281:
new electric motor of 180 hp (with a spare) was installed with four drums (so it could handled the working and safety cables better) located in a new building on the south side of
Mountain Park Ave. Two tunnels carried the cables to the upper platform then over the sheaves. The upgrade allowed trips of 90 seconds. The old steam engines and boilers were sold for scrap (in the middle of The Great War) but the buildings remained.
305:
319:
22:
284:
Many proposals were put forth about getting the incline over or under the two steam railway lines at the bottom, but they never came to pass. A double lane road was built by the City of
Hamilton which had to duck beneath the track in 1926, but it also removed 80% of the incline's traffic. The railway
280:
On April 24, 1906 the
Engineer's house burned down, with damage to the engine house. In November 1913 a landslide took out half the track. The incline was rebuilt on a steel trestle with new steel cars, though the 1910 passenger shelters were still in use. In 1915 the steam engines were retired and a
276:
The incline was operated by two horizontal steam engines of 75 horsepower, working a single drum. The cable of the west car went over the top of the drum and the east cable went under the drum, with no break in the cable. There was only one working cable of 1.625 inches but there was a safety cable
272:
The system had two tracks with two car operation with second generation cars used after 1910. The original cars were wood. The cars were quite wide (20.5 feet by 30 feet), so that small streetcars could have been carried, but this was never followed through. A number of structures were associated
292:
connecting from
Wentworth Street South and Charlton Avenue East up to Sherman Access and then again up to Upper Wentworth Street and Mountain Park Avenue. Most of these stairs are built on the original trestle foundations (1914). There are 498 steps, and they are informally rated as the most
285:
stopped running in 1936 when the company went bankrupt. The historic structure was vandalized and finally demolished 1949-50. The new electric motor house was sold in 1949 and converted to small apartments. This was demolished in 1983 and a new condo built, called
Incline Place.
273:
with the incline. The
Superintendent's home and Ticket Office were at the lower level. The Engineer's home with the Engine house and Boiler house behind were at the upper level, 90 degrees from the line of the track. ti
490:
440:
376:
277:
identical to it which worked the huge safety brake under the upper landing. The standard operation allowed trips of 120 seconds. The cable was replaced every five years.
510:
39:
505:
444:
261:
which became
Wentworth Street, climbing the Niagara Escarpment, though it remains impassible to this day. In 1906 a new owner renamed it
500:
495:
86:
398:
58:
105:
65:
43:
72:
54:
332:
32:
337:
79:
184:
247:
251:
243:
145:
134:
402:
310:
258:
416:
324:
484:
459:
121:
Hamilton
Incline Railway (Wentworth Street Incline Railway/Mount Hamilton Railway)
204:
21:
300:
441:"June 11, 1892: Hamilton and Barton incline railway opens | TheSpec.com"
254:. It was the second Hamilton furnicular, after the Hamilton and Barton.
362:
399:"Vintage Postcards of the Incline Railways in Hamilton, Ontario"
15:
288:
Today, the site of the railway is covered by trees, and the
417:"Mount Hamilton Incline Railway/Wentworth Incline Railway"
377:"Hamilton's incline railway started climbing in 1892"
203:
195:
190:
180:
172:
164:
159:
151:
141:
130:
125:
120:
46:. Unsourced material may be challenged and removed.
491:History of rail transport in Hamilton, Ontario
8:
265:(although many city residents called it the
246:in Hamilton, Ontario, Canada, climbing the
357:
355:
353:
106:Learn how and when to remove this message
349:
117:
363:"The Hamilton Street Railway Company"
7:
44:adding citations to reliable sources
293:difficult of the Hamilton stairs.
14:
511:1936 disestablishments in Ontario
379:. Hamilton Spectator. 2021-02-13
317:
303:
20:
250:. It opened August 26, 1895 in
31:needs additional citations for
506:1892 establishments in Ontario
240:Mount Hamilton Incline Railway
1:
460:"Hamilton Escarpment Stairs"
527:
501:Railway inclines in Canada
496:Defunct funicular railways
333:List of funicular railways
55:"Hamilton Incline Railway"
263:Wentworth Incline Railway
338:List of Ontario railways
199:721 feet (220 m)
257:The site was on the
185:The Peninsula Hotels
40:improve this article
248:Niagara Escarpment
152:Number of stations
252:Hamilton, Ontario
244:funicular railway
236:
235:
146:Funicular railway
135:Hamilton, Ontario
116:
115:
108:
90:
518:
475:
474:
472:
470:
455:
449:
448:
443:. Archived from
437:
431:
430:
428:
427:
413:
407:
406:
401:. Archived from
395:
389:
388:
386:
384:
373:
367:
366:
359:
327:
322:
321:
320:
313:
308:
307:
306:
290:Wentworth Stairs
267:East-End Incline
231:
226:
224:
223:
219:
216:
211:12 ft
118:
111:
104:
100:
97:
91:
89:
48:
24:
16:
526:
525:
521:
520:
519:
517:
516:
515:
481:
480:
479:
478:
468:
466:
457:
456:
452:
439:
438:
434:
425:
423:
415:
414:
410:
397:
396:
392:
382:
380:
375:
374:
370:
361:
360:
351:
346:
323:
318:
316:
311:Railways portal
309:
304:
302:
299:
259:concession road
229:
221:
217:
214:
212:
210:
173:Ended operation
165:Began operation
112:
101:
95:
92:
49:
47:
37:
25:
12:
11:
5:
524:
522:
514:
513:
508:
503:
498:
493:
483:
482:
477:
476:
450:
447:on 2019-06-11.
432:
408:
405:on 2003-04-07.
390:
368:
348:
347:
345:
342:
341:
340:
335:
329:
328:
325:Ontario portal
314:
298:
295:
234:
233:
207:
201:
200:
197:
193:
192:
188:
187:
182:
178:
177:
174:
170:
169:
166:
162:
161:
157:
156:
153:
149:
148:
143:
139:
138:
132:
128:
127:
123:
122:
114:
113:
96:September 2014
28:
26:
19:
13:
10:
9:
6:
4:
3:
2:
523:
512:
509:
507:
504:
502:
499:
497:
494:
492:
489:
488:
486:
465:
461:
458:Lenko, Greg.
454:
451:
446:
442:
436:
433:
422:
418:
412:
409:
404:
400:
394:
391:
378:
372:
369:
364:
358:
356:
354:
350:
343:
339:
336:
334:
331:
330:
326:
315:
312:
301:
296:
294:
291:
286:
282:
278:
274:
270:
268:
264:
260:
255:
253:
249:
245:
241:
230:3,696 mm
227:
208:
206:
202:
198:
196:System length
194:
189:
186:
183:
179:
175:
171:
167:
163:
158:
154:
150:
147:
144:
140:
136:
133:
129:
124:
119:
110:
107:
99:
88:
85:
81:
78:
74:
71:
67:
64:
60:
57: –
56:
52:
51:Find sources:
45:
41:
35:
34:
29:This article
27:
23:
18:
17:
467:. Retrieved
464:greglenko.ca
463:
453:
445:the original
435:
424:. Retrieved
421:trainweb.org
420:
411:
403:the original
393:
381:. Retrieved
371:
289:
287:
283:
279:
275:
271:
266:
262:
256:
239:
237:
209:
142:Transit type
102:
93:
83:
76:
69:
62:
50:
38:Please help
33:verification
30:
469:28 December
383:28 December
205:Track gauge
181:Operator(s)
485:Categories
426:2023-12-28
344:References
66:newspapers
191:Technical
160:Operation
297:See also
225: in
137:, Canada
126:Overview
220:⁄
80:scholar
242:was a
131:Locale
82:
75:
68:
61:
53:
87:JSTOR
73:books
471:2023
385:2023
269:.
238:The
176:1936
168:1895
59:news
42:by
487::
462:.
419:.
352:^
473:.
429:.
387:.
365:.
232:)
228:(
222:2
218:1
215:+
213:1
155:2
109:)
103:(
98:)
94:(
84:·
77:·
70:·
63:·
36:.
Text is available under the Creative Commons Attribution-ShareAlike License. Additional terms may apply.