Knowledge

Bakun Dam

Source 📝

493:. When the project was shelved, the Malaysian government took back the project from this consortium. By this time, RM1.6 billion had already been paid out by the government. RM700 million to RM1.1 billion was paid as 'compensation' to Ekran, according to figures disclosed in Parliament. The completed works were the river diversion tunnels by Dong Ah of Korea for RM400 million, and to Global Upline for work completed on the auxiliary cofferdams for RM60 million. Other works are for selective clearing of biomass, and relocation of the affected native residents. The government had also turned over RM1 billion for the purchase of eight turbines. 61: 625: 711: 988: 960: 367:, where the dam is located. Even in Peninsular Malaysia, however, there is an oversupply of electricity, with Tenaga Nasional Berhad being locked into unfavourable purchasing agreements with Independent Power Producers. The original idea was to have 30% of the generated capacity consumed in East Malaysia and the rest transmitted to Peninsular Malaysia. This plan envisioned 730 km of overhead 558:. This plant was expected to consume 50% of the power generated. The government has agreed in principle that 60% of Sarawak Hidro, the entity that owns the dam, will be sold to GIIG. Owing to delays in dam construction, the plans for the smelter have since been shelved. The agreement for this smelter was originally signed in 2003 and some conditions have lapsed owing to delays in construction. 2284: 974: 68: 45: 474:. ABB's consortium partner for the civil works will be Companhia Brasileira de Projetos e Obras (CBPO) of Brazil, a large civil engineering company belonging to the Odebrecht Group, responsible for the construction of the dam and power house. Engineering consulting firms involved in the project then were TNB Hydro, a subsidiary of 597:
Sime Engineering Sdn Bhd has filed a suit against AZRB over alleged breaches in the Malaysia–China Hydro joint venture agreement dated 12 June 2002 relating to the Bakun dam. AZRB was served with a writ summons and statement of claim dated 12 Oct by Sime Engineering claiming "RM15.24 million for
693:
includes Bakun Dam in its 'Monuments of corruption' Global Corruption Report 2005. The mandate to develop the project went to a timber contractor and friend of Sarawak's governor. The provincial government of Sarawak is still looking for customers to consume the power to be generated by the project.
682:
accumulation shortening the useful lifespan of the dam. A 5-part series of Bakun dam documentaries was filmed by Chou Z Lam. The series highlighted the basic community problems faced by displaced indigenous people such as the lack of land areas for farming and hunting caused by the flooding, lack of
413:
On 16 August 2017, Sarawak Energy completes acquisition of Bakun HEP from Federal Government. Under the deal, the Sarawak government will pay Putrajaya RM2.5 billion and take over the remaining RM6.4 billion remaining debts. Prime Minister Najib Razak handed over the dam to the Sarawak government on
701:
coalition that includes organisations from the US, Norway and Switzerland is showing its solidarity with Malaysian groups who are protesting against the construction of twelve hydroelectric dams in the Malaysian state of Sarawak on Borneo. The NGO coalition supports the Malaysian groups' demand for
427:
Initial survey was conducted in the early 1960s and more studies were conducted in the early 1980s. The studies cover the masterplan and feasibility report, rock and soil studies, hydro potential, detailed design and costing, environmental and socio-economic studies and HVDC transmission studies.
521:
of China. Other members of the consortium are WCT Berhad, MTD Capital, Ahmad Zaki Resources, Syarikat Ismail and Edward & Sons. It targeted a completion date of September 2007. The total sum to be paid to this consortium was budgeted at RM1.8 billion. The electromechanical works for the
589:
As of February 2007, there are three developments affecting the Bakun project. The first is the merger of the Sime Darby, Guthrie and Golden Hope into a new entity named Synergy Drive. The second is the proposed takeover of the Bakun project by the contractor, Sime Engineering. The third is the
593:
In November 2007, Sime Darby, the parent company of the contractor Sime Engineering will be merged with Golden Hope and Guthrie into a new company with a market capitalisation of RM31 billion (US$ 8 billion). Concurrently with the merger, the contractor Sime Engineering will takeover the
538:
In May 2004 Ting Pek Khing's name again was raised in connection with the project. A Ting-owned company, Global Upline, was rumoured to have been awarded a contract to undertake "biomass removal" in the flood basin. This would allow him to harvest timber in the area without a separate permit.
911:
After many delays, Sarawak Energy Berhad announced that the contract to build the submarine cable would be awarded in mid-2010 with international tenders to be called in early 2010. It was expected that the construction would be completed by 2015 at an estimated cost of MYR8 billion to
435:
Although the project was first approved by government in 1986, it was shelved in 1990 owing to decreased projection of electricity demand due to the recession of 1985 and the decision to use the then low-cost alternative of natural gas as fuel for developing the petrochemical industry.
569:
At the end of 2004, the minor partners in the Malaysia–China Hydro JV consortium (Ahmad Zaki Resources Bhd, WCT Engineering Bhd and MTD Capital) will report quarterly losses due to the Bakun project. Discounting this project, they would all be operating profitably for the quarter.
905:. The rate proposed is RM0.17 per kilowatt hour at the intake onto the National Grid. Analysts estimated that generation cost using world-market-rate natural gas would cost RM0.22 per kilowatt hour. A 4% increase every 4 years is envisaged over the 35-year concession period. 1153: 886:. The use of HVDC cables would ensure that the energy loss is minimal, at about 5% to 6% only. The cost of the undersea cable is estimated at RM9 billion. The proposed concept is for two 800 MW cables being laid about 660 km under the 529:
In 2004, engineering consulting firm JR Knowles, was hired to study the delays in construction. Other engineering consulting firms involved in the project were Snowy Mountain Engineering Corporation, of Australia and Opus International Malaysia.
584:
The lead partner in the project, Sime Engineering reported a profit of RM521,000 for the same quarter versus a profit of RM4.18 million for the same quarter in 2003. Declines in profit were attributed to cost overruns and project
580:
MTD Capital reported a RM4.04 million loss in the quarter ending 30 September 2004 and attributed it to "a major project undertaken by the company in joint venture with both local and foreign partners" without specifically naming
481:
Ekran launched a rights issue to finance the building of the dam, but it was undersubscribed and Ting Pek Khing (Ekran's chairman) had to put up $ 500 million to take up the unsubscribed portion as part of his agreement with the
2219: 640:. The rainforest of this part of Southeast Asia has some of the highest rates of plant and animal endemism, species found there and nowhere else on Earth, and this dam has done irreparable ecological damage to that region. 501:
In May 2000 it was revived through a 100% government-owned company, Sarawak Hidro, but the transmission of power to Peninsular Malaysia was not part of the revived project. The construction work was tendered out as a
486:. Ekran was a company of Ting Pek Khing, himself a timber businessman. Neither he nor his company had built a dam before. The entire project was not tendered publicly, and instead was awarded by government contract. 1161: 893:
Sime Darby would take ownership of the submarine cable project but not undertake its construction. The contractor is rumoured to be Malaysian Resources Corporation Berhad (MRCB), a public listed company on the
930:
Bakun Lake will be the largest lake in Malaysia by surface area, even though it is not apparent on the map, owing to the narrow shapes of the various lake arms, as a result of its location in the highland
1858: 2272: 1772: 702:
an immediate halt to the realisation of these dams, which threaten to displace tens of thousands of Sarawak natives and flood hundreds of square miles of Sarawak's precious tropical rainforests.
574:
For Ahmad Zaki Resources Bhd, this is the first time it will report losses since 1993. Ahmad Zaki estimates net losses suffered for nine months ending 30 September 2004 at RM4.55 million.
566:
to build an aluminium smelter. The production capacity would be 550,000 tonnes initially with expansion to 1.5 million tonnes possible. Production of aluminium would start at the end of 2010.
818:
500 kV line. The first section of this line running from Similajau Static Inverter Plant to Kampung Pueh on Borneo will be implemented as overhead lines with a length of 670 km.
908:
On 7 January 2008, Sime Darby announced that they had appointed a financial adviser for the undersea power transmission project. However, the company did not name the financial adviser.
655:
settlement named Sungai Asap in Bakun. Most of them were subsistence farmers. Each family was promised 3 acres (1.21 ha) of land but many families still have not been compensated.
2223: 1680: 1660: 2096: 2180: 1611: 1528: 1456: 2197: 2265: 1751: 539:
Issuance of timber permits has come under increased scrutiny due to political conditions and environmental concerns. However, as of December 2006 it has not been awarded.
2431: 2451: 1489: 1041: 554:(Dubal) and Gulf International Investment Group (GIIG), an investment fund jointly set up by Malaysian tycoon Syed Mokhtar, and Dubai-based international financier 863:
portion is to transmit the electricity generated at Bakun Dam in Borneo to Peninsular Malaysia, possibly by 2012. The consortium partners' equity possibly will be
2258: 1816: 1734: 1776: 1982: 683:
educational, medical, and transport facilities, and also the promises not being kept by the government. This documentary series was later banned from
2250: 636:
The Bakun dam flooding commenced on 13 October 2010 with a faulty start and will put 700 km of land underwater – equivalent to the size of
2456: 2239: 829:. It will have a length of 670 km. It is planned to be implemented by 3 or 4 parallel cables each with a transmission capacity of 700 MW. 455:
The dam was to be built beginning in 1994 by a privatised joint-venture consortium called Bakun Hydroelectric Corporation, comprising Ekran Berhad,
1097: 728:
Crest elevation is 235 m above sea level (ASL), maximum flood level is 232 m, operating levels maximum 228 m and minimum 195 m.
429: 464: 2446: 1135: 612:
reported that Sinohydro had widely used a technique involving adding excessive water to cement, with potentially dangerous consequences. The
1544: 871:(20%) and the Malaysian Ministry of Finance (20%). The consortium is exploring financing facilities of up to 80% of the planned investment. 2288: 1949: 1645: 406:
meetings but no actions have been taken by any party. Bakun Dam came online on 6 August 2011. As of 2015, Bakun Dam is the biggest dam in
2244: 1672: 843:
As part of the transmission works two converter stations will be built at Bakun and Tanjung Tenggara. The HVDC lines will connect to the
807:
double circuit overhead line running over a distance of 160 km from Bakun Dam to Similajau Static Inverter Plant, situated east of
60: 2466: 1186: 1018: 1798: 606:
Chinese constructor Sinohydro has acknowledged that its construction procedures used for Bakun were flawed. The admission came after
2374: 1269:
The Bakun Hydro Electrical Project (HEP), Sarawak, Malaysia: The Manifestation of Islamic System Between Environment and Development
1697: 598:
alleged breaches by AZRB of the Malaysia–China Hydro JVA" relating to Bakun hydroelectric project package CW2 – main civil works.
1847: 101: 2441: 2129: 1499: 449: 2106: 2172: 1621: 1521: 1466: 1423: 2205: 1290: 1579: 1276: 1243: 698: 662:
that had to be cut down (230 km); possible dam collapse issues; increase in diseases with waterborne vectors such as
590:
revival of the submarine HVDC cable under the South China Sea to transmit electricity from Borneo to Peninsular Malaysia.
2155: 1068: 2053: 2001: 1748: 1720: 577:
WCT has reported a net loss of RM13.08 million for the quarter ending 30 September 2004 due to the Bakun project.
2072: 1826: 1215: 2461: 1944: 725:
Maximum height above foundation of 205 m, and crest length of 750 m, volume of fill is 16,710,000 m.
690: 359:
The purpose for the dam was to meet growing demand for electricity. However, most of this demand is said to lie in
684: 2436: 2426: 651:) of the indigenous peoples who lived in the area to be flooded. Many Sarawak natives have been relocated to a 2020: 452:
of the project. The project was to cost US$ 2.4 billion and was originally scheduled for completion in 2003.
1003: 993: 883: 844: 1978: 941:
Bakun submarine power cable will be the longest in the world, surpassing the current Norway-to-Netherlands
770:
Surface powerhouse, with 4-level measuring 250 m length × 48 m width × 48 m height
2347: 1941:"A world built on bribes?: Corruption in construction bankrupts countries and costs lives, says TI report" 848: 490: 475: 456: 448:. In January 1994, a privatised contract was awarded to Ekran Berhad. In April 1995, Ekran completed the 2024: 1093: 1013: 942: 934:
Bakun Power Station will be the largest hydroelectric dam in Malaysia, surpassing the currently largest
860: 644: 518: 471: 1870: 1548: 1874: 624: 2101: 1616: 1494: 1461: 1114: 659: 555: 360: 432:
and Maeda-Okumura Joint Venture, Fichtner and Swedpower Swedish Agency for Technical Cooperation.
1237: 782: 563: 278: 1642: 444:
It was revived in September 1993 by the Malaysian Federal Government led by then-Prime Minister
1940: 1965: 1735:"Bakun Dam 'Unsafe'! – Exclusive Evidence on Corner-Cutting and Sloppy Construction Practices" 832:
The last section on the Malay Peninsula will consist of an overhead DC powerline running from
658:
Concerns were raised also about such things as the relocation of people; the amount of virgin
543: 2318: 2303: 1321: 643:
Construction of the dam required the relocation of more than 9,000 native residents (mainly
445: 428:
Notable consultants involved were SAMA Consortium German Agency for Technical Cooperation,
17: 2400: 2240:
ABB consortium awarded the Bakun project – largest hydro-electric power system in Malaysia
2184: 2076: 2057: 2005: 1986: 1953: 1755: 1684: 1649: 1532: 1119: 1101: 965: 902: 887: 868: 778: 752: 667: 663: 559: 345: 321: 1384:"The truth about privatisation – It has led to more bailouts than benefits in Bolehland" 550:, approximately 180 km inland from the dam. The project is a joint venture between 2313: 2308: 1584: 1428: 1008: 895: 732: 608: 407: 325: 317: 309: 239: 762:
Power tunnels – 8 tunnels of 8.5 m diameter each with lengths of 760 m each.
710: 2420: 2405: 2395: 2369: 2323: 2220:"Federal government to sell Bakun dam to Sarawak; no power transmission to peninsula" 1821: 1322:"A sinking feeling – Financing Bakun is looking almost as tricky as building the dam" 1267: 833: 822: 765: 648: 364: 262: 2133: 1383: 1357: 979: 341: 271: 1433: 632:
built in Sungai Asap for the relocation of the natives displaced by the Bakun Dam.
1298: 616:
said its website was attacked by Chinese scammers after it published the report.
562:
announced in August 2007 that they had signed a deal with Malaysian conglomerate
1589: 987: 786: 756: 483: 337: 179: 1220: 1046: 955: 935: 924:
Bakun Dam will be the tallest concrete-faced rockfill dam (CFRD) in the world.
874:
The cable is planned to transmit 1,600 MW of power from the Bakun Dam to
864: 675: 514: 510: 395: 386:
Power Grid Interconnection, which would be a grid to supply power to Sarawak,
1906: 1072: 116: 103: 2379: 2049: 973: 875: 774: 735:
area of 14,750 km. Gross storage volume is 43,800 million cubic meters.
652: 637: 629: 399: 353: 1997: 1154:"Sarawak Energy Completes Acquisition Of Bakun HEP From Federal Government" 2068: 1924: 1889: 1352: 470:
Ekran awarded the electromechanical works and the transmission portion to
1326: 744: 679: 333: 284: 268: 1580:"Bakun pushes profitable companies into the red (subscription required)" 509:
The new civil builder is the Malaysia–China Hydro JV consortium, led by
882:
by undersea HVDC power cables and then by land line onto the Malaysian
837: 808: 671: 547: 503: 460: 329: 152: 87: 382:
Future plans for the dam include connecting it to an envisioned Trans-
523: 391: 383: 44: 2198:"Malaysia-Sarawak submarine cable contract to be awarded next year" 296: 2342: 2028: 927:
Bakun Lake will be the biggest lake in Malaysia by storage volume.
879: 826: 709: 623: 551: 403: 387: 522:
turbines were awarded in two contracts to IMPSA of Argentina and
506:
contract. The completion date has been revised to February 2008.
1216:"Special Report – Malaysia's Bakun project: Build and be damned" 821:
The next section is the submarine cable between Kampung Pueh to
815: 804: 748: 376: 372: 368: 2254: 542:
Usage of the generated capacity was to have been by a proposed
349: 166: 1698:"Sinohydro admits flaws in Bakun Dam construction procedures" 371:
transmission lines in East Malaysia, 670 km of undersea
890:
from the Sarawak shore to Yong Peng on Peninsular Malaysia.
731:
Reservoir area at 228 m ASL is 695 km, and with a
687:(RTM) in May 2010, forcing the remaining series to YouTube. 912:
MYR10 billion. However, the project has been shelved.
1966:"International NGO coalition condemns Malaysian dam plans" 1661:
Malaysia's Stock Index Falls, Led by IOI; DRB-Hicom Slides
1136:"Hire locals to manage Bakun dam, PRS tells Sarawak Hidro" 1071:. Malaysia–China Hydro Joint Venture. 2004. Archived from 1035: 1033: 2173:"Sime appoints financial adviser for Bakun transmission" 2071:
Malaysia–China Hydro. URL assessed on 4 September 2012
2052:
Malaysia–China Hydro. URL accessed on 4 September 2012
2000:
Malaysia–China Hydro. URL assessed on 4 September 2012
1981:
Friends of the Earth. URL assessed on 4 September 2012
2222:. The Edge Malaysia. 27 September 2010. Archived from 1799:"SAVE_Rivers_Press_release_on_conference_13__February" 1775:. Free Malaysia Today. 14 October 2010. Archived from 1042:"Sarawak acquires Bakun Dam from Putrajaya for RM2.5b" 740:
Power intake structure – 8 bays with 16 roller gates.
402:). There have been mentions of this grid made within 352:
in the world would be built. It would generate 2,400
467:(Sesco), and Malaysia Mining Corporation Bhd (MMC). 2388: 2362: 2332: 2296: 277: 261: 256: 248: 238: 230: 222: 217: 209: 201: 193: 185: 175: 165: 160: 148: 140: 132: 95: 83: 37: 2097:"Bakun reservoir – 695 sq km – ready to be filled" 1187:"Najib hands over Bakun Dam to Sarawak government" 759:, with capacity of 15,000 cubic meters per second. 489:The project was halted in 1997 in the face of the 1069:"Bakun National Hydroelectric Project Milestones" 800:There are four major transmission line sections: 2021:"Bakun power plant and transmission – Main data" 1721:"In Southeast Asia, Big Dams Raise Big Concerns" 1353:"Damned dams in Sarawak (subscription required)" 814:The three further sections consist of a bipolar 534:Items of temporary interest during third attempt 1907:"Another TV producer claims political meddling" 714:View of turbines inside the powerhouse in 2009. 234:43,800,000,000 m (35,500,000 acre⋅ft) 2266: 1859:Bakun compensation: Dispute delaying payments 1848:Bakun compensation: Dispute delaying payments 1643:Sime Shareholders Yes To RM32 Bln Merger 718:The permanent dam components are as follows: 348:. As part of the project, the second-tallest 8: 1612:"Synergy Drive to be world's largest player" 1547:. news.com.au. 7 August 2007. Archived from 1224:. Archived from the original on 5 April 2001 1181: 1179: 697:Launched in February 2012, an international 1209: 1207: 777:to powertrains comprising 8 vertical-shaft 213:15,000 m/s (530,000 cu ft/s) 2273: 2259: 2251: 2247:Brief chronology of Bakun Dam construction 2090: 2088: 2086: 2084: 2015: 2013: 1979:The Bakun Hydroelectric Project – Malaysia 1291:"SMEC mulls options to fund future growth" 379:transmission line in Peninsular Malaysia. 43: 34: 1773:"Faulty start to impounding of Bakun dam" 2432:Hydroelectric power stations in Malaysia 1925:"Banned Bakun Dam series now on YouTube" 1804:. Save Rivers Network. 13 February 2012. 602:Sinohydro flawed construction procedures 2452:Energy infrastructure completed in 2011 1574: 1572: 1570: 1568: 1566: 1275:(Conference or Workshop Item (Paper)). 1029: 430:Snowy Mountains Engineering Corporation 49:The dam under construction in June 2009 1346: 1344: 1235: 465:Sarawak Electricity Supply Corporation 244:14,750 km (5,695 sq mi) 2156:"Sime to power up mega Bakun project" 2050:The Making of a Dam ... Power Tunnels 1673:"Public Bank, PLUS, AZRB, Konsortium" 1417: 1415: 1413: 1411: 1409: 1407: 1405: 1261: 1259: 1257: 1255: 1253: 7: 2289:Sarawak Corridor of Renewable Energy 1737:. The Sarawak Report. 13 April 2011. 855:Revival of submarine cable component 594:ownership of the Bakun Dam project. 356:(MW) of electricity once completed. 1923:Gavaskar Brian Raj (24 June 2010). 1719:Joshua Kurlantzick (30 June 2011). 785:of 360 MVA each and 8 oil-immersed 171:Embankment, concrete face rock-fill 2069:The Making of a Dam ... Powerhouse 1696:Cesar Tordesillas (21 June 2011). 1019:List of power stations in Malaysia 781:of 300 MW each, 8 air-cooled 344:and some sixty kilometres east of 25: 1890:"Shadow of Bakun looms over Sibu" 1588:. 1 December 2004. Archived from 1545:"Rio Tinto in $ 2bn smelter deal" 1297:. 1 February 2010. Archived from 1214:Allison, Tony (28 October 2000). 628:Uma Daro longhouse is one of the 252:695 km (268 sq mi) 205:Service, controlled stepped chute 75:Location of Bakun Dam in Malaysia 67: 2282: 2095:Kuen, Y. L. (16 November 2009). 1488:Yang, S. K. (26 November 2007). 986: 972: 958: 901:The buyer of the electricity is 836:to the static inverter plant at 564:Cahya Mata Sarawak Berhad (CMSB) 156:Sarawak Hidro Sdn Bhd (Operator) 66: 59: 2457:2011 establishments in Malaysia 1815:Yang, S. K. (9 December 2011). 1723:. Council on Foreign Relations. 1620:. 6 August 2007. Archived from 1522:"US$ 1b JV smelter for Sarawak" 1134:Sulok Tawie (26 October 2015). 620:Environmental and social damage 340:, a tributary or source of the 27:Dam in Kapit, Sarawak, Malaysia 2128:Raj, Charles (31 March 2008). 1909:. Malaysiakini. 28 April 2010. 1817:"Xayaburi Dam Stopped for Now" 1455:Kuen, Y. L. (16 August 2010). 1320:Shameen, Assif (4 July 1997). 1: 1998:Bakun Dam project information 1422:Joe, Hakim (3 October 2009). 1351:Yang, S. K. (28 March 2009). 1277:Universiti Teknologi Malaysia 1113:Peter Sibon (6 August 2011). 513:of Malaysia (a subsidiary of 2447:Concrete-face rock-fill dams 1040:SULOK TAWIE (8 March 2017). 1749:"Bakun dam flooding begins" 350:concrete-faced rockfill dam 18:Bakun Hydroelectric Project 2483: 1945:Transparency International 1888:Keruah Usit (5 May 2010). 1390:. Vol. 25, no. 6 1266:Kadikon, Arnold A (2011). 691:Transparency International 197:750 m (2,461 ft) 2467:Controversies in Malaysia 2196:Jack Wong (7 July 2009). 1985:27 September 2007 at the 1490:"Cheaper source of power" 1457:"Cheaper source of power" 1242:: CS1 maint: unfit URL ( 1115:"Energy boost from Bakun" 803:The first consists of an 685:Radio Television Malaysia 459:(TNB), the government of 375:cable and 300 km of 290: 54: 42: 2363:SCORE hydroelectric dams 2183:15 February 2012 at the 1952:3 September 2010 at the 1648:25 February 2014 at the 1295:Asia Today International 1158:www.sarawakenergy.com.my 706:Technical specifications 544:aluminium smelting plant 189:205 m (673 ft) 32:Dam in Sarawak, Malaysia 1968:. Stop Corruption Dams. 1930:(subscription required) 1912:(subscription required) 1895:(subscription required) 1754:25 October 2012 at the 1371:(subscription required) 1004:National Grid, Malaysia 994:Renewable energy portal 845:National Grid, Malaysia 511:Sime Engineering Berhad 279:Installed capacity 133:Construction began 2442:Dams completed in 2011 2333:SCORE cities and towns 2027:. 1996. Archived from 1382:Jalleh Martin (2005). 849:Tenaga Nasional Berhad 715: 633: 552:Dubai Aluminum Co, Ltd 491:Asian financial crisis 476:Tenaga Nasional Berhad 457:Tenaga Nasional Berhad 313: 210:Spillway capacity 2056:14 April 2012 at the 2025:ABB Asea Brown Boveri 2004:14 April 2012 at the 1683:14 March 2012 at the 1096:of the dam location. 1014:List of HVDC projects 789:of 360 MVA each. 713: 627: 519:Sinohydro Corporation 167:Type of dam 153:Sarawak Energy Berhad 117:2.75639°N 114.06306°E 2389:SCORE infrastructure 1875:International Rivers 1802:(Microsoft Word doc) 1531:12 June 2012 at the 1469:on 18 September 2010 1100:27 July 2011 at the 1075:on 27 September 2007 2136:on 28 February 2014 2109:on 19 November 2009 2075:31 May 2013 at the 1779:on 26 February 2014 1679:. 19 October 2010. 1527:. 10 February 2011 1502:on 21 February 2013 660:tropical rainforest 556:Mohamed Ali Alabbar 546:in Similajau, near 361:Peninsular Malaysia 240:Catchment area 231:Total capacity 113: /  2179:. 7 January 2008. 1762:. 14 October 2010. 796:Transmission lines 716: 634: 478:and KLIA Consult. 202:Spillway type 122:2.75639; 114.06306 2462:Dam controversies 2414: 2413: 2245:Bakun Basic facts 2226:on 14 March 2012. 2162:, 2 February 2007 2160:New Straits Times 1948:. 16 March 2005. 1677:The Edge Malaysia 1436:on 3 October 2009 747:– gated concrete 302: 301: 249:Surface area 161:Dam and spillways 141:Opening date 16:(Redirected from 2474: 2319:Sarikei Division 2304:Bintulu Division 2287: 2286: 2285: 2275: 2268: 2261: 2252: 2228: 2227: 2216: 2210: 2209: 2204:. Archived from 2193: 2187: 2169: 2163: 2152: 2146: 2145: 2143: 2141: 2132:. Archived from 2125: 2119: 2118: 2116: 2114: 2105:. Archived from 2092: 2079: 2066: 2060: 2047: 2041: 2040: 2038: 2036: 2017: 2008: 1995: 1989: 1976: 1970: 1969: 1962: 1956: 1938: 1932: 1931: 1928: 1920: 1914: 1913: 1910: 1903: 1897: 1896: 1893: 1885: 1879: 1878: 1867: 1861: 1856: 1850: 1845: 1839: 1838: 1836: 1834: 1829:on 21 March 2012 1825:. Archived from 1812: 1806: 1805: 1803: 1795: 1789: 1788: 1786: 1784: 1769: 1763: 1745: 1739: 1738: 1731: 1725: 1724: 1716: 1710: 1709: 1707: 1705: 1693: 1687: 1669: 1663: 1658: 1652: 1640: 1634: 1633: 1631: 1629: 1608: 1602: 1601: 1599: 1597: 1576: 1561: 1560: 1558: 1556: 1541: 1535: 1518: 1512: 1511: 1509: 1507: 1498:. Archived from 1485: 1479: 1478: 1476: 1474: 1465:. Archived from 1452: 1446: 1445: 1443: 1441: 1432:. Archived from 1424:"We are damned!" 1419: 1400: 1399: 1397: 1395: 1379: 1373: 1372: 1369: 1367: 1365: 1348: 1339: 1338: 1336: 1334: 1317: 1311: 1310: 1308: 1306: 1287: 1281: 1280: 1274: 1263: 1248: 1247: 1241: 1233: 1231: 1229: 1211: 1202: 1201: 1199: 1197: 1183: 1174: 1173: 1171: 1169: 1160:. Archived from 1150: 1144: 1143: 1131: 1125: 1124: 1110: 1104: 1091: 1085: 1084: 1082: 1080: 1065: 1059: 1058: 1056: 1054: 1037: 996: 991: 990: 982: 977: 976: 968: 963: 962: 961: 920:Once completed: 779:Francis turbines 446:Mahathir Mohamad 298: 128: 127: 125: 124: 123: 118: 114: 111: 110: 109: 106: 70: 69: 63: 47: 35: 21: 2482: 2481: 2477: 2476: 2475: 2473: 2472: 2471: 2437:Dams in Sarawak 2427:Belaga District 2417: 2416: 2415: 2410: 2401:Bintulu Airport 2384: 2358: 2328: 2292: 2283: 2281: 2279: 2236: 2231: 2218: 2217: 2213: 2208:on 8 July 2009. 2195: 2194: 2190: 2185:Wayback Machine 2177:The Star Online 2170: 2166: 2153: 2149: 2139: 2137: 2127: 2126: 2122: 2112: 2110: 2094: 2093: 2082: 2077:Wayback Machine 2067: 2063: 2058:Wayback Machine 2048: 2044: 2034: 2032: 2019: 2018: 2011: 2006:Wayback Machine 1996: 1992: 1987:Wayback Machine 1977: 1973: 1964: 1963: 1959: 1954:Wayback Machine 1939: 1935: 1929: 1927:. Malaysiakini. 1922: 1921: 1917: 1911: 1905: 1904: 1900: 1894: 1892:. Malaysiakini. 1887: 1886: 1882: 1869: 1868: 1864: 1857: 1853: 1846: 1842: 1832: 1830: 1814: 1813: 1809: 1801: 1797: 1796: 1792: 1782: 1780: 1771: 1770: 1766: 1760:The Star Online 1756:Wayback Machine 1747:Then, Stephen. 1746: 1742: 1733: 1732: 1728: 1718: 1717: 1713: 1703: 1701: 1695: 1694: 1690: 1685:Wayback Machine 1670: 1666: 1659: 1655: 1650:Wayback Machine 1641: 1637: 1627: 1625: 1610: 1609: 1605: 1595: 1593: 1592:on 11 June 2014 1578: 1577: 1564: 1554: 1552: 1543: 1542: 1538: 1533:Wayback Machine 1525:The Star Online 1519: 1515: 1505: 1503: 1487: 1486: 1482: 1472: 1470: 1454: 1453: 1449: 1439: 1437: 1421: 1420: 1403: 1393: 1391: 1381: 1380: 1376: 1370: 1363: 1361: 1350: 1349: 1342: 1332: 1330: 1319: 1318: 1314: 1304: 1302: 1301:on 11 June 2014 1289: 1288: 1284: 1272: 1265: 1264: 1251: 1234: 1227: 1225: 1213: 1212: 1205: 1195: 1193: 1191:The Star Online 1185: 1184: 1177: 1167: 1165: 1164:on 5 April 2018 1152: 1151: 1147: 1133: 1132: 1128: 1120:The Borneo Post 1112: 1111: 1107: 1102:Wayback Machine 1092: 1088: 1078: 1076: 1067: 1066: 1062: 1052: 1050: 1039: 1038: 1031: 1027: 1000: 999: 992: 985: 978: 971: 966:Malaysia portal 964: 959: 957: 952: 943:submarine cable 918: 903:Tenaga Nasional 888:South China Sea 869:Tenaga Nasional 861:submarine cable 857: 798: 708: 668:opisthorchiasis 664:schistosomiasis 622: 604: 536: 499: 442: 425: 420: 418:Project history 322:Belaga District 295: 294: 226:Bakun Reservoir 155: 121: 119: 115: 112: 107: 104: 102: 100: 99: 90: 79: 78: 77: 76: 73: 72: 71: 50: 33: 28: 23: 22: 15: 12: 11: 5: 2480: 2478: 2470: 2469: 2464: 2459: 2454: 2449: 2444: 2439: 2434: 2429: 2419: 2418: 2412: 2411: 2409: 2408: 2403: 2398: 2392: 2390: 2386: 2385: 2383: 2382: 2377: 2372: 2366: 2364: 2360: 2359: 2357: 2356: 2353: 2350: 2345: 2340: 2336: 2334: 2330: 2329: 2327: 2326: 2321: 2316: 2314:Mukah Division 2311: 2309:Kapit Division 2306: 2300: 2298: 2297:SCORE division 2294: 2293: 2280: 2278: 2277: 2270: 2263: 2255: 2249: 2248: 2242: 2235: 2234:External links 2232: 2230: 2229: 2211: 2188: 2164: 2147: 2130:"Bakun puzzle" 2120: 2080: 2061: 2042: 2031:on 6 July 1997 2009: 1990: 1971: 1957: 1933: 1915: 1898: 1880: 1862: 1851: 1840: 1807: 1790: 1764: 1740: 1726: 1711: 1688: 1671:Chin, Joseph. 1664: 1653: 1635: 1624:on 20 May 2010 1603: 1585:The Malay Mail 1562: 1551:on 4 June 2011 1536: 1513: 1480: 1447: 1429:Malaysia Today 1401: 1388:Aliran Monthly 1374: 1340: 1312: 1282: 1249: 1203: 1175: 1145: 1126: 1105: 1086: 1060: 1028: 1026: 1023: 1022: 1021: 1016: 1011: 1009:Sarawak Energy 1006: 998: 997: 983: 969: 954: 953: 951: 948: 947: 946: 939: 932: 928: 925: 917: 914: 856: 853: 797: 794: 793: 792: 791: 790: 771: 763: 760: 741: 738: 737: 736: 729: 726: 707: 704: 621: 618: 614:Sarawak Report 609:Sarawak Report 603: 600: 587: 586: 582: 578: 575: 535: 532: 498: 495: 441: 440:Second attempt 438: 424: 421: 419: 416: 414:5 April 2018. 408:Southeast Asia 326:Kapit Division 318:embankment dam 314:Empangan Bakun 300: 299: 288: 287: 281: 275: 274: 265: 259: 258: 254: 253: 250: 246: 245: 242: 236: 235: 232: 228: 227: 224: 220: 219: 215: 214: 211: 207: 206: 203: 199: 198: 195: 191: 190: 187: 183: 182: 177: 173: 172: 169: 163: 162: 158: 157: 150: 146: 145: 142: 138: 137: 134: 130: 129: 97: 93: 92: 85: 81: 80: 74: 65: 64: 58: 57: 56: 55: 52: 51: 48: 40: 39: 31: 26: 24: 14: 13: 10: 9: 6: 4: 3: 2: 2479: 2468: 2465: 2463: 2460: 2458: 2455: 2453: 2450: 2448: 2445: 2443: 2440: 2438: 2435: 2433: 2430: 2428: 2425: 2424: 2422: 2407: 2406:Lebaan Bridge 2404: 2402: 2399: 2397: 2396:Mukah Airport 2394: 2393: 2391: 2387: 2381: 2378: 2376: 2373: 2371: 2370:Batang Ai Dam 2368: 2367: 2365: 2361: 2354: 2351: 2349: 2348:Tanjung Manis 2346: 2344: 2341: 2338: 2337: 2335: 2331: 2325: 2324:Sibu Division 2322: 2320: 2317: 2315: 2312: 2310: 2307: 2305: 2302: 2301: 2299: 2295: 2290: 2276: 2271: 2269: 2264: 2262: 2257: 2256: 2253: 2246: 2243: 2241: 2238: 2237: 2233: 2225: 2221: 2215: 2212: 2207: 2203: 2199: 2192: 2189: 2186: 2182: 2178: 2174: 2168: 2165: 2161: 2157: 2154:Rajan Moses: 2151: 2148: 2135: 2131: 2124: 2121: 2108: 2104: 2103: 2098: 2091: 2089: 2087: 2085: 2081: 2078: 2074: 2070: 2065: 2062: 2059: 2055: 2051: 2046: 2043: 2030: 2026: 2022: 2016: 2014: 2010: 2007: 2003: 1999: 1994: 1991: 1988: 1984: 1980: 1975: 1972: 1967: 1961: 1958: 1955: 1951: 1947: 1946: 1942: 1937: 1934: 1926: 1919: 1916: 1908: 1902: 1899: 1891: 1884: 1881: 1876: 1872: 1866: 1863: 1860: 1855: 1852: 1849: 1844: 1841: 1828: 1824: 1823: 1822:Asia Sentinel 1818: 1811: 1808: 1800: 1794: 1791: 1778: 1774: 1768: 1765: 1761: 1757: 1753: 1750: 1744: 1741: 1736: 1730: 1727: 1722: 1715: 1712: 1700:. Asian Power 1699: 1692: 1689: 1686: 1682: 1678: 1674: 1668: 1665: 1662: 1657: 1654: 1651: 1647: 1644: 1639: 1636: 1623: 1619: 1618: 1613: 1607: 1604: 1591: 1587: 1586: 1581: 1575: 1573: 1571: 1569: 1567: 1563: 1550: 1546: 1540: 1537: 1534: 1530: 1526: 1523: 1520:B. K. Sidhu. 1517: 1514: 1501: 1497: 1496: 1491: 1484: 1481: 1468: 1464: 1463: 1458: 1451: 1448: 1435: 1431: 1430: 1425: 1418: 1416: 1414: 1412: 1410: 1408: 1406: 1402: 1389: 1385: 1378: 1375: 1360: 1359: 1354: 1347: 1345: 1341: 1329: 1328: 1323: 1316: 1313: 1300: 1296: 1292: 1286: 1283: 1278: 1271: 1270: 1262: 1260: 1258: 1256: 1254: 1250: 1245: 1239: 1223: 1222: 1217: 1210: 1208: 1204: 1192: 1188: 1182: 1180: 1176: 1163: 1159: 1155: 1149: 1146: 1141: 1137: 1130: 1127: 1122: 1121: 1116: 1109: 1106: 1103: 1099: 1095: 1090: 1087: 1074: 1070: 1064: 1061: 1049: 1048: 1043: 1036: 1034: 1030: 1024: 1020: 1017: 1015: 1012: 1010: 1007: 1005: 1002: 1001: 995: 989: 984: 981: 975: 970: 967: 956: 949: 944: 940: 937: 933: 929: 926: 923: 922: 921: 915: 913: 909: 906: 904: 899: 897: 891: 889: 885: 884:National Grid 881: 877: 872: 870: 866: 862: 854: 852: 850: 846: 841: 839: 835: 834:Tanjung Leman 830: 828: 824: 823:Tanjung Leman 819: 817: 812: 810: 806: 801: 795: 788: 784: 780: 776: 772: 769: 768: 767: 764: 761: 758: 754: 750: 746: 742: 739: 734: 730: 727: 724: 723: 721: 720: 719: 712: 705: 703: 700: 695: 692: 688: 686: 681: 677: 673: 669: 665: 661: 656: 654: 650: 646: 641: 639: 631: 626: 619: 617: 615: 611: 610: 601: 599: 595: 591: 583: 579: 576: 573: 572: 571: 567: 565: 561: 557: 553: 549: 545: 540: 533: 531: 527: 525: 520: 516: 512: 507: 505: 497:Third attempt 496: 494: 492: 487: 485: 479: 477: 473: 468: 466: 462: 458: 453: 451: 447: 439: 437: 433: 431: 423:First attempt 422: 417: 415: 411: 409: 405: 401: 397: 393: 389: 385: 380: 378: 374: 370: 366: 365:East Malaysia 362: 357: 355: 351: 347: 343: 339: 335: 331: 327: 323: 319: 315: 311: 307: 297: 293: 289: 286: 282: 280: 276: 273: 270: 266: 264: 260: 257:Power Station 255: 251: 247: 243: 241: 237: 233: 229: 225: 221: 216: 212: 208: 204: 200: 196: 192: 188: 184: 181: 178: 174: 170: 168: 164: 159: 154: 151: 147: 143: 139: 135: 131: 126: 98: 94: 89: 86: 82: 62: 53: 46: 41: 36: 30: 19: 2224:the original 2214: 2206:the original 2201: 2191: 2176: 2171:Ng, Fintar. 2167: 2159: 2150: 2138:. Retrieved 2134:the original 2123: 2111:. Retrieved 2107:the original 2100: 2064: 2045: 2033:. Retrieved 2029:the original 1993: 1974: 1960: 1943: 1936: 1918: 1901: 1883: 1865: 1854: 1843: 1831:. Retrieved 1827:the original 1820: 1810: 1793: 1781:. Retrieved 1777:the original 1767: 1759: 1743: 1729: 1714: 1702:. Retrieved 1691: 1676: 1667: 1656: 1638: 1626:. Retrieved 1622:the original 1615: 1606: 1594:. Retrieved 1590:the original 1583: 1553:. Retrieved 1549:the original 1539: 1524: 1516: 1504:. Retrieved 1500:the original 1493: 1483: 1471:. Retrieved 1467:the original 1460: 1450: 1438:. Retrieved 1434:the original 1427: 1392:. Retrieved 1387: 1377: 1362:. Retrieved 1358:Malaysiakini 1356: 1331:. Retrieved 1325: 1315: 1303:. Retrieved 1299:the original 1294: 1285: 1268: 1226:. Retrieved 1219: 1194:. Retrieved 1190: 1166:. Retrieved 1162:the original 1157: 1148: 1139: 1129: 1118: 1108: 1089: 1077:. Retrieved 1073:the original 1063: 1051:. Retrieved 1045: 980:Water portal 919: 910: 907: 900: 892: 873: 859:The revived 858: 847:operated by 842: 831: 820: 813: 802: 799: 787:transformers 717: 696: 689: 657: 642: 635: 613: 607: 605: 596: 592: 588: 568: 541: 537: 528: 508: 500: 488: 484:underwriters 480: 469: 454: 443: 434: 426: 412: 381: 358: 342:Rajang River 305: 303: 291: 272:Francis-type 29: 2140:4 September 2113:4 September 2035:4 September 1871:"Bakun Dam" 1833:3 September 1783:3 September 1704:22 February 1628:3 September 1596:3 September 1506:3 September 1473:3 September 1440:2 September 1394:2 September 1364:2 September 1333:2 September 1305:2 September 1228:2 September 757:flip bucket 526:of France. 338:Balui River 320:located in 180:Balui River 120: / 108:114°03′47″E 96:Coordinates 2421:Categories 1221:Asia Times 1140:Malay Mail 1047:Malay Mail 1025:References 936:Pergau Dam 865:Sime Darby 783:generators 766:Powerhouse 676:filariasis 630:longhouses 515:Sime Darby 396:Kalimantan 105:02°45′23″N 2380:Baram Dam 2375:Bakun Dam 1238:cite news 876:Yong Peng 775:penstocks 733:catchment 722:Main dam 653:longhouse 638:Singapore 560:Rio Tinto 400:Indonesia 354:megawatts 336:, on the 306:Bakun Dam 218:Reservoir 38:Bakun Dam 2339:Samalaju 2202:The Star 2181:Archived 2102:The Star 2073:Archived 2054:Archived 2002:Archived 1983:Archived 1950:Archived 1752:Archived 1681:Archived 1646:Archived 1617:The Star 1555:7 August 1529:Archived 1495:The Star 1462:The Star 1327:Asiaweek 1196:23 April 1098:Archived 1079:7 August 950:See also 931:valleys. 745:spillway 680:sediment 363:and not 334:Malaysia 316:) is an 267:8 × 300 263:Turbines 176:Impounds 149:Owner(s) 91:Malaysia 84:Location 2291:(SCORE) 1168:5 April 1053:8 March 916:Records 867:(60%), 838:Bentong 809:Bintulu 773:with 8 672:malaria 585:delays. 548:Bintulu 504:turnkey 461:Sarawak 330:Sarawak 292:Website 223:Creates 88:Sarawak 743:Gated 678:; and 674:, and 649:Kenyah 581:Bakun. 524:Alstom 394:, and 392:Brunei 384:Borneo 346:Belaga 283:2,400 194:Length 186:Height 2355:Tunoh 2352:Baram 2343:Mukah 1273:(PDF) 880:Johor 827:Johor 753:chute 751:with 645:Kayan 404:ASEAN 388:Sabah 310:Malay 2142:2012 2115:2012 2037:2012 1835:2012 1785:2012 1706:2012 1630:2012 1598:2012 1557:2007 1508:2012 1475:2012 1442:2012 1396:2012 1366:2012 1335:2012 1307:2012 1244:link 1230:2012 1198:2018 1170:2018 1081:2007 1055:2017 896:KLSE 816:HVDC 805:HVAC 755:and 749:weir 517:and 377:HVDC 373:HVDC 369:HVDC 304:The 144:2011 136:1996 1094:Map 699:NGO 472:ABB 450:EIA 2423:: 2200:. 2175:. 2158:, 2099:. 2083:^ 2023:. 2012:^ 1873:. 1819:. 1758:. 1675:. 1614:. 1582:. 1565:^ 1492:. 1459:. 1426:. 1404:^ 1386:. 1355:. 1343:^ 1324:. 1293:. 1252:^ 1240:}} 1236:{{ 1218:. 1206:^ 1189:. 1178:^ 1156:. 1138:. 1117:. 1044:. 1032:^ 898:. 878:, 851:. 840:. 825:, 811:. 670:, 666:, 463:, 410:. 390:, 332:, 328:, 324:, 312:: 285:MW 269:MW 2274:e 2267:t 2260:v 2144:. 2117:. 2039:. 1877:. 1837:. 1787:. 1708:. 1632:. 1600:. 1559:. 1510:. 1477:. 1444:. 1398:. 1368:. 1337:. 1309:. 1279:. 1246:) 1232:. 1200:. 1172:. 1142:. 1123:. 1083:. 1057:. 945:. 938:. 647:/ 398:( 308:( 20:)

Index

Bakun Hydroelectric Project

Bakun Dam is located in Malaysia
Sarawak
02°45′23″N 114°03′47″E / 2.75639°N 114.06306°E / 2.75639; 114.06306
Sarawak Energy Berhad
Type of dam
Balui River
Catchment area
Turbines
MW
Francis-type
Installed capacity
MW

Malay
embankment dam
Belaga District
Kapit Division
Sarawak
Malaysia
Balui River
Rajang River
Belaga
concrete-faced rockfill dam
megawatts
Peninsular Malaysia
East Malaysia
HVDC
HVDC

Text is available under the Creative Commons Attribution-ShareAlike License. Additional terms may apply.