329:
22:
325:
System
Operator, allowing KOSTT to join the 42 other transmission operators that make up the regional energy cooperation organisation. The membership of ENTSO-E as an independent zone would end Kosovo's reliance on the Serbian power grid, and enable a joint energy bloc between Kosovo and Albania, an agreement which was signed in December.
324:
In April 2020, a vote by the
European Network of Transmission System Operators for Electricity, ENTSO-E, paved the way for Kosovo to become an independent regulatory zone for electricity. The vote confirmed that a connection agreement would be signed between ENTSO-E and KOSTT, the Kosovo Transmission
278:
and licensed by the Energy
Regulatory Office pursuant to the provisions of the primary and secondary Kosovo legislation, KOSTT j.s.c became a licensed entity for the transmission system operator and for the market operation, in October 2006.
247:
It plays an important role in the energy sector in Kosovo. As a market operator it is responsible for the organization and administration of trades in electricity and the management of the settlement process.
364:
KOSTT has a strategic position and it represents an important knot in the regional energy market. KOSTT is interconnected with four (4) other systems, namely, Albania, North
Macedonia, Montenegro and Serbia.
294:
263:
533:
313:
has legal jurisdiction over
Kosovar electricity transmission network, but due to political dispute, does not exercise full control over it. The direct loss of 113 GWh would amount to 24.86 million
371:
The energy sector is considered as one of the most important sectors in Kosovo. 96.8% of electricity in Kosovo is generated by Thermo Power Plants and 3.2% is generated by Hydro Power Plants.
368:
The KOSTT j.s.c transmission system consists of 1186 km overhead lines (181 km – 400 kV; 361 km – 220 kV; and 643 km – 110 kV) and 2400 MVA of transformation capacities.
301:
throughout Europe's power network due to lower frequency which was caused by the loss of electricity in the network. Namely, the loss was created due to political dispute between Serbia and
286:(KEK) (a vertically integrated company) on 1 July 2006, following the decision of the Government of Kosovo taken in July 2005 for restructuring of KEK and the obligations deriving from the
282:
The establishment of KOSTT j.s.c was a consequence of the restructuring of the energy sector in Kosovo. The transmission and dispatch functions officially have been divided from the
262:
KOSTT is control area and it is synchronously connected with continental Europe and cooperating with RG CE TSOs to abide by the EU packages. It expects to become a member of the
538:
336:
With that agreement
Albania and Kosovo will now be able to exchange energy reserves, which is expected to result in €4 million in savings per year for Kosovo.
543:
490:
465:
105:
287:
414:
275:
43:
440:
548:
233:
389:
309:
unauthorizedly from the network in the period of
January–February 2018. The Serbian electricity transmission operator
86:
58:
32:
283:
65:
186:
310:
39:
72:
206:
127:
328:
54:
318:
252:
348:
Planning, developing, maintaining and operating the Kosovo electricity transmission system
298:
256:
527:
79:
21:
491:"Kosovos electricity transmission system becomes independent from serbia"
237:
164:
360:
Working with neighboring TSOs for the benefit of Kosovo and the region
302:
241:
170:
327:
293:
In March 2018, the
European electricity transmission association
264:
European
Network of Transmission System Operators for Electricity
314:
306:
15:
317:, as per average euro area electricity price (per KWh) of 22
305:
where the
Kosovar power transmission company KOSTT took 113
357:
Providing conditions that promote competition within Kosovo
518:
415:"EMS: Kosovo neovlašćeno preuzimalo električnu energiju"
534:
Electric power transmission system operators in Kosovo
390:"Serbia-Kosovo spat delays electric clocks in Europe"
218:
213:
202:
194:
177:
159:
141:
133:
123:
46:. Unsourced material may be challenged and removed.
255:, an international organization consisting of the
288:Energy Community Treaty for South East Europe
8:
118:
117:
106:Learn how and when to remove this message
351:Providing non–discriminatory open access
380:
276:Ministry of Energy and Mining of Kosovo
259:(EU) and a number of non-EU countries.
236:company with its headquarters based in
466:"Kostt gains independence from Serbia"
7:
539:Government-owned companies of Europe
388:Oroschakoff, Kalina (7 March 2018).
354:Operating the new electricity market
44:adding citations to reliable sources
14:
544:Government-owned energy companies
421:(in Serbian). FoNet. 7 March 2018
290:where Kosovo is an equal member.
344:KOSTT j.s.c is responsible for:
332:Kosovo-Albania transmission line
20:
31:needs additional citations for
441:"Electricity price statistics"
1:
234:transmission system operator
565:
284:Kosovo Energy Corporation
321:for households in 2017.
198:Electricity transmission
147: (18 years ago)
187:chief executive officer
333:
251:It is a member of the
331:
297:warned over delay of
470:Prishtinainsight.com
207:Government of Kosovo
40:improve this article
549:Economy of Pristina
311:ElektromreĹľa Srbije
128:Joint-stock company
120:
334:
274:Appointed by the
227:
226:
116:
115:
108:
90:
556:
519:Official website
506:
505:
503:
501:
487:
481:
480:
478:
476:
462:
456:
455:
453:
451:
437:
431:
430:
428:
426:
411:
405:
404:
402:
400:
385:
253:Energy Community
223:
220:
190:
155:
153:
148:
121:
111:
104:
100:
97:
91:
89:
48:
24:
16:
564:
563:
559:
558:
557:
555:
554:
553:
524:
523:
515:
510:
509:
499:
497:
489:
488:
484:
474:
472:
464:
463:
459:
449:
447:
439:
438:
434:
424:
422:
413:
412:
408:
398:
396:
387:
386:
382:
377:
342:
299:electric clocks
272:
266:in the future.
217:
184:
180:
173:
167:
151:
149:
146:
112:
101:
95:
92:
49:
47:
37:
25:
12:
11:
5:
562:
560:
552:
551:
546:
541:
536:
526:
525:
522:
521:
514:
513:External links
511:
508:
507:
482:
457:
432:
406:
379:
378:
376:
373:
362:
361:
358:
355:
352:
349:
341:
338:
271:
268:
257:European Union
225:
224:
215:
211:
210:
204:
200:
199:
196:
192:
191:
183:Kadri Kadriu
181:
178:
175:
174:
169:
163:
161:
157:
156:
143:
139:
138:
135:
131:
130:
125:
114:
113:
28:
26:
19:
13:
10:
9:
6:
4:
3:
2:
561:
550:
547:
545:
542:
540:
537:
535:
532:
531:
529:
520:
517:
516:
512:
496:
492:
486:
483:
471:
467:
461:
458:
446:
442:
436:
433:
420:
416:
410:
407:
395:
391:
384:
381:
374:
372:
369:
366:
359:
356:
353:
350:
347:
346:
345:
339:
337:
330:
326:
322:
320:
316:
312:
308:
304:
300:
296:
291:
289:
285:
280:
277:
269:
267:
265:
260:
258:
254:
249:
245:
243:
239:
235:
231:
222:
216:
212:
208:
205:
201:
197:
193:
188:
182:
176:
172:
166:
162:
158:
144:
140:
136:
132:
129:
126:
122:
110:
107:
99:
96:February 2011
88:
85:
81:
78:
74:
71:
67:
64:
60:
57: –
56:
52:
51:Find sources:
45:
41:
35:
34:
29:This article
27:
23:
18:
17:
498:. Retrieved
494:
485:
473:. Retrieved
469:
460:
448:. Retrieved
444:
435:
423:. Retrieved
418:
409:
397:. Retrieved
393:
383:
370:
367:
363:
343:
340:Jurisdiction
335:
323:
292:
281:
273:
261:
250:
246:
229:
228:
209:(100 %)
160:Headquarters
124:Company type
102:
93:
83:
76:
69:
62:
50:
38:Please help
33:verification
30:
394:politico.eu
232:j.s.c is a
528:Categories
419:n1info.com
375:References
179:Key people
66:newspapers
445:europa.eu
319:eurocents
500:21 April
475:21 April
238:Pristina
195:Services
185:(acting
165:Pristina
134:Industry
495:Exit.al
450:8 March
425:8 March
399:8 March
295:ENTSO-E
270:History
214:Website
150: (
142:Founded
80:scholar
55:"KOSTT"
303:Kosovo
242:Kosovo
171:Kosovo
137:Energy
82:
75:
68:
61:
53:
315:euros
230:KOSTT
219:kostt
203:Owner
119:KOSTT
87:JSTOR
73:books
502:2020
477:2020
452:2018
427:2018
401:2018
221:.com
152:2006
145:2006
59:news
307:GWh
244:.
42:by
530::
493:.
468:.
443:.
417:.
392:.
240:,
168:,
504:.
479:.
454:.
429:.
403:.
189:)
154:)
109:)
103:(
98:)
94:(
84:·
77:·
70:·
63:·
36:.
Text is available under the Creative Commons Attribution-ShareAlike License. Additional terms may apply.