in the power line or transformer field. With two transmission lines in the direction of TS Mostar 3 and one in the direction of HPP PeruÄica, the plant is connected to the 220 kV network, via 400/220 kV transformers with a 400 MVA autotransformer and 220/110 kV with a 150 MVA autotransformer with a 400 kV network and a 110 kV network. . The center of the technical information system of the TrebiÅ”njica
Hydroelectric Power Plant and the hub of the radio and HF telecommunication systems are located in the switchyard.
477:
402:
waters during operation is carried out by an open side overflow of two fields with two segmental closures, which is located on the left side of the dam. A bypass tunnel at the bottom of the right side of the dam can also be used for the eventual need for urgent emptying of the reservoir. 2 main outlets pass through the body of the dam, each with a diameter of 2.5 meters, symmetrically placed on the axis of the dam.
505:
63:
491:
40:
410:
Electric energy produced in HPP Trebinje I and HPP Dubrovnik is transmitted with two connecting transmission lines each to the 220 kV busbars of the
Trebinje plant. The 220 kV plant was built with two bus systems using the mixed phase method. The connecting field enables the replacement of any switch
401:
The hydroelectric power plant is from the
Pribran region and uses the water of the reservoir BileÄ Lake. The GranÄarevo arch dam is double-curved with a perimeter joint. The excavation of the foundation of the dam is 230,000 m3, and the volume of embedded concrete is 376,000 m3. Evacuation of large
419:
The machine hall is located 35 meters downstream from the dam, from which it is separated only by the plateau of the 220 kV outlet from the power plant. It consists of turbine and generator space, rooms for diffuser shutters, control, assembly platform, as well as auxiliary rooms.
436:
Building is 123 m in height and 439 meters in length in crown. Thickness of the dam at the bottom is 27 and at the top 4.60 meters. Reservoir volume is 1280 hm3 of surface area, at full capacity is 2764 ha. Maximum height difference, the
736:
716:
55:
726:
741:
721:
393:
power generation at
Trebinje-1 HPP. The dam was completed in 1967 and its 180 MW power station, A smaller 8 MW power station, Treblinje-2, was completed downstream in 1979.
428:
Number of aggregates installed is 3, powered with 3 x60 MW (180 MW) Francis turbines; network voltage is 220 kV, with average annual production in excess of 370 ā 420 GWh
706:
108:
691:
450:
518:
696:
458:
482:
659:
381:. At the height of 123 m (404 ft), GranÄarevo dam is the tallest dam in the country. Its reservoir,
731:
510:
366:
147:
82:
358:
354:
208:
92:
538:
701:
327:
633:
711:
539:"Countries, regions, transboundary river basins (select "Bosnia and Herzegovina" and "Dams")"
438:
370:
350:
291:
462:
255:
382:
301:
685:
390:
386:
311:
143:
496:
385:, is the largest by volume in Bosnia and Herzegovina as well. The dam provides for
320:
504:
454:
608:
582:
663:
560:
472:
17:
123:
110:
490:
70:
Location of
Trebinje-1 Hydroelectric Power Station in Bosnia and Herzegovina
39:
378:
362:
198:
96:
563:(in Croatian). Electric Power Industry of the Republic of Serbian
317:
193:
62:
457:, was commissioned in 1968. The river TrebiŔnjca also powers
717:
453:, using TrebiŔnjica waters through compensation basin
637:
737:
TrebiŔnjica river damming and regulation controversy
461:
in
Croatia, which receiving TrebiŔnjica waters from
326:
310:
300:
290:
282:
277:
269:
261:
251:
246:
238:
230:
222:
214:
204:
192:
187:
179:
161:
153:
139:
102:
88:
78:
32:
727:Lower Horizons Hydroelectric Power Stations System
742:Hydroelectric power stations in the Neretva basin
465:across the state border via derivation tunnel.
722:1968 establishments in Bosnia and Herzegovina
265:1,280,000,000 m (1,040,000 acreā
ft)
8:
441:, is 52 m with concentrated fall of 100 m.
273:1,082,000,000 m (877,000 acreā
ft)
38:
29:
377:type of facility with a large GranÄarevo
707:Energy infrastructure completed in 1968
530:
519:Trebinje-2 Hydroelectric Power Station
347:Trebinje-1 Hydroelectric Power Station
343:Trebinje I Hydroelectric Power Station
278:Trebinje-1 Hydroelectric Power Station
44:Trebinje-1 Hydroelectric Power Station
33:Trebinje-1 Hydroelectric Power Station
459:Dubrovnik Hydroelectric Power Station
7:
561:"Hydroelectric power on TrebiŔnjici"
451:Äapljina Hydroelectric Power Station
27:Dam in Gornje GranÄarevo, Trebinje
25:
445:Äapljina and Dubrovnik facilities
503:
489:
475:
61:
54:
351:hydroelectric power plant (HPP)
692:Dams in Bosnia and Herzegovina
1:
483:Bosnia and Herzegovina portal
183:1968 (1975 expanded capacity)
449:Reversible (pumped-storage)
167:; 57 years ago
758:
613:www.elektroenergetika.info
587:www.elektroenergetika.info
306:104.5 m (343 ft)
226:439 m (1,440 ft)
336:
124:42.7339306Ā°N 18.4968250Ā°E
49:
37:
218:123 m (404 ft)
511:Renewable energy portal
361:in the municipality of
328:Installed capacity
234:4.6 m (15 ft)
162:Construction began
697:Dams completed in 1967
367:Bosnia and Herzegovina
242:27 m (89 ft)
148:Electricity generation
129:42.7339306; 18.4968250
83:Bosnia and Herzegovina
194:Type of dam
541:. United Nations FAO
369:. Trebinje-1 HPP is
283:Commission date
270:Active capacity
262:Total capacity
120: /
609:"EE SISTEMI - BIH"
375:dam toe powerhouse
231:Width (crest)
359:Gornje GranÄarevo
355:TrebiŔnjica River
340:
339:
239:Width (base)
209:TrebiŔnjica River
188:Dam and spillways
180:Opening date
93:Gornje GranÄarevo
16:(Redirected from
749:
676:
675:
673:
671:
666:on 1 August 2013
662:. Archived from
656:
650:
649:
647:
645:
640:on 18 April 2017
636:. Archived from
630:
624:
623:
621:
619:
605:
599:
598:
596:
594:
579:
573:
572:
570:
568:
557:
551:
550:
548:
546:
535:
513:
508:
507:
499:
494:
493:
485:
480:
479:
478:
175:
173:
168:
135:
134:
132:
131:
130:
125:
121:
118:
117:
116:
113:
65:
64:
58:
42:
30:
21:
757:
756:
752:
751:
750:
748:
747:
746:
682:
681:
680:
679:
669:
667:
660:"HE Trebinje I"
658:
657:
653:
643:
641:
632:
631:
627:
617:
615:
607:
606:
602:
592:
590:
581:
580:
576:
566:
564:
559:
558:
554:
544:
542:
537:
536:
532:
527:
509:
502:
495:
488:
481:
476:
474:
471:
463:Trebinjsko Lake
447:
434:
426:
417:
415:Characteristics
408:
399:
171:
169:
166:
128:
126:
122:
119:
114:
111:
109:
107:
106:
74:
73:
72:
71:
68:
67:
66:
45:
28:
23:
22:
15:
12:
11:
5:
755:
753:
745:
744:
739:
734:
729:
724:
719:
714:
709:
704:
699:
694:
684:
683:
678:
677:
651:
625:
600:
574:
552:
529:
528:
526:
523:
522:
521:
515:
514:
500:
486:
470:
467:
446:
443:
433:
430:
425:
422:
416:
413:
407:
404:
398:
395:
338:
337:
334:
333:
330:
324:
323:
314:
308:
307:
304:
302:Hydraulic head
298:
297:
294:
288:
287:
284:
280:
279:
275:
274:
271:
267:
266:
263:
259:
258:
253:
249:
248:
244:
243:
240:
236:
235:
232:
228:
227:
224:
220:
219:
216:
212:
211:
206:
202:
201:
196:
190:
189:
185:
184:
181:
177:
176:
163:
159:
158:
155:
151:
150:
141:
137:
136:
104:
100:
99:
90:
86:
85:
80:
76:
75:
69:
60:
59:
53:
52:
51:
50:
47:
46:
43:
35:
34:
26:
24:
18:GranÄarevo Dam
14:
13:
10:
9:
6:
4:
3:
2:
754:
743:
740:
738:
735:
733:
730:
728:
725:
723:
720:
718:
715:
713:
710:
708:
705:
703:
700:
698:
695:
693:
690:
689:
687:
665:
661:
655:
652:
639:
635:
629:
626:
614:
610:
604:
601:
588:
584:
578:
575:
562:
556:
553:
540:
534:
531:
524:
520:
517:
516:
512:
506:
501:
498:
492:
487:
484:
473:
468:
466:
464:
460:
456:
452:
444:
442:
440:
431:
429:
423:
421:
414:
412:
405:
403:
396:
394:
392:
391:hydroelectric
388:
387:flood control
384:
380:
376:
372:
368:
364:
360:
356:
352:
348:
344:
335:
331:
329:
325:
322:
319:
315:
313:
309:
305:
303:
299:
295:
293:
289:
285:
281:
276:
272:
268:
264:
260:
257:
254:
250:
245:
241:
237:
233:
229:
225:
221:
217:
213:
210:
207:
203:
200:
197:
195:
191:
186:
182:
178:
164:
160:
156:
152:
149:
145:
144:Flood control
142:
138:
133:
115:18Ā°29ā²48.57ā³E
105:
101:
98:
94:
91:
87:
84:
81:
77:
57:
48:
41:
36:
31:
19:
668:. Retrieved
664:the original
654:
642:. Retrieved
638:the original
628:
616:. Retrieved
612:
603:
591:. Retrieved
589:(in Bosnian)
586:
577:
565:. Retrieved
555:
543:. Retrieved
533:
497:Water portal
448:
435:
432:Dam and lake
427:
418:
409:
400:
374:
371:accumulation
346:
342:
341:
321:Francis-type
296:Conventional
256:BileÄko Lake
112:42Ā°44ā²2.15ā³N
732:TrebiŔnjica
455:Lake Vrutak
424:Power plant
383:BileÄa Lake
316:2x54, 1x63
157:Operational
127: /
103:Coordinates
686:Categories
525:References
406:Substation
702:Arch dams
593:24 August
397:Reservoir
247:Reservoir
712:Trebinje
583:"HE BIH"
469:See also
379:arch dam
363:Trebinje
312:Turbines
205:Impounds
199:Arch dam
97:Trebinje
89:Location
670:7 April
644:7 April
353:on the
252:Creates
170: (
140:Purpose
79:Country
618:7 June
567:27 May
545:27 May
332:180 MW
223:Length
215:Height
154:Status
634:"HET"
373:with
357:near
672:2017
646:2017
620:2024
595:2018
569:2014
547:2014
439:head
389:and
292:Type
286:1968
172:1967
165:1967
365:in
349:is
345:or
688::
611:.
585:.
318:MW
146:,
95:,
674:.
648:.
622:.
597:.
571:.
549:.
174:)
20:)
Text is available under the Creative Commons Attribution-ShareAlike License. Additional terms may apply.