Yugoslavian company on a turnkey basis, was commissioned in 1963 while Unit I was commissioned by the end of 1966. All the three units were of 15MW.The total capital investment was Rs. 6.7 crore. Unit III was shut down in 1983 after 1,13,013 hours and 39 minutes of operation and Unit I and II was shut down in 1985 after operation of 64,658 hours and 52 minutes, and 94,752 hours and 54 minutes respectively.
1072: 39: 1060: 286:
Unit No. 4 & 5 of 50 MW each, which are Polish made, Total capital investment in construction of both the units ran to 20.69 crore. Both the units were shut down in 1995 after operation of 1,07,399 hours and 21 minutes, and 76,150 hours and 49 minutes respectively." BSEB states that it proposed
254:
will provide uninterrupted supply of coal to thermal power station. NTPC completed the acquisition of 720 MW Barauni thermal power plant with effect from 15 December 2018. Unit-6 & 7 (2X 110 MW) retired w.e.f. 31st March 2024. The units (8 & 9) of Barauni power station will be progressively
302:
Unit No. 7 which too was supplied by Bharat Heavy Electricals was also renovated. Commercial generation of 110 MW electricity started from Unit 7 on 4 November 2016. The unit started generation after NTPC takeover from 23.05.2019. The tariff of Barauni Thermal power station will be determined by
282:
Unit No. 1, 2 & 3 of 15MW units at the plant, which were commissioned in the early to mid-1960s have been decommissioned. Barauni Thermal power station was set up in 86.85 acres, ash yard was set up in 340 acres and Residential colony was set up in 139.25 acres.Unit III and II, supplied by a
237:
in Bihar came into existence in association with the Russian collaboration and came into operation in the year 1962. Bihar Government was mulling over the idea to hand over Barauni Thermal Power Station to NTPC Limited. On 17 April 2018, Bihar state cabinet, headed by chief minister
309:
In line with the corporate disclosure requirement under Regulation 30 of the SEBI (Listing Obligations and Disclosure Requirements) Regulations, 2015, operation of two Units (Unit 6 & 7) of 110 MW each permanently discontinued w.e.f. 31st March 2024.
294:
To meet the rising demand and rapid growth of industry in the region, further extension of the power station was contemplated by adding two units of 110 MW each. The foundation stone for which was laid in 1976 by the Chief Minister of Bihar, Dr.
1037: 914: 306:
Commercial generation of 250 MW electricity started from Unit 8 in January 2018. While commercial generation of 250 MW electricity started from Unit 9 in November 2021.
1107: 637: 1001: 996: 788: 497: 838: 548: 665: 679: 619: 1092: 1032: 87: 738: 991: 472: 573: 605: 813: 591: 870: 1102: 970: 960: 907: 1011: 693: 247: 243: 523: 950: 900: 975: 299:. Unit VI was commissioned in 1983 and Unit VII in 1985.Unit No. 6 which was supplied by BHEL was renovated & modernized. 288: 226: 1050: 707: 1027: 965: 477: 69: 955: 623: 251: 246:. On 15 May 2018, Bihar Government signed a memorandum of understanding (MoU) to hand over the thermal plant to 222: 927: 577: 291:"declared revival/R&M of these units not Techno-economically viable." Thus these units stand retired. 234: 127: 144: 140: 276: 196: 652:"NTPC signs MoU with Government of Bihar; aims to improve performance of Power Sector in Bihar" 651: 19: 1097: 892: 296: 275:
helped finance the project. The foundation stone of the Barauni station was laid by late
923: 233:. The power station is located at Barauni in Begusarai district, Bihar, India. Barauni 1086: 1076: 272: 1064: 1006: 239: 230: 264: 102: 89: 1071: 715: 38: 763: 739:"Barauni Thermal Power expansion hits funding hurdle | Business Line" 208: 680:"NTPC acquires 720 Mw (2x110+2x250) Barauni thermal power plant in Bihar" 263:
The Barauni Thermal Station was established with the technical help of
72: 268: 242:, gave its nod to handing over of Barauni Thermal Power Station to 931: 694:"Uniform Pricing of Power Ruled Out, Says Power Minister RK Singh" 592:"बरौनी थर्मल पावर स्टेशन को भी एनटीपीसी के हाथों सौंपने की तैयारी" 75: 325: 168: 896: 638:"Bihar transfers 3 power plants to NTPC on lease for 30 years" 843:] production of thermal power, Bihar Patna Hindi News" 1038:
Indian states ranking by households having electricity
1048: 871:"BHEL Commissions 250 MW Thermal Power Unit In Bihar" 789:"Kanit, Barauni power plants to be ready by December" 498:"Kanit, Barauni power plants to be ready by December" 279:, first Chief Minister of Bihar on January 26, 1960. 865: 863: 666:"Railways assures NTPC of uninterrupted coal supply" 1020: 984: 938: 195: 174: 164: 159: 151: 136: 126: 118: 81: 65: 57: 49: 31: 1002:North Bihar Power Distribution Company Limited 997:South Bihar Power Distribution Company Limited 219:NTPC, Barauni Or Barauni Thermal Power Station 908: 839:"The seventh unit of barauni begain [ 8: 1033:States of India by installed power capacity 606:"Patna to hand over 3 power plants to NTPC" 915: 901: 893: 814:"State's power generation up to 330MW now" 317: 28: 992:Bihar State Power Holding Company Limited 549:"Centre moots Barauni refinery expansion" 473:Bihar State Power Holding Company Limited 768:Bihar State Power Generation Company Ltd 18: 1108:Energy infrastructure completed in 1962 1055: 489: 971:Nabinagar Super Thermal Power Project 961:Kahalgaon Super Thermal Power Station 758: 756: 7: 1012:Bhartiya Rail Bijlee Company Limited 1093:Coal-fired power stations in Bihar 287:recommissioning the units but the 248:National Thermal Power Corporation 244:National Thermal Power Corporation 14: 1070: 1058: 951:Barh Super Thermal Power Station 255:put under commercial operation. 160:Thermal power station 37: 976:Nabinagar Thermal Power Project 764:"Barauni Thermal Power Station" 23:National Thermal Power Station 1: 946:Barauni Thermal Power Station 620:"State happy with power deal" 289:Central Electricity Authority 227:Bihar State Electricity Board 1103:1962 establishments in Bihar 524:"Bihar to get 5k MW by 2015" 221:is an existing 500 megawatt 1028:Electricity sector in India 966:Kanti Thermal Power Station 478:Kanti thermal power station 1124: 741:. Thehindubusinessline.com 956:Buxar Thermal Power Plant 205: 183: 179: 45: 36: 223:coal-fired power station 250:for a 33- years lease. 229:(BSEB)and currently by 197:Nameplate capacity 793:Business Standard News 574:"Power plant transfer" 188:Units operational 24: 331:Date of Commissioning 235:thermal power station 175:Power generation 22: 737:Pratim Ranjan Bose. 324:Installed Capacity ( 252:East Central Railway 128:Commission date 580:on 1 December 2017. 145:Government of Bihar 141:Government of India 99: /  718:on 15 October 2013 708:"Power Generation" 25: 1046: 1045: 877:. 12 January 2018 712:bsphcl.bih.nic.in 502:Business Standard 464: 463: 277:Dr. Krishna Singh 225:earlier owned by 216: 215: 165:Primary fuel 103:25.392°N 86.024°E 16:Building in India 1115: 1075: 1074: 1063: 1062: 1061: 1054: 917: 910: 903: 894: 887: 886: 884: 882: 867: 858: 857: 855: 853: 835: 829: 828: 826: 824: 810: 804: 803: 801: 799: 785: 779: 778: 776: 774: 760: 751: 750: 748: 746: 734: 728: 727: 725: 723: 714:. Archived from 704: 698: 697: 690: 684: 683: 676: 670: 669: 662: 656: 655: 648: 642: 641: 634: 628: 627: 622:. Archived from 616: 610: 609: 602: 596: 595: 588: 582: 581: 576:. Archived from 570: 564: 563: 561: 559: 545: 539: 538: 536: 534: 520: 514: 513: 511: 509: 494: 318: 297:Jagannath Mishra 209:edit on Wikidata 114: 113: 111: 110: 109: 104: 100: 97: 96: 95: 92: 41: 29: 1123: 1122: 1118: 1117: 1116: 1114: 1113: 1112: 1083: 1082: 1081: 1069: 1059: 1057: 1049: 1047: 1042: 1016: 980: 934: 921: 891: 890: 880: 878: 869: 868: 861: 851: 849: 837: 836: 832: 822: 820: 812: 811: 807: 797: 795: 787: 786: 782: 772: 770: 762: 761: 754: 744: 742: 736: 735: 731: 721: 719: 706: 705: 701: 692: 691: 687: 678: 677: 673: 664: 663: 659: 650: 649: 645: 636: 635: 631: 626:on 18 May 2018. 618: 617: 613: 604: 603: 599: 590: 589: 585: 572: 571: 567: 557: 555: 547: 546: 542: 532: 530: 522: 521: 517: 507: 505: 504:. 31 March 2013 496: 495: 491: 486: 469: 316: 261: 212: 132:26 January 1960 107: 105: 101: 98: 93: 90: 88: 86: 85: 17: 12: 11: 5: 1121: 1119: 1111: 1110: 1105: 1100: 1095: 1085: 1084: 1080: 1079: 1067: 1044: 1043: 1041: 1040: 1035: 1030: 1024: 1022: 1021:Related topics 1018: 1017: 1015: 1014: 1009: 1004: 999: 994: 988: 986: 982: 981: 979: 978: 973: 968: 963: 958: 953: 948: 942: 940: 939:Power stations 936: 935: 924:Power stations 922: 920: 919: 912: 905: 897: 889: 888: 859: 830: 818:Times of India 805: 780: 752: 729: 699: 685: 671: 657: 643: 629: 611: 597: 583: 565: 553:Times of India 540: 528:Times of India 515: 488: 487: 485: 482: 481: 480: 475: 468: 465: 462: 461: 458: 455: 452: 448: 447: 444: 441: 438: 434: 433: 430: 427: 424: 420: 419: 416: 413: 410: 406: 405: 402: 399: 396: 392: 391: 388: 385: 382: 378: 377: 374: 371: 368: 364: 363: 360: 357: 354: 350: 349: 346: 343: 340: 336: 335: 332: 329: 322: 315: 312: 260: 257: 214: 213: 206: 203: 202: 199: 193: 192: 191:2X 250 MW 189: 185: 184: 181: 180: 177: 176: 172: 171: 166: 162: 161: 157: 156: 153: 149: 148: 138: 134: 133: 130: 124: 123: 120: 116: 115: 108:25.392; 86.024 83: 79: 78: 67: 63: 62: 59: 55: 54: 51: 47: 46: 43: 42: 34: 33: 15: 13: 10: 9: 6: 4: 3: 2: 1120: 1109: 1106: 1104: 1101: 1099: 1096: 1094: 1091: 1090: 1088: 1078: 1073: 1068: 1066: 1056: 1052: 1039: 1036: 1034: 1031: 1029: 1026: 1025: 1023: 1019: 1013: 1010: 1008: 1005: 1003: 1000: 998: 995: 993: 990: 989: 987: 985:Organizations 983: 977: 974: 972: 969: 967: 964: 962: 959: 957: 954: 952: 949: 947: 944: 943: 941: 937: 933: 929: 928:organizations 925: 918: 913: 911: 906: 904: 899: 898: 895: 876: 872: 866: 864: 860: 848: 844: 842: 834: 831: 819: 815: 809: 806: 794: 790: 784: 781: 769: 765: 759: 757: 753: 740: 733: 730: 717: 713: 709: 703: 700: 695: 689: 686: 681: 675: 672: 667: 661: 658: 653: 647: 644: 639: 633: 630: 625: 621: 615: 612: 607: 601: 598: 593: 587: 584: 579: 575: 569: 566: 554: 550: 544: 541: 529: 525: 519: 516: 503: 499: 493: 490: 483: 479: 476: 474: 471: 470: 466: 459: 456: 453: 450: 449: 445: 442: 439: 436: 435: 431: 428: 425: 422: 421: 417: 415:1983 November 414: 411: 408: 407: 403: 400: 397: 394: 393: 389: 386: 383: 380: 379: 375: 373:1963 February 372: 369: 366: 365: 361: 358: 355: 352: 351: 347: 345:1966 December 344: 341: 338: 337: 333: 330: 327: 323: 320: 319: 313: 311: 307: 304: 300: 298: 292: 290: 284: 280: 278: 274: 270: 266: 258: 256: 253: 249: 245: 241: 236: 232: 228: 224: 220: 210: 204: 200: 198: 194: 190: 187: 186: 182: 178: 173: 170: 167: 163: 158: 154: 150: 146: 142: 139: 135: 131: 129: 125: 121: 117: 112: 84: 80: 77: 74: 71: 68: 64: 60: 56: 53:NTPC, Barauni 52: 50:Official name 48: 44: 40: 35: 30: 27: 21: 1007:NTPC Limited 945: 879:. Retrieved 875:Moneycontrol 874: 850:. Retrieved 846: 840: 833: 821:. Retrieved 817: 808: 796:. Retrieved 792: 783: 773:22 September 771:. Retrieved 767: 743:. Retrieved 732: 720:. Retrieved 716:the original 711: 702: 688: 674: 660: 646: 632: 624:the original 614: 600: 586: 578:the original 568: 556:. Retrieved 552: 543: 531:. Retrieved 527: 518: 506:. Retrieved 501: 492: 443:2018 January 401:1971 October 387:1969 October 308: 305: 301: 293: 285: 281: 271:, while the 262: 240:Nitish Kumar 231:NTPC Limited 218: 217: 143:, (formerly 32:NTPC Barauni 26: 359:1963 August 152:Operator(s) 122:Operational 106: / 82:Coordinates 1087:Categories 745:5 November 508:5 November 484:References 457:2021 June 265:Yugoslavia 94:86°01′26″E 91:25°23′31″N 852:11 August 847:Hindustan 823:11 August 798:11 August 722:11 August 558:11 August 533:11 August 881:27 March 467:See also 460:Running 446:Running 432:Retired 418:Retired 404:Retired 390:Retired 376:Retired 362:Retired 348:Retired 314:Capacity 137:Owner(s) 66:Location 1098:Barauni 1051:Portals 334:Status 259:History 73:Barauni 58:Country 1077:Energy 303:CERC. 269:Poland 201:500 MW 119:Status 1065:India 932:Bihar 321:Unit# 207:[ 76:Bihar 70:NH 31 61:India 926:and 883:2021 854:2017 825:2017 800:2017 775:2022 747:2013 724:2017 560:2017 535:2017 510:2013 429:1985 267:and 169:Coal 155:NTPC 930:of 841:sic 454:250 440:250 426:110 412:110 273:USA 1089:: 873:. 862:^ 845:. 816:. 791:. 766:. 755:^ 710:. 551:. 526:. 500:. 398:50 384:50 370:15 356:15 342:15 326:MW 1053:: 916:e 909:t 902:v 885:. 856:. 827:. 802:. 777:. 749:. 726:. 696:. 682:. 668:. 654:. 640:. 608:. 594:. 562:. 537:. 512:. 451:9 437:8 423:7 409:6 395:5 381:4 367:3 353:2 339:1 328:) 211:] 147:)

Index



NH 31
Barauni
Bihar
25°23′31″N 86°01′26″E / 25.392°N 86.024°E / 25.392; 86.024
Commission date
Government of India
Government of Bihar
Coal
Nameplate capacity
edit on Wikidata
coal-fired power station
Bihar State Electricity Board
NTPC Limited
thermal power station
Nitish Kumar
National Thermal Power Corporation
National Thermal Power Corporation
East Central Railway
Yugoslavia
Poland
USA
Dr. Krishna Singh
Central Electricity Authority
Jagannath Mishra
MW
Bihar State Power Holding Company Limited
Kanti thermal power station
"Kanit, Barauni power plants to be ready by December"