the two closed tunnels with explosives but were unsuccessful. On 10 May, when the reservoir reached the power station intake, engineers began releasing water through the unfinished power house to prevent a breach of the dam. On 12 May one of the previous sealed tunnels naturally reopened, which suddenly increased downstream flows by three times the average. This promoted evacuations downstream, eventually totaling around 25,000.
505: 477: 491: 385:
tunnels) began in September 2011 and it is expected to be complete in 2013. Main works will begin thereafter and the power plant is expected to being commissioning in 2018. Development of the project is being proposed by EPM Ituango, a consortium of Empresas Publicas de Medellin (EPM) and the Antioquia government. The total cost is expected to be US$ 2.8 billion.
1102: 63: 384:
The dam's feasibility study was completed in 1983 but the project was shelved in the 1990s due to an economic crisis. The final designs for the project were finished in 2008 and on 8 July 2011, the project management contract was awarded. Preliminary construction (surveying, roads, bridges, diversion
444:
On May 19 the dam works reached level 405 masl; 5 m below cofferdam target the level. On May 25 Dr Ordoñez issued a letter expressing his panic about the situation because "Ituango project is dead and there is no control over it, so the most natural thing is to expect it to fail; we are sure that it
432:
Three tunnels were constructed to divert the Cauca River around the construction site. Two were eventually sealed during construction, leaving a third to divert the river. Between 28 April and 7 May 2018, three landslides blocked the tunnel, leading the reservoir to fill. Engineers attempted to open
407:
will have a capacity of 2,720-million-cubic-metre (2,210,000 acreâ‹…ft) of which 980-million-cubic-metre (790,000 acreâ‹…ft) will be active (or "useful") capacity. The reservoir will be 127 kilometres (79 mi) long and cover an area of 38 square kilometres (15 sq mi). To maintain
375:
of 2,456 megawatts (3,294,000 hp) if completed. Preliminary construction on the dam began in September 2011 and the power plant was expected to begin operations in late 2018, but will not after heavy rainfall and landslides in April/May 2018 blocked the river's diversion tunnel, threatening a
453:
Some sources argue the dam construction has severe ecological consequences, and there are displaced families, environmentalists, youth groups and concerned locals that oppose the project. Other publications argue the project will benefit millions through extra revenue towards social and
631: 436:
On May 16 silt build-up in a portion of the power house, the only means to drain the reservoir, led to water escaping into a transit gallery used by construction vehicles. The water eventually poured onto the downstream face of the dam, eroding the roadway and a portion of the
441:. Subsequently, EPM announced a risk of collapse existed and workers continued to fill the dam to its design height in hopes the spillway could be used to prevent an over-topping of the dam. Heavy rainfall was expected in the Cauca River basin through the end of May. 462:
showed that the failure of the dam is likely unless an emergency plan was adopted. The safety of the downstream communities was highlighted as critical. By November 2022, drills evacuated 5,000 people to prepare for the operation of the dam.
635: 457:
In February 2019 the Project came under increased pressure from local and national governmental regulatory agencies because of the closure of the river flow and the environmental and economic impact downstream. Moreover, studies from the
682: 605: 579: 553: 821: 1034: 1142: 686: 609: 843: 1127: 865: 557: 1080: 583: 393:
The dam will be a 225-metre (738 ft) tall earth-fill embankment type with a clay core. The volume of the dam will be 19 million cubic metres (670
1059: 39: 777: 55: 1012: 520: 110: 887: 539: 1132: 459: 938: 987: 416:
with a design flow of 22,600 cubic metres per second (800,000 cu ft/s). The dam's power plant will have a nominal
755: 916: 799: 708: 1137: 1122: 1106: 510: 733: 371:. The primary purpose of the project is hydroelectric power generation and its power plant will have an 364: 657: 372: 304: 1035:"Estudio de la Universidad Nacional revela panorama preocupante del futuro de Hidroituango" 554:"Chadbourne Represented EPM Ituango in BOOMT Contract for the 2400 MW Hidroituango Project" 482: 421: 297: 822:"Hidroituango: cuatro puentes afectados deja incremento del nivel de aguas del rĂ­o Cauca" 1061:
Hidroituango es una amenaza para comunidades en área de influencia: científico Portilla
961: 417: 352: 314: 281: 1116: 844:""Hubo una obstrucción en la casa de máquinas": EPM sobre emergencia en Hidroituango" 291: 683:"Consortium wins US66 million contract for Ituango hydro project build in Colombia" 496: 376:
breach of the dam. If completed, it will be the largest power station in Colombia.
866:"'Existe la posibilidad de que se rompa la presa de Hidroituango': gerente de EPM" 540:"Primera turbina de Hidroituango empieza a operar el 30 de noviembre: Irene VĂ©lez" 504: 413: 356: 192: 472: 420:
of 197 metres (646 ft) and contain eight 307 megawatts (412,000 hp)
1081:"EPM evacuates downstream towns in test before starting 2.4 GW Ituango hydro" 125: 112: 1014:
Hidroituango: investigan al alcalde de MedellĂ­n y al gobernador de Antioquia
490: 404: 17: 1101: 409: 368: 778:"Se agrava situación en Hidroituango, deberán inundar casa de máquinas" 360: 98: 438: 580:"China, South Korea companies in race for Colombia hydropower deal" 632:"Construction preparation begins for 2,400-MW Ituango in Colombia" 445:
is easier to fail than not to fail, and we are truly in a panic".
734:"Reabren 3 tĂşneles para evacuar aguas embalsadas en Hidroituango" 329: 939:"Hidroituango hydropower dam Colombia. Opinion from Dr Ordoñez" 179: 606:"Colombia hydro utility to build 2,688-MW Pescadero Ituango" 941:. Science Engineering & Sustainability. 24 March 2019 919:. Science Engineering & Sustainability. 24 March 2019 800:"AsĂ­ fue el destaponamiento del tĂşnel de Hidroituango" 988:"Hidroituango avanza con beneficios para Antioquia" 582:. Colombia Reports. 3 February 2010. Archived from 313: 303: 290: 280: 272: 267: 259: 251: 243: 235: 230: 222: 214: 206: 198: 188: 178: 173: 165: 157: 149: 141: 104: 94: 86: 78: 32: 1143:Buildings and structures in Antioquia Department 634:. Hydro World. 22 September 2011. Archived from 210:19,000,000 m (670,000,000 cu ft) 608:. HydroWorld. 7 December 2011. Archived from 239:2,720,000,000 m (2,210,000 acreâ‹…ft) 8: 888:"Colombia Ituango Dam Emergency 22 May 2018" 309:2,456 MW (3,294,000 hp) (planned) 226:22,600 m/s (800,000 cu ft/s) 38: 29: 756:"Nuevo derrumbe en proyecto Hidroituango" 685:. HydroWorld. 8 July 2011. Archived from 247:980,000,000 m (790,000 acreâ‹…ft) 1128:Hydroelectric power stations in Colombia 531: 728: 726: 408:reservoir levels, the dam will have a 319:9,200 GWh (33,000 TJ) (firm) 82:Pescadero-Ituango "JosĂ© Tejada Sáenz" 7: 711:(in Spanish). HidroelĂ©ctrica Ituango 355:currently under construction on the 70:Location of Ituango Dam in Colombia 62: 521:List of power stations in Colombia 296:8 x 307 MW (412,000 hp) 286:197 m (646 ft) (nominal) 25: 986:Edgar DomĂ­nguez (13 March 2013). 917:"Hidroituango dam fail emergency" 1100: 503: 489: 475: 460:Universidad Nacional de Colombia 184:Embankment, earth-fill clay core 61: 54: 960:Naomi Cohen (16 January 2017). 556:. 28 April 2011. Archived from 255:38 km (15 sq mi) 758:. El Colombiano. 30 April 2018 658:"Evolution of Expansion Plans" 330:http://www.hidroituango.com.co 1: 868:. El Espectador. 17 May 2018 846:. El Espectador. 16 May 2018 802:. El Colombiano. 12 May 2018 736:. Caracol Radio. 8 May 2018 1159: 343:, also referred to as the 454:infrastructure programs. 428:Diversion tunnel blockage 323: 49: 44:Construction site in 2014 37: 1041:(in Spanish). 2019-02-06 780:. El Tiempo. 10 May 2018 263:127 km (79 mi) 218:Service, gate controlled 202:225 m (738 ft) 1133:Dams under construction 511:Renewable energy portal 403: cu ft). Its 305:Installed capacity 150:Construction began 126:7.1305667°N 75.663528°W 962:"Colombia's other war" 824:. W Radio. 13 May 2018 315:Annual generation 223:Spillway capacity 166:Construction cost 966:Le Monde diplomatique 897:. European Commission 345:Pescadero-Ituango Dam 180:Type of dam 131:7.1305667; -75.663528 1109:at Wikimedia Commons 586:on 21 September 2010 449:Environmental impact 365:Antioquia Department 244:Active capacity 1087:. 16 November 2022. 412:controlled by four 260:Maximum length 236:Total capacity 122: /  542:. 18 October 2022. 373:installed capacity 215:Spillway type 161:2022 (2 turbines)) 145:Under construction 1138:Earth-filled dams 1105:Media related to 337: 336: 252:Surface area 174:Dam and spillways 158:Opening date 16:(Redirected from 1150: 1123:Dams in Colombia 1104: 1089: 1088: 1077: 1071: 1070: 1069: 1068: 1056: 1050: 1049: 1047: 1046: 1039:Noticias Caracol 1031: 1025: 1024: 1023: 1022: 1009: 1003: 1002: 1000: 998: 983: 977: 976: 974: 972: 957: 951: 950: 948: 946: 935: 929: 928: 926: 924: 913: 907: 906: 904: 902: 892: 884: 878: 877: 875: 873: 862: 856: 855: 853: 851: 840: 834: 833: 831: 829: 818: 812: 811: 809: 807: 796: 790: 789: 787: 785: 774: 768: 767: 765: 763: 752: 746: 745: 743: 741: 730: 721: 720: 718: 716: 709:"Datos TĂ©cnicos" 705: 699: 698: 696: 694: 689:on 13 March 2012 679: 673: 672: 670: 668: 662: 654: 648: 647: 645: 643: 638:on 24 March 2016 628: 622: 621: 619: 617: 612:on 13 March 2012 602: 596: 595: 593: 591: 576: 570: 569: 567: 565: 550: 544: 543: 536: 513: 508: 507: 499: 494: 493: 485: 480: 479: 478: 399: 398: 333: 137: 136: 134: 133: 132: 127: 123: 120: 119: 118: 115: 65: 64: 58: 42: 30: 21: 1158: 1157: 1153: 1152: 1151: 1149: 1148: 1147: 1113: 1112: 1097: 1092: 1079: 1078: 1074: 1066: 1064: 1058: 1057: 1053: 1044: 1042: 1033: 1032: 1028: 1020: 1018: 1011: 1010: 1006: 996: 994: 985: 984: 980: 970: 968: 959: 958: 954: 944: 942: 937: 936: 932: 922: 920: 915: 914: 910: 900: 898: 890: 886: 885: 881: 871: 869: 864: 863: 859: 849: 847: 842: 841: 837: 827: 825: 820: 819: 815: 805: 803: 798: 797: 793: 783: 781: 776: 775: 771: 761: 759: 754: 753: 749: 739: 737: 732: 731: 724: 714: 712: 707: 706: 702: 692: 690: 681: 680: 676: 666: 664: 660: 656: 655: 651: 641: 639: 630: 629: 625: 615: 613: 604: 603: 599: 589: 587: 578: 577: 573: 563: 561: 560:on 29 July 2012 552: 551: 547: 538: 537: 533: 529: 517: 516: 509: 502: 495: 488: 483:Colombia portal 481: 476: 474: 469: 451: 430: 422:Francis turbine 396: 394: 391: 382: 328: 327: 207:Dam volume 169:US$ 3.8 billion 130: 128: 124: 121: 116: 113: 111: 109: 108: 74: 73: 72: 71: 68: 67: 66: 45: 28: 23: 22: 15: 12: 11: 5: 1156: 1154: 1146: 1145: 1140: 1135: 1130: 1125: 1115: 1114: 1111: 1110: 1096: 1095:External links 1093: 1091: 1090: 1072: 1051: 1026: 1004: 978: 952: 930: 908: 879: 857: 835: 813: 791: 769: 747: 722: 700: 674: 649: 623: 597: 571: 545: 530: 528: 525: 524: 523: 515: 514: 500: 486: 471: 470: 468: 465: 450: 447: 429: 426: 418:hydraulic head 390: 387: 381: 378: 353:embankment dam 335: 334: 321: 320: 317: 311: 310: 307: 301: 300: 294: 288: 287: 284: 282:Hydraulic head 278: 277: 274: 270: 269: 265: 264: 261: 257: 256: 253: 249: 248: 245: 241: 240: 237: 233: 232: 228: 227: 224: 220: 219: 216: 212: 211: 208: 204: 203: 200: 196: 195: 190: 186: 185: 182: 176: 175: 171: 170: 167: 163: 162: 159: 155: 154: 151: 147: 146: 143: 139: 138: 106: 102: 101: 96: 92: 91: 88: 84: 83: 80: 76: 75: 69: 60: 59: 53: 52: 51: 50: 47: 46: 43: 35: 34: 27:Dam in Ituango 26: 24: 14: 13: 10: 9: 6: 4: 3: 2: 1155: 1144: 1141: 1139: 1136: 1134: 1131: 1129: 1126: 1124: 1121: 1120: 1118: 1108: 1103: 1099: 1098: 1094: 1086: 1082: 1076: 1073: 1063: 1062: 1055: 1052: 1040: 1036: 1030: 1027: 1016: 1015: 1008: 1005: 993: 989: 982: 979: 967: 963: 956: 953: 940: 934: 931: 918: 912: 909: 896: 889: 883: 880: 867: 861: 858: 845: 839: 836: 823: 817: 814: 801: 795: 792: 779: 773: 770: 757: 751: 748: 735: 729: 727: 723: 710: 704: 701: 688: 684: 678: 675: 659: 653: 650: 637: 633: 627: 624: 611: 607: 601: 598: 585: 581: 575: 572: 559: 555: 549: 546: 541: 535: 532: 526: 522: 519: 518: 512: 506: 501: 498: 492: 487: 484: 473: 466: 464: 461: 455: 448: 446: 442: 440: 434: 427: 425: 424:-generators. 423: 419: 415: 411: 406: 402: 388: 386: 379: 377: 374: 370: 366: 362: 358: 354: 350: 346: 342: 331: 326: 322: 318: 316: 312: 308: 306: 302: 299: 295: 293: 289: 285: 283: 279: 275: 271: 268:Power Station 266: 262: 258: 254: 250: 246: 242: 238: 234: 229: 225: 221: 217: 213: 209: 205: 201: 197: 194: 191: 187: 183: 181: 177: 172: 168: 164: 160: 156: 152: 148: 144: 140: 135: 107: 103: 100: 97: 93: 89: 85: 81: 79:Official name 77: 57: 48: 41: 36: 31: 19: 1107:Hidroituango 1085:Hydro Review 1084: 1075: 1065:, retrieved 1060: 1054: 1043:. Retrieved 1038: 1029: 1019:, retrieved 1017:, 2019-02-11 1013: 1007: 995:. Retrieved 991: 981: 969:. Retrieved 965: 955: 943:. Retrieved 933: 921:. Retrieved 911: 899:. Retrieved 894: 882: 870:. Retrieved 860: 848:. Retrieved 838: 826:. Retrieved 816: 804:. Retrieved 794: 782:. Retrieved 772: 760:. Retrieved 750: 738:. Retrieved 713:. Retrieved 703: 691:. Retrieved 687:the original 677: 665:. Retrieved 652: 640:. Retrieved 636:the original 626: 614:. Retrieved 610:the original 600: 588:. Retrieved 584:the original 574: 562:. Retrieved 558:the original 548: 534: 497:Water portal 456: 452: 443: 435: 431: 414:radial gates 400: 392: 383: 349:Hidroituango 348: 344: 340: 338: 324: 298:Francis type 117:75°39′48.7″W 114:7°07′50.04″N 18:Hidroituango 357:Cauca River 341:Ituango Dam 276:EPM Ituango 273:Operator(s) 193:Cauca River 129: / 105:Coordinates 33:Ituango Dam 1117:Categories 1067:2019-02-12 1045:2019-02-12 1021:2019-02-12 997:6 February 971:28 January 895:Relief Web 527:References 380:Background 992:Portfolio 405:reservoir 351:, is an 332:(Spanish) 231:Reservoir 945:24 March 923:24 March 642:29 March 467:See also 410:spillway 369:Colombia 292:Turbines 189:Impounds 95:Location 90:Colombia 361:Ituango 325:Website 99:Ituango 87:Country 901:25 May 872:17 May 850:17 May 828:17 May 806:17 May 784:17 May 762:17 May 740:17 May 715:9 July 693:9 July 667:9 July 616:9 July 590:9 July 564:9 July 439:riprap 389:Design 199:Height 142:Status 891:(PDF) 663:. EPM 661:(PDF) 359:near 999:2019 973:2017 947:2019 925:2019 903:2018 874:2018 852:2018 830:2018 808:2018 786:2018 764:2018 742:2018 717:2011 695:2011 669:2011 644:2012 618:2011 592:2011 566:2011 339:The 153:2011 363:in 347:or 1119:: 1083:. 1037:. 990:. 964:. 893:. 725:^ 397:10 367:, 1048:. 1001:. 975:. 949:. 927:. 905:. 876:. 854:. 832:. 810:. 788:. 766:. 744:. 719:. 697:. 671:. 646:. 620:. 594:. 568:. 401:^ 395:Ă— 20:)

Index

Hidroituango

Ituango Dam is located in Colombia
Ituango
7°07′50.04″N 75°39′48.7″W / 7.1305667°N 75.663528°W / 7.1305667; -75.663528
Type of dam
Cauca River
Hydraulic head
Turbines
Francis type
Installed capacity
Annual generation
http://www.hidroituango.com.co
embankment dam
Cauca River
Ituango
Antioquia Department
Colombia
installed capacity
reservoir
spillway
radial gates
hydraulic head
Francis turbine
riprap
Universidad Nacional de Colombia
Colombia portal
icon
Water portal
icon

Text is available under the Creative Commons Attribution-ShareAlike License. Additional terms may apply.

↑