kV and are built as overhead lines with a length of 818 (North line) and 807 (South line) kilometers. Away from their terminal stations, the two lines are at least 10 km apart to reduce risks. Each one is designed for 3150 MW at ± 600 kV D.C. and 2625 A. The lines are 4 x 689 mm (about 30 mm ∅)
358:
High Voltage Direct Current (HVDC) was chosen both because this technique allows long transmission lines with little loss compared to other systems (like AC), and also allows interchange of the Paraguayan 50 Hz input and the Brazilian 60 Hz input and user grid. Both lines operate at ±600
434:
In its first few years, the project suffered many failures of converter transformers, with six in the first year of commercial operation and twelve in the first four years. Modifications had to be made to all of the transformers on the system, and led to markedly improved performance, with no
438:
On 29 May 1989, a complete quadrivalve in converter 5 of the Foz do Iguaçu converter station was destroyed by a fire which started as a result of a water leakage from a cooling pipe. The affected converter was out of action for 14 months. Similar incidents on the
333:
When the first bipole was completed in 1985, it became the world's largest HVDC system by both power transmission capacity and voltage, titles which it would hold for 25 years until the completion, in 2010, of the ±800 kV, 6400 MW HVDC link from
350:. Nevertheless, it suffered reliability problems in its first few years of operation, with numerous converter transformer failures and one serious converter fire, although reliability is now reported to be much improved. 365:
The incoming supply is 500 kV AC from the 50 Hz generators at the hydro dam (Foz do Iguaçu). The outgoing power is 345 and 500 kV, 60 Hz AC into the South/Southeastern grid (Ibiúna, São Paulo).
817: 765: 596: 556: 473: 513: 711: 55: 1116: 1101: 1015: 1079: 868: 452: 384:
In parallel with the HVDC system, two 765 kV AC lines carry power from the 60 Hz generators on the Brazilian side of the dam to the São Paulo region. At
95: 360: 330:, São Paulo. The system was put in service in several steps between 1984 and 1987, and remains among the most important HVDC installations in the world. 986: 346:. It also contained important innovations in real-time control systems, being one of the first HVDC schemes to use digital control equipment using 310:. The project consists of two ±600 kV bipoles, each with a rated power of 3150 MW, which transmit power generated at 50 Hz from the 1111: 1032: 1106: 48: 399: 946: 398:, there is a branch into 500 kV, 60 Hz AC, delivering into the Southern grid. By introducing, in 1989 and later, 289: 1082: 444: 646: 951: 323: 1058: 990: 633:
and are connected to the converter station via lines of 66 km and 67.2 km length respectively.
550:
and are connected to the converter station via lines of 15.5 km and 16 km length respectively.
440: 966: 755: 327: 1036: 448: 292: 673: 467:
of both bipoles are installed on wooden poles and consist of 2 x 689 mm 1272 MCM conductors.
668: 319: 463:
Each bipole can be operated also as monopole and is equipped with a grounding electrode. The
663: 315: 151: 961: 956: 464: 455:
publishing guidelines on the design of thyristor valves in order to reduce fire risks.
370: 347: 470:
The electrodes for Foz do Iguaçu Station are situated at Santa Terezinha de Itaipu at
1095: 938: 924: 303: 307: 165: 395: 914: 413: 335: 300: 147: 884: 870: 833: 819: 781: 767: 727: 713: 612: 598: 572: 558: 529: 515: 489: 475: 111: 97: 71: 57: 932: 378: 374: 193: 1014:
Praça, A., Arakari, H., Alves, S.R., Eriksson, K., Graham, J., Biledt, G.,
658: 161: 553:
The electrodes for San Roque Station are situated at Córrego Boa Vista at
339: 311: 1019: 296: 41: 343: 1016:
Itaipu HVDC Transmission System - 10 years operational experience
1078:
Fire aspects of HVDC thyristor valves and valve halls,
381:
valves arranged in two, twelve-pulse bridges per pole.
271: 260: 252: 244: 236: 228: 220: 212: 207: 199: 189: 184: 176: 171: 157: 143: 135: 47: 37: 32: 20: 845:Ortigueira PLC Repeater Station (Southern line) 793:Ortigueira PLC Repeater Station (Northern line) 501:Santa Terezinha de Itaipu Grounding Electrode 426:) the capacity grew from 4300 MW to 6300 MW. 8: 683: 624:Córrego Boa Vista Grounding Electrode East 584:Córrego Boa Vista Grounding Electrode West 1010: 1008: 1117:Energy infrastructure completed in 1987 1102:Electric power infrastructure in Brazil 978: 541:Alvorada do Iguaçu Grounding Electrode 17: 180:Furnas Centrais Elétricas S.A. Brazil 7: 14: 931: 917: 739:Foz do Iguaçu Converter Station 148:Itaipu hydroelectric power plan 83:Foz do Iguaçu converter station 987:"The Itaipu HVDC transmission" 272: 261: 1: 1112:1984 establishments in Brazil 510:and at Alvorada do Iguaçu at 314:side of the Itaipu Dam (near 306:power plant to the region of 947:High-voltage direct current 674:GPX (secondary coordinates) 290:High-voltage direct current 190:Manufacturer of substations 1133: 1083:Technical Brochure No. 136 216:overhead transmission line 1033:"Itaipu HVDC description" 669:GPX (primary coordinates) 644:Map all coordinates using 232:780 km (480 mi) 25: 896:Ibiuna Converter Station 652:Download coordinates as: 445:Sylmar Converter Station 443:project in 1990 and the 435:failures in years 4–10. 295:transmission system in 185:Construction information 123:Ibiuna converter station 1107:HVDC transmission lines 373:equipment, supplied by 203:October 1984, July 1987 27:Location of HVDC Itaipu 952:HVDC converter station 451:scheme in 1993 led to 967:List of HVDC projects 885:23.66722°S 47.10528°W 834:24.32111°S 50.85611°W 782:24.03083°S 51.09778°W 728:25.46611°S 54.54250°W 664:GPX (all coordinates) 613:23.59694°S 47.61833°W 573:23.59750°S 47.62694°W 530:25.39222°S 54.46194°W 490:25.49944°S 54.40083°W 354:Technical description 208:Technical information 172:Ownership information 112:23.66722°S 47.10528°W 72:25.46611°S 54.54250°W 1059:"Itaipu HVDC scheme" 890:-23.66722; -47.10528 839:-24.32111; -50.85611 809:PLC repeater station 787:-24.03083; -51.09778 756:PLC repeater station 733:-25.46611; -54.54250 618:-23.59694; -47.61833 578:-23.59750; -47.62694 535:-25.39222; -54.46194 495:-25.49944; -54.40083 117:-23.66722; -47.10528 77:-25.46611; -54.54250 1039:on 15 November 2005 993:on 16 February 2007 880: /  829: /  777: /  723: /  608: /  568: /  525: /  485: /  449:Pacific DC Intertie 394:into the route, at 107: /  67: /  908: 907: 861:Converter Station 704:Converter Station 412:of the line) and 400:series capacitors 324:converter station 282: 281: 136:General direction 1124: 1086: 1085:, February 1999. 1076: 1070: 1069: 1067: 1065: 1055: 1049: 1048: 1046: 1044: 1035:. Archived from 1029: 1023: 1012: 1003: 1002: 1000: 998: 989:. Archived from 983: 941: 936: 935: 927: 922: 921: 920: 904: 903: 901: 900: 899: 897: 892: 891: 886: 881: 878: 877: 876: 873: 853: 852: 850: 849: 848: 846: 841: 840: 835: 830: 827: 826: 825: 822: 801: 800: 798: 797: 796: 794: 789: 788: 783: 778: 775: 774: 773: 770: 747: 746: 744: 743: 742: 740: 735: 734: 729: 724: 721: 720: 719: 716: 684: 632: 631: 629: 628: 627: 625: 620: 619: 614: 609: 606: 605: 604: 601: 592: 591: 589: 588: 587: 585: 580: 579: 574: 569: 566: 565: 564: 561: 549: 548: 546: 545: 544: 542: 537: 536: 531: 526: 523: 522: 521: 518: 509: 508: 506: 505: 504: 502: 497: 496: 491: 486: 483: 482: 481: 478: 425: 424: 420: 411: 410: 406: 402:in Ivaiporã (at 393: 392: 388: 322:) to the Ibiúna 274: 263: 131: 130: 128: 127: 126: 124: 119: 118: 113: 108: 105: 104: 103: 100: 91: 90: 88: 87: 86: 84: 79: 78: 73: 68: 65: 64: 63: 60: 18: 1132: 1131: 1127: 1126: 1125: 1123: 1122: 1121: 1092: 1091: 1090: 1089: 1077: 1073: 1063: 1061: 1057: 1056: 1052: 1042: 1040: 1031: 1030: 1026: 1013: 1006: 996: 994: 985: 984: 980: 975: 937: 930: 923: 918: 916: 913: 895: 893: 889: 887: 883: 882: 879: 874: 871: 869: 867: 866: 844: 842: 838: 836: 832: 831: 828: 823: 820: 818: 816: 815: 792: 790: 786: 784: 780: 779: 776: 771: 768: 766: 764: 763: 738: 736: 732: 730: 726: 725: 722: 717: 714: 712: 710: 709: 682: 681: 680: 679: 678: 639: 623: 621: 617: 615: 611: 610: 607: 602: 599: 597: 595: 594: 583: 581: 577: 575: 571: 570: 567: 562: 559: 557: 555: 554: 540: 538: 534: 532: 528: 527: 524: 519: 516: 514: 512: 511: 500: 498: 494: 492: 488: 487: 484: 479: 476: 474: 472: 471: 465:electrode lines 461: 432: 422: 418: 417: 408: 404: 403: 390: 386: 385: 356: 348:microprocessors 221:Type of current 122: 120: 116: 114: 110: 109: 106: 101: 98: 96: 94: 93: 92: 82: 80: 76: 74: 70: 69: 66: 61: 58: 56: 54: 53: 28: 12: 11: 5: 1130: 1128: 1120: 1119: 1114: 1109: 1104: 1094: 1093: 1088: 1087: 1071: 1050: 1024: 1004: 977: 976: 974: 971: 970: 969: 964: 962:Electrode line 959: 957:HVDC converter 954: 949: 943: 942: 928: 912: 909: 906: 905: 864: 862: 859: 855: 854: 813: 810: 807: 803: 802: 761: 758: 753: 749: 748: 707: 705: 702: 698: 697: 694: 691: 688: 677: 676: 671: 666: 661: 655: 649: 642: 641: 640: 638: 635: 460: 457: 431: 428: 355: 352: 280: 279: 276: 269: 268: 265: 258: 257: 254: 250: 249: 248:345 and 500 kV 246: 242: 241: 238: 234: 233: 230: 226: 225: 222: 218: 217: 214: 210: 209: 205: 204: 201: 197: 196: 191: 187: 186: 182: 181: 178: 174: 173: 169: 168: 159: 155: 154: 145: 141: 140: 137: 133: 132: 51: 45: 44: 39: 35: 34: 30: 29: 26: 23: 22: 13: 10: 9: 6: 4: 3: 2: 1129: 1118: 1115: 1113: 1110: 1108: 1105: 1103: 1100: 1099: 1097: 1084: 1081: 1075: 1072: 1060: 1054: 1051: 1038: 1034: 1028: 1025: 1021: 1017: 1011: 1009: 1005: 992: 988: 982: 979: 972: 968: 965: 963: 960: 958: 955: 953: 950: 948: 945: 944: 940: 939:Energy portal 934: 929: 926: 925:Brazil portal 915: 910: 902: 865: 863: 860: 857: 856: 851: 814: 812:southern line 811: 808: 805: 804: 799: 762: 760:northern line 759: 757: 754: 751: 750: 745: 708: 706: 703: 701:Foz do Iguaçu 700: 699: 695: 692: 690:Station type 689: 686: 685: 675: 672: 670: 667: 665: 662: 660: 657: 656: 654: 653: 648: 647:OpenStreetMap 645: 636: 634: 630: 590: 551: 547: 507: 468: 466: 458: 456: 454: 450: 446: 442: 436: 429: 427: 415: 401: 397: 382: 380: 376: 372: 367: 363: 362: 353: 351: 349: 345: 341: 337: 331: 329: 325: 321: 317: 316:Foz do Iguaçu 313: 309: 305: 304:hydroelectric 302: 298: 294: 293:overhead line 291: 287: 277: 270: 266: 259: 255: 251: 247: 243: 239: 235: 231: 227: 223: 219: 215: 211: 206: 202: 198: 195: 192: 188: 183: 179: 175: 170: 167: 163: 160: 156: 153: 152:Foz do Iguaçu 149: 146: 142: 138: 134: 129: 89: 52: 50: 46: 43: 40: 36: 31: 24: 19: 16: 1074: 1062:. Retrieved 1053: 1041:. Retrieved 1037:the original 1027: 1018:, V SEPOPE, 995:. Retrieved 991:the original 981: 696:Coordinates 651: 650: 643: 552: 469: 462: 441:Rihand–Delhi 437: 433: 383: 368: 364: 357: 332: 285: 283: 237:Power rating 229:Total length 200:Commissioned 15: 1022:, May 1996. 888: / 837: / 785: / 731: / 616: / 576: / 533: / 493: / 430:Reliability 286:HVDC Itaipu 275:of circuits 115: / 75: / 49:Coordinates 21:HVDC Itaipu 1096:Categories 973:References 894: ( 875:47°06′19″W 872:23°40′02″S 843: ( 824:50°51′22″W 821:24°19′16″S 806:Ortigueira 791: ( 772:51°05′52″W 769:24°01′51″S 752:Ortigueira 737: ( 718:54°32′33″W 715:25°27′58″S 622: ( 603:47°37′06″W 600:23°35′49″S 582: ( 563:47°37′37″W 560:23°35′51″S 539: ( 520:54°27′43″W 517:25°23′32″S 499: ( 480:54°24′03″W 477:25°29′58″S 459:Electrodes 336:Xiangjiaba 253:DC voltage 245:AC voltage 121: ( 102:47°06′19″W 99:23°40′02″S 81: ( 62:54°32′33″W 59:25°27′58″S 637:Waypoints 379:thyristor 375:ABB Group 371:converter 328:São Roque 308:São Paulo 299:from the 194:ABB Group 166:São Paulo 139:East-West 1064:16 April 1043:16 April 997:16 April 911:See also 396:Ivaiporã 340:Shanghai 312:Paraguay 264:of poles 33:Location 593:and at 447:of the 421:⁄ 414:Itaberá 407:⁄ 389:⁄ 377:, uses 338:Dam to 256:±600 kV 240:6300 MW 150:, near 38:Country 1020:Recife 858:Ibiúna 320:Paraná 301:Itaipu 297:Brazil 162:Ibiúna 42:Brazil 1080:CIGRÉ 693:Line 687:Site 453:CIGRÉ 344:China 326:near 288:is a 177:Owner 1066:2010 1045:2010 999:2010 416:(at 369:The 361:ACSR 284:The 224:HVDC 213:Type 144:From 659:KML 342:in 318:in 273:No. 267:2x2 262:No. 1098:: 1007:^ 164:, 158:To 1068:. 1047:. 1001:. 898:) 847:) 795:) 741:) 626:) 586:) 543:) 503:) 423:3 419:2 409:3 405:1 391:3 387:1 278:2 125:) 85:)

Index

Brazil
Coordinates
25°27′58″S 54°32′33″W / 25.46611°S 54.54250°W / -25.46611; -54.54250 (Foz do Iguaçu converter station)
23°40′02″S 47°06′19″W / 23.66722°S 47.10528°W / -23.66722; -47.10528 (Ibiuna converter station)
Itaipu hydroelectric power plan
Foz do Iguaçu
Ibiúna
São Paulo
ABB Group
High-voltage direct current
overhead line
Brazil
Itaipu
hydroelectric
São Paulo
Paraguay
Foz do Iguaçu
Paraná
converter station
São Roque
Xiangjiaba
Shanghai
China
microprocessors
ACSR
converter
ABB Group
thyristor
Ivaiporã
series capacitors

Text is available under the Creative Commons Attribution-ShareAlike License. Additional terms may apply.