414:. It was designed for a 4-year refueling cycle. In the process of refuelling, the entire core will be completely removed in a single evolution, and replaced in a second separate evolution, making the core nearly "plug and play", unlike traditional reactors, which require fuel handling and movement of individual fuel rods during a refueling outage. The entire used core, once removed, can be placed in storage in the spent fuel pool next to the IRV in the containment, which was designed to hold an entire 60 years worth of used fuel, and was accessible by the containment gantry crane located above the IRV within the containment. 132: 465:. If secondary cooling was lost, creating an effective loss of standard heat removal, there are water supplies located above and within the containment that can cool the vessel with gravity-driven cooling. Heat removal can be used if these systems are exhausted, such as by flooding the containment and establishing natural circulation, as no electrically driven pumps are required. 66: 25: 285:
The reactor was unveiled by Babcock & Wilcox in June 2009. In July 2010, Babcock & Wilcox announced a formal alliance with Bechtel called Generation mPower LLC. At the same time, Babcock & Wilcox announced that it would build a test facility for the mPower reactor design at the Center for
445:
The integral once-through steam generator was an advanced derivative of the steam generators used in older B&W designs (Davis Besse). Control rod drives do not penetrate the IRV, as in the light water reactors of today, but are instead wholly enclosed within the IRV. Burnable neutron absorbers
394:
The reactor was planned to have a rated electrical output of 125–180 MWe. When originally announced, the reactor had planned capacity of 125 MWe. Later the power was increased to 160 MWe and then to 180 MWe. In its pre-application design certification interaction with the
361:
In March 2017 Bechtel withdrew from the joint venture, citing the inability to find a utility company that would provide a site for a first reactor and an investor. The development project was terminated, with Babcock & Wilcox paying Bechtel a $ 30 million settlement.
349:
In February 2014, Jim Ferland, B&W's CEO, announced that spending on the mPower reactor development will be decreased by 75%. The official explanation was that the company had failed in its effort to find additional major investors to participate in the project.
382:
that would store all of the spent fuel. The modular unit had a diameter of 4.5 metres (15 ft) and it was 23 metres (75 ft) high. The reactor core was 2 by 2 metres (6 ft 7 in by 6 ft 7 in). The steam generator was similar to
357:"Without the ability to secure significant additional investors or customer engineering, procurement and construction contracts to provide the financial support necessary to develop and deploy mPower reactors, the current development pace will be slowed." 343:(SMR) designs. The competition was intended to accelerate development of SMRs. The award was funded at $ 79 million in 2013, from a total of $ 150 million over five years, with a possibility of total government grants reaching $ 226 million or more. 1212: 461:
as the integral reactor vessel would not have a large cold or hot leg piping; it contains the entire primary coolant loop within the reactor pressure vessel with automatic primary loop
1294: 353:
In April 2014, Babcock & Wilcox announced it was scaling back investment in the programme, projecting investment of up to $ 15 million annually. It stated:
446:
within the fuel and control rod inventory are used to suppress hot excess reactivity. Cold shut-down was accomplished with control rod insertion (as in BWRs).
449:
The mPower was designed to produce superheated steam and would not require steam separators and dryers before admitting steam into the high-pressure turbine.
346:
In 2013 Babcock & Wilcox had intended to sell a majority stake in the mPower joint venture, but in February 2014 announced it was unable to find a buyer.
1205: 507: 1365: 1284: 733: 559: 533: 291: 965: 1198: 892: 1299: 1360: 1248: 1123: 325: 792: 1061: 336: 370:
B&W mPower was a Generation III+ integral pressurized water reactor (light water reactor) with a modular design. The reactor and
1242: 233: 215: 113: 52: 822: 697: 371: 95: 76: 431: 153: 869: 149: 38: 672: 196: 1253: 1092: 1037: 1001: 396: 317: 320:
for design certification by 2013. Babcock & Wilcox announced on February 20, 2013, that they had contracted with the
168: 1066: 384: 306: 942: 597: 647: 175: 767: 321: 302: 847: 1005: 474: 388: 267: 743: 622: 569: 1269: 458: 287: 91: 399:, the reactor's rated capacity was described as 500MWt of thermal power and 160 MWe of electrical power. 182: 142: 702: 263: 164: 918: 423: 340: 251: 1138: 1071: 426:(BWR). Like a BWR, the mPower reactor's primary coolant/moderator was highly purified water (with no 379: 329: 430:). The Reactor Water Cleanup System ensures that primary system water remains pure. Similar to the 411: 271: 255: 1154: 295: 44: 438:(IRV). The mPower reactor control rods are inserted from the top of the core and inserted upon 1334: 1185: 1097: 1339: 1279: 796: 711: 442:
under gravity. All of the primary coolants were in the liquid phase during normal operation.
1289: 1146: 1102: 707: 462: 435: 387:(OTSG) used in existing B&W plants (i.e. Three Mile island). The unit had an air-cooled 1274: 1227: 1221: 410:
B&W mPower uses standard fuel enriched to 5%, similar to the fuel loaded in the other
189: 1142: 258:, and to be built by Generation mPower LLC, a joint venture of Babcock & Wilcox and 375: 277:
In March 2017, Bechtel withdrew from the joint venture and the project was terminated.
87: 1354: 1224: 1158: 1033: 1180: 1190: 1319: 131: 1009: 1329: 1304: 484: 427: 1150: 310: 290:. In April 2011, Babcock & Wilcox received a $ 5 million grant from the 434:, the mPower reactor had integral coolant recirculation pumps inside the 795:. Charlotte, NC: Babcock & Wilcox. February 20, 2013. Archived from 793:"B&W, TVA Sign Contract for Clinch River mPower Construction Permit" 1314: 738: 564: 479: 324:
to apply for permits to build an mPower small modular reactor at TVA's
259: 893:"No sale: Babcock & Wilcox can.t find buyer for Generation mPower" 1186:
Pre-Application Documents for the B&W mPower Design (NRC website)
1309: 439: 301:
In June 2011 Generation mPower signed a letter of intent with the
1249:
United States-India Peaceful Atomic Energy Cooperation Agreement
1194: 402:
The reactor was designed for an expected lifetime of 60 years.
125: 59: 18: 558:
Disavino, Scott; O'Grady, Eileen; Doggett, Tom (2009-06-10).
919:"B&W mPower cover story about lack of interest is bogus" 1122:
Rosner, Robert; Lordan, Rebecca; Goldberg, Stephen (2011).
534:"Bechtel And BWXT Quietly Terminate mPower Reactor Project" 391:
giving 31% thermal efficiency, and passive safety systems.
823:"Deal Advances Development of a Smaller Nuclear Reactor" 83: 698:"Babcock & Wilcox plans Virginia testing facility" 560:"McDermott B&W unit unveils small nuclear reactor" 1181:
B&W mPower reactor (Babcock & Wilcox website)
1093:"Babcock & Wilcox planning mini nuclear reactor" 1055: 1053: 94:, and by adding encyclopedic content written from a 1262: 1234: 457:The mPower was designed to eliminate the potential 156:. Unsourced material may be challenged and removed. 945:. Nuclear Engineering International. 15 April 2014 734:"FACTBOX-U.S. proposed new nuclear power reactors" 527: 525: 422:The mPower incorporates several features of the 943:"B&W scales back small reactor development" 508:"Bechtel pulls out of mini-nuclear development" 355: 673:"B&W awarded grant for mPower development" 598:"B&W unveils modular nuclear power design" 1206: 501: 499: 8: 762: 760: 592: 590: 588: 586: 53:Learn how and when to remove these messages 1213: 1199: 1191: 870:"SMR funding signed, sealed and delivered" 316:Generation mPower planned to apply to the 234:Learn how and when to remove this message 216:Learn how and when to remove this message 114:Learn how and when to remove this message 374:would be located in a single integrated 648:"B&W to build mPower test facility" 495: 305:for constructing up to six reactors at 1300:Russian floating nuclear power station 1028: 1026: 996: 994: 992: 990: 988: 986: 75:contains content that is written like 966:"BWXT, Bechtel shelve mPower program" 821:Matthew L. Wald (February 20, 2013). 286:Advanced Engineering and Research in 7: 768:"TVA progresses with mPower project" 623:"B&W, Bechtel team up on mPower" 154:adding citations to reliable sources 296:Community Revitalisation Commission 1366:Nuclear power in the United States 964:Carmel, Margaret (15 March 2017). 14: 1243:Global Nuclear Energy Partnership 1131:Bulletin of the Atomic Scientists 34:This article has multiple issues. 1091:Mansfield, Duncan (2009-06-10). 891:John Downey (28 February 2014). 380:underground containment facility 292:Virginia Tobacco Indemnification 130: 64: 23: 1008:. February 2012. Archived from 848:"mPower empowered by SMR funds" 506:Simpson, Jack (17 March 2017). 335:In November 2012, mPower won a 141:needs additional citations for 42:or discuss these issues on the 1002:"Small Nuclear Power Reactors" 732:Disavino, Scott (2011-06-16). 16:Proposed small modular reactor 1: 1254:Next Generation Nuclear Plant 1038:Nuclear Regulatory Commission 397:Nuclear Regulatory Commission 385:Once Through Steam Generators 318:Nuclear Regulatory Commission 1060:Spring, Nancy (2010-01-01). 710:. 2010-07-27. Archived from 532:Adams, Rod (13 March 2017). 339:funding competition for new 307:Clinch River Breeder Reactor 1361:Nuclear power reactor types 1124:"Moving to passive designs" 1382: 897:Charlotte Business Journal 322:Tennessee Valley Authority 303:Tennessee Valley Authority 1263:Specialized plant designs 1006:World Nuclear Association 917:Adams, Roy (2014-06-20). 459:loss of coolant accidents 268:pressurized water reactor 1151:10.1177/0096340211413374 298:for this test facility. 288:Bedford County, Virginia 436:Integral Reactor Vessel 337:US Department of Energy 703:Bloomberg Businessweek 359: 475:Hyperion Power Module 424:boiling water reactor 341:Small modular reactor 252:small modular reactor 96:neutral point of view 1072:Pennwell Corporation 330:Oak Ridge, Tennessee 256:Babcock & Wilcox 150:improve this article 1143:2011BuAtS..67d..23R 850:. November 21, 2012 510:. Construction News 272:light water reactor 88:promotional content 827:The New York Times 772:World Nuclear News 677:World Nuclear News 652:World Nuclear News 627:World Nuclear News 602:World Nuclear News 418:Thermal hydraulics 406:Fuel and refueling 90:and inappropriate 1348: 1347: 1335:Transatomic Power 1098:The Seattle Times 1067:Power Engineering 802:on March 30, 2013 326:Clinch River site 244: 243: 236: 226: 225: 218: 200: 124: 123: 116: 57: 1373: 1215: 1208: 1201: 1192: 1169: 1168: 1166: 1165: 1128: 1119: 1113: 1112: 1110: 1109: 1103:Associated Press 1088: 1082: 1081: 1079: 1078: 1062:"B&W mPower" 1057: 1048: 1047: 1045: 1044: 1034:"B&W mPower" 1030: 1021: 1020: 1018: 1017: 998: 981: 980: 978: 976: 961: 955: 954: 952: 950: 939: 933: 932: 930: 929: 914: 908: 907: 905: 903: 888: 882: 881: 879: 877: 872:. April 16, 2013 866: 860: 859: 857: 855: 844: 838: 837: 835: 833: 818: 812: 811: 809: 807: 801: 789: 783: 782: 780: 779: 764: 755: 754: 752: 751: 746:on March 6, 2016 742:. Archived from 729: 723: 722: 720: 719: 708:Associated Press 694: 688: 687: 685: 684: 669: 663: 662: 660: 659: 644: 638: 637: 635: 634: 619: 613: 612: 610: 609: 594: 581: 580: 578: 577: 572:on March 6, 2016 568:. Archived from 555: 549: 548: 546: 544: 529: 520: 519: 517: 515: 503: 463:depressurization 239: 232: 221: 214: 210: 207: 201: 199: 165:"B&W mPower" 158: 134: 126: 119: 112: 108: 105: 99: 77:an advertisement 68: 67: 60: 49: 27: 26: 19: 1381: 1380: 1376: 1375: 1374: 1372: 1371: 1370: 1351: 1350: 1349: 1344: 1258: 1230: 1219: 1177: 1172: 1163: 1161: 1126: 1121: 1120: 1116: 1107: 1105: 1090: 1089: 1085: 1076: 1074: 1059: 1058: 1051: 1042: 1040: 1032: 1031: 1024: 1015: 1013: 1000: 999: 984: 974: 972: 963: 962: 958: 948: 946: 941: 940: 936: 927: 925: 923:Atomic Insights 916: 915: 911: 901: 899: 890: 889: 885: 875: 873: 868: 867: 863: 853: 851: 846: 845: 841: 831: 829: 820: 819: 815: 805: 803: 800:(press release) 799: 791: 790: 786: 777: 775: 766: 765: 758: 749: 747: 731: 730: 726: 717: 715: 696: 695: 691: 682: 680: 671: 670: 666: 657: 655: 646: 645: 641: 632: 630: 621: 620: 616: 607: 605: 596: 595: 584: 575: 573: 557: 556: 552: 542: 540: 531: 530: 523: 513: 511: 505: 504: 497: 493: 471: 455: 420: 408: 372:steam generator 368: 283: 264:Generation III+ 250:was a proposed 240: 229: 228: 227: 222: 211: 205: 202: 159: 157: 147: 135: 120: 109: 103: 100: 81: 69: 65: 28: 24: 17: 12: 11: 5: 1379: 1377: 1369: 1368: 1363: 1353: 1352: 1346: 1345: 1343: 1342: 1337: 1332: 1327: 1325:B&W mPower 1322: 1317: 1312: 1307: 1302: 1297: 1292: 1287: 1282: 1277: 1272: 1266: 1264: 1260: 1259: 1257: 1256: 1251: 1246: 1238: 1236: 1232: 1231: 1220: 1218: 1217: 1210: 1203: 1195: 1189: 1188: 1183: 1176: 1175:External links 1173: 1171: 1170: 1114: 1083: 1049: 1022: 982: 956: 934: 909: 883: 861: 839: 813: 784: 756: 724: 689: 664: 639: 614: 582: 550: 521: 494: 492: 489: 488: 487: 482: 477: 470: 467: 454: 451: 419: 416: 407: 404: 378:located in an 376:reactor vessel 367: 364: 282: 279: 248:B&W mPower 242: 241: 224: 223: 138: 136: 129: 122: 121: 92:external links 72: 70: 63: 58: 32: 31: 29: 22: 15: 13: 10: 9: 6: 4: 3: 2: 1378: 1367: 1364: 1362: 1359: 1358: 1356: 1341: 1338: 1336: 1333: 1331: 1328: 1326: 1323: 1321: 1318: 1316: 1313: 1311: 1308: 1306: 1303: 1301: 1298: 1296: 1293: 1291: 1288: 1286: 1283: 1281: 1278: 1276: 1273: 1271: 1268: 1267: 1265: 1261: 1255: 1252: 1250: 1247: 1245: 1244: 1240: 1239: 1237: 1233: 1229: 1226: 1225:nuclear power 1223: 1216: 1211: 1209: 1204: 1202: 1197: 1196: 1193: 1187: 1184: 1182: 1179: 1178: 1174: 1160: 1156: 1152: 1148: 1144: 1140: 1136: 1132: 1125: 1118: 1115: 1104: 1100: 1099: 1094: 1087: 1084: 1073: 1069: 1068: 1063: 1056: 1054: 1050: 1039: 1035: 1029: 1027: 1023: 1012:on 2013-02-12 1011: 1007: 1003: 997: 995: 993: 991: 989: 987: 983: 971: 970:Roanoke Times 967: 960: 957: 944: 938: 935: 924: 920: 913: 910: 898: 894: 887: 884: 871: 865: 862: 849: 843: 840: 828: 824: 817: 814: 798: 794: 788: 785: 773: 769: 763: 761: 757: 745: 741: 740: 735: 728: 725: 714:on 2013-01-19 713: 709: 705: 704: 699: 693: 690: 678: 674: 668: 665: 653: 649: 643: 640: 628: 624: 618: 615: 603: 599: 593: 591: 589: 587: 583: 571: 567: 566: 561: 554: 551: 539: 535: 528: 526: 522: 509: 502: 500: 496: 490: 486: 483: 481: 478: 476: 473: 472: 468: 466: 464: 460: 452: 450: 447: 443: 441: 437: 433: 429: 425: 417: 415: 413: 405: 403: 400: 398: 392: 390: 386: 381: 377: 373: 365: 363: 358: 354: 351: 347: 344: 342: 338: 333: 331: 327: 323: 319: 314: 312: 308: 304: 299: 297: 293: 289: 280: 278: 275: 273: 269: 265: 261: 257: 253: 249: 238: 235: 220: 217: 209: 206:February 2012 198: 195: 191: 188: 184: 181: 177: 174: 170: 167: –  166: 162: 161:Find sources: 155: 151: 145: 144: 139:This article 137: 133: 128: 127: 118: 115: 107: 104:February 2012 97: 93: 89: 85: 79: 78: 73:This article 71: 62: 61: 56: 54: 47: 46: 41: 40: 35: 30: 21: 20: 1324: 1241: 1235:Partnerships 1162:. Retrieved 1134: 1130: 1117: 1106:. Retrieved 1096: 1086: 1075:. Retrieved 1065: 1041:. Retrieved 1014:. Retrieved 1010:the original 973:. Retrieved 969: 959: 947:. Retrieved 937: 926:. Retrieved 922: 912: 900:. Retrieved 896: 886: 874:. Retrieved 864: 852:. Retrieved 842: 832:February 21, 830:. Retrieved 826: 816: 806:February 20, 804:. Retrieved 797:the original 787: 776:. Retrieved 774:. 2011-06-17 771: 748:. Retrieved 744:the original 737: 727: 716:. Retrieved 712:the original 701: 692: 681:. Retrieved 679:. 2011-04-13 676: 667: 656:. Retrieved 654:. 2010-07-28 651: 642: 631:. Retrieved 629:. 2010-07-14 626: 617: 606:. Retrieved 604:. 2009-06-10 601: 574:. Retrieved 570:the original 563: 553: 541:. Retrieved 537: 512:. Retrieved 456: 448: 444: 421: 409: 401: 393: 369: 360: 356: 352: 348: 345: 334: 315: 300: 284: 276: 254:designed by 247: 245: 230: 212: 203: 193: 186: 179: 172: 160: 148:Please help 143:verification 140: 110: 101: 86:by removing 82:Please help 74: 50: 43: 37: 36:Please help 33: 1320:Gen4 Energy 274:) concept. 262:. It was a 1355:Categories 1330:TerraPower 1305:Toshiba 4S 1164:2012-02-21 1108:2012-02-17 1077:2012-02-16 1043:2012-02-16 1016:2012-02-17 928:2020-01-09 778:2012-02-17 750:2012-02-20 718:2012-02-17 683:2012-02-17 658:2012-02-17 633:2012-02-17 608:2012-02-17 576:2012-02-17 491:References 485:Toshiba 4S 428:boric acid 176:newspapers 84:improve it 39:improve it 1159:144323935 1137:(4): 27. 389:condenser 311:Tennessee 266:integral 45:talk page 1270:Fuji MSR 1222:Emerging 975:23 March 949:16 April 902:17 April 543:23 March 514:18 March 469:See also 309:site in 1340:Thorcon 1315:NuScale 1280:SC-HTGR 1228:markets 1139:Bibcode 739:Reuters 565:Reuters 480:NuScale 281:History 260:Bechtel 190:scholar 1290:SmAHTR 1157:  876:May 9, 854:May 9, 538:Forbes 453:Safety 366:Design 192:  185:  178:  171:  163:  1310:CAREM 1295:SSTAR 1275:PRISM 1155:S2CID 1127:(PDF) 440:scram 197:JSTOR 183:books 1285:IRIS 977:2017 951:2014 904:2014 878:2014 856:2014 834:2013 808:2013 545:2017 516:2017 432:ABWR 412:PWRs 294:and 246:The 169:news 1147:doi 328:in 152:by 1357:: 1153:. 1145:. 1135:67 1133:. 1129:. 1101:. 1095:. 1070:. 1064:. 1052:^ 1036:. 1025:^ 1004:. 985:^ 968:. 921:. 895:. 825:. 770:. 759:^ 736:. 706:. 700:. 675:. 650:. 625:. 600:. 585:^ 562:. 536:. 524:^ 498:^ 332:. 313:. 48:. 1214:e 1207:t 1200:v 1167:. 1149:: 1141:: 1111:. 1080:. 1046:. 1019:. 979:. 953:. 931:. 906:. 880:. 858:. 836:. 810:. 781:. 753:. 721:. 686:. 661:. 636:. 611:. 579:. 547:. 518:. 270:( 237:) 231:( 219:) 213:( 208:) 204:( 194:· 187:· 180:· 173:· 146:. 117:) 111:( 106:) 102:( 98:. 80:. 55:) 51:(

Index

improve it
talk page
Learn how and when to remove these messages
an advertisement
improve it
promotional content
external links
neutral point of view
Learn how and when to remove this message

verification
improve this article
adding citations to reliable sources
"B&W mPower"
news
newspapers
books
scholar
JSTOR
Learn how and when to remove this message
Learn how and when to remove this message
small modular reactor
Babcock & Wilcox
Bechtel
Generation III+
pressurized water reactor
light water reactor
Bedford County, Virginia
Virginia Tobacco Indemnification
Community Revitalisation Commission

Text is available under the Creative Commons Attribution-ShareAlike License. Additional terms may apply.