54:. The project is constructed on a build-own-operate and transfer (BOOT) basis. SJVN will operate the plant for 30 years and then transfer the ownership to the Nepal government. During 30 years of operation, 21.9% of power will be provided to Nepal free of cost. The project's construction is expected to generate 3,000 jobs in Nepal and India. 74:
tunnel is 192m long and has a diameter of 10m. Four vertical Francis turbine units of 225MW each will be housed in an underground powerhouse. The gross head is 308m and the design net head is 286.21m. The power evacuation will be done via a 300 km-long, 400kV transmission line to India. It will
70:(they have since been removed from the proposal) having a length of 420m, a width of 16m and a height of 24m each. A 9.5m diameter tunnel having length of 11.74 km followed by 9.5m diameter two steel-lined pressure shafts and four penstocks will convey the flow to the powerhouse. The 102:
affecting the culture and natural beauty of the Arun valley expressed concerns. There were also fears that this project was inappropriately large and would lead to further increases in the price of electricity. There was also a debate for the road to the project area concerning
118:
In November 2014, the project resurfaced and a Project Development Agreement was signed. The surplus power from the project will be exported to India from Dhalkebar, Nepal to Muzaffarpur, Bihar. In 2017, the cabinet of India approved the project for construction.
90:. Total Management Services will monitor the environmental aspects. 269 families will be affected by the project construction, and they will be compensated by being provided with 30 units of electricity each free of cost every month. 45:
The estimated cost is US$ 1.6 billion including $ 156 million to develop the transmission line. It will generate about 4,018.87 million units of electricity annually. In February 2020, financial closure was done by the governments of
66:
across the Arun River which will be able to store 13.94 million cubic meters of water. The dam will have six (now only five) sluice gates. There will be four underground
328: 255: 42:
plant in South Asia. It is constructed by SJVN Arun III Power Development Company Private Limited, a wholly owned subsidiary of SJVN Ltd.
98:
The project was formed by Nepal Government in 1992. However, NGOs, environmental activists and individuals worried against rampant
323: 87: 128: 227: 147: 318: 279: 31: 202: 108: 177: 67: 272:
Whitewater adventurers kayaking through the stretch of Arun river that Arun- III project will affect.
51: 47: 27: 83: 23: 312: 104: 99: 79: 71: 63: 271: 112: 75:
be routed from Diding to Dhalkebar, Nepal, and finally to Muzzafarpur, India.
39: 294: 281: 155: 35: 115:
decided to withdraw their support, effectively cancelling the project.
178:"Arun-III hydroelectric power project, Sankhuwasabha, Nepal" 62:
The project consists of a 70m high, 466m wide concrete
256:"Indian PM Modi likely to visit Nepal this month" 8: 34:of Province 1, Nepal. The project is of 900 139: 86:. The electro-mechanical contractor is 197: 195: 193: 329:Hydroelectric power stations in Nepal 82:. The hydro-mechanical contractor is 7: 26:project under construction on the 14: 38:capacity and will be the largest 203:"Arun – III Hydropower Project" 129:List of power stations in Nepal 16:Hydro electric project in Nepal 1: 345: 78:The civil contractor is 324:Dams under construction 228:"The Loss of Arun III" 32:Sankhuwasabha District 109:habitat fragmentation 80:Jaiprakash Associates 291: /  235:Nepal Study Center 319:Politics of Nepal 295:27.550°N 85.183°E 336: 306: 305: 303: 302: 301: 296: 292: 289: 288: 287: 284: 260: 259: 252: 246: 245: 243: 241: 232: 223: 217: 216: 214: 213: 207:Power Technology 199: 188: 187: 185: 184: 174: 168: 167: 165: 163: 158:on June 30, 2019 154:. Archived from 144: 68:desilting basins 344: 343: 339: 338: 337: 335: 334: 333: 309: 308: 299: 297: 293: 290: 285: 282: 280: 278: 277: 268: 263: 254: 253: 249: 239: 237: 230: 225: 224: 220: 211: 209: 201: 200: 191: 182: 180: 176: 175: 171: 161: 159: 146: 145: 141: 137: 125: 111:. In 1995, the 96: 60: 58:Project details 17: 12: 11: 5: 342: 340: 332: 331: 326: 321: 311: 310: 300:27.550; 85.183 275: 274: 267: 266:External links 264: 262: 261: 247: 218: 189: 169: 138: 136: 133: 132: 131: 124: 121: 95: 92: 59: 56: 24:hydro-electric 15: 13: 10: 9: 6: 4: 3: 2: 341: 330: 327: 325: 322: 320: 317: 316: 314: 307: 304: 273: 270: 269: 265: 257: 251: 248: 236: 229: 222: 219: 208: 204: 198: 196: 194: 190: 179: 173: 170: 157: 153: 149: 143: 140: 134: 130: 127: 126: 122: 120: 116: 114: 110: 106: 105:deforestation 101: 100:privatization 93: 91: 89: 85: 81: 76: 73: 69: 65: 57: 55: 53: 49: 43: 41: 37: 33: 29: 25: 21: 276: 250: 238:. Retrieved 234: 226:Mahat, Ram. 221: 210:. Retrieved 206: 181:. Retrieved 172: 160:. Retrieved 156:the original 151: 148:"Arun 3 HEP" 142: 117: 97: 77: 61: 44: 19: 18: 298: / 64:gravity dam 313:Categories 212:2022-07-28 183:2022-07-28 152:Arun 3 HEP 135:References 113:World Bank 40:hydropower 28:Arun River 84:Om Metals 36:megawatts 123:See also 72:tailrace 20:Arun III 286:85°11′E 283:27°33′N 240:May 13, 162:May 13, 94:History 231:(PDF) 52:Nepal 48:India 22:is a 242:2023 164:2023 107:and 88:BHEL 50:and 30:in 315:: 233:. 205:. 192:^ 150:. 258:. 244:. 215:. 186:. 166:.

Index

hydro-electric
Arun River
Sankhuwasabha District
megawatts
hydropower
India
Nepal
gravity dam
desilting basins
tailrace
Jaiprakash Associates
Om Metals
BHEL
privatization
deforestation
habitat fragmentation
World Bank
List of power stations in Nepal
"Arun 3 HEP"
the original
"Arun-III hydroelectric power project, Sankhuwasabha, Nepal"



"Arun – III Hydropower Project"
"The Loss of Arun III"
"Indian PM Modi likely to visit Nepal this month"
Whitewater adventurers kayaking through the stretch of Arun river that Arun- III project will affect.