Huntly Power Station

Source 📝

1571: 31: 313:, a publicly listed company (currently 51% owned by the NZ Government). The station has five operational generating units – three 250 MW coal-and-gas-fired steam turbine units, a 50 MW gas peaking plant, and a 403 MW combined cycle gas turbine plant. The station also plays an important role in voltage support for the Northland, Auckland and Waikato regions. 405:), specifying the quantity of water that can be removed by the station along with the maximum temperature of the water when returned to the river (25 °C). These conditions mean that on very hot summer days the station cannot operate at maximum capacity, and has sometimes effectively been shut down. A new 493:
mitigation and energy policies was seen by the operator as a sign that the plant might have to be closed by 2015 under these plans, with around 10 years of design life still remaining. It was also noted that, apart from being difficult to replace as a source of power (due to New Zealand's annually
788:
New Zealand has only one coal-fired power station, which is the 1000 MW Huntly Power Station in the North Island. The use of this had been scaled back in 2007 in favour of gas, however, the plant was pushed into use again by a particularly dry winter in 2008 impacting on hydroelectricity
348:(CCGT) plant was commissioned. This plant increased the total generating capacity of Huntly by 403 MW (250 MW gas turbine + 153 MW steam turbine). The new turbine represented an investment of NZ$ 520 million and it increased the total installed capacity to 1453 MW. 362:
In December 2012, Genesis Energy placed one of the four Huntly Power Station 250 MW units into long-term storage. The second coal-fired 250 MW unit was permanently retired in June 2015 after being placed in storage (with a 90 day return to service) in 2013.
366:
In February 2021, a third 250 MW unit was brought back online to assist with drought and gas shortages and made available until September 2021. Most of the coal it is burning is imported from Indonesia, with much of it coming to Huntly by truck from
504:
In April 2016, Genesis Energy announced that the Huntly Power Station would continue operation of its two remaining coal / gas burning units until December 2022. The two gas turbine generators would continue to operate into the future.
383:
The four 250 MW units were constructed as dual fuel, able to operate on natural gas from Taranaki or coal from the nearby Rotowaro coal mine. A 10 km conveyor belt was constructed to carry coal from the mine to the power station.
642: 1040: 508:
Company chief executive Marc England has stated "By 2025, Genesis will only use coal in its thermal units in abnormal market conditions, and it is our intent to remove coal completely by 2030".
1324: 334:, giving a historical generating capacity of 1000 MW. Its chimneys are 150 metres high and each chimney has two flues that are 7 metres in diameter. The plant uses a reheat steam cycle, with 387:
Previous to the substitution of coal, Huntly used gas from the fields to power the generation of the main units as well, but these were switched in the 1990s because of dwindling resources.
713: 394:. The gas is transmitted along the 307 km, 750 mm diameter Maui gas pipeline from Oaonui production station near Opunake, which was commissioned in 1979 to supply the station. 1649: 1075: 1644: 326:
Each of the four original generating units, which are capable of burning either coal or gas, installed in stages between 1973 and 1985, is capable of generating 250 MW (
1226: 1058: 1317: 1669: 1140: 717: 852: 1018: 875: 818: 749: 1654: 1044: 835: 1664: 1310: 721: 699: 501:
In May 2012, resource consent was granted by the Waikato Regional Council to continue running the gas and coal units for a period of 25 years.
997:
The coal-burning Huntly power station on the Waikato river is responsible for over half of New Zealand's emissions from electricity generation
1107: 902: 578: 1219: 72: 1121: 1178: 568: 409:
has been built as part of expansion works at the site, which allows one 250 MW unit to run at full load even during such times.
1212: 1093: 270: 516: 401:
for cooling. However, in order to protect aquatic life, conditions are imposed by the resource consent (issued under the
1659: 402: 928: 1414: 583: 470: 433: 418: 801: 954: 739: 195: 1419: 771: 335: 980: 528: 482: 352: 1010: 689: 1517: 1472: 498:), such a decision would also be uneconomical for the foreseeable future, even if coal prices were to rise. 341:
In 2004 the power station was upgraded with the addition of a 50 MW gas turbine plant, and in 2007 the
461:
a double circuit line (HLY-DEV A) to the Ohinewai switching station, where it connects with the Otahuhu to
359:. In 2007, the plant was mainly gas-fired, but a dry winter in 2008 prompted more coal thermal generation. 1613: 1591: 1585: 1492: 1482: 1477: 1449: 1434: 1333: 1249: 1235: 1198: 1014: 744: 694: 668: 621: 573: 441: 310: 132: 1173:. Wellington: Bridget Williams Books Ltd and Electricity Corporation of New Zealand. pp. 316 pages. 1556: 1512: 1507: 1502: 1497: 1487: 1467: 1444: 1439: 1429: 1286: 429: 294: 112: 1424: 1391: 1270: 1409: 302: 56: 906: 425:, New Zealand's largest city, which lies 95 kilometres (59 mi) to the north of the station. 212: 1302: 1291: 1174: 1076:"Genesis Energy Limited (GNE) announces timetable to end coal-fired generation in New Zealand" 368: 35:
Huntly Power Station in 2005, with the four steam turbine units (two operational as of 2017).
1570: 1535: 1459: 1401: 486: 372: 1623: 1551: 880: 643:"Waikato and Upper North Island Voltage Management Investigation - Long List Consultation" 535: 445: 222: 489:
and has been the focus of associated protests. A 2006 government report outlining future
417:
The majority of the energy generated at Huntly Power Station is transmitted through the
1618: 1608: 545: 490: 342: 232: 165: 1171:
People, Power and Power Stations: Electric Power Generation in New Zealand 1880 – 1990
1638: 406: 398: 355:
of 85% and was providing a large amount of the baseload energy needs of the northern
455: 432:
switchyard and six 220 kV transmission circuits carried on three high capacity
30: 356: 544:
The power station is featured as an external setting for the 2002 television film
984: 1372: 345: 331: 298: 147: 1527: 469:
The Huntly switchyard also includes a grid exit point for supply to the local
449: 87: 74: 1141:"Purple Pilgrims: The Kiwi sisters conquering the world from the Coromandel" 932: 853:"Genesis To Make Third Rankine Available To Cover Drought And Gas Shortages" 588: 549: 462: 983:. Office of the Prime Minister’s Science Advisory Committee. Archived from 775: 1204: 1194: 495: 422: 391: 327: 251: 617: 279: 1337: 512: 306: 60: 559:, where it was added on February 23, 2023 as part of a free update. 390:
Natural gas to power units 5 and 6 comes from several gas fields in
876:"Budget's carbon savings equal about five days coal use at Huntly" 714:"Genesis 385MW gas-fired power station nears completion at Huntly" 931:. Gas Industry Company. December 2016. p. 92. Archived from 428:
Huntly is connected to the rest of the national grid via a large
1353: 157: 1306: 1208: 1122:"Saft to supply 200 MWh battery storage project in New Zealand" 673:
Speech at opening of Genesis Energy e3p power station, Huntly
485:
from electricity generation, has repeatedly drawn the ire of
548:, fictionally named as Hellman-Klein Nuclear Power Plant in 836:"Second Huntly coal/gas unit to be placed into storage" 774:. Coal Association of New Zealand. 2010. Archived from 534:
The Huntly Power Station features in the video for the
527:
In the online game ElectroCity, run by Genesis Energy,
690:"Protesters could be charged over power station climb" 1041:"Resource consents granted for Huntly Power Station" 772:"World Coal Institute Country Profile – New Zealand" 515:
over summer 2022/23, and ordered a 100 MW / 200 MWh
1601: 1578: 1544: 1526: 1458: 1400: 1371: 1352: 1345: 1279: 1258: 1242: 266: 246: 241: 231: 221: 211: 175: 164: 153: 143: 138: 128: 111: 103: 66: 52: 44: 23: 855:(Press release). Genesis Energy. 15 February 2021 481:The plant contributes over half of New Zealand's 1650:Natural gas-fired power stations in New Zealand 1064:(Press release). Genesis Energy. 28 April 2016. 824:(Press release). Genesis Energy. 29 June 2015. 802:"Genesis Power Limited Interim Report 2012/13" 458:substation in Auckland, via Drury and Takanini 1318: 1220: 1094:"Genesis Energy to phase out Huntly coal use" 1043:. Genesis Energy. 31 May 2012. Archived from 494:growing generation demand, especially around 338:turbines and Combustion Engineering boilers. 8: 669:"e3p leads the way towards a sustainable NZ" 1011:"Little gain for the power consumer's pain" 979:Professor Peter Gluckman (13 August 2009). 1349: 1325: 1311: 1303: 1227: 1213: 1205: 20: 1059:"Rankine units operational life extended" 1645:Coal-fired power stations in New Zealand 733: 731: 600: 271:Related media on Commons 960:. Transpower New Zealand Limited. 2017 702:from the original on 23 February 2013. 612: 610: 608: 606: 604: 1670:Brutalist architecture in New Zealand 579:List of power stations in New Zealand 454:a double circuit line (HLY-OTA-A) to 440:a double circuit line (HLY-TMN-A) to 7: 874:Pullar-Strecker, Tom (18 May 2021). 841:. Genesis Energy. 27 September 2013. 752:from the original on 24 October 2012 684: 682: 371:, while some comes by rail from the 1655:Buildings and structures in Waikato 1108:"Genesis Greenlane Letter template" 1092:Frykberg, Eric (14 February 2019). 955:"North Island Power System Diagram" 819:"Second stored coal unit to retire" 807:. Genesis Energy. 27 February 2013. 720:. 14 September 2006. Archived from 648:. Transpower New Zealand. July 2016 738:Fallow, Brian (6 September 2007). 436:. These transmission lines are: 14: 1665:1980s architecture in New Zealand 667:Trevor Mallard (31 August 2007). 569:Electricity sector in New Zealand 1569: 1139:Smithies, Grant (7 March 2020). 1081:. Genesis Energy. 6 August 2015. 1021:from the original on 4 June 2011 718:Ministry of Economic Development 397:The station uses water from the 139:Thermal power station 29: 1009:Fallow, Brian (13 April 2007). 555:It appears, fully modelled, in 905:. Solid Energy. Archived from 351:In 2007, Huntly operated at a 301:and is located in the town of 1: 483:emissions of greenhouse gases 413:Transmission and distribution 192:3× 250 MW steam turbine 1169:Martin, John E, ed. (1991). 473:network in the Huntly area. 207:1× 250 MW steam turbine 16:Power station in New Zealand 929:"The New Zealand Gas Story" 584:National Grid (New Zealand) 233:Annual net output 1686: 557:Microsoft Flight Simulator 1567: 675:. New Zealand Government. 531:take the form of Huntly. 529:coal-fired power stations 511:Genesis plans a trial of 276: 204:Units decommissioned 184: 180: 40: 28: 1346:Operating power stations 740:"Tough choices on power" 199:1× 50 MW open-cycle 1579:Decommissioned stations 538:song "Two Worlds Apart" 403:Resource Management Act 213:Nameplate capacity 1334:Electricity generation 1250:Tongariro Power Scheme 1236:Genesis Energy Limited 1199:Genesis Energy Limited 1015:The New Zealand Herald 745:The New Zealand Herald 695:The New Zealand Herald 622:Genesis Energy Limited 618:"Huntly Power Station" 574:Genesis Energy Limited 311:Genesis Energy Limited 189:Units operational 133:Genesis Energy Limited 88:37.54389°S 175.15278°E 1287:Castle Hill Wind Farm 1047:on 23 September 2012. 295:thermal power station 176:Power generation 1392:Te Rapa cogeneration 1271:Rodney Power Station 1266:Huntly Power Station 1195:Huntly Power Station 1128:. 19 September 2024. 698:. 26 February 2007. 448:, via Te Kowhai and 309:. It is operated by 291:Huntly Power Station 223:Capacity factor 113:Commission date 93:-37.54389; 175.15278 24:Huntly Power Station 1660:Huntly, New Zealand 987:on 20 December 2012 724:on 18 October 2008. 242:External links 166:Combined cycle 154:Secondary fuel 84: /  935:on 2 February 2017 778:on 6 February 2013 523:In popular culture 434:transmission lines 1632: 1631: 1565: 1564: 1300: 1299: 1292:Hau Nui Wind Farm 519:for winter 2026. 487:environmentalists 369:Ports of Auckland 287: 286: 144:Primary fuel 1677: 1573: 1350: 1327: 1320: 1313: 1304: 1229: 1222: 1215: 1206: 1184: 1156: 1155: 1153: 1151: 1136: 1130: 1129: 1118: 1112: 1111: 1104: 1098: 1097: 1089: 1083: 1082: 1080: 1072: 1066: 1065: 1063: 1055: 1049: 1048: 1037: 1031: 1030: 1028: 1026: 1006: 1000: 999: 994: 992: 981:"Climate change" 976: 970: 969: 967: 965: 959: 951: 945: 944: 942: 940: 925: 919: 918: 916: 914: 909:on 26 March 2017 899: 893: 892: 890: 888: 871: 865: 864: 862: 860: 849: 843: 842: 840: 832: 826: 825: 823: 815: 809: 808: 806: 798: 792: 791: 785: 783: 768: 762: 761: 759: 757: 735: 726: 725: 710: 704: 703: 686: 677: 676: 664: 658: 657: 655: 653: 647: 639: 633: 632: 630: 628: 614: 379:Fuel and coolant 373:Port of Tauranga 280:edit on Wikidata 262: 259: 257: 255: 253: 124: 122: 99: 98: 96: 95: 94: 89: 85: 82: 81: 80: 77: 33: 21: 1685: 1684: 1680: 1679: 1678: 1676: 1675: 1674: 1635: 1634: 1633: 1628: 1624:Meridian Energy 1597: 1574: 1561: 1552:Hauauru ma raki 1540: 1522: 1454: 1396: 1367: 1341: 1331: 1301: 1296: 1275: 1254: 1238: 1233: 1191: 1181: 1168: 1165: 1163:Further reading 1160: 1159: 1149: 1147: 1138: 1137: 1133: 1120: 1119: 1115: 1110:. October 2022. 1106: 1105: 1101: 1091: 1090: 1086: 1078: 1074: 1073: 1069: 1061: 1057: 1056: 1052: 1039: 1038: 1034: 1024: 1022: 1008: 1007: 1003: 990: 988: 978: 977: 973: 963: 961: 957: 953: 952: 948: 938: 936: 927: 926: 922: 912: 910: 903:"Rotowaro Mine" 901: 900: 896: 886: 884: 873: 872: 868: 858: 856: 851: 850: 846: 838: 834: 833: 829: 821: 817: 816: 812: 804: 800: 799: 795: 781: 779: 770: 769: 765: 755: 753: 737: 736: 729: 712: 711: 707: 688: 687: 680: 666: 665: 661: 651: 649: 645: 641: 640: 636: 626: 624: 616: 615: 602: 597: 565: 536:Purple Pilgrims 525: 479: 415: 381: 324: 319: 293:is the largest 283: 250: 198: 194:1× 403 MW 193: 120: 118: 92: 90: 86: 83: 78: 75: 73: 71: 70: 36: 17: 12: 11: 5: 1683: 1681: 1673: 1672: 1667: 1662: 1657: 1652: 1647: 1637: 1636: 1630: 1629: 1627: 1626: 1621: 1619:Mercury Energy 1616: 1614:Genesis Energy 1611: 1609:Contact Energy 1605: 1603: 1599: 1598: 1596: 1595: 1589: 1582: 1580: 1576: 1575: 1568: 1566: 1563: 1562: 1560: 1559: 1554: 1548: 1546: 1542: 1541: 1539: 1538: 1532: 1530: 1524: 1523: 1521: 1520: 1515: 1510: 1505: 1500: 1495: 1490: 1485: 1480: 1475: 1470: 1464: 1462: 1456: 1455: 1453: 1452: 1447: 1442: 1437: 1432: 1427: 1422: 1417: 1412: 1406: 1404: 1398: 1397: 1395: 1394: 1389: 1384: 1377: 1375: 1369: 1368: 1366: 1365: 1358: 1356: 1347: 1343: 1342: 1332: 1330: 1329: 1322: 1315: 1307: 1298: 1297: 1295: 1294: 1289: 1283: 1281: 1277: 1276: 1274: 1273: 1268: 1262: 1260: 1259:Power stations 1256: 1255: 1253: 1252: 1246: 1244: 1240: 1239: 1234: 1232: 1231: 1224: 1217: 1209: 1203: 1202: 1190: 1189:External links 1187: 1186: 1185: 1179: 1164: 1161: 1158: 1157: 1131: 1126:Energy Storage 1113: 1099: 1084: 1067: 1050: 1032: 1001: 971: 946: 920: 894: 866: 844: 827: 810: 793: 763: 727: 705: 678: 659: 634: 599: 598: 596: 593: 592: 591: 586: 581: 576: 571: 564: 561: 546:Atomic Twister 524: 521: 491:climate change 478: 475: 467: 466: 459: 452: 414: 411: 380: 377: 343:combined cycle 323: 320: 318: 315: 285: 284: 277: 274: 273: 268: 264: 263: 254:.genesisenergy 248: 244: 243: 239: 238: 235: 229: 228: 225: 219: 218: 215: 209: 208: 205: 201: 200: 190: 186: 185: 182: 181: 178: 177: 173: 172: 169: 162: 161: 155: 151: 150: 145: 141: 140: 136: 135: 130: 126: 125: 115: 109: 108: 105: 101: 100: 68: 64: 63: 54: 50: 49: 46: 42: 41: 38: 37: 34: 26: 25: 15: 13: 10: 9: 6: 4: 3: 2: 1682: 1671: 1668: 1666: 1663: 1661: 1658: 1656: 1653: 1651: 1648: 1646: 1643: 1642: 1640: 1625: 1622: 1620: 1617: 1615: 1612: 1610: 1607: 1606: 1604: 1600: 1593: 1590: 1587: 1584: 1583: 1581: 1577: 1572: 1558: 1555: 1553: 1550: 1549: 1547: 1543: 1537: 1534: 1533: 1531: 1529: 1525: 1519: 1516: 1514: 1511: 1509: 1506: 1504: 1501: 1499: 1496: 1494: 1491: 1489: 1486: 1484: 1481: 1479: 1476: 1474: 1471: 1469: 1466: 1465: 1463: 1461: 1460:Hydroelectric 1457: 1451: 1448: 1446: 1443: 1441: 1438: 1436: 1433: 1431: 1428: 1426: 1423: 1421: 1418: 1416: 1415:Nga Awa Purua 1413: 1411: 1408: 1407: 1405: 1403: 1399: 1393: 1390: 1388: 1385: 1382: 1379: 1378: 1376: 1374: 1370: 1363: 1360: 1359: 1357: 1355: 1351: 1348: 1344: 1339: 1335: 1328: 1323: 1321: 1316: 1314: 1309: 1308: 1305: 1293: 1290: 1288: 1285: 1284: 1282: 1278: 1272: 1269: 1267: 1264: 1263: 1261: 1257: 1251: 1248: 1247: 1245: 1243:Power schemes 1241: 1237: 1230: 1225: 1223: 1218: 1216: 1211: 1210: 1207: 1200: 1196: 1193: 1192: 1188: 1182: 1180:0-908912-16-1 1176: 1172: 1167: 1166: 1162: 1146: 1142: 1135: 1132: 1127: 1123: 1117: 1114: 1109: 1103: 1100: 1095: 1088: 1085: 1077: 1071: 1068: 1060: 1054: 1051: 1046: 1042: 1036: 1033: 1020: 1016: 1012: 1005: 1002: 998: 986: 982: 975: 972: 956: 950: 947: 934: 930: 924: 921: 908: 904: 898: 895: 883: 882: 877: 870: 867: 854: 848: 845: 837: 831: 828: 820: 814: 811: 803: 797: 794: 790: 777: 773: 767: 764: 751: 747: 746: 741: 734: 732: 728: 723: 719: 715: 709: 706: 701: 697: 696: 691: 685: 683: 679: 674: 670: 663: 660: 644: 638: 635: 623: 619: 613: 611: 609: 607: 605: 601: 594: 590: 587: 585: 582: 580: 577: 575: 572: 570: 567: 566: 562: 560: 558: 553: 551: 547: 542: 541: 537: 532: 530: 522: 520: 518: 514: 509: 506: 502: 499: 497: 492: 488: 484: 476: 474: 472: 464: 460: 457: 453: 451: 447: 443: 439: 438: 437: 435: 431: 426: 424: 420: 419:national grid 412: 410: 408: 407:cooling tower 404: 400: 399:Waikato River 395: 393: 388: 385: 378: 376: 374: 370: 364: 360: 358: 354: 349: 347: 344: 339: 337: 333: 329: 321: 316: 314: 312: 308: 304: 300: 296: 292: 281: 275: 272: 269: 265: 261: 249: 245: 240: 237:4991 GWh 236: 234: 230: 226: 224: 220: 216: 214: 210: 206: 203: 202: 197: 191: 188: 187: 183: 179: 174: 170: 167: 163: 159: 156: 152: 149: 146: 142: 137: 134: 131: 127: 116: 114: 110: 106: 102: 97: 69: 65: 62: 58: 55: 51: 47: 43: 39: 32: 27: 22: 19: 1386: 1380: 1361: 1265: 1170: 1148:. Retrieved 1144: 1134: 1125: 1116: 1102: 1087: 1070: 1053: 1045:the original 1035: 1023:. Retrieved 1004: 996: 989:. Retrieved 985:the original 974: 962:. Retrieved 949: 937:. Retrieved 933:the original 923: 911:. Retrieved 907:the original 897: 885:. Retrieved 879: 869: 857:. Retrieved 847: 830: 813: 796: 787: 780:. Retrieved 776:the original 766: 754:. Retrieved 743: 722:the original 708: 693: 672: 662: 650:. Retrieved 637: 625:. Retrieved 556: 554: 543: 539: 533: 526: 517:grid battery 510: 507: 503: 500: 480: 471:distribution 468: 427: 416: 396: 389: 386: 382: 365: 361: 357:North Island 350: 340: 325: 290: 288: 18: 1420:Ngatamariki 939:13 February 627:15 February 353:load factor 346:gas turbine 336:C A Parsons 332:electricity 299:New Zealand 217:953 MW 171:Unit 5 only 160:(units 1–4) 148:Natural gas 107:Operational 91: / 67:Coordinates 48:New Zealand 1639:Categories 1402:Geothermal 1387:Huntly 5-6 1383:(co-fires) 1381:Huntly 1-4 1364:(co-fires) 1362:Huntly 1-4 1280:Wind farms 1197:(from the 1150:13 October 1096:. RadioNZ. 789:production 595:References 450:Taumarunui 430:substation 322:Generation 79:175°9′10″E 76:37°32′38″S 1602:Companies 1518:Whakamaru 1473:Aratiatia 991:7 January 756:7 January 589:Marsden B 550:Tennessee 463:Whakamaru 442:Stratford 328:Megawatts 317:Operation 1592:Meremere 1586:Horahora 1545:Proposed 1493:Maraetai 1483:Karapiro 1478:Atiamuri 1450:Wairakei 1435:Rotokawa 1201:website) 1019:Archived 859:11 April 782:13 March 750:Archived 700:Archived 563:See also 513:bio-fuel 496:Auckland 446:Taranaki 423:Auckland 392:Taranaki 129:Owner(s) 53:Location 1588:(hydro) 1557:Tauhara 1513:Waipapa 1508:Tokaanu 1503:Rangipo 1498:Ohakuri 1488:Mangaio 1468:Arapuni 1445:Te Mihi 1440:Te Huka 1430:Poihipi 1338:Waikato 1336:in the 964:9 March 887:15 July 456:Ōtāhuhu 307:Waikato 305:in the 267:Commons 260:/assets 247:Website 119: ( 61:Waikato 45:Country 1594:(coal) 1536:Te Uku 1425:Ohaaki 1340:Region 1177:  913:14 May 477:Future 465:C line 303:Huntly 104:Status 57:Huntly 1410:Mokai 1145:Stuff 1079:(PDF) 1062:(PDF) 1025:4 May 958:(PDF) 881:Stuff 839:(PDF) 822:(PDF) 805:(PDF) 652:2 May 646:(PDF) 330:) of 278:[ 227:66.5% 1528:Wind 1354:Coal 1175:ISBN 1152:2020 1027:2007 993:2011 966:2017 941:2017 915:2017 889:2021 861:2021 784:2012 758:2011 654:2018 629:2019 289:The 196:CCGT 158:Coal 121:1982 117:1982 1373:Gas 444:in 421:to 297:in 258:.nz 256:.co 252:www 1641:: 1143:. 1124:. 1017:. 1013:. 995:. 878:. 786:. 748:. 742:. 730:^ 716:. 692:. 681:^ 671:. 620:. 603:^ 552:. 375:. 59:, 1326:e 1319:t 1312:v 1228:e 1221:t 1214:v 1183:. 1154:. 1029:. 968:. 943:. 917:. 891:. 863:. 760:. 656:. 631:. 540:. 282:] 168:? 123:)

Index


Huntly
Waikato
37°32′38″S 175°9′10″E / 37.54389°S 175.15278°E / -37.54389; 175.15278
Commission date
Genesis Energy Limited
Natural gas
Coal
Combined cycle
CCGT
Nameplate capacity
Capacity factor
Annual net output
www.genesisenergy.co.nz/assets
Related media on Commons
edit on Wikidata
thermal power station
New Zealand
Huntly
Waikato
Genesis Energy Limited
Megawatts
electricity
C A Parsons
combined cycle
gas turbine
load factor
North Island
Ports of Auckland
Port of Tauranga

Text is available under the Creative Commons Attribution-ShareAlike License. Additional terms may apply.