300:
314:
328:
274:
In April 2020, the company submitted three planning applications for onshore construction in Wales. The project still required planning permission and marine licences in both the United
Kingdom and in Ireland, but the process of procuring construction contracts had started.
278:
In March 2021, the project was granted a licence to install the sea cable in UK waters, with a similar licence for Irish waters still pending. As of March 2021, commissioning of the interconnector was planned for the end of 2023.
774:
206:
Offshore construction commenced in May 2022. Construction and trial operation was completed in August 2024. Testing of the link is expected to commence in
November 2024 and it expected to be in operation by mid-December.
685:
744:
764:
749:
779:
759:
695:
479:
769:
356:
604:
580:
288:
As of
September 2022, work had started on the cable route from Great Island to Baginbun with completion of the project now expected in 2024.
634:
754:
433:
351:
220:
365:
346:
236:
183:
239:
in Wales. The total length will be 200 km (120 miles), of which 160 km (100 miles) will be under the sea.
724:
658:
451:
405:
551:
69:
375:
305:
187:
105:
500:
361:
248:
224:
690:
341:
610:
603:
232:
319:
228:
191:
43:
738:
333:
195:
581:"Greenlink interconnector submits planning applications for onshore works in Wales"
686:"Greenlink Interconnector works 'vital' to sustainable energy supply in Wexford"
295:
480:"Construction begins on converter station for €400m Greenlink Interconnector"
526:
327:
285:
In March 2022, the company announced that it had reached financial close.
271:
Subsea surveys were undertaken in 2018, and public consultations in 2019.
223:
Pembroke substation in
Pembrokeshire, with the cable making landfall at
216:
39:
729:
605:"Element Power's Greenlink interconnector energises Partners Group"
282:
In
January 2022, construction work on converter stations started.
775:
Proposed electric power infrastructure in the
Republic of Ireland
115:
745:
Electrical interconnectors to and from the island of
Ireland
719:
635:"Greenlink gets the greenlight from Natural Resources Wales"
765:
Electric power infrastructure in the
Republic of Ireland
750:
Electrical interconnectors to and from Great
Britain
474:
472:
157:
141:
129:
121:
111:
101:
96:
88:
83:
75:
65:
57:
49:
35:
30:
18:
659:"Greenlink Interconnector reaches financial close"
452:"Greenlink Interconnector reaches financial close"
219:'s Great Island substation in County Wexford, and
25:County Wexford, Ireland and Pembrokeshire, Wales
780:Proposed electric power infrastructure in Wales
552:"TEN-E Regulation Information Brochure Issue 3"
382:MW cable project to connect Ireland and France
8:
760:Proposed electric power transmission systems
521:
519:
517:
501:"Sumitomo completes Greenlink cable system"
663:Greenlink Interconnector – Press releases
357:Electricity sector in the United Kingdom
259:MW. The project is expected to cost €400
392:
372:MW interconnectors across the Irish Sea
247:The HVDC link is to be configured as a
770:Electric power infrastructure in Wales
428:
426:
15:
7:
400:
398:
396:
730:Planning and consultation documents
255:kV, and nominal power rating of 500
725:Information brochure: October 2021
602:Connolly, Philip (17 March 2019).
14:
326:
312:
298:
1:
352:Electricity sector in Ireland
347:Energy in the United Kingdom
684:Looby, David (2022-09-12).
633:Russell, Tom (2021-03-03).
458:(Press release). 2022-03-21
215:The cable will run between
190:under construction between
184:high-voltage direct current
796:
665:. Greenlink. 21 March 2022
583:. Greenlink. 22 April 2020
406:"Greenlink Interconnector"
251:, with DC voltages of ±320
125:190 km (120 mi)
23:
531:Greenlink Interconnector
366:East–West Interconnector
84:Construction information
19:Greenlink Interconnector
755:HVDC transmission lines
527:"The Project: Overview"
434:"REMIT Message Details"
376:Celtic Interconnector
306:United Kingdom portal
188:submarine power cable
97:Technical information
440:. 13 September 2024.
362:Moyle Interconnector
249:symmetrical monopole
70:St George's Channel
231:in Ireland and at
691:Irish Independent
342:Energy in Ireland
169:
168:
50:General direction
787:
707:
706:
704:
703:
694:. Archived from
681:
675:
674:
672:
670:
655:
649:
648:
646:
645:
630:
624:
623:
621:
619:
611:The Sunday Times
607:
599:
593:
592:
590:
588:
577:
571:
570:
568:
566:
556:
548:
542:
541:
539:
537:
523:
512:
511:
509:
508:
497:
491:
490:
488:
487:
476:
467:
466:
464:
463:
448:
442:
441:
430:
421:
420:
418:
416:
402:
381:
371:
336:
331:
330:
322:
317:
316:
315:
308:
303:
302:
301:
262:
258:
254:
181:
177:
164:
152:
148:
136:
16:
795:
794:
790:
789:
788:
786:
785:
784:
735:
734:
720:Company website
716:
711:
710:
701:
699:
683:
682:
678:
668:
666:
657:
656:
652:
643:
641:
632:
631:
627:
617:
615:
601:
600:
596:
586:
584:
579:
578:
574:
564:
562:
554:
550:
549:
545:
535:
533:
525:
524:
515:
506:
504:
499:
498:
494:
485:
483:
478:
477:
470:
461:
459:
450:
449:
445:
432:
431:
424:
414:
412:
404:
403:
394:
389:
379:
369:
332:
325:
318:
313:
311:
304:
299:
297:
294:
269:
267:Project history
260:
256:
252:
245:
233:Freshwater West
221:National Grid's
213:
204:
194:in Ireland and
179:
175:
162:
150:
146:
134:
112:Type of current
106:Submarine cable
26:
12:
11:
5:
793:
791:
783:
782:
777:
772:
767:
762:
757:
752:
747:
737:
736:
733:
732:
727:
722:
715:
714:External links
712:
709:
708:
676:
650:
625:
594:
572:
543:
513:
492:
468:
443:
422:
391:
390:
388:
385:
384:
383:
373:
368:, existing 500
359:
354:
349:
344:
338:
337:
323:
320:Ireland portal
309:
293:
290:
268:
265:
244:
241:
229:Fethard-on-Sea
225:Baginbun Beach
212:
209:
203:
202:Project status
200:
192:County Wexford
167:
166:
159:
155:
154:
143:
139:
138:
131:
127:
126:
123:
119:
118:
113:
109:
108:
103:
99:
98:
94:
93:
90:
86:
85:
81:
80:
77:
73:
72:
67:
66:Passes through
63:
62:
59:
55:
54:
51:
47:
46:
44:United Kingdom
37:
33:
32:
28:
27:
24:
21:
20:
13:
10:
9:
6:
4:
3:
2:
792:
781:
778:
776:
773:
771:
768:
766:
763:
761:
758:
756:
753:
751:
748:
746:
743:
742:
740:
731:
728:
726:
723:
721:
718:
717:
713:
698:on 2022-09-13
697:
693:
692:
687:
680:
677:
664:
660:
654:
651:
640:
639:coffshore.com
636:
629:
626:
613:
612:
606:
598:
595:
582:
576:
573:
560:
553:
547:
544:
532:
528:
522:
520:
518:
514:
502:
496:
493:
481:
475:
473:
469:
457:
453:
447:
444:
439:
435:
429:
427:
423:
411:
407:
401:
399:
397:
393:
386:
377:
374:
367:
363:
360:
358:
355:
353:
350:
348:
345:
343:
340:
339:
335:
334:Energy portal
329:
324:
321:
310:
307:
296:
291:
289:
286:
283:
280:
276:
272:
266:
264:
250:
243:Specification
242:
240:
238:
234:
230:
226:
222:
218:
210:
208:
201:
199:
197:
196:Pembrokeshire
193:
189:
185:
173:
160:
156:
144:
140:
132:
128:
124:
120:
117:
114:
110:
107:
104:
100:
95:
92:December 2024
91:
87:
82:
78:
74:
71:
68:
64:
60:
56:
52:
48:
45:
41:
38:
34:
29:
22:
17:
700:. Retrieved
696:the original
689:
679:
667:. Retrieved
662:
653:
642:. Retrieved
638:
628:
616:. Retrieved
609:
597:
585:. Retrieved
575:
563:. Retrieved
558:
546:
534:. Retrieved
530:
505:. Retrieved
503:. 2024-08-23
495:
484:. Retrieved
482:. 2022-02-02
460:. Retrieved
456:greenlink.ie
455:
446:
437:
413:. Retrieved
409:
287:
284:
281:
277:
273:
270:
246:
237:Castlemartin
214:
205:
171:
170:
153:kV (Ireland)
149:kV (UK); 220
130:Power rating
122:Total length
565:11 November
561:. June 2019
235:beach near
178:km long 500
739:Categories
702:2022-09-13
644:2021-03-04
618:24 October
536:24 October
507:2024-08-24
486:2022-03-19
462:2023-09-07
415:24 October
410:4Coffshore
387:References
198:in Wales.
158:DC voltage
142:AC voltage
559:Greenlink
263:million.
172:Greenlink
53:east-west
614:. London
292:See also
174:is a 190
89:Expected
31:Location
217:EirGrid
186:(HVDC)
61:Ireland
40:Ireland
36:Country
669:23 May
587:4 June
438:Elexon
380:
370:
261:
257:
253:
180:
176:
163:
151:
147:
135:
555:(PDF)
378:, 700
227:near
211:Route
79:Wales
671:2022
620:2019
589:2020
567:2019
538:2019
417:2019
364:and
116:HVDC
102:Type
58:From
182:MW
161:320
145:400
133:500
741::
688:.
661:.
637:.
608:.
557:.
529:.
516:^
471:^
454:.
436:.
425:^
408:.
395:^
165:kV
137:MW
76:To
42:,
705:.
673:.
647:.
622:.
591:.
569:.
540:.
510:.
489:.
465:.
419:.
Text is available under the Creative Commons Attribution-ShareAlike License. Additional terms may apply.