Knowledge

Christchurch tramway system

Source đź“ť

1062:
by buses. John Fardell, appointed General Manager of the Board in 1946, delivered his own report on the future direction of the Board on 6 October 1947. He pointed out the poor state of the board's tramway assets and that even with repairs, new infrastructure and rolling stock would be required within a few years to keep the system operational. The board was also at the time in a precarious financial state with years of losses having made it difficult to set aside sufficient funds for the repayment of loans, many of which were due to mature in the 1950s and 1960s. To upgrade the existing tramway to modern standards and extend it into the new suburbs could not be contemplated. While he did not push for the immediate removal of the trams, preferring to run them as long as possible in part to pay off outstanding loans, he did strongly advocate for the introduction of diesel buses to replace trams when they were withdrawn. In this first report, his preference for diesel buses was not absolute, however, as he did recommend the use of
956:
North Beach (steam, 24 December 1911; electric, 1 October 1914), Spreydon (3 August 1911), Cashmere Hills extension (1 May 1912), Dallington (1 November 1912), Northcote extension (28 February 1913), and the St. Martins line (7 April 1914) which was the last major line to be opened. The only new tracks to be commissioned after this time (aside from single- or double-tracking and renewals) were the extension of the Riccarton line to Plumpton Park (December 1915), the Lichfield Street link (July 1922), and the extension of the Spreydon line to Barrington Street (August 1922). For many years afterwards Christchurch was able to boast the largest network in the country by route mileage at 53.5 miles (86.1 km) and in 1912 it was reportedly second only to
835:
built, on which construction began on 1 May 1893. The Company ran into financial difficulties during construction that held up progress until the contractor secured a debt over the Company and completed the line in August 1894. Revenue services commenced as far as Stanmore Road on 1 September 1893 and it was not until 25 October 1894 that trams were able to run the full length of the line to New Brighton Pier. A deleterious financial position, brought about in part by the Company's need to rent both horses and rolling stock, resulted in the collapse of the Company in 1895. It was purchased by the contractor who built the Company's line and run under the same name.
916: 1075:
that was highly critical of trolley buses. Later that month, the board decided not to proceed with trolley buses and cancelled the order it had already placed for them. They were still undecided on the future of the Papanui–Cashmere route, the most profitable and popular of the tram routes, as they were not convinced that buses would be able to cope as a replacement. The General Manager made a point of convincing the board that only buses could adequately serve its needs and those of its customers and finally succeeded in January 1953, when the board relented and agreed that this route would also be served by buses.
1621: 1033: 1174: 948: 1079: 1420:
by the New Brighton Tramway Company, prompting the board to hire a private contractor for the supply of horses and drivers to continue to provide services using horse trams until the line was ready for electric tram operation the following year. Horses were also used by the board on the city to Richmond section of the old City and Suburban line for a short time, possibly due to the demands placed on their resources by the International Exhibition. Those horses that became surplus to requirements were sold to farmers.
38: 796: 280: 819:
carriage of people. Construction began on 26 November 1885 at Latimer Square and was completed by March 1886. The line was officially opened on 23 April 1886 and was to have passenger services provided by private contractor Charles O’Malley who had earlier secured a three-year lease. He proved to be unsuitable and was replaced in August 1886 by the Canterbury Tramway Company. The lease changed hands again after 18 months and was picked up by the New Brighton Tramway Company who remained the leaseholder until
1166: 631: 1707:, a well-known advocate for rail-based transport, has pointed out that the trend for traffic congestion in Christchurch is for it to only get worse. He does not believe that roads will be able to meet the city's needs in the future and that they will reach a saturation point if alternatives are not developed. Relying on a bus-based system, as has been the focus of the regional council, will not be enough to attract a sufficient number of people away from their private vehicles and onto public transport. 452: 1182: 1629: 1513: 125: 1138: 1726:, which was conducted in three major New Zealand cities including Christchurch, has highlighted how entrenched attitudes towards public transport and the ephemeral benefits enjoyed by commuters using private vehicles has thus far proved to be a barrier to greater adoption of public transport. Despite this, the mayor is confident that rail-based options will provide a sufficiently attractive alternative. 104: 1054:
presenting the board with a twofold problem of trying to maintain what they already had whilst trying to serve many more people over a greater area. Operating costs also increased, due in part to changing work patterns that placed a higher demand on the trams during peak times and reduced off-peak demand, but also an increase in staff costs, which only served to further increase losses.
831:
1887. The first service on the line was a trial run on 8 January 1887, which proved to be a success, and was followed on 15 February by the commencement of revenue services. The Company's acquisition of the lease for the Corporation line at the end of 1888 proved to be fortuitous, giving the Company control over the entire route from the central city to the New Brighton terminus.
1429: 1441:
maintenance work until 1935. Three (Kitsons 6, 7, 8) were reconditioned as an emergency wartime measure in 1942. During this time, they were also available for charter and special occasions. Kitson no. 7 was the only steam motor still in service by 1950 and the Tramway Historical Society at the Ferrymead Heritage Park is now its custodian.
1111:
this track was simply covered over with a layer of tar that was reapplied when the road surface required renewal. This has caused problems when such roads have needed to be dug up for the installation of utilities and even in more modern times, old tram tracks have been discovered during excavations for the heritage tram circuit extension.
792:. The company behind the venture, the Canterbury Tramway Company, had been formed in 1878 then spent the next two years negotiating with the various councils involved, purchasing equipment, constructing its lines, etc. After the first day, issues with the track were identified which resulted in a suspension of services until 16 March. 1370:
would traverse the distance, a situation that proved to be most unsatisfactory for all concerned. The lease for the Corporation Line was eventually transferred to the New Brighton Tramway Company in late 1888 and they remained the operator of the line until the Christchurch Tramway Board acquired it in 1906.
1153:
goal of making the tramway experience available to the general public. John Fardell, then general manager of the Christchurch Transport Board, officially opened the tramway on 6 January 1968. Rides were hauled using the society's Kitson steam motor as it was the only motive power available at the time.
1655:
The first stage will involve a new loop, connected to the existing circuit, running down Oxford Terrace, through the Cashel Mall, down High Street to the corner with Tuam Street, and back up High Street to Colombo Street where it will join the existing circuit behind the cathedral. The original plan
1295:
Financial woes continued and by the end of the company's third year of operation, it was in a parlous state. Renting horses and rolling stock because it could not afford to purchase its own in sufficient number was a significant expense, track maintenance was lacking, and a large debt was still owed
1275:
There were trying times ahead for the company in the form of competition from the Canterbury Tramway Company's Sumner line and the alternate Christchurch–New Brighton route established by the City and Suburban Tramway Company. Counter-measures implemented by the company resulted in only a modicum of
1248:
However, not all of the company's decisions proved to be sound, and in 1886 its brief 18-month tenure as operator of the Corporation Line joined a growing list of missteps. By the end of the 1880s the company's future was uncertain and it implemented several economy measures in an attempt to improve
1074:
The Tramway Board, which had been hoping that the diesel buses would be a temporary measure on some routes pending the erection of a trolley bus system, ran into the opposition of the General Manager who was a strong advocate for a standardised diesel bus fleet. He produced a report in December 1951
1061:
in Christchurch, the Future Policy Committee was formed in February 1945. It considered the matter of the tram network and concluded that the remaining tram routes should be retained and operated until such time as the tracks reached the end of their useful lives at which time they would be replaced
1053:
Perhaps one of the biggest problems faced by the tramway system following the war was the much-improved economic situation that ensued, increasing prosperity for many and giving them options that they might not have had before. Rates of car ownership increased and the city grew significantly in size
996:
To contain its financial problems, the board implemented several economy measures. It experimented with the St. Martins cars to trial "one-man" tram operation, which proved that the concept could work. Between 1932 and 1936, additional trams were converted for this purpose and deployed initially on
883:
The electrified tram network was inaugurated on 5 June 1905 when an official opening day was held. After speeches at the board's car shed on Falsgrave Street, the official party departed on a procession of seven electric trams bound for Papanui. After an accident en route required the withdrawal of
838:
The Canterbury Tramway Company had earlier had its own financial difficulties resulting in its collapse in 1893. After various options were explored the Company was recapitalised as the Christchurch Tramway Company. Various measures were implemented to remedy the issues that plagued the old company
818:
It was not until 1884 that another player joined the Canterbury Tramway Company in the tramway business. The city council decided that it needed its own line from the central city to serve its cemetery and Reserve. It intended to run the municipal services on the line itself and to contract out the
803:
The Company opened several other lines that same year including: Christchurch Railway Station via High and Manchester Streets (24 July); Papanui Railway Station (24 June); Agricultural Show Grounds (6 August) and later in the year to Devon Street. Orders were also placed with local coachbuilders for
780:
The idea of building a tramway did not gain widespread support until 1876. By this time, the city had experienced significant development and the need for improved transport had become evident. With the passing into law of the Tramways Act in 1872 and the city council dropping its opposition to the
1471:
Some special occasions, such as race days, required a large number of trams and trailers to convey all of the patrons. For these events, trams were typically dispatched in convoy for track control purposes (to avoid collisions). Even so, the demand they placed on the power supply was so great that
1436:
Of the private tramway companies based in Christchurch, only the Canterbury Tramway Company and its successor, the Christchurch Tramway Company, ever operated steam motors. The Canterbury Company initially purchased five Kitson steam motors, later ordering a further three. One was scrapped in 1893
1373:
The council's rubbish disposal service operated during the early hours of the morning from August 1886 until 1902 when a new facility was established in Manchester Street. It involved the use of four men, two horses, two trolleys, and twelve tipcarts with extra men and horses required on Saturdays.
1369:
Nominal through passenger services ran between Christchurch and New Brighton along the Corporation Line and the New Brighton Tramway Company's line with an interchange at "The Junction". Passengers were required to walk about 200 metres (660 ft) between the two services because neither company
1347:
Following the boom of the war years, the board's financial position slowly declined as economic prosperity changed the market in which the Board operated. The rise of competition to the board's services and the irreparably dilapidated state of the tramway network led to its phased withdrawal in the
1335:
The first election was held on 21 January 1903 and the newly elected board met several days later on the 29th. One of its first orders of business was to seek a mandate to raise two loans with which to fund the construction of the new tramway network, proposals that were carried by the ratepayers.
1308:
The Christchurch Tramway Company was formed from the remnants of the Canterbury Tramway Company after new capital was secured. This enabled the new company to commence work on improving the state of its assets. Various economy measures were also implemented including the closure and lifting of its
1110:
Little time was wasted in removing sleepered track, which was ploughed out of the ground, and the roads quickly rebuilt. There was also track fixed to concrete for which removal was a much more difficult proposition. As the price of materials recovered would not have met the cost of removing them,
1049:
Though several lines were closed and replaced by buses in the 1930s due to prevailing economic conditions, most tram routes were closed in the decade following the end of World War 2. While the war was in some respects a boon for the tramway – with restrictions on other forms of transport patronage
1040:
The end of the war also brought about the end of the boom for the tramway and marked the beginning of the end. Unlike other tramway systems around the country, the newest of vehicles in service in Christchurch were decades old and the track had suffered from years of neglect with little maintenance
992:
of the 1930s, a situation that severely affected the operation of the tramway as much as it affected the rest of the country. Both revenue and patronage suffered sharp declines and as if to make matters worse the loans used to establish the tramway system were due to mature in 1934. Competition was
955:
It was during this period that the construction of the tramway network was completed. Additional lines opened were St. Albans Park (24 December 1906), Opawa (steam, 14 March 1907; electric, 21 September 1909), Fendalton (steam, 3 May 1907; electric, 20 November 1909), Cranford Street (1 July 1910),
834:
The last entrant to the Christchurch tramway scene was the City and Suburban Tramway Company, formed early in 1892 with the intention of constructing lines to Springfield Road and New Brighton from its base at the corner of Manchester, Lichfield, and High Streets. Only the latter of these lines was
1647:
The Christchurch Long-Term Council Community Plan 2009–2019, adopted 30 June 2009, confirmed the council's intention to extend the existing tram circuit in the central city, for which $ 11.5m was set aside. The extension will be constructed in two stages, with the first stage expected to have been
1419:
When the Christchurch Tramway Board assumed control of the tramways, it also acquired some horses from the private tramway companies as a transition measure until such time as its network was fully electrified. A lack of materials delayed the completion of the board's line along the route operated
1252:
By the early 1890s, the company's position had become dire and further attempts to alleviate its problems ensued including fare reductions and an increase in services. However, maintenance suffered which only served to further compound the company's troubles. A liquidator was finally appointed in
1189:
At the suggestion of the Tramway Historical Society, the city council included plans for a tramline in its Worcester Boulevard project in the early 1990s. It was originally intended to be a line extending along Worcester Street from Cathedral Square but was later extended into a circuit around the
1125:
The genesis of tram preservation in Christchurch was the Tramway Preservation Association. Tramway enthusiasts set it up in 1960 with branches in Christchurch and Wellington. The Christchurch group aimed to restore to working order two tram vehicles formerly in service with the Canterbury Tramway
967:
The growth of the board's business in its early years soon necessitated the purchase of new rolling stock to meet demand. By 1908, the number of electric trams had increased to 39 and had grown to 65 in 1912. An additional 34 trailers were also added to the fleet by 1920. Other vehicles acquired
830:
following the opening of the city council's Corporation line, the New Brighton Tramway Company was formed in 1885 with the intention of constructing and operating a line from a junction with the Corporation line to a terminus at New Brighton. Construction began in 1886 and was completed by January
723:
It was not until 1858 that the matter once again gained attention in official circles. Despite a general belief that the idea itself was good, the Provincial Engineer's estimate of ÂŁ6,000 was enough to ensure that the idea was not acted upon. The Provincial Council eventually opted to construct a
1415:
Where horses were used, they were worked in shifts and changed several times a day. The nature of the work was such that the typical working life of a tramway horse was about four years. Though Christchurch's flat terrain was favourable to the operation of tramways, the task of the tramway horse
1343:
The board's financial performance was very sound in its early years, consistently returning a profit and increased patronage year-on-year. It was not until the 1919–1920 fiscal year that the board experienced its first loss, and then again in 1924–1925 and 1927–1928, a symptom of the increasingly
1316:
The company sought extensions to its city concessions (due to expire in September 1899) from the mid-1890s, without which it would not be able to invest further in its business or even, eventually, continue in operation. The various councils through whose territory the company operated eventually
1299:
After an attempt to sell the line and vehicles by tender failed, the company was taken over by the construction contractor in lieu of its debt to him. He continued to operate the business under the same name and was somewhat successful in improving the company's fortunes. The line was eventually
1271:
One of the most important events for the company was becoming the operator of passenger services on the Corporation Line. The city council had put the operation up for tender in late 1888 and accepted the bid from the New Brighton Tramway Company. It began running its services on the line from 7
1016:
came constraints on many aspects of ordinary life that were both beneficial and detrimental to the tramway. Restrictions and rationing of many basic supplies limited the use of private motorised transport leading to huge growth in patronage of the trams and, often, severe overcrowding. This also
1008:
Several under-performing or severely dilapidated lines were also closed during this period, notably the North Beach line, the Papanui railway station spur and Northcote extension of the Papanui line, and the Dallington–Railway Station route. In most cases, trams on these routes were replaced with
971:
The tramway was credited with encouraging the suburban development of Christchurch. Land along tram routes became more valuable and made it easier for people to live out in the suburbs. The main central city retail precinct, which had been concentrated around the railway station, gradually moved
854:
When the concessions under which the lines of the private tramway companies were operated came up for renewal from the late 1890s, the various local bodies involved saw it as an opportunity to consider municipalisation of the whole system. The tramway companies, which were seeking to extend their
1663:
Construction began on the first stage in August 2009. Much of this extension was complete prior to the February 2011 earthquake, including the section through the Cashel Mall and along High Street from Colombo Street to Cashel Street. The condition of the tracks has been assessed by the council
1152:
The society, which had been using old Christchurch Transport Board tramway buildings for storage and restoration, created a purpose-built facility in 1967 on land obtained at the Ferrymead Historic Park. It was here that a permanent tramway was established and the society was able to realise its
1090:
to replace them. Since the war, two tram routes had already closed: St. Martins on 20 May 1946 and Fendalton–Opawa on 6 February 1950. This was now accelerated with the remaining routes being closed over the next few years: Brighton on 18 October 1952; Sumner on 6 December 1952; Riccarton on 14
906:
Lines built and electrified by the New Zealand Electrical Construction Company were mainly those that had been acquired from the private tramway companies and included: Papanui to Christchurch Railway Station (6 June 1905); Sumner (steam, 6 June 1905; electric, 25 April 1907); Cashmere (16 August
1667:
A significant portion of the stage 1 tramway extension opened to the public on 12 February 2015. The trams run the complete stage 1 extension route up to the High and Lichfield Street intersection, where the trams will then continue using the northbound track via a new set of points. Total route
1365:
The council only intended to run the night soil service on its Corporation Line and to contract out the other functions to private operators. Tenders for working the line were called for in February 1886 with a three-year contract being awarded to Charles O’Malley. It soon became apparent that
1210:
that damaged the heritage tram circuit. Services were suspended for approximately 1000 days from the 22 February 2011 earthquake until November 2013. The tramway reopened in November 2013 on a limited route from New Regent Street to Worcester Boulevard. In November 2014, the pre-earthquake loop
1156:
A series of extensions to the tramway line opened over the next 16 years culminating in the completion of the Moorhouse township loop in 1984. Also during this period, the tramway was electrified, allowing the society to run its restored electric trams in addition to its horse- and steam-hauled
1291:
Construction of the company's line began in May 1893 but the company ran short of funds before the line was completed. It commenced services anyway in September 1893 but they were not able to run the full distance to New Brighton until the line was completed the following year in October 1894.
876:
Installation of tramlines sometimes led to improvements of the roads on which they were built. Because as was standard practice at the time, single-track tram lines were laid in the middle of the road requiring some roads to be widened to allow vehicles to pass trams on either side. Also, any
1440:
The board continued to use steam motors for regular services for a couple of years after commencing operations until its lines were fully electrified but even then continued to use them as demand required it. Several were scrapped in the 1920s but some were retained for use as shunters and in
1411:
Horses, often the first form of motive power for early tramways elsewhere, were not introduced to Christchurch until 1882 by the Canterbury Tramway Company. They were found to be cheaper to use on shorter lines and where there were fewer passengers. Services provided by both the New Brighton
1331:
The Christchurch Tramway Board was an autonomous, democratically elected body with full authority to create and operate a tramway within its district. In addition to generating revenue through the collection of fares, it was given authority to levy rates within its district and to raise loans
1231:
Christchurch's tramway lines were initially constructed and operated by several privately held companies, with the exception of the Corporation Line which was built by the city council and later operated by private companies. The precarious financial state of these companies early in the 20th
1070:
The board favoured a mixed trolley/diesel bus fleet and unsuccessfully tried in 1948 and 1949 to raise a loan to further this plan. Mindful of these earlier failures, they were careful to impress upon the public the dire consequences of not planning for bus replacements given the state of the
939:
The reality of the environment in which the tramway business was conducted was made clear in 1912 when chairman of the board George Booth explained the main problems the board faced in his annual report. First, Christchurch had a considerable amount of route mileage with little or no revenue
1244:
The company initially enjoyed commercial success on commencement of its services in 1880 as the novelty of tram travel quickly became fashionable. A steady rise in patronage necessitated the purchase of additional rolling stock. The company's directors were able to report favourably on the
1094:
The last route to close was Papanui–Cashmere for which the last timetabled services ran on Friday 10 September 1954. This was followed the next day by a ceremonial running of the last trams, a task performed by two Hills cars. After their journey to Papanui, then Cashmere, they returned to
1028:
It was not all good news for the board during the war years, as its costs also increased during this period; primarily wages, electricity, and maintenance. The war also made it more difficult to obtain supplies and spare parts needed to maintain and repair its assets, requiring a measure of
763:
White began construction in 1863 and by year's end had built 1-mile (1.6 km) of the line. The project ultimately failed, due largely to a lack of capital, but animosity from the line's neighbours also disrupted business. Work on the line had ceased by the end of 1866 by which time the
735:
earlier that year. Estimates had been prepared and it was suggested that the company be called "The Christchurch and Papanui Junction Tramway Company". The city council, however, was opposed to the idea and declined to support it, saying, "That in the opinion of this meeting a tramway … is
1287:
The City and Suburban Tramway Company was formed in early 1892 for the purpose of establishing an alternative route from the city to New Brighton. An Order-in-Council was sought in May of that year for permission to construct the two lines it had planned, which was granted in November.
1193:
Wood Scenic Line Limited purchased the tramway in 2005 to run it as a commercial operation. As such, it is not considered to be part of the public transport system, with its primary focus being tourist traffic. Additional vehicles have been acquired by the tramway including a former
1264:
Following the city council's decision in early 1884 to construct the Corporation Line, a group of local residents informed the council of their intention to build a line from the end of the Corporation Line to New Brighton and registered the New Brighton Tramway Company in mid-1885.
872:
Work on the Tramway Board's lines began in September 1904 at the intersection of Fitzgerald Avenue and Ferry Road. It required a great many men using only basic tools with the assistance of horse-drawn drays and traction engines and attracted considerable interest from the public.
1149:. It was also in August of that year that the restored horse car was run along the remaining section of track from the old Papanui line to mark ten years since the closure of the line, an event that also served to significantly boost the profile of the society and its membership. 868:
Political pressure and public agitation for a modern tramway system resulted in the formation of the Christchurch Tramway Board in late 1902. It proceeded to create its own network by purchasing the lines of the private tramway companies and also establishing its own new lines.
1240:
The Canterbury Tramway Company was the first of three private Christchurch tramway companies to be formed. The idea for the company began in 1877 with a group of local entrepreneurs and was realised by early the following year. A prospectus was published and shares issued.
1029:
ingenuity to keep things working. War service depleted the board's staff resulting in the hiring of women where necessary to fill gaps. Women were not just to fill gaps – wartime photo shows 28 women conductors at the time. Most trams then carried women conductors. RNM
748:. The goal was to make it cheaper to cart timber from Little River and other building materials from the Halswell Quarry to Christchurch. The plan was for a line of approximately 38 miles (61 km) in length, starting in what is now Moorhouse Avenue, travelling to 1232:
century and the desire of Christchurch's residents for modern electric trams prompted the municipalisation of the tramway system. The Christchurch Tramway Board was formed and oversaw the operation of trams in Christchurch until they were withdrawn completely in 1954.
839:
including the closure of the Manchester Street route to the railway station, the use of horses in preference to steam motors, and the renewal or replacement of some of its assets. During its time, the Company also extended two of its lines: the Addington line reached
1377:
The tramway hearse was widely derided as a gimmick and was never used for its intended purpose. In 1888 it was suggested that the vehicle should be converted for use as a tramcar but was found to be unsuitable for this purpose and was eventually sold in August 1901.
931:
consisted of 27 electric vehicles supplied under the initial contract and the 7 steam motors and 42 trailers acquired from the Christchurch Tramway Company. Twenty-two trailers from the New Brighton and City and Suburban tramway companies later augmented the fleet.
1245:
company's position in 1881 giving shareholders cause to be optimistic about its future. New lines were opened between 1882 and 1888 resulting in a network of 17 miles (27 km) of tramway, with the Papanui and Sumner lines standing out as the most successful.
935:
Though the primary purpose of the tramway was the carriage of passengers, it also carried other items such as mail, newspapers, perambulators, bicycles, construction materials, and animals. The cartage of animals on the tramway was made illegal in December 1915.
1386:
The present-day heritage tram circuit around the central city was the result of a joint venture involving the city council, Christchurch Tramway Ltd., and the Tramway Historical Society. The council built the track as part of its Worcester Boulevard project.
1344:
difficult economic times ahead. After 1930–1931, the board never again made a profit with the exception of the war years. Despite this it still had a good financial base thanks to its reserve funds of which it had several to cover its various disbursements.
1656:
for the second stage was a line running down the remainder of High Street, along Ferry Road, and terminating in a smaller loop around Barbados Street and Williams Street, but it has since been suggested that the line should run through the grounds of the
1718:
network where possible and then light rail for street running to access areas not currently served by rail such as the central city. In such a system, buses would remain but would provide feeder services to light rail instead of running core routes.
708:
brought about the first proposal for a tramway at a meeting held on 26 September 1855. The merits of both wooden and iron-based tramways were discussed and a resolution was passed in support of the construction of either a tramway or a railway.
1754:. Heritage tram services would remain in the central city but that operation is under review pending decisions on when it will be safe to repair the infrastructure and run services but also options for linking it with public transport services. 1595:(wheel-sets), to make passenger access easier by reducing the number of steps required to get inside of the vehicle. The trams made by Boon & Co in 1906–07 for Christchurch may have been the first with this feature; they were referred to as 1444:
Only one other steam motor was used on the Christchurch tramway system, a Baldwin locomotive purchased from the New South Wales Government to help out with the International Exhibition and with existing services as horses were being withdrawn.
1222:
commissioned for Council and published in early 2010 suggested an extension of the tram system (and integration of the trams into the general public transport system) as one of a package of measures aimed at reducing car dominance in the city.
1729:
In response to the major earthquakes of 2010 and 2011, the Central City Plan adopted by the Christchurch City Council calls for the establishment of a light-rail network in Christchurch. Initially, a line between the central city and the
1041:
having been carried out. Though the imposition of rationing was not finally lifted until the early 1950s, post-war Christchurch grew faster than the tramway could keep up ensuring that the tramway's replacement was just a matter of time.
968:
included a Baldwin steam motor (1906), three sprinkler cars, and an overhead lines car. To match this, the size of the board's staff also grew from 196 in 1906 to 350 in 1913 and 530 in 1920, making it the largest employer in the city.
1583:
Boon and Co, of Ferry Road then St Asaph St, started with horse-trams for the New Brighton Company. From 1921 to 1926 they built 23 48-seater electric saloon trams (which could be coupled in pairs) for the Christchurch Tramway Board.
1272:
December after acquiring the remainder of the lease. This gave the company control over the line from the central city all the way out to New Brighton, allowing it to run a more efficient operation and carry many more passengers.
1351:
The board changed its name in 1951 to the Christchurch Transport Board to reflect its shift away from the tramway as the mainstay of its business. It disappeared as a result of the deregulation of the transport industry in 1989.
1249:
its fortunes. This included a permanent fare reduction, the replacement of steam motors with horses on some routes, and the introduction of a one man-operated tramcar. None of these measures were particularly successful.
1579:
was equal to that of the American vehicles, and a much needed improvement had been made on the roof 'by the addition of a board running along the outside, for the special benefit of the female patronisers of the tramway'.
1312:
The company's only additions to its operations were the opening of extensions to two of its existing lines in the 1890s; the Addington line was extended to Sunnyside Asylum, and the Sydenham line was extended to Cashmere.
736:
objectionable … for the following reasons: (1) A tramway is not required, (2) The streets are not wide enough, (3) A tramway would retard the railway station being brought into a more convenient place for the citizens".
1394:. Up to seven tram cars are currently in operation daily on the heritage circuit, providing both daytime transport services and a restaurant during evening hours. The tram circuit was closed in 2011 following the 1071:
tramway after deciding in April 1950 to purchase 39 diesel buses. The Loans Board subsequently approved this loan proposal in September and it was also sanctioned by a plebiscite of the board's ratepayers.
764:
Christchurch–Halswell Quarry section had been completed and work had started at the Little River end. The line to the quarry remained in use until 1872. Little River was eventually served by rail when the
1066:
on the existing North Beach route which still had useful infrastructure in place and on the Papanui–Cashmere route where the trolley buses would have superior hill-climbing performance characteristics.
1103:
The tram bodies were sold to private individuals, many of whom used them as sheds or huts, and the running gear was sold for scrap. Much of the tramway infrastructure was repurposed. Tram sheds at
1190:
central city. The city council granted a licence to Christchurch Tramway Limited to run the tramway and it was opened on 4 February 1995 using vehicles leased from the Tramway Historical Society.
1253:
March 1893. The company's failure has been attributed to various causes including a lack of revenue to cover expenditure on maintenance, competition, mismanagement, and an economic depression.
1348:
decade following he war. Buses were the new thinking in public transport and following the example of many other cities around the world, they replaced trams as the way to move people around.
1017:
had the effect of significantly improving the board's revenue. The increased popularity of the trams was also assisted by the large number of New Zealand military personnel based at both the
940:
potential, necessitated by the geographically diverse nature of the population it served. Second, the growing problem of competition from bicycles and motorcars since the development of the
855:
concessions to give them some certainty over the future of their business, were rebuffed and eventually the Christchurch Tramway Board was formed to bring the tramways under public control.
1797:
The history of the Christchurch Tramway Board included here is only the period in which it operated the tramway. The organisation continued to exist after this time as a bus-only operator.
972:
north to avail itself of the increased flow of people generated by the tram routes converging on Cathedral Square. Smaller retail precincts developed around the ends of some lines such as
1680:
in 2009. He was tasked with determining how the central city could be enhanced to improve public access and create a better sense of community. The report advocates for a shift away from
1398:, and was re-opened on a shortened loop in November 2013 before the full heritage loop was re-opened in November 2014. In 2016, local business groups also began in the Christchurch CBD. 2561: 2546: 672:
was reopened in the central city as a tourist attraction. This has now been is extended with a 1.4-kilometre (0.87 mi) loop down to High Street which was opened in February 2015.
1107:
and Sumner remained for many years afterwards, the Sumner shed being last used as a dye works factory. Tram shelters became bus stops and traction masts were reused as utility poles.
997:
the more lightly patronised lines before being used on the longer lines as a sufficient number were available. Consequent to the introduction of one-man trams was the need to install
880:
Private operators were contracted by the board to provide alternative transport while tramlines were unavailable due to construction. These services were run using horse-drawn drags.
884:
two of the trams, the rest of the party reached their destination where the festivities continued. Revenue services commenced on the Papanui–Railway Station route the following day.
2060: 727:
A meeting of prominent local citizens on 20 September 1872 discussed the matter of a tramway and concluded that it would be desirable to construct a line between Papanui and
944:, exacerbated by the generally flat nature of the terrain on which Christchurch was sited. The board's response to these issues had not improved the situation by 1914. 1095:
Cathedral Square where a huge crowd had gathered to witness the event. Speeches were made and a ribbon was cut to symbolically inaugurate the replacement bus service.
907:
1905); Riccarton (steam, 2 November 1905; electric, 12 March 1906); Lincoln Road (8 February 1906); New Brighton (Linwood, 26 March 1906; New Brighton, 6 August 1906).
1734:
would be built at a cost of $ 406m to trial the idea while a study would be conducted to assess the feasibility of extending the network to other destinations such as
1657: 1332:
subject to ratepayer approval. The board itself had eight members elected by voters in each of its wards at triennial elections. A ninth member was later added.
1268:
Despite mediocre results for the company's first annual returns, its service was proving to be popular, garnering between 3,000 and 5,000 passengers per week.
807:
In later years, other lines opened by the Company included: Addington Railway Station (5 January 1882) and later the Addington Show Grounds (28 October 1887);
2651: 720:
and goods could then be transported to Lyttelton by boat. A couple of leading and influential figures spoke out against the proposal and it was voted down.
2626: 2118: 1412:
Tramway Company and the City and Suburban Tramway Company were typically hauled by horses as that was the only form of motive power those companies owned.
1710:
During his 2007–2010 term, he visited several American cities with successful examples of light rail networks. He envisages a system for Christchurch of
744:
A partnership was formed in 1861, including well-known bridge engineer William White, with the aim of constructing a wooden tramway from Christchurch to
728: 1479:
were installed in Cashmere (1920) and Fendalton (1922) to boost power to southern and western sections respectively when required. They were supplied
2641: 2355: 1309:
Manchester Street line to Christchurch Railway Station and the replacement of steam motors with horses from September 1893 except on the Sumner line.
1559:
tram was built by William Moor & Son in November 1880 for the Canterbury Tramway Company, possibly the first built in New Zealand. The car was a
1603:. Trams for Christchurch and Wellington built in the 1920s with an enclosed section at each end and an open-sided middle section were also known as 2636: 1279:
In 1906, the Company sold most of its assets to the Christchurch Tramway Board, retaining only its horses, harness, and central city property.
2455: 2394: 1126:
Company, but then under the ownership of the Christchurch Transport Board. With the enthusiastic support of the board, work commenced on a
1336:
For the first two years of its existence, the board spent much of its time planning the new tramway including decisions on such matters as
724:
railway line; the first section between Christchurch and Ferrymead opened in 1863, and the Ferrymead to Lyttelton section opened in 1867.
2195: 2068: 2587: 1735: 752:
where it would roughly follow the present state highway to Little River, then on to an area now known as Puaha. The gauge was to be
2512: 2493: 2474: 2436: 2244: 1940: 1817: 81: 59: 2526: 1218:
The extension is part of an additional loop planned and partially constructed during the late 2000s, and a new strategy report by
915: 2646: 2091: 2001: 1620: 2631: 1978: 1773: 765: 2168: 920: 785: 609: 515: 371: 2299: 1256:
Following liquidation, attempts to get the council to assume control of the company, and to dispose of its assets, failed.
1317:
decided on municipalisation under the control of the Christchurch Tramway Board, which acquired the company in May 1905.
1395: 1207: 1032: 1763: 688: 679:
overhauls and restores the trams used on the Christchurch Tramway, and itself also runs operating trams on its site.
665:
from 1882. Electric trams ran from 1905 to 1954, when the last line from Cashmere to Papanui was replaced by buses.
2141: 1464:
in the powerhouse used during the start-up phase and for smoothing the power supply. The generators were run using
2381: 1903: 1747: 1676:
The Christchurch City Council commissioned the Public Space Public Life study in 2009 from renowned urban designer
1326: 1146: 619: 534: 408: 398: 268: 1875: 1145:
In 1964, the two branches of the association became independent with the Christchurch group becoming known as the
815:(9 December 1882) and finally Sumner (1 November 1888). The lines to Papanui and Sumner were the most lucrative. 2217: 2064: 2033: 1840:. On the move: Christchurch transport through the years. Vol. 4. Christchurch: Christchurch Transport Board. 1831:. On the move: Christchurch transport through the years. Vol. 3. Christchurch: Christchurch Transport Board. 1751: 1296:
to the construction contractor. Unable to meet its obligations, the company entered into voluntary liquidation.
1086:
With the fate of the trams sealed, the remaining tram routes closed as a sufficient number of buses arrived from
827: 784:
Trams became a reality for Christchurch on 9 March 1880 when the first revenue services commenced on a line from
745: 2576: 1731: 1571:. Brass fittings were supplied by Scott Brothers of Christchurch, and the only imported parts were the chilled 1437:
and the remaining seven were sold to the Christchurch Tramway Board when the Company ceased operation in 1905.
1173: 947: 713: 52: 46: 1078: 1050:
of the trams was significantly improved – it also caused problems, which contributed to the end of the trams.
2326: 1127: 1120: 795: 676: 279: 1390:
The tram is currently operated as a Christchurch tourist attraction by Welcome Aboard, who also manage the
1165: 630: 1849:. On the move: Christchurch transport through the years. Vol. 7. Christchurch: A & M Publishers. 1743: 1104: 705: 63: 1563:
of imported carriages; with ash framing, panelling of American whitewood, and roofs and window frames of
704:
The difficulty experienced by Christchurch's early residents in conveying them and their export goods to
2571: 2566: 1701: 1637: 1544: 1476: 1366:
O’Malley was unsuitable and the contract was taken up by the Canterbury Tramway Company in August 1886.
895:, 65 miles (105 km) of feeder cables, 120 miles (190 km) of telephone and other wires, 80,000 848: 844: 808: 1956: 1091:
June 1953; St. Albans Park–Spreydon on 21 June 1953; and Cranford Street–Lincoln Road on 26 July 1953.
451: 2556: 1778: 1649: 1575:
wheels. A contemporary report described the car as a most creditable specimen of local industry. The
1461: 1391: 1018: 2272: 1181: 993:
becoming an increasing problem, particularly from bicycles whose number had increased dramatically.
1739: 1480: 769: 717: 877:
undulations in the road were smoothed out so the track could be laid flush with the road surface.
1704: 1131: 927:
The trams quickly became popular with the public and revenue exceeded the board's expectations.
840: 669: 749: 1628: 2508: 2489: 2470: 2451: 2432: 2390: 1936: 1850: 1813: 1681: 1468:
from coal-fired boilers. Electricity was supplied to the trolley wires at a nominal 600 V DC.
1465: 1492: 1484: 1058: 1022: 989: 820: 812: 547: 1457: 1141:
Kitson no. 7 hauling two trailers around the township loop at the Ferrymead Heritage Park
1847:
Tram to the terminus: the Christchurch Tramway Board & its electric tramways 1921–54
1838:
The wire web: the Christchurch Tramway Board & its early electric tramways 1903–1920
781:
idea, the political environment had become more agreeable to the formation of tramways.
2061:"Jan Gehl Public Space Public Life Study (Christchurch 2009, Public Space Public Life)" 1641: 1454: 941: 789: 699: 524: 380: 170: 1512: 891:
in June 1906 show that materials used included 2,400 poles, 63 miles (101 km) of
2620: 1432:
Kitson no. 7 outside a Tramway Historical Society barn at the Ferrymead Heritage Park
928: 900: 892: 527: 383: 1215:
mall and High Street, which was under construction when the 2011 earthquake struck.
1137: 2028: 1013: 998: 896: 658: 2531: 2389:. Vol. 1. Christchurch: Christchurch City Council. August 2011. p. 92. 1926: 1924: 17: 1337: 961: 887:
The first tranche of work was completed by September 1906. Figures provided by
142: 130: 103: 2580:(Tramways) from the Cyclopaedia of New Zealand Volume III (Canterbury) of 1903 1715: 1711: 1689: 1063: 1002: 2602: 2589: 1854: 843:
at the end of 1895 with revenue services commencing in the New Year, and the
2331: 2249: 2096: 2006: 1880: 1768: 1576: 1572: 1560: 1495:
and steam plant, which were decommissioned prior to the end of the tramway.
1488: 1195: 973: 731:
railway stations, especially in light of the north railway having opened to
716:
meeting on 16 October 1855 at which it was proposed that a line be built to
2421:
All fares please: A pictorial record of the Christchurch Electric Tramways
1428: 2056: 1810:
The End of the Penny Section: When Trams Ruled the Streets of New Zealand
1677: 1633: 1556: 1219: 1212: 977: 732: 662: 2429:
Always A Tram In Sight: The Electric Trams of New Zealand – 1900 to 1964
642:
www.tram.co.nz https://www.christchurchattractions.nz/christchurch-tram/
1568: 1087: 2541: 1632:
Launch of the stage 1 extension on 12 February 2015 by Prime Minister
1416:
was made more difficult upon occasion by the overloading of tramcars.
1543:
In Christchurch, several firms constructed trailers and horse-trams:
957: 1082:
Christchurch Tramway Board electrified tramway network, January 1950
951:
Route map of Christchurch's electrified tramway network at its peak
1627: 1619: 1592: 1475:
The tramway power supply was improved in the 1920s when automatic
1427: 1180: 1172: 1164: 1136: 1077: 1031: 946: 914: 794: 1547:(later Boon & Co), Moor and Sons, and Booth McDonald and Co. 1487:
scheme and converted it to DC for use by the trams. Mercury-arc
2467:
Fares Please!: The Horse, Steam & Cable Trams of New Zealand
1829:
Rails in the roads: the steam and horse tram era in Christchurch
1685: 521: 377: 2551: 1564: 1507: 31: 988:
The economic uncertainty of the late 1920s culminated in the
2486:
From Rails to Rubber: The Downhill Ride of New Zealand Trams
1652:
and the second stage to be completed by the summer of 2013.
1211:
reopened. The route was also extended to travel through the
2557:
Christchurch Trams on City Library website under 'Heritage'
2119:"Calls to extend Christchurch tram past Dux on Poplar Lane" 1812:(Revised ed.). Wellington: Grantham House Publishing. 1453:
Power was initially provided for the tram network by three
1005:
at the termini of the lines on which these cars were used.
799:
Route map of private tramway company lines in Christchurch
108:
A Christchurch Tramway tram, Worcester Street (March 2005)
2536: 1668:
length has been increased to 4 kilometres (2.5 mi).
1587:
A distinctive feature of many Australasian trams was the
668:
In 1995, a 2.5-kilometre (1.6 mi) central city loop
641: 1664:
with a view to determining the future of the extension.
2419:
Dale, B. J., & Tramway Historical Society. (1967).
1524: 1460:
in the Falsgrave Street powerhouse. There was also an
1025:, and the contingent of American military in the city. 1624:
Central city heritage circuit with approved extensions
2572:
Photo of a tram at the Hackthorne Road terminus c1922
2029:"Press release – First tram tracks laid in City Mall" 1935:. Wellington: Grantham House Publishing. p. 47. 1792: 1198:W2 tram that has been converted into a restaurant. 441: 433: 425: 141: 136: 118: 113: 96: 27:
Tram transport network of Christchurch, New Zealand
2562:Christchurch Electric Tram 1905 on 1985 58c stamp 2279:. Christchurch: Fairfax New Zealand. 31 July 2010 1931:Stewart, Graham (1999). Olphert, Lorraine (ed.). 1177:Workers join tram tracks in City Mall, March 2009 2423:. Christchurch, N.Z: Tramway Historical Society. 1692:) and active modes such as walking and cycling. 1658:Christchurch Polytechnic Institute of Technology 1300:sold to the Christchurch Tramway Board in 1906. 1933:Around Christchurch by Tram in the 20th Century 1472:the trams were often slowed to a walking pace. 826:Buoyed by the prospect of a tram connection to 760:) and the estimated cost was ÂŁ1,023 per mile. 2567:Photo of Kitson steam tram and trailers c1906 1808:Stewart, Graham (1993) . Rogers, Anna (ed.). 8: 1283:City and Suburban Tramway Company: 1892–1906 273:21 miles 67 chains (35.1 km) 2142:"Christchurch mall revamp injects new life" 899:, 26,000 electrical bonds, 90,000 yards of 2527:Animated map for the electric tram network 2356:"Christchurch light-rail network proposed" 1491:were installed in 1949 displacing the old 1340:, routes, electrical specifications, etc. 557: 463: 291: 178: 102: 93: 2507:. Wellington: Grantham House Publishing. 2488:. Wellington: Grantham House Publishing. 2469:. Wellington: Grantham House Publishing. 2431:. Wellington: Grantham House Publishing. 772:opened to its namesake terminus in 1886. 82:Learn how and when to remove this message 2245:"Design guru Jan Gehl puts people first" 2196:"Christchurch tram operator eyes return" 45:This article includes a list of general 1867: 1304:Christchurch Tramway Company: 1893–1905 1260:New Brighton Tramway Company: 1885–1906 740:White’s Little River tramway: 1861–1872 2092:"Christchurch trams get back on track" 2090:O'Callaghan, Jody (10 November 2014). 2002:"Christchurch trams get back on track" 2000:O'Callaghan, Jody (10 November 2014). 403:63.25 mi (101.79 km) (1914) 2505:When Trams Were Trumps in New Zealand 1321:Christchurch Tramway Board: 1905–1989 1236:Canterbury Tramway Company: 1878–1893 1169:Central city heritage tramway circuit 851:Hills and opened on 7 December 1898. 7: 1684:towards public transport (including 1607:, but did not have the drop-centre. 1591:, a lowered central section between 788:to Christchurch Railway Station via 2652:Tourist attractions in Christchurch 2362:. Christchurch: Fairfax New Zealand 2335:. Christchurch: Fairfax New Zealand 2306:. Christchurch: Fairfax New Zealand 2253:. Christchurch: Fairfax New Zealand 2175:. Christchurch: Fairfax New Zealand 2148:. Christchurch: Fairfax New Zealand 1206:Christchurch was hit by a powerful 569:Open (building circuits over time) 413:53.5 mi (86.1 km) (1914) 2627:1880 establishments in New Zealand 2325:Sachdeva, Sam (14 December 2010). 2140:Conway, Glenn (18 December 2009). 1736:Christchurch International Airport 1130:single-deck horse car of 1887 and 51:it lacks sufficient corresponding 25: 2298:Conway, Glenn (16 October 2010). 2169:"Tram may go through polytechnic" 240:City and Suburban Tramway Company 224:City and Suburban Tramway Company 2642:Public transport in Christchurch 2450:. Auckland: New Holland Kowhai. 2354:Sachdeva, Sam (12 August 2011). 2243:Conway, Glenn (8 January 2010). 1511: 629: 450: 278: 123: 36: 2300:"Parker renews tram-train call" 2218:"Trams testing track extension" 1774:Public transport in New Zealand 1115:Ferrymead tramway: 1968–present 467:Preservation era: 1968–present 2327:"Chch commuters feel the pain" 2194:WOOD, ALAN (2 February 2012). 2167:Sachdeva, Sam (25 June 2010). 1979:"Christchurch Tramway History" 1904:"Interesting Tramway Projects" 1672:Public Space Public Life study 1208:earthquake on 22 February 2011 776:Horse and steam era: 1880–1906 661:, New Zealand, with steam and 577:Central city heritage circuit 263:Oxford Terrace (City Council) 1: 2637:Tram transport in New Zealand 1959:. Christchurch City Libraries 242:Christchurch Tramway Company 226:Christchurch Tramway Company 657:was an extensive network in 238:New Brighton Tramway Company 222:New Brighton Tramway Company 1764:Christchurch tramway routes 1134:steam motor no. 7 of 1881. 1057:To determine the future of 903:, and 5,500 tons of rails. 712:The issue arose again at a 689:Christchurch tramway routes 655:Christchurch tramway system 561:Heritage era: 1995–present 539:1.5 km (0.93 mi) 499:Tramway Historical Society 491:Tramway Historical Society 355:Christchurch Tramway Board 347:Christchurch Tramway Board 97:Christchurch tramway system 2668: 2542:Tramway Historical Society 2448:Christchurch from the tram 1957:"The Christchurch Tramway" 1748:Northlands Shopping Centre 1714:that utilise the existing 1616:Heritage circuit expansion 1327:Christchurch Tramway Board 1324: 1147:Tramway Historical Society 1118: 697: 686: 624:3.9 km (2.4 mi) 593:Christchurch Tramway Ltd. 366:Electric, steam (minimal) 234:Canterbury Tramway Company 218:Canterbury Tramway Company 206:Brighton (via North Beach) 2065:Christchurch City Council 2034:Christchurch City Council 1356:Christchurch City Council 847:line was extended to the 628: 560: 556: 466: 462: 449: 421: 294: 290: 277: 261:Cathedral Square (C.T.C.) 236:Christchurch City Council 220:Christchurch City Council 181: 177: 131:Christchurch, New Zealand 101: 2603:43.5309167°S 172.63444°E 2503:Stewart, Graham (1985). 2484:Stewart, Graham (2006). 2465:Stewart, Graham (1997). 2427:Stewart, Graham (1996). 2121:. The Press. 31 May 2016 1845:Alexander, Mark (1993). 1836:Alexander, Mark (1986). 1827:Alexander, Mark (1985). 1732:University of Canterbury 1724:IBM Commuter Pain Survey 1161:Modern era: 1995–present 483:Ferrymead Heritage Park 2647:History of Christchurch 2552:Ferrymead Heritage Park 1396:Christchurch earthquake 1121:Ferrymead Heritage Park 859:Electric era: 1905–1954 677:Ferrymead Heritage Park 675:The tram museum at the 510:Horse, steam, electric 182:Private era: 1880–1906 66:more precise citations. 2632:1906 disestablishments 2608:-43.5309167; 172.63444 2547:Tram extension project 2446:Sinclair, Roy (2006). 1981:. Christchurch Tramway 1648:ready in time for the 1644: 1625: 1433: 1186: 1178: 1170: 1142: 1083: 1037: 1036:Photo taken circa 1942 952: 924: 811:(7 July 1882) then to 800: 585:Wood Scenic Line Ltd. 204:Brighton (via Linwood) 1696:Political aspirations 1638:Mayor of Christchurch 1631: 1623: 1483:power from the State 1431: 1184: 1176: 1168: 1140: 1081: 1035: 950: 918: 798: 339:(16) St. Albans Park 2537:Christchurch Tramway 1779:Trams in New Zealand 1650:2011 Rugby World Cup 1392:Christchurch Gondola 1012:With the arrival of 399:Track length (total) 321:(6) Worcester Street 2599: /  2071:on 27 February 2010 2037:. 25 September 2008 1462:accumulator battery 770:Little River Branch 766:Railways Department 317:(4) Cranford Street 295:CTB era: 1905–1954 1702:Christchurch mayor 1645: 1626: 1545:Boon & Stevens 1523:. You can help by 1434: 1402:Propulsion systems 1187: 1179: 1171: 1143: 1084: 1038: 953: 925: 801: 714:Provincial Council 614:600 V DC catenary 2457:978-1-86966-124-3 2396:978-0-9876571-1-4 2383:Central City Plan 2198:. Fairfax NZ News 1884:. 1 February 2010 1682:private transport 1541: 1540: 1493:rotary converters 1466:superheated steam 651: 650: 647: 646: 552: 551: 458: 457: 393:Falsgrave Street 286: 285: 92: 91: 84: 18:Christchurch Tram 16:(Redirected from 2659: 2614: 2613: 2611: 2610: 2609: 2604: 2600: 2597: 2596: 2595: 2592: 2532:All fares please 2516: 2499: 2480: 2461: 2442: 2408: 2407: 2405: 2403: 2388: 2378: 2372: 2371: 2369: 2367: 2351: 2345: 2344: 2342: 2340: 2322: 2316: 2315: 2313: 2311: 2295: 2289: 2288: 2286: 2284: 2273:"Changing track" 2269: 2263: 2262: 2260: 2258: 2240: 2234: 2233: 2231: 2229: 2214: 2208: 2207: 2205: 2203: 2191: 2185: 2184: 2182: 2180: 2164: 2158: 2157: 2155: 2153: 2137: 2131: 2130: 2128: 2126: 2115: 2109: 2108: 2106: 2104: 2087: 2081: 2080: 2078: 2076: 2067:. Archived from 2053: 2047: 2046: 2044: 2042: 2025: 2019: 2018: 2016: 2014: 1997: 1991: 1990: 1988: 1986: 1975: 1969: 1968: 1966: 1964: 1953: 1947: 1946: 1928: 1919: 1918: 1916: 1914: 1900: 1894: 1893: 1891: 1889: 1872: 1858: 1841: 1832: 1823: 1796: 1555:A double-decker 1536: 1533: 1515: 1508: 1458:turbo-generators 1382:Heritage circuit 1361:Corporation Line 1059:public transport 1023:Wigram Aerodrome 990:Great Depression 921:Cathedral Square 919:Tram shelter in 841:Sunnyside Asylum 821:municipalisation 786:Cathedral Square 759: 755: 633: 601: 558: 507: 464: 454: 363: 331:(12) St. Martins 329:(10) North Beach 323:(7) Lincoln Road 292: 282: 250: 210:Railway Station 179: 173: 167: 165: 164: 160: 157: 149: 129: 127: 126: 106: 94: 87: 80: 76: 73: 67: 62:this article by 53:inline citations 40: 39: 32: 21: 2667: 2666: 2662: 2661: 2660: 2658: 2657: 2656: 2617: 2616: 2607: 2605: 2601: 2598: 2593: 2590: 2588: 2586: 2585: 2523: 2502: 2496: 2483: 2477: 2464: 2458: 2445: 2439: 2426: 2416: 2414:Further reading 2411: 2401: 2399: 2397: 2386: 2380: 2379: 2375: 2365: 2363: 2353: 2352: 2348: 2338: 2336: 2324: 2323: 2319: 2309: 2307: 2297: 2296: 2292: 2282: 2280: 2271: 2270: 2266: 2256: 2254: 2242: 2241: 2237: 2227: 2225: 2222:www.scoop.co.nz 2216: 2215: 2211: 2201: 2199: 2193: 2192: 2188: 2178: 2176: 2166: 2165: 2161: 2151: 2149: 2139: 2138: 2134: 2124: 2122: 2117: 2116: 2112: 2102: 2100: 2089: 2088: 2084: 2074: 2072: 2055: 2054: 2050: 2040: 2038: 2027: 2026: 2022: 2012: 2010: 1999: 1998: 1994: 1984: 1982: 1977: 1976: 1972: 1962: 1960: 1955: 1954: 1950: 1943: 1930: 1929: 1922: 1912: 1910: 1902: 1901: 1897: 1887: 1885: 1874: 1873: 1869: 1865: 1844: 1835: 1826: 1820: 1807: 1804: 1790: 1787: 1760: 1698: 1674: 1618: 1613: 1553: 1537: 1531: 1528: 1521:needs expansion 1506: 1501: 1451: 1426: 1409: 1404: 1384: 1363: 1358: 1329: 1323: 1306: 1285: 1262: 1238: 1229: 1204: 1202:Post-earthquake 1163: 1123: 1117: 1101: 1047: 986: 913: 866: 861: 804:more tramcars. 778: 757: 753: 742: 702: 696: 691: 685: 610:Electrification 599: 516:Electrification 505: 372:Electrification 361: 338: 336: 334: 332: 330: 328: 326: 324: 322: 320: 318: 316: 314: 312: 262: 248: 241: 239: 237: 235: 225: 223: 221: 219: 209: 207: 205: 203: 201: 199: 169: 162: 158: 155: 153: 152:4 ft  151: 147: 124: 122: 109: 88: 77: 71: 68: 58:Please help to 57: 41: 37: 28: 23: 22: 15: 12: 11: 5: 2665: 2663: 2655: 2654: 2649: 2644: 2639: 2634: 2629: 2619: 2618: 2583: 2582: 2574: 2569: 2564: 2559: 2554: 2549: 2544: 2539: 2534: 2529: 2522: 2521:External links 2519: 2518: 2517: 2500: 2494: 2481: 2475: 2462: 2456: 2443: 2437: 2424: 2415: 2412: 2410: 2409: 2395: 2373: 2346: 2317: 2290: 2264: 2235: 2209: 2186: 2159: 2132: 2110: 2082: 2048: 2020: 1992: 1970: 1948: 1941: 1920: 1895: 1866: 1864: 1861: 1860: 1859: 1842: 1833: 1824: 1818: 1803: 1800: 1799: 1798: 1786: 1783: 1782: 1781: 1776: 1771: 1766: 1759: 1756: 1697: 1694: 1673: 1670: 1642:Lianne Dalziel 1617: 1614: 1612: 1609: 1552: 1549: 1539: 1538: 1518: 1516: 1505: 1502: 1500: 1497: 1455:direct current 1450: 1447: 1425: 1422: 1408: 1405: 1403: 1400: 1383: 1380: 1362: 1359: 1357: 1354: 1325:Main article: 1322: 1319: 1305: 1302: 1284: 1281: 1261: 1258: 1237: 1234: 1228: 1225: 1203: 1200: 1162: 1159: 1116: 1113: 1100: 1097: 1046: 1043: 985: 982: 942:pneumatic tyre 912: 909: 865: 862: 860: 857: 790:Colombo Street 777: 774: 750:Birdlings Flat 741: 738: 700:Lyttelton Line 695: 692: 684: 681: 649: 648: 645: 644: 639: 635: 634: 626: 625: 622: 616: 615: 612: 606: 605: 602: 595: 594: 591: 587: 586: 583: 579: 578: 575: 571: 570: 567: 563: 562: 554: 553: 550: 549: 545: 541: 540: 537: 531: 530: 518: 512: 511: 508: 501: 500: 497: 493: 492: 489: 485: 484: 481: 477: 476: 473: 469: 468: 460: 459: 456: 455: 447: 446: 443: 439: 438: 435: 431: 430: 427: 423: 422: 419: 418: 415: 414: 411: 405: 404: 401: 395: 394: 391: 387: 386: 374: 368: 367: 364: 357: 356: 353: 349: 348: 345: 341: 340: 309: 305: 304: 301: 297: 296: 288: 287: 284: 283: 275: 274: 271: 265: 264: 259: 255: 254: 251: 244: 243: 232: 228: 227: 216: 212: 211: 196: 192: 191: 188: 184: 183: 175: 174: 171:standard gauge 145: 139: 138: 137:Infrastructure 134: 133: 120: 116: 115: 111: 110: 107: 99: 98: 90: 89: 72:September 2011 44: 42: 35: 26: 24: 14: 13: 10: 9: 6: 4: 3: 2: 2664: 2653: 2650: 2648: 2645: 2643: 2640: 2638: 2635: 2633: 2630: 2628: 2625: 2624: 2622: 2615: 2612: 2591:43°31′51.30″S 2581: 2579: 2578:Wheel Traffic 2575: 2573: 2570: 2568: 2565: 2563: 2560: 2558: 2555: 2553: 2550: 2548: 2545: 2543: 2540: 2538: 2535: 2533: 2530: 2528: 2525: 2524: 2520: 2514: 2513:1-86934-000-X 2510: 2506: 2501: 2497: 2495:1-86934-100-7 2491: 2487: 2482: 2478: 2476:1-86934-064-7 2472: 2468: 2463: 2459: 2453: 2449: 2444: 2440: 2438:1-86934-056-6 2434: 2430: 2425: 2422: 2418: 2417: 2413: 2398: 2392: 2385: 2384: 2377: 2374: 2361: 2357: 2350: 2347: 2334: 2333: 2328: 2321: 2318: 2305: 2301: 2294: 2291: 2278: 2274: 2268: 2265: 2252: 2251: 2246: 2239: 2236: 2224:. Scoop Media 2223: 2219: 2213: 2210: 2197: 2190: 2187: 2174: 2170: 2163: 2160: 2147: 2143: 2136: 2133: 2120: 2114: 2111: 2099: 2098: 2093: 2086: 2083: 2070: 2066: 2062: 2058: 2052: 2049: 2036: 2035: 2030: 2024: 2021: 2009: 2008: 2003: 1996: 1993: 1980: 1974: 1971: 1958: 1952: 1949: 1944: 1942:1-86934-071-X 1938: 1934: 1927: 1925: 1921: 1909: 1905: 1899: 1896: 1883: 1882: 1877: 1876:"The tramway" 1871: 1868: 1862: 1856: 1852: 1848: 1843: 1839: 1834: 1830: 1825: 1821: 1819:1-86934-037-X 1815: 1811: 1806: 1805: 1801: 1795: 1794: 1789: 1788: 1784: 1780: 1777: 1775: 1772: 1770: 1767: 1765: 1762: 1761: 1757: 1755: 1753: 1749: 1745: 1741: 1737: 1733: 1727: 1725: 1720: 1717: 1713: 1708: 1706: 1703: 1695: 1693: 1691: 1687: 1683: 1679: 1671: 1669: 1665: 1661: 1659: 1653: 1651: 1643: 1639: 1635: 1630: 1622: 1615: 1610: 1608: 1606: 1602: 1598: 1594: 1590: 1585: 1581: 1578: 1574: 1570: 1566: 1562: 1558: 1551:Rolling stock 1550: 1548: 1546: 1535: 1526: 1522: 1519:This section 1517: 1514: 1510: 1509: 1504:Manufacturers 1503: 1498: 1496: 1494: 1490: 1486: 1482: 1478: 1473: 1469: 1467: 1463: 1459: 1456: 1448: 1446: 1442: 1438: 1430: 1423: 1421: 1417: 1413: 1406: 1401: 1399: 1397: 1393: 1388: 1381: 1379: 1375: 1371: 1367: 1360: 1355: 1353: 1349: 1345: 1341: 1339: 1333: 1328: 1320: 1318: 1314: 1310: 1303: 1301: 1297: 1293: 1289: 1282: 1280: 1277: 1273: 1269: 1266: 1259: 1257: 1254: 1250: 1246: 1242: 1235: 1233: 1226: 1224: 1221: 1216: 1214: 1209: 1201: 1199: 1197: 1191: 1183: 1175: 1167: 1160: 1158: 1154: 1150: 1148: 1139: 1135: 1133: 1129: 1122: 1114: 1112: 1108: 1106: 1098: 1096: 1092: 1089: 1080: 1076: 1072: 1068: 1065: 1064:trolley buses 1060: 1055: 1051: 1044: 1042: 1034: 1030: 1026: 1024: 1020: 1015: 1010: 1006: 1004: 1000: 999:balloon loops 994: 991: 984:Halcyon years 983: 981: 979: 975: 969: 965: 963: 959: 949: 945: 943: 937: 933: 930: 929:Rolling stock 922: 917: 910: 908: 904: 902: 898: 894: 890: 885: 881: 878: 874: 870: 863: 858: 856: 852: 850: 846: 842: 836: 832: 829: 824: 822: 816: 814: 810: 805: 797: 793: 791: 787: 782: 775: 773: 771: 767: 761: 758:1,219 mm 751: 747: 739: 737: 734: 730: 725: 721: 719: 715: 710: 707: 701: 693: 690: 682: 680: 678: 673: 671: 670:heritage tram 666: 664: 660: 656: 643: 640: 637: 636: 632: 627: 623: 621: 618: 617: 613: 611: 608: 607: 603: 597: 596: 592: 589: 588: 584: 581: 580: 576: 573: 572: 568: 565: 564: 559: 555: 548: 546: 543: 542: 538: 536: 533: 532: 529: 526: 523: 519: 517: 514: 513: 509: 503: 502: 498: 495: 494: 490: 487: 486: 482: 479: 478: 474: 471: 470: 465: 461: 453: 448: 444: 440: 436: 432: 428: 424: 420: 417: 416: 412: 410: 407: 406: 402: 400: 397: 396: 392: 389: 388: 385: 382: 379: 375: 373: 370: 369: 365: 359: 358: 354: 351: 350: 346: 343: 342: 335:(14) Spreydon 327:(9) Fendalton 325:(8) Riccarton 310: 307: 306: 302: 299: 298: 293: 289: 281: 276: 272: 270: 267: 266: 260: 257: 256: 253:Horse, steam 252: 246: 245: 233: 230: 229: 217: 214: 213: 197: 194: 193: 189: 186: 185: 180: 176: 172: 148:1,435 mm 146: 144: 140: 135: 132: 121: 117: 112: 105: 100: 95: 86: 83: 75: 65: 61: 55: 54: 48: 43: 34: 33: 30: 19: 2584: 2577: 2504: 2485: 2466: 2447: 2428: 2420: 2400:. Retrieved 2382: 2376: 2364:. Retrieved 2359: 2349: 2337:. Retrieved 2330: 2320: 2308:. Retrieved 2303: 2293: 2281:. Retrieved 2276: 2267: 2255:. Retrieved 2248: 2238: 2226:. Retrieved 2221: 2212: 2200:. Retrieved 2189: 2177:. Retrieved 2172: 2162: 2150:. Retrieved 2145: 2135: 2123:. Retrieved 2113: 2101:. Retrieved 2095: 2085: 2073:. Retrieved 2069:the original 2051: 2039:. Retrieved 2032: 2023: 2011:. Retrieved 2005: 1995: 1983:. Retrieved 1973: 1961:. Retrieved 1951: 1932: 1911:. Retrieved 1907: 1898: 1886:. Retrieved 1879: 1870: 1846: 1837: 1828: 1809: 1791: 1752:New Brighton 1728: 1723: 1721: 1709: 1699: 1675: 1666: 1662: 1654: 1646: 1604: 1600: 1597:drop-centres 1596: 1588: 1586: 1582: 1554: 1542: 1532:October 2010 1529: 1525:adding to it 1520: 1474: 1470: 1452: 1443: 1439: 1435: 1418: 1414: 1410: 1389: 1385: 1376: 1372: 1368: 1364: 1350: 1346: 1342: 1334: 1330: 1315: 1311: 1307: 1298: 1294: 1290: 1286: 1278: 1274: 1270: 1267: 1263: 1255: 1251: 1247: 1243: 1239: 1230: 1217: 1205: 1192: 1188: 1155: 1151: 1144: 1124: 1109: 1102: 1093: 1085: 1073: 1069: 1056: 1052: 1048: 1039: 1027: 1019:Burnham Camp 1014:World War II 1011: 1007: 995: 987: 970: 966: 954: 938: 934: 926: 923:, circa 1905 905: 893:trolley wire 888: 886: 882: 879: 875: 871: 867: 853: 837: 833: 828:New Brighton 825: 817: 806: 802: 783: 779: 762: 746:Little River 743: 729:Christchurch 726: 722: 711: 703: 674: 667: 659:Christchurch 654: 652: 620:Route length 590:Operator(s) 535:Route length 496:Operator(s) 475:Operational 409:Route length 352:Operator(s) 337:(15) Railway 319:(5) Brighton 313:(2) Cashmere 269:Route length 231:Operator(s) 208:Lincoln Road 78: 69: 50: 29: 2606: / 2339:14 December 2228:11 February 2125:10 November 2103:10 November 2075:19 February 2041:13 February 2013:29 February 1888:13 February 1712:tram-trains 1589:drop-centre 1477:substations 1449:Electricity 1338:track gauge 1185:Tram driver 1099:Disposition 962:Australasia 864:Early years 663:horse trams 598:Propulsion 504:Propulsion 360:Propulsion 311:(1) Papanui 247:Propulsion 143:Track gauge 64:introducing 2621:Categories 2594:172°38′4″E 2310:18 October 2283:18 October 2257:18 October 2202:2 February 2179:18 October 2152:18 October 1985:24 October 1963:24 October 1802:References 1716:heavy rail 1705:Bob Parker 1690:light rail 1489:rectifiers 1157:vehicles. 1128:Stephenson 1119:See also: 698:See also: 694:Background 687:See also: 445:27,265,157 437:22,710,855 429:24,592,998 333:(13) Opawa 315:(3) Sumner 47:references 2402:12 August 2366:12 August 2360:The Press 2332:The Press 2304:The Press 2277:The Press 2250:The Press 2173:The Press 2146:The Press 2097:The Press 2057:Gehl, Jan 2007:The Press 1881:The Press 1863:Footnotes 1855:1171-4298 1769:Ferrymead 1744:Lyttelton 1722:The 2010 1605:Boon cars 1601:Boon cars 1577:coachwork 1573:cast iron 1561:facsimile 1276:success. 1227:Operators 1196:Melbourne 1105:Riccarton 974:Fendalton 889:The Press 813:Heathcote 754:4 ft 706:Lyttelton 604:Electric 600:system(s) 582:Owner(s) 506:system(s) 488:Owner(s) 442:1950–1951 434:1940–1941 426:1920–1921 390:Depot(s) 362:system(s) 344:Owner(s) 258:Depot(s) 249:system(s) 215:Owner(s) 114:Operation 2059:(2010). 1913:24 March 1758:See also 1678:Jan Gehl 1636:and the 1634:John Key 1557:horsecar 1499:Vehicles 1220:Jan Gehl 1213:Re:START 978:Spreydon 897:sleepers 849:Cashmere 845:Sydenham 809:Woolston 733:Rangiora 638:Website 544:Website 528:catenary 384:catenary 200:Cashmere 166: in 1700:Former 1569:hickory 1088:England 1009:buses. 683:History 574:Routes 566:Status 480:Routes 472:Status 308:Routes 303:Closed 300:Status 198:Papanui 195:Routes 190:Closed 187:Status 161:⁄ 60:improve 2511:  2492:  2473:  2454:  2435:  2393:  1939:  1853:  1816:  1750:, and 1740:Hornby 1611:Future 1593:bogies 1407:Horses 1132:Kitson 1045:Demise 958:Sydney 911:Heyday 718:Sumner 202:Sumner 128:  119:Locale 49:, but 2387:(PDF) 1908:NZETC 1785:Notes 1686:trams 1485:hydro 1424:Steam 901:metal 2509:ISBN 2490:ISBN 2471:ISBN 2452:ISBN 2433:ISBN 2404:2011 2391:ISBN 2368:2011 2341:2010 2312:2010 2285:2010 2259:2010 2230:2015 2204:2012 2181:2010 2154:2010 2127:2016 2105:2016 2077:2010 2043:2010 2015:2016 1987:2010 1965:2010 1937:ISBN 1915:2020 1890:2010 1851:ISSN 1814:ISBN 1567:and 1021:and 1003:wyes 976:and 653:The 520:600 376:600 1599:or 1565:oak 1527:. 1001:or 960:in 768:'s 2623:: 2358:. 2329:. 2302:. 2275:. 2247:. 2220:. 2171:. 2144:. 2094:. 2063:. 2031:. 2004:. 1923:^ 1906:. 1878:. 1793:^* 1746:, 1742:, 1738:, 1660:. 1640:, 1481:AC 980:. 964:. 823:. 525:DC 381:DC 168:) 2515:. 2498:. 2479:. 2460:. 2441:. 2406:. 2370:. 2343:. 2314:. 2287:. 2261:. 2232:. 2206:. 2183:. 2156:. 2129:. 2107:. 2079:. 2045:. 2017:. 1989:. 1967:. 1945:. 1917:. 1892:. 1857:. 1822:. 1688:/ 1534:) 1530:( 756:( 522:V 378:V 163:2 159:1 156:+ 154:8 150:( 85:) 79:( 74:) 70:( 56:. 20:)

Index

Christchurch Tram
references
inline citations
improve
introducing
Learn how and when to remove this message

Christchurch, New Zealand
Track gauge
standard gauge
Route length

Electrification
V
DC
catenary
Track length (total)
Route length

Electrification
V
DC
catenary
Route length

Electrification
Route length

www.tram.co.nz https://www.christchurchattractions.nz/christchurch-tram/
Christchurch

Text is available under the Creative Commons Attribution-ShareAlike License. Additional terms may apply.

↑