. 884:. 859:. 833:. 807:. 781:. 741:. 715:. 690:. 665:. 625:. 592:. 574:^ 556:. 530:. 505:. 479:. 454:. 429:. 290:. 1092:. 1050:. 1025:. 999:. 974:. 948:. 922:. 896:. 870:. 845:. 819:. 793:. 753:. 727:. 701:. 676:. 637:. 611:. 568:. 542:. 516:. 491:. 465:. 440:. 415:. 400:. 173:) 158:) 139:1

Index


40°14′36″S 175°35′06″E / 40.243305°S 175.585032°E / -40.243305; 175.585032
KiwiRail
North Island Main Trunk
Wellington
Feilding
North Island Main Trunk
KiwiRail
Taonui
North Island Main Trunk
New Zealand
Te Araroa
passing loop
Oroua River
ferro-concrete
Thomas Borthwick and Sons (Australasia) Ltd
AFFCO
ISBN
0589013165
"Te Araroa Trail"
"Feilding to Palmerston North — NZ Walking Access Commission Ara Hīkoi Aotearoa"
"PUBLIC WORKS STATEMENT, BY THE MINISTER FOR PUBLIC WORKS, THE HON. EDWARD RICHARDSON"
"THE FIELDING SETTLEMENT (REPORT ON THE PROGRESS AND PRESENT CONDITION OF). APPENDIX TO THE JOURNALS OF THE HOUSE OF REPRESENTATIVES, 1877"
"LOCAL AND GENERAL. WANGANUI CHRONICLE"
"Local and General News FEILDING STAR"




"Stations"

Text is available under the Creative Commons Attribution-ShareAlike License. Additional terms may apply.