Jebba Hydroelectric Power Station

Source 📝

115: 59: 87: 670: 642: 1034: 1022: 656: 1005: 122: 94: 66: 45: 446: 473: 500: 394:
The electrical-mechanical works include: (a) replacement of the 96.4 megawatts turbine (b) installation of a new 103MVA generator (c) installation of a new transformer (d) installation of a new outdoor switchyard and (e) replacement of accessory equipment, including the intake gate.
379:, located about 100 kilometres (62 mi). upstream of Jebba Power Station. Five of the generation units are available, as of January 2021. The sixth generation unit is inoperable, since it was damaged by a fire in April 2009. 370:
comprises six generation turbines, each with a rated capacity of 96.4 megawatts, for a maximum installed output of 578.4 megawatts. The concession agreement for operations and maintenance at this power station is held by
398:
The repairs and renovations are expected to cost approximately NGN13.68 billion (US$ 36 million or €30million). Renovation work is expected to last until the first quarter of 2024.
114: 1084: 1079: 629: 171: 1089: 422:"Our Member Organizations: Mainstream Energy Solutions Limited: Brief overview of the Kainji and Jebba Hydroelectric Power Plants: Jebba Hydroelectric Plant" 391:, an Austrian engineering conglomerate, was selected by Mainstream Energy to repair the defective turbine and restore to power station to maximum capacity. 574: 529:"Bathymetric and Volumetric Analysis of Jebba (Hydropower) Dam Harnessing its Capability for Multipurpose Use: Geographical Location of the Study Area" 705: 58: 1074: 86: 714: 978: 425: 323:, enough to power over 364,000 homes. The plant was commissioned on 13 April 1985, although commercial energy production began in 1983. 698: 367: 232: 346:, the capital of Niger State. The power station sits astride the Niger River at the border between Niger State and 971: 691: 421: 675: 600: 354:, the capital city of Kwara State. Jebba Dam sits at an elevation of 71.917 metres (236 ft) above 1069: 1064: 964: 308: 1009: 802: 550: 375:, an independent power company. Mainstream Energy also holds the concession on the 760 megawatts 288: 899: 758: 540: 206: 904: 881: 784: 748: 647: 355: 331:
The Jebba Power Station is located about 100 kilometres (62 mi) downstream of the
1058: 937: 822: 722: 554: 278: 1026: 922: 914: 740: 661: 447:"Travel Distance Between Mokwa Local Government Secretariat And Jebba Dam, Nigeria" 683: 545: 528: 1014: 991: 927: 863: 845: 776: 669: 505: 478: 451: 347: 312: 255: 159: 155: 1038: 873: 858: 830: 812: 794: 637: 388: 376: 332: 186: 173: 945: 891: 853: 766: 655: 630:
Generating unit undergoing rehab at Jebba hydro plant, further work planned
956: 474:"Road Distance Between Minna, Niger State, Nigeria And Jebba Dam, Nigeria" 835: 807: 730: 342:
This is approximately 256 kilometres (159 mi) by road, southwest of
73:
Map of Nigeria showing the location of Jebba Hydroelectric Power Station.
17: 316: 145: 44: 351: 350:, approximately 91.5 kilometres (57 mi), by road, northeast of 575:"Plans afoot to modernise generation unit at Nigerian hydro plant" 343: 336: 987: 320: 960: 687: 501:"Road Distance Between Ilorin, Nigeria And Jebba Dam, Nigeria" 335:, and approximately 40 kilometres (25 mi) southwest of 533:
Nigerian Journal of Environmental Sciences and Technology
121: 93: 65: 527:
Olushola S.O. and Ehigiator–Irughe R. (1 March 2017).
420:
International Hydropower Association (December 2020).
936: 913: 890: 872: 844: 821: 793: 775: 757: 739: 721: 287: 277: 269: 261: 251: 246: 238: 228: 220: 212: 202: 165: 151: 141: 37: 601:"Jebba Hydroelectric Power Plant To Gulp N13.68bn" 319:. It has a power generating capacity of 578.4 972: 699: 8: 979: 965: 957: 706: 692: 684: 101:Jebba Hydroelectric Power Station (Africa) 43: 34: 544: 129:Jebba Hydroelectric Power Station (Earth) 1085:Energy infrastructure completed in 1985 1080:Hydroelectric power stations in Nigeria 407: 577:. Rondebosch, South Africa: ESI Africa 7: 1090:20th-century architecture in Nigeria 594: 592: 568: 566: 564: 426:International Hydropower Association 415: 413: 411: 373:Mainstream Energy Solutions Limited 377:Kainji Hydroelectric Power Station 25: 301:Jebba Hydroelectric Power Station 293:578.4 megawatts (775,600 hp) 38:Jebba Hydroelectric Power Station 1032: 1020: 1003: 668: 654: 640: 599:Chika Izuora (28 January 2021). 366:The power station, owned by the 120: 113: 92: 85: 64: 57: 1075:1985 establishments in Nigeria 715:Dams and reservoirs in Nigeria 573:ESI Africa (26 January 2021). 32:Dam in Kwara State/Niger State 1: 368:Federal Government of Nigeria 233:Federal Government of Nigeria 546:10.36263/NIJEST.2017.01.0028 339:, the nearest urban centre. 1106: 424:. London, United Kingdom: 998: 51: 42: 27:Power station in Nigeria 676:Renewable energy portal 632:As of 11 December 2020. 289:Installed capacity 383:Repairs and renovation 270:Commission date 309:hydroelectric power 305:Jebba Power Station 187:9.13556°N 4.78778°E 183: /  76:Show map of Nigeria 803:Challawa Gorge Dam 605:Leadership Nigeria 104:Show map of Africa 1052: 1051: 954: 953: 900:Asejire Reservoir 759:Cross River State 387:In January 2021, 311:plant across the 297: 296: 265:Mainstream Energy 247:Dam and spillways 242:Mainstream Energy 221:Opening date 132:Show map of Earth 16:(Redirected from 1097: 1037: 1036: 1035: 1025: 1024: 1023: 1008: 1007: 1006: 981: 974: 967: 958: 708: 701: 694: 685: 678: 673: 672: 664: 659: 658: 650: 645: 644: 643: 617: 616: 614: 612: 596: 587: 586: 584: 582: 570: 559: 558: 548: 524: 518: 517: 515: 513: 497: 491: 490: 488: 486: 470: 464: 463: 461: 459: 443: 437: 436: 434: 432: 417: 198: 197: 195: 194: 193: 192:9.13556; 4.78778 188: 184: 181: 180: 179: 176: 133: 124: 123: 117: 105: 96: 95: 89: 77: 68: 67: 61: 47: 35: 21: 1105: 1104: 1100: 1099: 1098: 1096: 1095: 1094: 1055: 1054: 1053: 1048: 1033: 1031: 1021: 1019: 1004: 1002: 994: 985: 955: 950: 932: 909: 905:Ikere Gorge Dam 886: 868: 840: 817: 789: 771: 753: 735: 717: 712: 682: 681: 674: 667: 660: 653: 646: 641: 639: 626: 621: 620: 610: 608: 598: 597: 590: 580: 578: 572: 571: 562: 526: 525: 521: 511: 509: 499: 498: 494: 484: 482: 472: 471: 467: 457: 455: 445: 444: 440: 430: 428: 419: 418: 409: 404: 385: 364: 329: 191: 189: 185: 182: 177: 174: 172: 170: 169: 137: 136: 135: 134: 131: 130: 127: 126: 125: 108: 107: 106: 103: 102: 99: 98: 97: 80: 79: 78: 75: 74: 71: 70: 69: 33: 28: 23: 22: 15: 12: 11: 5: 1103: 1101: 1093: 1092: 1087: 1082: 1077: 1072: 1067: 1057: 1056: 1050: 1049: 1047: 1046: 1041: 1029: 1017: 1012: 999: 996: 995: 986: 984: 983: 976: 969: 961: 952: 951: 949: 948: 942: 940: 934: 933: 931: 930: 925: 919: 917: 911: 910: 908: 907: 902: 896: 894: 888: 887: 885: 884: 882:Oyan River Dam 878: 876: 870: 869: 867: 866: 861: 856: 850: 848: 842: 841: 839: 838: 833: 827: 825: 819: 818: 816: 815: 810: 805: 799: 797: 791: 790: 788: 787: 785:Dadin Kowa Dam 781: 779: 773: 772: 770: 769: 763: 761: 755: 754: 752: 751: 749:Kafin Zaki Dam 745: 743: 737: 736: 734: 733: 727: 725: 719: 718: 713: 711: 710: 703: 696: 688: 680: 679: 665: 651: 648:Nigeria portal 636: 635: 634: 633: 625: 624:External links 622: 619: 618: 588: 560: 519: 492: 465: 438: 406: 405: 403: 400: 384: 381: 363: 360: 356:mean sea level 328: 325: 295: 294: 291: 285: 284: 281: 275: 274: 271: 267: 266: 263: 259: 258: 253: 249: 248: 244: 243: 240: 236: 235: 230: 226: 225: 222: 218: 217: 214: 210: 209: 204: 200: 199: 167: 163: 162: 153: 149: 148: 143: 139: 138: 128: 119: 118: 112: 111: 110: 109: 100: 91: 90: 84: 83: 82: 81: 72: 63: 62: 56: 55: 54: 53: 52: 49: 48: 40: 39: 31: 26: 24: 14: 13: 10: 9: 6: 4: 3: 2: 1102: 1091: 1088: 1086: 1083: 1081: 1078: 1076: 1073: 1071: 1068: 1066: 1063: 1062: 1060: 1045: 1042: 1040: 1030: 1028: 1018: 1016: 1013: 1011: 1001: 1000: 997: 993: 989: 982: 977: 975: 970: 968: 963: 962: 959: 947: 944: 943: 941: 939: 938:Zamfara State 935: 929: 926: 924: 921: 920: 918: 916: 912: 906: 903: 901: 898: 897: 895: 893: 889: 883: 880: 879: 877: 875: 871: 865: 862: 860: 857: 855: 852: 851: 849: 847: 843: 837: 834: 832: 829: 828: 826: 824: 823:Katsina State 820: 814: 811: 809: 806: 804: 801: 800: 798: 796: 792: 786: 783: 782: 780: 778: 774: 768: 765: 764: 762: 760: 756: 750: 747: 746: 744: 742: 738: 732: 729: 728: 726: 724: 723:Adamawa State 720: 716: 709: 704: 702: 697: 695: 690: 689: 686: 677: 671: 666: 663: 657: 652: 649: 638: 631: 628: 627: 623: 606: 602: 595: 593: 589: 576: 569: 567: 565: 561: 556: 552: 547: 542: 538: 534: 530: 523: 520: 508: 507: 502: 496: 493: 481: 480: 475: 469: 466: 454: 453: 448: 442: 439: 427: 423: 416: 414: 412: 408: 401: 399: 396: 392: 390: 382: 380: 378: 374: 369: 361: 359: 357: 353: 349: 345: 340: 338: 334: 326: 324: 322: 318: 314: 310: 306: 302: 292: 290: 286: 282: 280: 276: 273:13 April 1985 272: 268: 264: 260: 257: 254: 250: 245: 241: 237: 234: 231: 227: 224:13 April 1985 223: 219: 215: 211: 208: 205: 201: 196: 168: 164: 161: 157: 154: 150: 147: 144: 140: 116: 88: 60: 50: 46: 41: 36: 30: 19: 1043: 923:Bakolori Dam 915:Sokoto State 741:Bauchi State 662:Water portal 609:. Retrieved 604: 579:. Retrieved 536: 532: 522: 510:. Retrieved 504: 495: 483:. Retrieved 477: 468: 456:. Retrieved 450: 441: 429:. Retrieved 397: 393: 386: 372: 365: 341: 330: 304: 300: 298: 29: 1070:Niger State 1065:Kwara State 992:Niger River 928:Goronyo Dam 864:Shiroro Dam 846:Niger State 777:Gombe State 539:: 111–122. 506:Google Maps 479:Google Maps 452:Google Maps 348:Kwara State 313:Niger River 283:6 x 96.4 MW 262:Operator(s) 256:Niger River 239:Operator(s) 216:Operational 190: / 166:Coordinates 160:Niger State 156:Kwara State 1059:Categories 874:Ogun State 859:Kainji Dam 831:Jibiya Dam 813:Watari Dam 795:Kano State 611:30 January 581:30 January 512:30 January 485:30 January 458:30 January 431:30 January 402:References 389:Andritz AG 333:Kainji Dam 178:04°47′16″E 175:09°08′08″N 946:Gusau Dam 892:Oyo State 854:Jebba Dam 767:Obudu Dam 555:202173933 321:megawatts 18:Jebba Dam 1027:Kandadji 836:Zobe Dam 808:Tiga Dam 731:Kiri Dam 362:Overview 327:Location 279:Turbines 252:Impounds 229:Owner(s) 152:Location 1015:Markala 1010:Taoussa 990:on the 607:. Abuja 503:(Map). 476:(Map). 449:(Map). 317:Nigeria 307:, is a 303:, also 203:Purpose 146:Nigeria 142:Country 1039:Kainji 553:  352:Ilorin 213:Status 1044:Jebba 551:S2CID 344:Minna 337:Mokwa 207:Power 988:Dams 613:2021 583:2021 514:2021 487:2021 460:2021 433:2021 315:in 299:The 541:doi 1061:: 603:. 591:^ 563:^ 549:. 535:. 531:. 410:^ 358:. 980:e 973:t 966:v 707:e 700:t 693:v 615:. 585:. 557:. 543:: 537:1 516:. 489:. 462:. 435:. 158:/ 20:)

Index

Jebba Dam

Jebba Hydroelectric Power Station is located in Nigeria
Jebba Hydroelectric Power Station is located in Africa
Jebba Hydroelectric Power Station is located in Earth
Nigeria
Kwara State
Niger State
09°08′08″N 04°47′16″E / 9.13556°N 4.78778°E / 9.13556; 4.78778
Power
Federal Government of Nigeria
Niger River
Turbines
Installed capacity
hydroelectric power
Niger River
Nigeria
megawatts
Kainji Dam
Mokwa
Minna
Kwara State
Ilorin
mean sea level
Federal Government of Nigeria
Kainji Hydroelectric Power Station
Andritz AG


Text is available under the Creative Commons Attribution-ShareAlike License. Additional terms may apply.