78: 104: 22: 150:
As of the 1 January 2018, electricity was generated by 184 small HPPs, with total installed capacity of 353 MW. In 2017 the generation of the electricity from small HPPs was around 862 million kW*h, which is about 11% of the total generated electricity in Armenia (7762 million kW*h). As of 1 January
446:
In 2010, the energy ministers of Armenia and Iran signed a document on the long-anticipated construction of two hydropower stations on the Arax River. The agreement stipulates that the $ 323 million project will be fundamentally financed and operated by Iran, 793 million kWh of energy transported to
962: 447:
Iran annually, and the stations transferred to Armenia's ownership 15 years later. Construction was expected to commence in 2011 and take five years to complete. By 2021, construction had not begun.
716: 891: 914: 151:
2018, and according to the provided licenses, 36 additional SHPPs are under construction, with about total projected 69 MW capacity and 250 million kW*h electricity annual supply.
435:, these projects would add a cumulative generation of 1,012 million kWh/year. The Meghri Hydro Power Plant is a joint Armenian-Iranian project slated to be constructed on the 170:
Armenia has nine hydroelectric power plants which together accounted for one third of its domestic electricity generation. The plants are grouped along two cascades: the
1030: 158:/year.From this amount, 1.500 GWh/year (or about 42% of economically justified hydropower potential) has been developed already.Six of the plants are in the enclave of 937: 750: 46: 954: 1013: 703: 992: 887: 867: 911: 1043: 711: 1072: 838: 64: 922: 237: 1049: 431:(also known as the Araks Hydro Power Plant) – by mid-2021, the project had not begun construction. Coupled with the 60 MW 934: 373: 261: 108: 37: 132: 740: 427:
Though both Iran and Armenia have long discussed opening a 140 MW, joint hydro power plant on the Artak's River –
206: 171: 809: 779: 327: 311: 278: 683: 245: 42:
The images and text at the start of the article could be better arranged to be easily visible on all devices.
405: 389: 295: 1008: 459:
sponsored report, 313 small hydroelectric power plants (small HPPs) with an installed capacity of 243.366
122: 136: 987: 77: 864: 32: 432: 95: 103: 1039: 830: 159: 1017: 996: 941: 918: 888:"Six months into blockade, Nagorno-Karabakh faces energy crisis as key reservoir dries up" 871: 344: 175: 140: 526: 1066: 646: 630: 558: 510: 366: 87: 776:
Ministry of Energy Infrastructures and Natural Resources of the Republic of Armenia
686:
leading to electricity shortages after cables connecting the enclave were damaged.
626: 542: 999:, Scientific Research Institute of Energy for the Alliance to Save Energy, 2007. 494: 436: 128: 983: 981: 979: 610: 594: 590: 574: 428: 144: 989:
National Program on Energy Saving and Renewable Energy of Republic of Armenia
154:
The economically justified hydropower potential of Armenia is around 3.600
483: 460: 112: 91: 83: 801: 771: 440: 802:"Hydro Energy - Investment projects - Projects - www.minenergy.am" 456: 102: 741:"Technical Report – Quantifying Fiscal Risks from climate change" 745: 464: 194: 155: 15: 471:
List of notable small hydroelectric power plants in Armenia
935:"Electric Power in Asia and the Pacific 2001–2002: Armenia" 233: 874:, Renewable Energy Armenia (Danish Energy Management A/S). 178:. The following table lists the details of each cascade: 860: 858: 856: 147:
potential of Armenia is reported to be 21.8 billion kWh.
463:
and an average yearly electricity production of 737.38
229: 955:"Tashir Group acquires International Energy Company" 226:(reduced to 487 because of the level of Lake Sevan) 232:(privatized in June 2003) (90% of which belongs to 835:Armenian Community Council of the United Kingdom 1010:US Concerned by Armenia's Energy Ties With Iran 125:but its share varies a lot from year to year. 8: 135:. Major HPP capacities are installed within 1038:. Yerevan: The Civilitas Foundation. 2010. 65:Learn how and when to remove this message 469: 180: 76: 695: 439:near Armenia's southern border town of 1032:Armenia in 2010. A Year of Uncertainty 831:"Small Hydro Power Plants in Armenia" 782:from the original on 20 December 2015 230:International Energy Corporation CJSC 7: 882: 880: 86:hydroelectric power plant along the 14: 865:"Hydropower Potential of Armenia" 912:Map of Armenian Electricity Grid 489:Average yearly production (GWh) 20: 965:from the original on 2022-01-14 923:Global Energy Network Institute 894:from the original on 2023-05-27 841:from the original on 2 May 2017 812:from the original on 2018-04-12 753:from the original on 2023-05-27 722:from the original on 2022-12-29 467:are installed in the country. 1: 682:Some plants were lost in the 131:plants provide 70 percent of 1020:, EurasiaNet, June 21, 2007. 374:Spandaryan Hydro Power Plant 262:Atarbekyan Hydro Power Plant 109:Atarbekyan Hydro Power Plant 1073:Hydroelectricity in Armenia 415: 412: 409: 404: 399: 396: 393: 388: 383: 380: 377: 372: 337: 334: 331: 328:Yerevan 1 Hydro Power Plant 326: 321: 318: 315: 310: 305: 302: 299: 294: 289: 286: 283: 277: 272: 269: 266: 260: 255: 252: 249: 244: 193:Annual Average Production ( 40:. The specific problem is: 1089: 704:"Energy Profile – Armenia" 482:Total installed capacity ( 133:Armenia's renewable energy 36:to meet Knowledge (XXG)'s 364: 312:Kanaker Hydro Power Plant 279:Gyumush Hydro Power Plant 228: 684:2nd Nagorno-Karabakh war 476:Name of water reservoir 190:Installed Capacity (MW) 944:, United Nations ESCAP. 406:Tatev Hydro Power Plant 390:Shamb Hydro Power Plant 296:Arzni Hydro Power Plant 246:Sevan Hydro Power Plant 121:generates about 30% of 115: 100: 207:Sevan-Hrazdan Cascade 172:Sevan–Hrazdan Cascade 137:Sevan-Hrazdan Cascade 123:Armenia's electricity 106: 80: 479:Number of HPP units 47:improve this article 472: 1016:2016-10-01 at the 995:2009-03-05 at the 940:2008-10-08 at the 925:, September, 2000. 917:2023-04-19 at the 870:2009-02-28 at the 470: 116: 101: 1045:978-99941-2-503-6 675: 674: 420: 419: 238:Samvel Karapetyan 75: 74: 67: 38:quality standards 29:This article may 1080: 1057: 1056: 1054: 1048:. Archived from 1037: 1027: 1021: 1006: 1000: 985: 974: 973: 971: 970: 951: 945: 932: 926: 909: 903: 902: 900: 899: 884: 875: 862: 851: 850: 848: 846: 827: 821: 820: 818: 817: 806:www.minenergy.am 798: 792: 791: 789: 787: 768: 762: 761: 759: 758: 737: 731: 730: 728: 727: 721: 708: 700: 473: 423:Planned projects 181: 160:Nagorno-Karabakh 70: 63: 59: 56: 50: 24: 23: 16: 1088: 1087: 1083: 1082: 1081: 1079: 1078: 1077: 1063: 1062: 1061: 1060: 1052: 1046: 1035: 1029: 1028: 1024: 1018:Wayback Machine 1007: 1003: 997:Wayback Machine 986: 977: 968: 966: 953: 952: 948: 942:Wayback Machine 933: 929: 919:Wayback Machine 910: 906: 897: 895: 886: 885: 878: 872:Wayback Machine 863: 854: 844: 842: 829: 828: 824: 815: 813: 800: 799: 795: 785: 783: 770: 769: 765: 756: 754: 739: 738: 734: 725: 723: 719: 706: 702: 701: 697: 692: 680: 455:According to a 453: 425: 345:Vorotan Cascade 225: 176:Vorotan Cascade 168: 141:Vorotan Cascade 99: 71: 60: 54: 51: 44: 25: 21: 12: 11: 5: 1086: 1084: 1076: 1075: 1065: 1064: 1059: 1058: 1055:on 2014-04-21. 1044: 1022: 1001: 975: 946: 927: 904: 876: 852: 822: 793: 772:"Hydro Energy" 763: 732: 694: 693: 691: 688: 679: 676: 673: 672: 669: 666: 663: 659: 658: 655: 652: 649: 643: 642: 639: 636: 633: 623: 622: 619: 616: 613: 607: 606: 603: 600: 597: 587: 586: 583: 580: 577: 571: 570: 567: 564: 561: 555: 554: 551: 548: 545: 539: 538: 535: 532: 529: 527:Akhuryan River 523: 522: 519: 516: 513: 507: 506: 503: 500: 497: 491: 490: 487: 480: 477: 452: 449: 424: 421: 418: 417: 414: 411: 408: 402: 401: 398: 395: 392: 386: 385: 382: 379: 376: 370: 369: 367:CountourGlobal 363: 358: 353: 348: 340: 339: 336: 333: 330: 324: 323: 320: 317: 314: 308: 307: 304: 301: 298: 292: 291: 288: 285: 282: 275: 274: 271: 268: 265: 258: 257: 254: 251: 248: 242: 241: 227: 220: 215: 210: 202: 201: 198: 191: 188: 185: 167: 164: 90:just north of 81: 73: 72: 28: 26: 19: 13: 10: 9: 6: 4: 3: 2: 1085: 1074: 1071: 1070: 1068: 1051: 1047: 1041: 1034: 1033: 1026: 1023: 1019: 1015: 1012: 1011: 1005: 1002: 998: 994: 991: 990: 984: 982: 980: 976: 964: 960: 959:www.tashir.ru 956: 950: 947: 943: 939: 936: 931: 928: 924: 920: 916: 913: 908: 905: 893: 889: 883: 881: 877: 873: 869: 866: 861: 859: 857: 853: 840: 836: 832: 826: 823: 811: 807: 803: 797: 794: 781: 777: 773: 767: 764: 752: 748: 747: 742: 736: 733: 718: 714: 713: 705: 699: 696: 689: 687: 685: 677: 670: 667: 664: 661: 660: 656: 653: 650: 648: 647:Vorotan River 645: 644: 640: 637: 634: 632: 631:Voghdji River 628: 625: 624: 620: 617: 614: 612: 609: 608: 604: 601: 598: 596: 592: 589: 588: 584: 581: 578: 576: 573: 572: 568: 565: 562: 560: 559:Hrazdan River 557: 556: 552: 549: 546: 544: 541: 540: 536: 533: 530: 528: 525: 524: 520: 517: 514: 512: 511:Aghstev River 509: 508: 504: 501: 498: 496: 493: 492: 488: 485: 481: 478: 475: 474: 468: 466: 462: 458: 450: 448: 444: 442: 438: 434: 430: 422: 407: 403: 391: 387: 375: 371: 368: 362: 359: 357: 354: 352: 349: 347: 346: 342: 341: 329: 325: 313: 309: 297: 293: 280: 276: 263: 259: 247: 243: 239: 235: 231: 224: 221: 219: 216: 214: 211: 209: 208: 204: 203: 199: 196: 192: 189: 186: 183: 182: 179: 177: 173: 165: 163: 161: 157: 152: 148: 146: 142: 138: 134: 130: 126: 124: 120: 114: 110: 105: 97: 93: 89: 88:Hrazdan river 85: 79: 69: 66: 58: 48: 43: 39: 35: 34: 27: 18: 17: 1050:the original 1031: 1025: 1009: 1004: 988: 967:. Retrieved 958: 949: 930: 907: 896:. Retrieved 843:. Retrieved 834: 825: 814:. Retrieved 805: 796: 784:. Retrieved 775: 766: 755:. Retrieved 744: 735: 724:. Retrieved 710: 698: 681: 627:Meghri River 543:Kasakh River 454: 451:Small plants 445: 433:Loriberd HPP 426: 360: 355: 350: 343: 234:Tashir Group 222: 217: 212: 205: 169: 166:Large plants 153: 149: 127: 118: 117: 61: 55:October 2023 52: 45:Please help 41: 30: 786:25 November 495:Debed River 437:Araks River 365:US company 236:, owned by 187:Year built 129:Hydro power 49:if you can. 969:2020-02-14 898:2023-05-27 845:9 December 816:2018-04-18 757:2023-05-27 726:2023-05-27 690:References 611:Arpa River 595:Vedi River 591:Azat River 575:Lake Sevan 429:Meghri HPP 264:(Hrazdan) 200:Ownership 145:hydropower 119:Hydropower 351:1970–1984 213:1936–1961 1067:Category 1014:Archived 993:Archived 963:Archived 938:Archived 915:Archived 892:Archived 868:Archived 839:Archived 810:Archived 780:Archived 751:Archived 717:Archived 668:243.366 281:(Argel) 174:and the 98:district 31:require 678:History 671:737.38 638:21.245 618:35.410 602:18.215 582:22.965 534:24.985 521:159.27 518:58.270 505:123.47 502:35.501 113:Hrazdan 96:Arabkir 92:Yerevan 84:Kanaker 33:cleanup 1042:  662:Total 657:44.97 654:9.800 641:72.63 621:88.58 605:56.15 585:66.03 569:27.37 566:9.070 553:19.16 550:7.905 537:79.75 441:Meghri 413:157.2 361:1010.7 356:405.46 184:Plant 143:. The 1053:(PDF) 1036:(PDF) 720:(PDF) 712:Irena 707:(PDF) 457:USAID 410:1970 394:1977 378:1984 332:1961 316:1936 303:70.5 300:1956 284:1953 270:81.6 267:1959 253:34.2 250:1949 1040:ISBN 847:2016 788:2016 665:313 629:and 593:and 416:580 400:272 397:171 384:154 322:151 319:102 290:378 287:224 273:136 139:and 107:The 82:The 746:IMF 635:53 615:26 599:20 579:20 563:13 547:14 531:14 515:67 499:79 465:GWh 381:76 338:83 335:44 306:13 256:50 223:936 218:556 195:GWh 156:GWh 111:in 94:'s 1069:: 978:^ 961:. 957:. 921:, 890:. 879:^ 855:^ 837:. 833:. 808:. 804:. 778:. 774:. 749:. 743:. 715:. 709:. 651:8 486:) 484:MW 461:MW 443:. 240:) 197:) 162:. 972:. 901:. 849:. 819:. 790:. 760:. 729:. 68:) 62:( 57:) 53:(

Index

cleanup
quality standards
improve this article
Learn how and when to remove this message

Kanaker
Hrazdan river
Yerevan
Arabkir

Atarbekyan Hydro Power Plant
Hrazdan
Armenia's electricity
Hydro power
Armenia's renewable energy
Sevan-Hrazdan Cascade
Vorotan Cascade
hydropower
GWh
Nagorno-Karabakh
Sevan–Hrazdan Cascade
Vorotan Cascade
GWh
Sevan-Hrazdan Cascade
International Energy Corporation CJSC
Tashir Group
Samvel Karapetyan
Sevan Hydro Power Plant
Atarbekyan Hydro Power Plant
Gyumush Hydro Power Plant

Text is available under the Creative Commons Attribution-ShareAlike License. Additional terms may apply.

↑