precedent. Brazilian law allows for expedited licensing for eco-friendly projects described by the Worldwatch institute as "kindler, gentler dams with smaller reservoirs, designed to lessen social and environmental impacts." The Worldwatch Institute insists that no project should "fast-track the licensing of new dams in Amazonia and allow projects to circumvent Brazil's tough environmental laws".
594: 580: 360:, Brazil. The dam's hydroelectric power stations have 50 turbines each 75 MW resulting total installed capacity of 3,750 MW. The power plant's first unit was commissioned in September 2013, the 16th in November 2014, 24th in February 2015, the 41st in December 2015, and the last in December 2016. Most of the power is designed to be exported to south-eastern Brazil via the 54: 450:
responsible for building the Jirau dam. A coalition of non-governmental organizations called for dam construction to be halted, and questions were raised during annual meeting of GDF Suez. After more than 10 years in operation, no one single Indian tribe was found in the region impacted by Jirau dam.
536:
She was known in the region for the struggle in defense of the affected populations, denouncing human rights violations committed by the consortium responsible for the Jirau power plant, called Energia Sustentável do Brasil (ESBR). Nicinha was daughter of rubber extractors who came from the Brazilian
532:
was found on 21 June 2016 in the hydro-power dam's lake of Jirau. Nicinha, leadership of MAB in Rondônia was missing since 7 January 2016. Her body was found only 400 meters away from where she used to live. Her body was found by the workers of the dam, her hands and feet were tied by a rope and tied
473:
Because both the Jirau and Santo Antonio dams are run-of-the-river projects, neither dam impounds a large reservoir. Both dams also feature significant environmental re-mediation efforts. As a consequence, there has not been strong environmental opposition to the implementation of the Madeira river
436:
claim that many legal criteria were rubber-stamped before all questions from impacted groups had been addressed. The dam's social impacts received the majority of substantive criticism (see below). However, environmental groups noted that the fast track approval for the Madeira dams sets a dangerous
519:
capable of raising and lowering oceangoing vessels. If the project is completed, "more than 4,000 km of waterways upstream from the dams in Brazil, Bolivia, and Peru would become navigable." Hence, if the project is completed, both Bolivian commercial vessels and the Bolivian navy would have
380:
in Brazil, construction of both dams was accelerated in 2009. The total estimated cost of the two facilities currently under construction is $ 15.6 billion ($ 8 billion for Jirau), including about $ 10 billion for the civil engineering and power plants, and $ 5 billion for ship locks, transmission
490:
Construction on the dam was halted on 18 March 2011 as workers rioted; setting fire to buses and destroying part of the worker housing. Wages and the treatment by security officials was attributed to the rioting. Additional security personal had to be sent to the site and construction was halted.
449:
predicts that there may be un-contacted indigenous populations in the region that will be affected by the Madeira complex. Most of the affected populations are nearest to the Jirau dam. The threat to uncontacted Indians has motivated both internal and external criticism of ESBR, the contractor
418:
for a total installed capacity of 3,750 MW. The reservoir created by the dam has a surface area of 258 km (100 sq mi) of which 135 km (52 sq mi) is the original riverbed. Bulb turbines are a variation of the Kaplan turbine, with the main differences being that bulb
385:, an effort by South American governments to integrate the continent's infrastructure with new investments in transportation, energy, and communication. Construction on the project was temporary halted in March 2011, February 2012 and April 2013 due to worker riots or strikes. 410:-core. Its structural volume is 2,000,000 m (70,629,333 cu ft) of which 17,000 m (600,349 cu ft) is asphalt. The dam's spillway consists of 21 gates and has a maximum discharge of 82,000 m/s (2,895,803 cu ft/s). The 729: 474:
complex. However, critics point out that if the fish ladders fail, "several valuable migratory fish species could suffer near-extinction as a result of the Madeira dams." Jirau's environmentally friendly design earned the plant registration under the "
382: 375:
and Jirau), a third on the border of Brazil and Bolivia, and a fourth station inside Bolivia. Two of these, Santo Antonio and Jirau, are already operating, while the smaller upstream dams are still in the planning stages. In part due to
775: 401:
The Jirau Dam is a combination embankment dam with concrete sections for the power stations and spillway. The length of the entire dam is 1,100 m (3,609 ft) while the embankment section is 800 m (2,625 ft). The
736: 431:
Brazilian law requires water impoundments to undergo a very thorough approval process to ensure that each project meets environmental, social, political, and safety criteria. However, critics of the Jirau and
458: 392:
approved an additional US$ 1.6 billion for the project in September 2012. The extra funding will add six more 75 MW bulb turbine-generators to the power station (a total of 50) and pay for transmission lines.
1036: 549:, where she lived almost fifty years and was evicted along with other fishers due to the construction of the dam. The encampment where they had lived had no access to clean water or electricity. 566:
His killer, Edione Pessoa da Silva, who was in prison after confessing to murder Nicinha, escaped from the State Penitentiary "Edvan Mariano Rosendo", located in Porto Velho (RO) in April 2016.
563:
and the State Prosecutor's Office on the non-implementation of the Program of Support to Fishing Activity and another of criminal character, because of data manipulation in monitoring reports.
445:
The most frequent objection is that the dam builders failed to adequately consult with indigenous peoples, as required by law. The Brazilian government indigenous protection foundation
419:
turbines are installed horizontally and are generally considered to be slightly more efficient. The power plant is constructed by Energias Sustentáveis do Brasil and Brazilian company
646: 1092: 482:. Jirau is the largest renewable energy plant to earn the CDM, which is awarded to innovative projects that help to solve environmental problems such as climate change. 515:, awaiting an eventual recovery of access to the sea. The Madeira river complex presents an opportunity for Bolivia because all of the hydroelectric dams would feature 465:
for the non-accomplishment of some of the conditions previewed by the environmental license and for the indemnification for losses on the traditional fishers' revenues.
1044: 1208: 819: 915: 555:
made several complaints over the years, attending public hearings and events, including, pointed out the serious impacts of predatory fishing activity on the
1037:"Ministério Público pede à Justiça Federal em Porto Velho cancelamento da licença de operação da Hidrelétrica de Jirau | Água e energia não são mercadorias!" 681: 761: 1171: 658: 1118: 703: 560: 834: 507:
in 1884. Many Bolivians feel a deep and lasting bitterness due to this loss, and the Bolivian military continues to build and maintain an
941: 446: 367:
The dam is part of a planned four power plant Madeira river hydroelectric complex, which will consist of two dams in Brazil (3,580 MW
623: 1096: 94: 46: 1216: 963: 1243: 864: 377: 919: 475: 890: 462: 389: 491:
Workers went on strike at Jirau and Santo Antonio in April 2013 after a salary increase proposal was rejected.
30: 799:
Initiatives for the Improvement of the South American Market of Roaming Services Analysis and Recommendations
1178: 613: 361: 1144: 1066: 516: 707: 508: 433: 368: 842: 262: 169: 504: 500: 300: 755: 420: 381:
lines, and environmental re-mediation. The Madeira river hydroelectric complex is part of the
1172:
Effects of Energy and Transportation Projects on Soybean Expansion in the Madeira River Basin
411: 407: 1209:"Nicinha's body is found after five months missing | Água e energia não são mercadorias!" 528:
The body of the Brazilian environmental activist Nilce de Souza Magalhães, also known as
479: 415: 403: 313: 293: 277: 1237: 585: 556: 512: 353: 287: 194: 520:
access to the open ocean, and lucrative sea lanes, for the first time in 120 years.
599: 538: 1014: 607: 546: 542: 372: 357: 81: 332: 967: 628: 575: 383:
Initiative for the Integration of the Regional Infrastructure of South America
1119:"Brazil's Jirau hydro project world's largest CDM-registered renewable plant" 109: 96: 682:"Commissioning of turbines at Brazil's 3,750-MW Jirau nearing halfway point" 593: 559:. The complaints generated two civil investigations being conducted by the 306: 629:
Jirau and Santo Antônio: tales of an Amazonian war (video documentary)
1093:"Madeira River Basin: Hydropower dams in the heart of the Amazon" 820:
The New York Times: Amid Brazil’s Rush to Develop, Workers Resist
706:. Energia Sustentável do Brasil. 22 December 2015. Archived from 659:"Aneel authorizes 16th turbine hydroelectric Jirau, in Rondônia" 647:
Enerdata: First 75 MW turbine commissioned at 3,750 MW Jirau dam
319: 181: 1009: 1007: 964:"Environmental lawsuits filed against Madeira dam projects" 865:"Brazil's development bank approves new loan for Jirau dam" 835:"Workers remain on strike in hydro Jirau and Santo Antônio" 987: 985: 220:
2,000,000 m (70,629,333 cu ft) (embankment)
776:"Brazil to Build $ 15.6 Billion in Dams in Amazon Region" 352:
is a rock-fill dam with an asphalt-concrete core, in the
942:"Jirau dam, responding to Brazil's growing energy needs" 798: 1177:(Report). Conservation Strategy Fund. Archived from 704:"UHE Jirau fecha o ano com 41 turbinas em operação" 406:is arched, 63 m (207 ft) tall and has an 312: 299: 286: 276: 268: 258: 253: 245: 240: 232: 224: 216: 208: 200: 190: 180: 175: 165: 157: 149: 141: 133: 125: 88: 77: 69: 23: 1015:"Amazon mega-dams endanger uncontacted Indians" 1145:"Brazil Sends Forces to Jirau Dam After Riots" 841:(in Portuguese). 11 April 2013. Archived from 453:Moreover, federal prosecutors are suing ESBR ( 236:82,000 m/s (2,895,803 cu ft/s) 8: 1095:. World Wildlife Fund Global. Archived from 503:since it lost its coastline to Chile in the 457:), the company responsible for the dam, the 1017:. Survival: the Movement for Tribal Peoples 797:José María Díaz Batanero (February 2010). 459:Brazilian Institute of Environment (IBAMA) 29: 20: 966:. Bank Information Center. Archived from 829: 827: 639: 414:dam's power station contain 50 x 75 MW 1000:(1). Worldwatch Institute: 8–18. 2010. 760:: CS1 maint: archived copy as title ( 753: 186:Embankment, concrete gravity composite 1203: 1201: 1199: 1067:"Brazil Engineers a Critic-Proof Dam" 7: 778:. Water World – PennWell Corporation 680:Harris, Michael (27 February 2015). 524:Killing of an environmental activist 1170:Maria del Carmen Vera-Diaz (2009). 61:Location of the Jirau Dam in Brazil 896:(in Portuguese). Eletrobras Furnas 463:Brazilian Development Bank (BNDES) 14: 249:258 km (100 sq mi) 53: 624:List of power stations in Brazil 606: 592: 578: 52: 45: 1: 455:Energia Sustentável do Brasil 228:Overflow, 21 controlled gates 801:(Report) (in Spanish). IIRSA 378:the 2001–2002 power shortage 212:1,500 m (4,921 ft) 992:"Greenwashing Hydropower". 661:. Rondonia. 4 November 2014 561:Federal Prosecutor's Office 541:to the city of Abuna (near 476:Clean Development Mechanism 335:.energiasustentaveldobrasil 1260: 918:. Veidekke. Archived from 390:Brazilian Development Bank 495:Opportunities for Bolivia 325: 282:15.10 m (50 ft) 40: 28: 73:Usina Hidrelétrica Jirau 1149:The Wall Street Journal 1071:The Wall Street Journal 614:Renewable energy portal 478:" (CDM) program of the 362:Rio Madeira HVDC system 301:Installed capacity 204:63 m (207 ft) 134:Construction began 18:Dam in Rondônia, Brazil 1213:www.mabnacional.org.br 1041:www.mabnacional.org.br 314:Annual generation 233:Spillway capacity 150:Construction cost 182:Type of dam 35:Site of the Jirau Dam 970:on 28 September 2011 269:Commission date 110:9.26667°S 64.64917°W 922:on 4 September 2011 916:"Jirau dam, Brasil" 871:. 28 September 2012 710:on 17 February 2017 499:Bolivia has been a 115:-9.26667; -64.64917 106: /  1219:on 7 November 2016 1184:on 12 October 2007 1047:on 8 November 2016 505:war of the pacific 501:landlocked country 225:Spillway type 1099:on 2 October 2012 434:Santo Antonio dam 369:Santo Antônio Dam 358:state of Rondônia 346: 345: 246:Surface area 176:Dam and spillways 142:Opening date 1251: 1244:Dams in Rondônia 1229: 1228: 1226: 1224: 1215:. Archived from 1205: 1194: 1193: 1191: 1189: 1183: 1176: 1167: 1161: 1160: 1158: 1156: 1141: 1135: 1134: 1132: 1130: 1115: 1109: 1108: 1106: 1104: 1089: 1083: 1082: 1080: 1078: 1073:. 6 October 2010 1063: 1057: 1056: 1054: 1052: 1043:. Archived from 1033: 1027: 1026: 1024: 1022: 1011: 1002: 1001: 989: 980: 979: 977: 975: 960: 954: 953: 951: 949: 938: 932: 931: 929: 927: 912: 906: 905: 903: 901: 895: 887: 881: 880: 878: 876: 861: 855: 854: 852: 850: 831: 822: 817: 811: 810: 808: 806: 794: 788: 787: 785: 783: 772: 766: 765: 759: 751: 749: 747: 742:on 28 April 2019 741: 735:. Archived from 734: 726: 720: 719: 717: 715: 700: 694: 693: 691: 689: 684:. HydroWorld.com 677: 671: 670: 668: 666: 655: 649: 644: 616: 611: 610: 602: 597: 596: 588: 583: 582: 581: 412:run-of-the-river 342: 341: 338: 336: 334: 121: 120: 118: 117: 116: 111: 107: 104: 103: 102: 99: 56: 55: 49: 33: 21: 1259: 1258: 1254: 1253: 1252: 1250: 1249: 1248: 1234: 1233: 1232: 1222: 1220: 1207: 1206: 1197: 1187: 1185: 1181: 1174: 1169: 1168: 1164: 1154: 1152: 1151:. 18 March 2011 1143: 1142: 1138: 1128: 1126: 1117: 1116: 1112: 1102: 1100: 1091: 1090: 1086: 1076: 1074: 1065: 1064: 1060: 1050: 1048: 1035: 1034: 1030: 1020: 1018: 1013: 1012: 1005: 991: 990: 983: 973: 971: 962: 961: 957: 947: 945: 940: 939: 935: 925: 923: 914: 913: 909: 899: 897: 893: 891:"Jirau Project" 889: 888: 884: 874: 872: 863: 862: 858: 848: 846: 845:on 4 March 2016 833: 832: 825: 818: 814: 804: 802: 796: 795: 791: 781: 779: 774: 773: 769: 752: 745: 743: 739: 732: 730:"Archived copy" 728: 727: 723: 713: 711: 702: 701: 697: 687: 685: 679: 678: 674: 664: 662: 657: 656: 652: 645: 641: 637: 620: 619: 612: 605: 598: 591: 584: 579: 577: 572: 526: 509:open ocean navy 497: 488: 471: 443: 429: 399: 371:at the city of 331: 330: 329: 217:Dam volume 114: 112: 108: 105: 100: 97: 95: 93: 92: 65: 64: 63: 62: 59: 58: 57: 36: 19: 12: 11: 5: 1257: 1255: 1247: 1246: 1236: 1235: 1231: 1230: 1195: 1162: 1136: 1110: 1084: 1058: 1028: 1003: 981: 955: 933: 907: 882: 856: 823: 812: 789: 767: 721: 695: 672: 650: 638: 636: 633: 632: 631: 626: 618: 617: 603: 589: 574: 573: 571: 568: 525: 522: 496: 493: 487: 484: 480:United Nations 470: 467: 442: 439: 428: 425: 421:Camargo Correa 404:embankment dam 398: 395: 344: 343: 323: 322: 316: 310: 309: 303: 297: 296: 290: 284: 283: 280: 278:Hydraulic head 274: 273: 270: 266: 265: 260: 256: 255: 251: 250: 247: 243: 242: 238: 237: 234: 230: 229: 226: 222: 221: 218: 214: 213: 210: 206: 205: 202: 198: 197: 192: 188: 187: 184: 178: 177: 173: 172: 167: 163: 162: 159: 155: 154: 151: 147: 146: 143: 139: 138: 135: 131: 130: 127: 123: 122: 90: 86: 85: 79: 75: 74: 71: 67: 66: 60: 51: 50: 44: 43: 42: 41: 38: 37: 34: 26: 25: 17: 13: 10: 9: 6: 4: 3: 2: 1256: 1245: 1242: 1241: 1239: 1218: 1214: 1210: 1204: 1202: 1200: 1196: 1180: 1173: 1166: 1163: 1150: 1146: 1140: 1137: 1124: 1120: 1114: 1111: 1098: 1094: 1088: 1085: 1072: 1068: 1062: 1059: 1046: 1042: 1038: 1032: 1029: 1016: 1010: 1008: 1004: 999: 995: 988: 986: 982: 969: 965: 959: 956: 943: 937: 934: 921: 917: 911: 908: 892: 886: 883: 870: 866: 860: 857: 844: 840: 836: 830: 828: 824: 821: 816: 813: 800: 793: 790: 777: 771: 768: 763: 757: 738: 731: 725: 722: 709: 705: 699: 696: 683: 676: 673: 660: 654: 651: 648: 643: 640: 634: 630: 627: 625: 622: 621: 615: 609: 604: 601: 595: 590: 587: 586:Brazil portal 576: 569: 567: 564: 562: 558: 557:Madeira River 554: 550: 548: 544: 540: 534: 531: 523: 521: 518: 514: 513:Lake Titicaca 510: 506: 502: 494: 492: 485: 483: 481: 477: 469:Environmental 468: 466: 464: 460: 456: 451: 448: 440: 438: 435: 426: 424: 422: 417: 416:bulb turbines 413: 409: 405: 396: 394: 391: 386: 384: 379: 374: 370: 365: 363: 359: 355: 354:Madeira River 351: 340: 328: 324: 321: 317: 315: 311: 308: 304: 302: 298: 295: 294:bulb turbines 291: 289: 285: 281: 279: 275: 271: 267: 264: 263:Jirau Energia 261: 257: 254:Power Station 252: 248: 244: 239: 235: 231: 227: 223: 219: 215: 211: 207: 203: 199: 196: 195:Madeira River 193: 189: 185: 183: 179: 174: 171: 170:Jirau Energia 168: 164: 160: 156: 153:US$ 8 billion 152: 148: 145:December 2016 144: 140: 137:December 2008 136: 132: 128: 124: 119: 91: 87: 83: 80: 76: 72: 70:Official name 68: 48: 39: 32: 27: 22: 16: 1221:. Retrieved 1217:the original 1212: 1186:. Retrieved 1179:the original 1165: 1153:. Retrieved 1148: 1139: 1127:. Retrieved 1125:. 6 May 2013 1122: 1113: 1101:. Retrieved 1097:the original 1087: 1075:. Retrieved 1070: 1061: 1049:. Retrieved 1045:the original 1040: 1031: 1019:. Retrieved 997: 993: 972:. Retrieved 968:the original 958: 946:. Retrieved 936: 924:. Retrieved 920:the original 910: 898:. Retrieved 885: 873:. Retrieved 868: 859: 847:. Retrieved 843:the original 838: 815: 803:. Retrieved 792: 780:. Retrieved 770: 744:. Retrieved 737:the original 724: 712:. Retrieved 708:the original 698: 686:. Retrieved 675: 663:. Retrieved 653: 642: 600:Water portal 565: 552: 551: 535: 529: 527: 498: 489: 472: 454: 452: 444: 430: 400: 387: 366: 349: 347: 326: 318:19 100  15: 1129:30 December 1123:Hydro World 994:World Watch 875:26 February 543:Porto Velho 533:to a rock. 373:Porto Velho 305:3,750  292:50 x 75 MW 259:Operator(s) 166:Operator(s) 129:Operational 113: / 89:Coordinates 1223:7 November 1051:7 November 944:. GDF Suez 714:1 February 665:26 January 635:References 517:ship locks 101:64°38′57″W 746:23 August 537:state of 350:Jirau Dam 272:2013–2016 241:Reservoir 98:9°16′00″S 24:Jirau Dam 1238:Category 756:cite web 688:1 August 570:See also 547:Rondonia 530:Nicinha, 461:and the 288:Turbines 191:Impounds 158:Owner(s) 84:, Brazil 82:Rondônia 78:Location 1155:2 April 1077:2 April 974:2 April 948:2 April 926:2 April 900:2 April 869:Reuters 839:Reuters 782:2 April 553:Nicinha 427:Impacts 408:asphalt 356:in the 327:Website 1188:7 July 1103:7 July 1021:7 July 849:1 June 805:7 July 441:Social 397:Design 209:Length 201:Height 126:Status 1182:(PDF) 1175:(PDF) 894:(PDF) 740:(PDF) 733:(PDF) 545:) in 486:Labor 447:FUNAI 1225:2016 1190:2011 1157:2011 1131:2014 1105:2011 1079:2011 1053:2016 1023:2011 976:2011 950:2011 928:2011 902:2011 877:2013 851:2013 807:2011 784:2011 762:link 748:2017 716:2016 690:2015 667:2015 539:Acre 423:SA. 388:The 348:The 337:.com 161:ESBR 511:in 339:.br 333:www 320:GWh 1240:: 1211:. 1198:^ 1147:. 1121:. 1069:. 1039:. 1006:^ 998:23 996:. 984:^ 867:. 837:. 826:^ 758:}} 754:{{ 364:. 307:MW 1227:. 1192:. 1159:. 1133:. 1107:. 1081:. 1055:. 1025:. 978:. 952:. 930:. 904:. 879:. 853:. 809:. 786:. 764:) 750:. 718:. 692:. 669:.

Index


Jirau Dam is located in Brazil
Rondônia
9°16′00″S 64°38′57″W / 9.26667°S 64.64917°W / -9.26667; -64.64917
Jirau Energia
Type of dam
Madeira River
Jirau Energia
Hydraulic head
Turbines
bulb turbines
Installed capacity
MW
Annual generation
GWh
www.energiasustentaveldobrasil.com.br
Madeira River
state of Rondônia
Rio Madeira HVDC system
Santo Antônio Dam
Porto Velho
the 2001–2002 power shortage
Initiative for the Integration of the Regional Infrastructure of South America
Brazilian Development Bank
embankment dam
asphalt
run-of-the-river
bulb turbines
Camargo Correa
Santo Antonio dam

Text is available under the Creative Commons Attribution-ShareAlike License. Additional terms may apply.