proposed metro lines to the airport. The proposed extension routes had an average length of 30 km (19 mi), and cost estimates ranged between ₹4,500 crore and ₹7,000 crore. A 25.9 km (16.1 mi) extension from Nagawara via Kannur and Bagaluru was the shortest, while the 35.4 km (22.0 mi) extension from Yeshwanthpur via Yelahanka, Kannur and Bagaluru was the longest of the proposed routes. BMRC received 1,300 responses from the public. The shortest (25.9 km, 16.1 mi) extension of the Kalena Agrahara (previously Gottigere) – Nagawara line via Kannur and Bagaluru to the airport emerged as the most popular choice. In February 2017, the Centre requested BMRC to start work on the airport link before Phase 3. Thus, the Airport Line was included in Phase 2 as Phase 2B.
2712: 1222: 714: 1211: 337: 312: 1204: 696: 1363: 1332: 860: 844: 703: 658: 633: 329: 321: 1308: 1285: 1250: 1182: 1160: 1135: 1113: 1091: 1066: 1044: 1022: 965: 934: 912: 852: 820: 798: 776: 754: 732: 650: 642: 611: 589: 567: 545: 523: 501: 479: 457: 435: 413: 391: 1242: 1975: 671: 2421: 978: 1277: 2718: 4472: 2744: 2725: 2668: 2593: 2408: 2164: 2120: 2049: 4518: 4434: 3019: 1348: 1887:
firms in March 2020. There are two packages. The first package included 2.84 km of ramps for a flyover at Central Silk board junction in addition to 9.859 km of viaduct with six elevated stations. The second package was for 8.377 km viaduct with seven elevated stations, 1.097 km depot line and a 0.30 km pocket track.
1492:(opened during May 2008) being very far from city center (about 35 km), commuting time by road in traffic congestion is time-consuming. Hence, attention for building a fast mass transit was in the minds of planners from the very beginning, especially since air traffic had kept increasing. The old airport in Bengaluru, the 1886:
emerged the lowest bidder for all packages. However, the tenders were quashed due to cash flow problems and bankruptcy proceedings by the selected firm, IL&FS. A second round of tendering was done in December 2019. The project cost was revised to ₹5994 crores. Fresh bids were received by multiple
1527:
This was changed and on 10 January 2019, the State Cabinet approved a change in alignment for the proposed metro line to the airport. The new line would begin at Krishnarajapura (K.R. Puram) and be aligned along the northern part of ORR (Outer Ring road), passing Kasturinagar, Nagawara, Hebbal, and
1518:
forbade underground construction from the southern side of the airport (due to security concerns as it would have to pass beneath the airport's second runway), the shortest route options (i.e. extending the Pink line from Nagawara directly north) were eliminated. An alternate route proceeding north
1480:
The route from Central Silkboard to K R Puram along the eastern part of Outer Ring Road (ORR) was included as Phase-2A since development on that part of ORR had leap-frogged much ahead of the rest of the city with huge number of new office buildings. As a result, traffic increased several fold with
1941:
The Union and State governments will contribute ₹3,973 crore by way of equity and subordinate debt. Land acquisition costs, estimated at ₹2,762 crore, will be funded by the Government of Karnataka. BMRCL will raise the remaining amount of ₹5,960 crores through loans. In March-2021, it had entered
1911:
Bettadahalasuru station would be built by Embassy group at a cost of ₹140 crore. Kempegowda International Airport is likely to fund the construction of two airport stations off the highway. An MoU was signed between BMRC and KIAL for construction of the 4.95 km line and stations entailing an
1915:
Central government's approval was delayed and finally received in April 2021. Nagarjuna Construction Company (NCC) emerged as the lowest bidder to construct the line on September 16, 2021. Construction finally began in February 2022. Opening of this phase as per August 2022 from MD of BMRCL is
1907:
Tenders for the Airport line were called in July 2020. There are three packages. The first package was for 11.003 km viaduct, including 281 mtrs viaduct beyond Phase-2A with eight elevated stations and 650 mtrs link line to Baiyyappanahalli depot. The second package was for 11.678 km
1510:
It was decided that BMRC would manage the airport rail project and a regular metro line with fewer halts would be built instead of a high speed rail. Following this, suggestions were invited from public during September 2016 to choose any one of nine possible extension routes from existing and
1507:(KIA). Cost was estimated at ₹5,767 crore (US$ 810 million). This was to be executed by an independent SPV - Bangalore Airport Rail Link Limited (BARLL). However, the plan for an exclusive city-airport high speed rail was canceled during October 2013 due to high cost and viability concerns. 1428:. It consists of two sections - Phase-2A (Central Silk Board to Krishnarajapura) and Phase-2B (Krishnarajapura to Airport). Construction of Phase-2A began in August 2021. Construction of Phase-2B began in February 2022. The 58.19 km line connects Central Silk Board with the 1908:
viaduct with 250 mtrs pocket track and two elevated stations. The third package was for 15.011 km viaduct, including 718.18 mtrs cut and cover portion in front of Yelahanka Air Force Station. All three packages include road widening, utility diversion and allied works.
1924:
In January 2023, there was an accident when an reinforcement cage of the under-construction metro pier fell on a woman software engineer, Tejaswini Sulakhe and her son Vihan in HBR Layout, which led to their eventual death. BMRCL announced a financial assistance of
1476:
The routes under Phase-2A and Phase-2B (Blue Line) were actually part of Phase-3 but 'fast-tracked' and prioritized under Phase-2. As early as in February 2012, the Central government had also requested BMRC to start work on the airport link during Phase 2 itself.
1523:
announced on 12 May 2017 that the government had finalized the Nagawara—Ramakrishna Hegde Nagar—Jakkur—Yelahanka route to the airport. However, this route had an obstacle as a high-pressure petroleum pipeline was passing through the originally proposed route.
1890:
Central government's approval was much delayed and finally received in April-2021. Tenders were awarded in May-2021 and construction on Phase-2A finally began in August-2021. Opening of this phase as per August 2022 from MD of BMRCL is expected around
1459:
In June 2022, BMRCL launched the first ever U Girder span on ORR-Airport metro line. The extension of the Purple Line and construction of the Pink and Yellow Lines is currently in progress. The Pink, Yellow and Blue lines will be
1878:
BMRCL prepared the detailed project report for the proposed Central Silk Board - KR Puram Line and submitted the DPR to the state government on 28 October 2016. Phase 2A was approved by the State Cabinet on 1 March 2017.
1956:
has secured a contract worth approximately Rs. 762 crore from Bangalore Metro Rail Corporation. This contract encompasses the 750V DC third rail electrification work under package EPC5-CC for the 57 km Blue Line of the
1485:
announced in September 2016 that a new 18 km (11 mi) line connecting Central Silk Board with K.R.Puram along ORR would be included in Phase 2 as Phase-2A of the project at an estimated cost of ₹4202 crores.
3180: 3831:"Public-Private Partnership between Bangalore Metro Rail Corporation Limited (BMRCL) and Bangalore International Airport Limited (BIAL) for Airport section of the ORR-Airport Metro: Signing of MoU" 3699: 3636: 3835:
Public-Private Partnership between Bangalore Metro Rail Corporation Limited (BMRCL) and Bangalore International Airport Limited (BIAL) for Airport section of the ORR-Airport Metro: Signing of MoU
3881: 3778: 1528:
Jakkur before heading towards the airport. The line would be 38 km long, about 9 km longer than the route previously proposed, estimated to cost ₹10,584 crore (US$ 1.5 billion).
3945: 3369: 4005: 3195: 1942:
into a loan agreement with JICA for US$ 318 million (₹2,317 crore). BMRC has raised US$ 500 million (₹3643 crore) from ADB to fund construction of the Blue Line (Phase-2A and 2B).
3977: 3555: 3931: 3899: 3830: 3421: 3130: 3292: 4030: 3527: 3112: 3727: 3148: 3913: 3753: 1440:. There are 30 stations on the line of which the two station/s at the Airport may be at surface level or underground. Blue Line will have interchanges with the 3455: 1464:-signaling enabled, unlike Namma Metro's first two lines (Purple and Green lines use distance-signaling). In June 2023, the Deputy Chief Minister of Karnataka 3855: 3992:"Bengaluru News Highlights: Woman, her son die after under-construction metro pillar collapses in Hennur CM Bommai announces Rs 10 lakh compensation each" 3644: 4090: 4560: 3963: 1432:. The Line is mostly elevated but also has an at-grade (surface) section close to the Airport and 2 short underground sections where it passes the 3166: 4128: 3991: 4056: 3804: 4252: 3584: 2345: 1461: 597: 3670: 4521: 4167: 3023: 2424: 2036: 1504: 1489: 1429: 1347: 670: 346: 82: 4259: 2369: 1945:
Thus, financial arrangements have been completed for Phases 2A and 2B. The 58.19-km line is estimated to cost ₹14,788 crores.
619: 4224: 4217: 2394: 2245: 2220: 1519:
till RK Hegde Nagar and then turning west to Jakkur and then along Airport Road was explored. Bangalore Development Minister
1500: 509: 487: 3978:"'I will pay you Rs 1 crore. Can you bring back my daughter and grandson?': Bengaluru Metro pillar collapse victim's father" 4266: 1496:, located well within the city, had closed for commercial operations as part of the terms of the PPP for the new airport. 666: 87: 4511: 4428: 3083: 3006: 1341: 293: 91: 3480: 4400: 4338: 4291: 2873: 2630: 2454: 1437: 1121: 920: 740: 3610: 3318: 3278: 1904:
DPR for the Airport Line had been prepared in September 2017 and cleared by Government of Karnataka in January 2019.
1468:
informed that Metro line to Kempegowda International Airport will be completed by June 2026, plus or minus 3 months.
4555: 4421: 4386: 4312: 4245: 4231: 2974: 2801: 2530: 2320: 2270: 1933:
also announced a separate compensation of Rs 10 lakh for each of the deaths from the Chief Ministers’ Relief Fund.
1294: 1052: 806: 575: 531: 4379: 4366: 4349: 4305: 4270: 4171: 4121: 3501: 3395: 3069: 3059: 3049: 2776: 2729: 2672: 2505: 2412: 2053: 1453: 1445: 1441: 1030: 947: 784: 678: 360: 4407: 4319: 4179: 4091:"Bangalore Metro: Siemens - RVNL JV Bags Rs. 762 Crore Electrification Contract Of Blue Line - Metro Rail News" 3964:"I regret not insisting on her to work from home, says mother-in-law of Bengaluru Metro pillar collapse victim" 3054: 2924: 2555: 2082: 1168: 828: 399: 4414: 4393: 4345: 4330: 4210: 3064: 2949: 2848: 2655: 2597: 2195: 1449: 1190: 1099: 881: 465: 255: 3248: 4371: 4354: 4326: 4298: 4202: 4198: 4190: 3088: 3074: 2748: 2580: 2480: 2168: 2151: 2124: 991: 977: 868: 762: 443: 4362: 3093: 2699: 1586: 4114: 973: 3344: 4186: 2107: 1481:
employees traveling from different parts of the city to this new CBD. Chief Minister of Karnataka,
421: 4238: 3222: 2295: 553: 1772: 3181:"Karnataka deputy CM DK Shivakumar clarifies on upcoming new metro lines in Bengaluru. Details" 4064: 3429: 3203: 2025: 2020: 1949: 1930: 1842: 1465: 1433: 3234: 3481:"Bangalore Metro Rail yet to decide on route for Airport Line – RailNews Media India Ltd" 264: 247: 17: 4549: 130: 3946:"Metro structure falls on family of 4, kills mother & toddler-son in Bengaluru" 1974: 1520: 1482: 4137: 3196:"Namma Metro link to Bengaluru airport will be completed by June 2026: Governor" 3044: 2743: 2724: 2667: 2592: 2407: 2163: 2119: 2048: 1958: 1493: 1413: 219: 140: 4471: 3779:"Kempe Gowda International Airport Metro link DPR ready, but for Phase 2 or 3?" 267: 4068: 3433: 3370:"Cost, viability nix high-speed rail link to Bengaluru International Airport" 3207: 3728:"Bengaluru Metro: Govt approves 58-km phase 2 project, to cost 14,788 crore" 1421: 1417: 68: 64: 4006:"Metro Seeks ₹3.5k cr from ADB - The Economic Times - Bangalore, 2/26/2019" 4517: 4433: 3900:"'I wish I had died too': Husband recalls Bengaluru metro accident horror" 3167:"Metro line to Bengaluru Airport to be ready by June 2026: D K Shivakumar" 3018: 1883: 3422:"Central funding brightens prospects of metro line to Bengaluru airport" 3274: 1953: 1882:
Tenders for the ORR (East) Metro line were called in February 2018 and
1838: 1816: 288: 3805:"Bengaluru Metro | BMRC plans two metro stations at Bengaluru Airport" 3131:"BMRCL launches U Girder for the first time on ORR-Airport metro line" 1973: 986: 876: 355: 3932:"What caused the under-construction metro pier in Bengaluru to fall?" 3556:"Karnataka government clears suburban rail project, Metro to airport" 3671:"BMRCL expecting central nod on ORR Metro Corridor in Next 3 months" 3882:"Metro pillar crash: Sudden loss leaves Bengaluru family shattered" 3856:"Embassy Group signs MoU with BMRCL for Bettahalasur Metro Station" 1425: 2432: 2071: 1794: 261: 4110: 1503:
a 33 km (21 mi) high speed rail line from MG Road to
4106: 4031:"ADB approves $ 500 million loan for Silk Board-airport metro" 3275:"Bangalore Metro Rail yet to decide on route for Airport Line" 2717: 115: 3700:"Bengaluru Metro Corp to Blame for ORR, Airport Lines Delay?" 3293:"Metro line from Silk Board to KR Puram to be fast-tracked" 3754:"Soil testing marks start of work on Namma Metro ORR line" 3113:"Bengaluru: Namma Metro's first U-girder launched on ORR" 3528:"Bengaluru Metro airport line to now run through Hebbal" 3149:"BMRCL to switch to U-girders for ORR, KIA Metro lines" 1499:
To connect airport to city, there had initially been a
3319:"KR Puram-Silk Board Metro line gets Cabinet approval" 1952:
disclosed in a BSE filing that its joint venture with
328: 320: 3914:"Bengaluru metro structure falls; techie, kid killed" 851: 843: 4502: 4479: 4443: 4281: 4157: 4146: 3579: 3577: 2619: 2615: 254: 218: 210: 202: 194: 189: 159: 154: 146: 136: 126: 121: 111: 100: 75: 60: 52: 44: 39: 34: 649: 641: 3396:"Now, suggest a Namma Metro route to the airport" 56:Bangalore Metro Rail Corporation Limited (BMRCL) 3611:"9 Companies Bid for Namma Metro's ORR Project" 3637:"Namma Metro ORR line tender receives 14 bids" 1516:Bengaluru International Airport Limited (BIAL) 1249: 1241: 4122: 3456:"Bengaluru wants KIA Metro line via Nagawara" 1284: 1276: 8: 4154: 4129: 4115: 4107: 3249:"DPR for Metro link to BIA in five months" 3017: 1452:at Nagawara and with the future /proposed 301: 274: 2438: 1992: 1983: 1980: 1538: 1535: 336: 311: 3104: 1571:Central Silk Board - Kodibeesanahalli 1210: 1203: 695: 276: 3585:"Bengaluru: Dead lines of Namma Metro" 3230: 3220: 3194:Bureau, The Hindu (12 February 2024). 1514:Since the airport's managing company, 1362: 1331: 859: 702: 657: 632: 31: 4057:"BMRCL signs loan agreement with ADB" 3722: 3720: 3693: 3691: 3664: 3662: 3550: 3548: 3502:"Govt finalises KIA metro link route" 3454:Kidiyoor, Suchith (7 December 2016). 7: 3281:from the original on 12 August 2019. 1970:The Blue Line will have 30 stations. 1307: 1181: 1159: 1134: 1112: 1090: 1065: 1043: 1021: 964: 933: 911: 819: 797: 775: 753: 731: 610: 588: 566: 544: 522: 500: 478: 456: 434: 412: 390: 1826:750V DC Third Rail electrification 25: 4522:Kempegowda International Airport 4516: 4470: 4432: 4089:Reporter, Staff (12 June 2024). 3345:"Bangalore High-Speed Rail Link" 3024:Kempegowda International Airport 2742: 2723: 2716: 2710: 2666: 2591: 2419: 2406: 2162: 2118: 2047: 1505:Kempegowda International Airport 1490:Kempegowda International Airport 1430:Kempegowda International Airport 1361: 1346: 1330: 1306: 1283: 1275: 1248: 1240: 1220: 1209: 1202: 1180: 1158: 1133: 1111: 1089: 1064: 1042: 1020: 976: 963: 932: 910: 858: 850: 842: 818: 796: 774: 752: 730: 712: 701: 694: 669: 656: 648: 640: 631: 609: 587: 565: 543: 521: 499: 477: 455: 433: 411: 389: 335: 327: 319: 310: 104:13 (Phase-2A) + 19 (Phase-2B) = 4561:Proposed railway lines in India 4494:Baiyappanahalli & Doddajala 1680:15.011 km (9.327 mi) 1677:Bagalur Cross - KIAL Terminals 1654:11.678 km (7.256 mi) 1628:11.003 km (6.837 mi) 214:Elevated, At Grade, Underground 1856:58.19 km (36.16 mi) 1700:Project Management Consultant 1602:9.774 km (6.073 mi) 1574:9.859 km (6.126 mi) 27:Metro line in Bengaluru, India 1: 1599:Kodibeesanahalli - KR Puram 1416:rail network for the city of 198:58.19 km (36.16 mi) 4512:List of Namma Metro stations 3084:List of Namma Metro Stations 1950:Rail Vikas Nigam Ltd. (RVNL) 1782:Rolling Stock (222 Coaches) 177:; 1 year's time 165:; 1 year's time 3669:Singh, Neha (4 June 2020). 2443:(Expected around June 2026) 718:Baiyappanahalli Depot (U/C) 48:ORR East-Airport Metro Line 4577: 1912:investment of ₹800 crore. 1651:Kempapura - Bagalur Cross 150:Baiyappanahalli, Doddajala 4530: 4468: 2910: 2834: 2352:ರ.ಸಂ.ಅ.ಸಂ. ಕ್ರೀಡಾ ಸಂಕೀರ್ಣ 2014: 2011: 2008: 2005: 2002: 1867: 1852: 1825: 1803: 1781: 1759: 1739: 1719: 1699: 1370: 1355: 1339: 1324: 1315: 1300: 1293: 1267: 1258: 1232: 1218: 1196: 1189: 1174: 1167: 1152: 1142: 1127: 1120: 1105: 1098: 1083: 1073: 1058: 1051: 1036: 1029: 1014: 957: 926: 919: 904: 834: 827: 812: 805: 790: 783: 768: 761: 746: 739: 724: 710: 688: 625: 618: 603: 596: 581: 574: 559: 552: 537: 530: 515: 508: 493: 486: 471: 464: 449: 442: 427: 420: 405: 398: 383: 304: 273: 175:Phase 2B - June 2026 163:Phase 2A - June 2026 3013:ಕ ಅಂ ವಿ ನಿ ಕೊನೆಯ ನಿಲ್ದಾಣ 1929:20 lakh. Chief Minister 2512:ಎಚ್‌ ಆರ್‌ ಬಿ ಆರ್ ಬಡಾವಣೆ 1865:(US$ 900 million) 1813:(US$ 3.6 million) 1791:(US$ 270 million) 1760:Ballastless Track Work 1709:(US$ 2.5 million) 1444:at Central Silk Board, 18:Kempapura metro station 4537:are Under Construction 3758:The New Indian Express 3641:The New Indian Express 3532:The New Indian Express 3089:Rapid transit in India 1978: 1835:(US$ 92 million) 1769:(US$ 60 million) 1749:(US$ 22 million) 1729:(US$ 30 million) 1720:Baiyappanahalli Depot 1689:(US$ 82 million) 1663:(US$ 90 million) 1637:(US$ 89 million) 1611:(US$ 75 million) 1583:(US$ 94 million) 1410:ORR-Airport Metro Line 4010:epaper.timesgroup.com 3094:List of metro systems 1977: 1625:KR Puram - Kempapura 1557:Successful Bid /Cost 1226:Doddajala Depot (U/C) 3155:. 16 September 2019. 2089:ಎಚ್‌ ಎಸ್‌ ಆರ್ ಬಡಾವಣೆ 2015:Platform Level Type 1996:(Expected June 2026) 1674:Package 2B/P2/69(c) 1648:Package 2B/P2/69(b) 1622:Package 2B/P2/69(a) 1596:Package 2A/P2/60(b) 1568:Package 2A/P1/60(a) 4253:DRDO Sports Complex 3811:. 27 September 2017 3428:. 14 January 2017. 3402:. 15 September 2016 3299:. 15 September 2016 2346:DRDO Sports Complex 2043:ಕೇಂದ್ರ ರೇಷ್ಮೆ ಮಂಡಳಿ 1773:Larsen & Toubro 1752:J Kumar – AICPL JV 1732:J Kumar – AICPL JV 598:DRDO Sports Complex 279:Blue Line Map (TBC) 4168:Central Silk Board 4063:. 20 August 2021. 3980:. 11 January 2023. 3966:. 10 January 2023. 3952:. 11 January 2023. 3950:The Times of India 3934:. 11 January 2023. 3920:. 11 January 2023. 3918:The Times of India 3902:. 11 January 2023. 3888:. 12 January 2023. 3886:The Times of India 3862:. 8 September 2020 3704:The Economic Times 3560:The Times of India 3374:The Times of India 3349:Railway Technology 3297:The Times of India 3233:has generic name ( 3153:The Times of India 3117:The Times of India 2826:Jakkuru Plantation 2606:Under Construction 2562:ಎಚ್‌ ಬಿ ಆರ್ ಬಡಾವಣೆ 2062:Under Construction 2037:Central Silk Board 1979: 1948:On June 10, 2024, 1074:Jakkur Plantation 892:Under Construction 371:Under Construction 347:Central Silk Board 83:Central Silk Board 4556:Namma Metro lines 4543: 4542: 4466: 4465: 4458:Jakkur Plantation 4037:. 9 December 2020 3994:. 9 January 2023. 3698:Menezes, Naveen. 3591:. 25 January 2020 3562:. 11 January 2019 3376:. 19 October 2013 3255:. 3 November 2012 3036: 3035: 2990: 2981:ವಿಮಾನ ನಿಲ್ದಾಣ ನಗರ 2758: 2740: 2683: 2607: 2444: 2178: 2134: 2063: 1997: 1871: 1870: 1614:Shankaranarayana 1501:proposal to build 1402: 1401: 1398: 1397: 1394: 1393: 1390: 1389: 1320: 1263: 1148: 1079: 1007: 1006: 897: 896: 376: 375: 16:(Redirected from 4568: 4520: 4491: 4474: 4436: 4374: 4369: 4357: 4352: 4333: 4273: 4260:Sarasvathi Nagar 4225:Kodibeesanahalli 4218:Kadubeesanahalli 4205: 4193: 4174: 4155: 4140: 4131: 4124: 4117: 4108: 4102: 4101: 4099: 4097: 4086: 4080: 4079: 4077: 4075: 4053: 4047: 4046: 4044: 4042: 4027: 4021: 4020: 4018: 4016: 4002: 3996: 3995: 3988: 3982: 3981: 3974: 3968: 3967: 3960: 3954: 3953: 3942: 3936: 3935: 3928: 3922: 3921: 3910: 3904: 3903: 3896: 3890: 3889: 3878: 3872: 3871: 3869: 3867: 3852: 3846: 3845: 3843: 3841: 3827: 3821: 3820: 3818: 3816: 3801: 3795: 3794: 3792: 3790: 3785:. 5 October 2017 3783:Bangalore Mirror 3775: 3769: 3768: 3766: 3764: 3750: 3744: 3743: 3741: 3739: 3724: 3715: 3714: 3712: 3710: 3695: 3686: 3685: 3683: 3681: 3666: 3657: 3656: 3654: 3652: 3643:. Archived from 3633: 3627: 3626: 3624: 3622: 3607: 3601: 3600: 3598: 3596: 3581: 3572: 3571: 3569: 3567: 3552: 3543: 3542: 3540: 3538: 3524: 3518: 3517: 3515: 3513: 3498: 3492: 3491: 3489: 3487: 3477: 3471: 3470: 3468: 3466: 3460:Bangalore Mirror 3451: 3445: 3444: 3442: 3440: 3418: 3412: 3411: 3409: 3407: 3392: 3386: 3385: 3383: 3381: 3366: 3360: 3359: 3357: 3355: 3341: 3335: 3334: 3332: 3330: 3315: 3309: 3308: 3306: 3304: 3289: 3283: 3282: 3271: 3265: 3264: 3262: 3260: 3245: 3239: 3238: 3232: 3228: 3226: 3218: 3216: 3214: 3191: 3185: 3184: 3177: 3171: 3170: 3163: 3157: 3156: 3145: 3139: 3138: 3127: 3121: 3120: 3109: 3021: 2986: 2756: 2753: 2751: 2746: 2736: 2734: 2732: 2727: 2720: 2714: 2713: 2679: 2677: 2675: 2670: 2621: 2617: 2605: 2602: 2600: 2595: 2446: 2442: 2434: 2425:Krishnarajapuram 2423: 2422: 2417: 2415: 2410: 2371:Sarasvathi Nagar 2246:Kodibeesanahalli 2221:Kadubeesanahalli 2176: 2173: 2171: 2166: 2132: 2129: 2127: 2122: 2073: 2061: 2058: 2056: 2051: 1998: 1995: 1988: 1981: 1931:Basavaraj Bommai 1928: 1916:expected around 1864: 1862: 1834: 1832: 1812: 1810: 1790: 1788: 1768: 1766: 1748: 1746: 1728: 1726: 1708: 1706: 1688: 1686: 1662: 1660: 1636: 1634: 1610: 1608: 1582: 1580: 1543: 1536: 1466:D. K. Shivakumar 1434:Jakkur Aerodrome 1365: 1364: 1350: 1334: 1333: 1316: 1310: 1309: 1287: 1286: 1279: 1278: 1259: 1252: 1251: 1244: 1243: 1224: 1223: 1213: 1212: 1206: 1205: 1184: 1183: 1162: 1161: 1144: 1137: 1136: 1115: 1114: 1093: 1092: 1075: 1068: 1067: 1046: 1045: 1024: 1023: 996: 994: 987: 980: 967: 966: 952: 950: 936: 935: 914: 913: 886: 884: 877: 862: 861: 854: 853: 846: 845: 822: 821: 800: 799: 778: 777: 756: 755: 734: 733: 716: 715: 705: 704: 698: 697: 683: 681: 673: 660: 659: 652: 651: 644: 643: 635: 634: 620:Sarasvathi Nagar 613: 612: 591: 590: 569: 568: 547: 546: 525: 524: 510:Kodibeesanahalli 503: 502: 488:Kadubeesanahalli 481: 480: 459: 458: 437: 436: 415: 414: 393: 392: 365: 363: 356: 339: 338: 331: 330: 323: 322: 314: 313: 302: 289: 275: 250: 244: 242: 241: 237: 234: 226: 203:Number of tracks 185: 183: 178: 173: 171: 166: 32: 21: 4576: 4575: 4571: 4570: 4569: 4567: 4566: 4565: 4546: 4545: 4544: 4539: 4526: 4505: 4498: 4489: 4482: 4475: 4462: 4446: 4439: 4372: 4367: 4355: 4350: 4331: 4284: 4277: 4271: 4267:Krishnarajapura 4203: 4191: 4172: 4160: 4151: 4142: 4138: 4135: 4105: 4095: 4093: 4088: 4087: 4083: 4073: 4071: 4055: 4054: 4050: 4040: 4038: 4029: 4028: 4024: 4014: 4012: 4004: 4003: 3999: 3990: 3989: 3985: 3976: 3975: 3971: 3962: 3961: 3957: 3944: 3943: 3939: 3930: 3929: 3925: 3912: 3911: 3907: 3898: 3897: 3893: 3880: 3879: 3875: 3865: 3863: 3854: 3853: 3849: 3839: 3837: 3829: 3828: 3824: 3814: 3812: 3809:Metro Rail News 3803: 3802: 3798: 3788: 3786: 3777: 3776: 3772: 3762: 3760: 3752: 3751: 3747: 3737: 3735: 3734:. 20 April 2021 3726: 3725: 3718: 3708: 3706: 3697: 3696: 3689: 3679: 3677: 3675:Metro Rail News 3668: 3667: 3660: 3650: 3648: 3647:on 4 April 2023 3635: 3634: 3630: 3620: 3618: 3617:. 16 March 2020 3609: 3608: 3604: 3594: 3592: 3583: 3582: 3575: 3565: 3563: 3554: 3553: 3546: 3536: 3534: 3526: 3525: 3521: 3511: 3509: 3500: 3499: 3495: 3485: 3483: 3479: 3478: 3474: 3464: 3462: 3453: 3452: 3448: 3438: 3436: 3420: 3419: 3415: 3405: 3403: 3394: 3393: 3389: 3379: 3377: 3368: 3367: 3363: 3353: 3351: 3343: 3342: 3338: 3328: 3326: 3317: 3316: 3312: 3302: 3300: 3291: 3290: 3286: 3273: 3272: 3268: 3258: 3256: 3247: 3246: 3242: 3229: 3219: 3212: 3210: 3193: 3192: 3188: 3179: 3178: 3174: 3165: 3164: 3160: 3147: 3146: 3142: 3137:. 19 June 2022. 3129: 3128: 3124: 3119:. 19 June 2022. 3111: 3110: 3106: 3102: 3041: 2749: 2747: 2730: 2728: 2711: 2673: 2671: 2598: 2596: 2439: 2420: 2418: 2413: 2411: 2396:Krishnarajapura 2169: 2167: 2125: 2123: 2054: 2052: 2012:Station Layout 1993: 1984: 1967: 1939: 1926: 1902: 1876: 1860: 1859: 1830: 1829: 1808: 1807: 1786: 1785: 1764: 1763: 1744: 1743: 1724: 1723: 1704: 1703: 1684: 1683: 1658: 1657: 1632: 1631: 1606: 1605: 1578: 1577: 1539: 1534: 1474: 1412:is part of the 1366: 1351: 1335: 1311: 1289: 1288: 1281: 1280: 1254: 1253: 1246: 1245: 1228: 1221: 1214: 1207: 1185: 1163: 1138: 1116: 1094: 1069: 1047: 1025: 1010: 1009: 992: 990: 968: 953: 948: 946: 937: 915: 900: 899: 882: 880: 863: 856: 855: 848: 847: 823: 801: 779: 757: 735: 720: 713: 706: 699: 684: 679: 677: 667:Krishnarajapura 661: 654: 653: 646: 645: 636: 614: 592: 570: 548: 526: 504: 482: 460: 438: 416: 394: 379: 378: 361: 359: 340: 333: 332: 325: 324: 315: 296: 280: 256:Electrification 246: 239: 235: 232: 230: 229:4 ft  228: 224: 181: 179: 176: 174: 169: 167: 164: 160:Planned opening 96: 88:Krishnarajapura 28: 23: 22: 15: 12: 11: 5: 4574: 4572: 4564: 4563: 4558: 4548: 4547: 4541: 4540: 4531: 4528: 4527: 4525: 4524: 4514: 4508: 4506: 4503: 4500: 4499: 4497: 4496: 4485: 4483: 4480: 4477: 4476: 4469: 4467: 4464: 4463: 4461: 4460: 4455: 4449: 4447: 4444: 4441: 4440: 4438: 4437: 4429:KIAL Terminals 4425: 4418: 4411: 4404: 4397: 4390: 4383: 4376: 4359: 4342: 4335: 4323: 4316: 4309: 4302: 4295: 4287: 4285: 4282: 4279: 4278: 4276: 4275: 4263: 4256: 4249: 4242: 4235: 4228: 4221: 4214: 4207: 4195: 4183: 4176: 4163: 4161: 4158: 4152: 4147: 4144: 4143: 4136: 4134: 4133: 4126: 4119: 4111: 4104: 4103: 4081: 4048: 4022: 3997: 3983: 3969: 3955: 3937: 3923: 3905: 3891: 3873: 3847: 3822: 3796: 3770: 3745: 3716: 3687: 3658: 3628: 3615:Urban Railways 3602: 3573: 3544: 3519: 3493: 3472: 3446: 3413: 3387: 3361: 3336: 3325:. 2 March 2017 3310: 3284: 3266: 3240: 3186: 3172: 3158: 3140: 3122: 3103: 3101: 3098: 3097: 3096: 3091: 3086: 3080: 3079: 3078: 3077: 3072: 3067: 3062: 3057: 3052: 3040: 3037: 3034: 3033: 3030: 3027: 3015: 3010: 3007:KIAL Terminals 3003: 2999: 2998: 2995: 2992: 2985:Airport City ( 2983: 2978: 2971: 2967: 2966: 2963: 2960: 2958: 2953: 2946: 2942: 2941: 2938: 2935: 2933: 2928: 2921: 2917: 2916: 2909: 2902: 2895: 2891: 2890: 2887: 2884: 2882: 2877: 2870: 2866: 2865: 2862: 2859: 2857: 2852: 2845: 2841: 2840: 2833: 2828: 2823: 2819: 2818: 2815: 2812: 2810: 2805: 2798: 2794: 2793: 2790: 2787: 2785: 2780: 2773: 2769: 2768: 2765: 2762: 2708: 2703: 2696: 2692: 2691: 2688: 2685: 2664: 2659: 2652: 2648: 2647: 2644: 2641: 2639: 2634: 2627: 2623: 2622: 2613: 2610: 2589: 2584: 2577: 2573: 2572: 2569: 2566: 2564: 2559: 2552: 2548: 2547: 2544: 2541: 2539: 2534: 2527: 2523: 2522: 2519: 2516: 2514: 2509: 2502: 2498: 2497: 2494: 2491: 2489: 2484: 2477: 2473: 2472: 2469: 2466: 2464: 2459: 2452: 2448: 2447: 2436: 2435: 2430: 2427: 2404: 2399: 2392: 2388: 2387: 2384: 2381: 2379: 2374: 2367: 2363: 2362: 2359: 2356: 2354: 2349: 2342: 2338: 2337: 2334: 2331: 2329: 2327:ದೊಡ್ದನೆಕ್ಕುಂದಿ 2324: 2317: 2313: 2312: 2309: 2306: 2304: 2299: 2292: 2288: 2287: 2284: 2281: 2279: 2274: 2267: 2263: 2262: 2259: 2256: 2254: 2249: 2242: 2238: 2237: 2234: 2231: 2229: 2224: 2217: 2213: 2212: 2209: 2206: 2204: 2199: 2192: 2188: 2187: 2184: 2181: 2160: 2155: 2148: 2144: 2143: 2140: 2137: 2116: 2111: 2104: 2100: 2099: 2096: 2093: 2091: 2086: 2079: 2075: 2074: 2069: 2066: 2045: 2040: 2033: 2029: 2028: 2023: 2017: 2016: 2013: 2010: 2007: 2004: 2000: 1999: 1990: 1989: 1966: 1963: 1938: 1935: 1919:December 2025. 1901: 1898: 1894:December 2024. 1875: 1872: 1869: 1868: 1866: 1863:7,541.54 crore 1857: 1854: 1850: 1849: 1846: 1836: 1827: 1823: 1822: 1819: 1814: 1805: 1804:Track Turnout 1801: 1800: 1797: 1792: 1789:2,217.78 crore 1783: 1779: 1778: 1775: 1770: 1761: 1757: 1756: 1753: 1750: 1741: 1740:Airport Depot 1737: 1736: 1733: 1730: 1721: 1717: 1716: 1713: 1710: 1701: 1697: 1696: 1693: 1690: 1681: 1678: 1675: 1671: 1670: 1667: 1664: 1655: 1652: 1649: 1645: 1644: 1641: 1638: 1629: 1626: 1623: 1619: 1618: 1615: 1612: 1603: 1600: 1597: 1593: 1592: 1589: 1584: 1575: 1572: 1569: 1565: 1564: 1561: 1558: 1555: 1552: 1549: 1545: 1544: 1533: 1530: 1473: 1470: 1400: 1399: 1396: 1395: 1392: 1391: 1388: 1387: 1385: 1383: 1381: 1379: 1377: 1375: 1372: 1371: 1369: 1367: 1360: 1358: 1356: 1353: 1352: 1345: 1342:KIAL Terminals 1338: 1336: 1329: 1327: 1325: 1322: 1321: 1314: 1312: 1305: 1303: 1301: 1298: 1297: 1292: 1290: 1282: 1274: 1273: 1272: 1270: 1268: 1265: 1264: 1257: 1255: 1247: 1239: 1238: 1237: 1235: 1233: 1230: 1229: 1219: 1217: 1215: 1208: 1201: 1199: 1197: 1194: 1193: 1188: 1186: 1179: 1177: 1175: 1172: 1171: 1166: 1164: 1157: 1155: 1153: 1150: 1149: 1143:Bettahalasuru 1141: 1139: 1132: 1130: 1128: 1125: 1124: 1119: 1117: 1110: 1108: 1106: 1103: 1102: 1097: 1095: 1088: 1086: 1084: 1081: 1080: 1072: 1070: 1063: 1061: 1059: 1056: 1055: 1050: 1048: 1041: 1039: 1037: 1034: 1033: 1028: 1026: 1019: 1017: 1015: 1012: 1011: 1005: 1004: 998: 997: 984: 983: 981: 971: 969: 962: 960: 958: 955: 954: 945: 943: 940: 938: 931: 929: 927: 924: 923: 918: 916: 909: 907: 905: 902: 901: 895: 894: 888: 887: 874: 873: 871: 866: 864: 857: 849: 841: 840: 839: 837: 835: 832: 831: 826: 824: 817: 815: 813: 810: 809: 804: 802: 795: 793: 791: 788: 787: 782: 780: 773: 771: 769: 766: 765: 760: 758: 751: 749: 747: 744: 743: 738: 736: 729: 727: 725: 722: 721: 711: 709: 707: 700: 693: 691: 689: 686: 685: 676: 674: 664: 662: 655: 647: 639: 638: 637: 630: 628: 626: 623: 622: 617: 615: 608: 606: 604: 601: 600: 595: 593: 586: 584: 582: 579: 578: 573: 571: 564: 562: 560: 557: 556: 551: 549: 542: 540: 538: 535: 534: 529: 527: 520: 518: 516: 513: 512: 507: 505: 498: 496: 494: 491: 490: 485: 483: 476: 474: 472: 469: 468: 463: 461: 454: 452: 450: 447: 446: 441: 439: 432: 430: 428: 425: 424: 419: 417: 410: 408: 406: 403: 402: 397: 395: 388: 386: 384: 381: 380: 374: 373: 367: 366: 353: 352: 350: 343: 341: 334: 326: 318: 317: 316: 309: 307: 305: 298: 297: 292: 282: 281: 278: 271: 270: 258: 252: 251: 248:standard gauge 222: 216: 215: 212: 208: 207: 204: 200: 199: 196: 192: 191: 187: 186: 161: 157: 156: 152: 151: 148: 144: 143: 138: 134: 133: 128: 124: 123: 119: 118: 113: 109: 108: 102: 98: 97: 95: 94: 92:KIAL Terminals 85: 79: 77: 73: 72: 62: 58: 57: 54: 50: 49: 46: 42: 41: 37: 36: 26: 24: 14: 13: 10: 9: 6: 4: 3: 2: 4573: 4562: 4559: 4557: 4554: 4553: 4551: 4538: 4536: 4533:*Stations in 4529: 4523: 4519: 4515: 4513: 4510: 4509: 4507: 4501: 4495: 4492: 4487: 4486: 4484: 4478: 4473: 4459: 4456: 4454: 4453:Bettahalasuru 4451: 4450: 4448: 4442: 4435: 4431: 4430: 4426: 4424: 4423: 4419: 4417: 4416: 4412: 4410: 4409: 4405: 4403: 4402: 4401:Bagalur Cross 4398: 4396: 4395: 4391: 4389: 4388: 4384: 4382: 4381: 4377: 4375: 4370: 4365: 4364: 4360: 4358: 4353: 4348: 4347: 4343: 4341: 4340: 4339:Veerannapalya 4336: 4334: 4329: 4328: 4324: 4322: 4321: 4317: 4315: 4314: 4310: 4308: 4307: 4303: 4301: 4300: 4296: 4294: 4293: 4292:Kasturi Nagar 4289: 4288: 4286: 4280: 4274: 4269: 4268: 4264: 4262: 4261: 4257: 4255: 4254: 4250: 4248: 4247: 4243: 4241: 4240: 4236: 4234: 4233: 4229: 4227: 4226: 4222: 4220: 4219: 4215: 4213: 4212: 4208: 4206: 4201: 4200: 4196: 4194: 4189: 4188: 4184: 4182: 4181: 4177: 4175: 4170: 4169: 4165: 4164: 4162: 4156: 4153: 4150: 4145: 4141: 4132: 4127: 4125: 4120: 4118: 4113: 4112: 4109: 4092: 4085: 4082: 4070: 4066: 4062: 4058: 4052: 4049: 4036: 4035:Deccan Herald 4032: 4026: 4023: 4011: 4007: 4001: 3998: 3993: 3987: 3984: 3979: 3973: 3970: 3965: 3959: 3956: 3951: 3947: 3941: 3938: 3933: 3927: 3924: 3919: 3915: 3909: 3906: 3901: 3895: 3892: 3887: 3883: 3877: 3874: 3861: 3857: 3851: 3848: 3836: 3832: 3826: 3823: 3810: 3806: 3800: 3797: 3784: 3780: 3774: 3771: 3759: 3755: 3749: 3746: 3733: 3729: 3723: 3721: 3717: 3705: 3701: 3694: 3692: 3688: 3676: 3672: 3665: 3663: 3659: 3646: 3642: 3638: 3632: 3629: 3616: 3612: 3606: 3603: 3590: 3589:Deccan Herald 3586: 3580: 3578: 3574: 3561: 3557: 3551: 3549: 3545: 3533: 3529: 3523: 3520: 3508:. 13 May 2017 3507: 3506:Deccan Herald 3503: 3497: 3494: 3482: 3476: 3473: 3461: 3457: 3450: 3447: 3435: 3431: 3427: 3423: 3417: 3414: 3401: 3400:Deccan Herald 3397: 3391: 3388: 3375: 3371: 3365: 3362: 3350: 3346: 3340: 3337: 3324: 3323:Deccan Herald 3320: 3314: 3311: 3298: 3294: 3288: 3285: 3280: 3276: 3270: 3267: 3254: 3253:Deccan Herald 3250: 3244: 3241: 3236: 3224: 3209: 3205: 3201: 3197: 3190: 3187: 3182: 3176: 3173: 3168: 3162: 3159: 3154: 3150: 3144: 3141: 3136: 3132: 3126: 3123: 3118: 3114: 3108: 3105: 3099: 3095: 3092: 3090: 3087: 3085: 3082: 3081: 3076: 3073: 3071: 3068: 3066: 3063: 3061: 3058: 3056: 3053: 3051: 3048: 3047: 3046: 3043: 3042: 3038: 3031: 3028: 3026: 3025: 3020: 3016: 3014: 3011: 3009: 3008: 3004: 3001: 3000: 2996: 2993: 2989: 2984: 2982: 2979: 2977: 2976: 2972: 2969: 2968: 2964: 2961: 2959: 2957: 2954: 2952: 2951: 2947: 2944: 2943: 2939: 2936: 2934: 2932: 2929: 2927: 2926: 2922: 2919: 2918: 2915: 2914: 2908: 2907: 2903: 2901: 2900: 2899:Bettahalasuru 2896: 2893: 2892: 2888: 2885: 2883: 2881: 2880:ಬಾಗಲೂರು ಅಡ್ಡ 2878: 2876: 2875: 2874:Bagalur Cross 2871: 2868: 2867: 2863: 2860: 2858: 2856: 2853: 2851: 2850: 2846: 2843: 2842: 2839: 2838: 2832: 2829: 2827: 2824: 2821: 2820: 2816: 2813: 2811: 2809: 2806: 2804: 2803: 2799: 2796: 2795: 2791: 2788: 2786: 2784: 2781: 2779: 2778: 2774: 2771: 2770: 2766: 2763: 2761: 2759: 2752: 2745: 2739: 2733: 2726: 2721:Hebbal TTMC; 2719: 2709: 2707: 2704: 2702: 2701: 2697: 2694: 2693: 2689: 2686: 2682: 2676: 2669: 2665: 2663: 2660: 2658: 2657: 2653: 2650: 2649: 2645: 2642: 2640: 2638: 2635: 2633: 2632: 2631:Veerannapalya 2628: 2625: 2624: 2614: 2611: 2608: 2601: 2594: 2590: 2588: 2585: 2583: 2582: 2578: 2575: 2574: 2570: 2567: 2565: 2563: 2560: 2558: 2557: 2553: 2550: 2549: 2545: 2542: 2540: 2538: 2535: 2533: 2532: 2528: 2525: 2524: 2520: 2517: 2515: 2513: 2510: 2508: 2507: 2503: 2500: 2499: 2495: 2492: 2490: 2488: 2485: 2483: 2482: 2478: 2475: 2474: 2470: 2467: 2465: 2463: 2460: 2458: 2457: 2456:Kasturi Nagar 2453: 2450: 2449: 2445: 2437: 2431: 2428: 2426: 2416: 2409: 2405: 2403: 2400: 2398: 2397: 2393: 2390: 2389: 2385: 2382: 2380: 2378: 2375: 2373: 2372: 2368: 2365: 2364: 2360: 2357: 2355: 2353: 2350: 2348: 2347: 2343: 2340: 2339: 2335: 2332: 2330: 2328: 2325: 2323: 2322: 2318: 2315: 2314: 2310: 2307: 2305: 2303: 2300: 2298: 2297: 2293: 2290: 2289: 2285: 2282: 2280: 2278: 2275: 2273: 2272: 2268: 2265: 2264: 2260: 2257: 2255: 2253: 2252:ಕೋಡಿಬೀಸನಹಳ್ಳಿ 2250: 2248: 2247: 2243: 2240: 2239: 2235: 2232: 2230: 2228: 2227:ಕಾಡುಬೀಸನಹಳ್ಳಿ 2225: 2223: 2222: 2218: 2215: 2214: 2210: 2207: 2205: 2203: 2200: 2198: 2197: 2193: 2190: 2189: 2185: 2182: 2179: 2172: 2165: 2161: 2159: 2156: 2154: 2153: 2149: 2146: 2145: 2141: 2138: 2135: 2128: 2121: 2117: 2115: 2112: 2110: 2109: 2105: 2102: 2101: 2097: 2094: 2092: 2090: 2087: 2085: 2084: 2080: 2077: 2076: 2070: 2067: 2064: 2057: 2050: 2046: 2044: 2041: 2039: 2038: 2034: 2031: 2030: 2027: 2024: 2022: 2019: 2018: 2006:Station Name 2001: 1991: 1987: 1982: 1976: 1972: 1971: 1964: 1962: 1960: 1955: 1951: 1946: 1943: 1936: 1934: 1932: 1922: 1921: 1920: 1913: 1909: 1905: 1899: 1897: 1896: 1895: 1888: 1885: 1880: 1873: 1858: 1855: 1851: 1847: 1844: 1840: 1837: 1828: 1824: 1820: 1818: 1815: 1806: 1802: 1798: 1796: 1793: 1784: 1780: 1776: 1774: 1771: 1762: 1758: 1754: 1751: 1742: 1738: 1734: 1731: 1722: 1718: 1714: 1711: 1702: 1698: 1694: 1691: 1682: 1679: 1676: 1673: 1672: 1668: 1665: 1656: 1653: 1650: 1647: 1646: 1642: 1639: 1630: 1627: 1624: 1621: 1620: 1616: 1613: 1604: 1601: 1598: 1595: 1594: 1590: 1588: 1585: 1576: 1573: 1570: 1567: 1566: 1562: 1559: 1556: 1553: 1550: 1547: 1546: 1542: 1537: 1531: 1529: 1525: 1522: 1517: 1512: 1508: 1506: 1502: 1497: 1495: 1491: 1487: 1484: 1478: 1471: 1469: 1467: 1463: 1457: 1455: 1451: 1447: 1443: 1439: 1438:Yelahanka AFB 1435: 1431: 1427: 1423: 1419: 1415: 1411: 1407: 1386: 1384: 1382: 1380: 1378: 1376: 1374: 1373: 1368: 1359: 1357: 1354: 1349: 1344: 1343: 1337: 1328: 1326: 1323: 1319: 1318:(Underground) 1313: 1304: 1302: 1299: 1296: 1291: 1271: 1269: 1266: 1262: 1256: 1236: 1234: 1231: 1227: 1216: 1200: 1198: 1195: 1192: 1187: 1178: 1176: 1173: 1170: 1165: 1156: 1154: 1151: 1147: 1140: 1131: 1129: 1126: 1123: 1122:Bagalur Cross 1118: 1109: 1107: 1104: 1101: 1096: 1087: 1085: 1082: 1078: 1071: 1062: 1060: 1057: 1054: 1049: 1040: 1038: 1035: 1032: 1027: 1018: 1016: 1013: 1003: 1000: 999: 995: 989: 988: 982: 979: 975: 972: 970: 961: 959: 956: 951: 944: 941: 939: 930: 928: 925: 922: 921:Veerannapalya 917: 908: 906: 903: 893: 890: 889: 885: 879: 878: 872: 870: 867: 865: 838: 836: 833: 830: 825: 816: 814: 811: 808: 803: 794: 792: 789: 786: 781: 772: 770: 767: 764: 759: 750: 748: 745: 742: 741:Kasturi Nagar 737: 728: 726: 723: 719: 708: 692: 690: 687: 682: 675: 672: 668: 665: 663: 629: 627: 624: 621: 616: 607: 605: 602: 599: 594: 585: 583: 580: 577: 572: 563: 561: 558: 555: 550: 541: 539: 536: 533: 528: 519: 517: 514: 511: 506: 497: 495: 492: 489: 484: 475: 473: 470: 467: 462: 453: 451: 448: 445: 440: 431: 429: 426: 423: 418: 409: 407: 404: 401: 396: 387: 385: 382: 372: 369: 368: 364: 358: 357: 351: 349: 348: 344: 342: 308: 306: 303: 300: 299: 295: 291: 290: 287: 284: 283: 277: 272: 269: 266: 263: 259: 257: 253: 249: 225:1,435 mm 223: 221: 217: 213: 209: 205: 201: 197: 193: 188: 162: 158: 153: 149: 145: 142: 139: 135: 132: 129: 125: 120: 117: 114: 110: 107: 103: 99: 93: 89: 86: 84: 81: 80: 78: 74: 70: 66: 63: 59: 55: 51: 47: 45:Other name(s) 43: 38: 33: 30: 19: 4534: 4532: 4493: 4488: 4457: 4452: 4445:Not In Scope 4427: 4422:Airport City 4420: 4413: 4406: 4399: 4392: 4387:Jakkur Cross 4385: 4378: 4361: 4344: 4337: 4325: 4318: 4313:Kalyan Nagar 4311: 4304: 4297: 4290: 4265: 4258: 4251: 4246:Doddanekundi 4244: 4237: 4232:Marathahalli 4230: 4223: 4216: 4209: 4197: 4185: 4178: 4166: 4148: 4094:. Retrieved 4084: 4072:. Retrieved 4060: 4051: 4039:. Retrieved 4034: 4025: 4015:10 September 4013:. Retrieved 4009: 4000: 3986: 3972: 3958: 3949: 3940: 3926: 3917: 3908: 3894: 3885: 3876: 3866:10 September 3864:. Retrieved 3860:Moneycontrol 3859: 3850: 3840:10 September 3838:. Retrieved 3834: 3825: 3815:10 September 3813:. Retrieved 3808: 3799: 3789:10 September 3787:. Retrieved 3782: 3773: 3761:. Retrieved 3757: 3748: 3736:. Retrieved 3731: 3709:10 September 3707:. Retrieved 3703: 3680:10 September 3678:. Retrieved 3674: 3651:10 September 3649:. Retrieved 3645:the original 3640: 3631: 3621:10 September 3619:. Retrieved 3614: 3605: 3595:10 September 3593:. Retrieved 3588: 3566:10 September 3564:. Retrieved 3559: 3537:10 September 3535:. Retrieved 3531: 3522: 3512:10 September 3510:. Retrieved 3505: 3496: 3486:10 September 3484:. Retrieved 3475: 3465:10 September 3463:. Retrieved 3459: 3449: 3439:10 September 3437:. Retrieved 3425: 3416: 3406:10 September 3404:. Retrieved 3399: 3390: 3380:10 September 3378:. Retrieved 3373: 3364: 3354:10 September 3352:. Retrieved 3348: 3339: 3329:10 September 3327:. Retrieved 3322: 3313: 3303:10 September 3301:. Retrieved 3296: 3287: 3269: 3257:. Retrieved 3252: 3243: 3211:. Retrieved 3199: 3189: 3175: 3161: 3152: 3143: 3134: 3125: 3116: 3107: 3029:Underground 3022: 3012: 3005: 2987: 2980: 2975:Airport City 2973: 2955: 2948: 2930: 2923: 2912: 2911: 2905: 2904: 2898: 2897: 2879: 2872: 2854: 2847: 2836: 2835: 2830: 2825: 2808:ಜಕ್ಕೂರು ಅಡ್ಡ 2807: 2802:Jakkur Cross 2800: 2782: 2775: 2755: 2737: 2722: 2705: 2698: 2680: 2661: 2654: 2636: 2629: 2604: 2586: 2579: 2561: 2554: 2536: 2531:Kalyan Nagar 2529: 2511: 2504: 2486: 2479: 2461: 2455: 2440: 2401: 2395: 2376: 2370: 2351: 2344: 2326: 2321:Doddanekundi 2319: 2301: 2294: 2276: 2271:Marathahalli 2269: 2251: 2244: 2226: 2219: 2201: 2194: 2175: 2157: 2150: 2131: 2113: 2106: 2088: 2081: 2060: 2042: 2035: 2009:Connections 1985: 1969: 1968: 1947: 1944: 1940: 1923: 1918: 1917: 1914: 1910: 1906: 1903: 1893: 1892: 1889: 1881: 1877: 1848:11 Jun 2024 1833:764.64 crore 1821:22 Mar 2024 1799:08 Aug 2023 1777:02 Jun 2023 1767:500.94 crore 1755:18 Mar 2023 1747:182.39 crore 1735:18 Mar 2023 1727:249.19 crore 1715:17 Dec 2021 1695:17 Nov 2021 1687:680.21 crore 1669:17 Nov 2021 1661:747.99 crore 1643:17 Nov 2021 1635:739.04 crore 1617:25 May 2021 1609:623.55 crore 1591:25 May 2021 1581:785.25 crore 1540: 1526: 1521:K. J. George 1515: 1513: 1509: 1498: 1488: 1483:Siddaramaiah 1479: 1475: 1458: 1448:at KR Pura, 1409: 1405: 1403: 1340: 1317: 1295:Airport City 1260: 1225: 1145: 1076: 1053:Jakkur Cross 1001: 891: 807:Kalyan Nagar 717: 576:Doddanekundi 532:Marathahalli 370: 345: 285: 105: 29: 4380:Kodigehalli 4306:HRBR Layout 4149:Blue Line 5 4139:Namma Metro 3231:|last= 3213:12 February 3070:Orange Line 3060:Yellow Line 3050:Purple Line 3045:Namma Metro 2906:ಬೆಟ್ಟಹಲಸೂರು 2831:ಜಕ್ಕೂರು ತೋಟ 2783:ಕೊಡಿಗೇಹಳ್ಳಿ 2777:Kodigehalli 2731:Orange Line 2674:Orange Line 2637:ವೀರಣ್ಣಪಾಳ್ಯ 2506:HRBR Layout 2414:Purple Line 2402:ಕೃಷ್ಣರಾಜಪುರ 2377:ಸರಸ್ವತಿ ನಗರ 2055:Yellow Line 1959:Namma Metro 1811:29.98 crore 1707:20.58 crore 1560:Contractor 1494:HAL Airport 1456:at Hebbal. 1454:Orange Line 1446:Purple Line 1442:Yellow Line 1414:Namma Metro 1031:Kodigehalli 949:Orange Line 785:HRBR Layout 680:Purple Line 362:Yellow Line 220:Track gauge 195:Line length 141:Namma Metro 4550:Categories 4408:Chikkajala 4320:HBR Layout 4180:HSR Layout 3100:References 3055:Green Line 2925:Chikkajala 2556:HBR Layout 2537:ಕಲ್ಯಾಣ ನಗರ 2462:ಕಸ್ತೂರಿನಗರ 2202:ಬೆಳ್ಳಂದೂರು 2083:HSR Layout 1548:Tendering 1261:(At-Grade) 1169:Chikkajala 1146:(No Scope) 1077:(No Scope) 942:Kempapura 829:HBR Layout 400:HSR Layout 268:third rail 116:bmrc.co.in 4415:Doddajala 4394:Yelahanka 4346:Kempapura 4211:Bellandur 4074:21 August 4069:0971-751X 4061:The Hindu 4041:21 August 3763:21 August 3738:21 August 3434:0971-751X 3426:The Hindu 3259:8 October 3223:cite news 3208:0971-751X 3200:The Hindu 3135:The Hindu 3065:Pink Line 2994:At-Grade 2962:Elevated 2950:Doddajala 2937:Elevated 2886:Elevated 2861:Elevated 2849:Yelahanka 2814:Elevated 2789:Elevated 2764:Elevated 2715:Hebbal; 2687:Elevated 2656:Kempapura 2643:Elevated 2612:Elevated 2599:Pink Line 2568:Elevated 2543:Elevated 2518:Elevated 2493:Elevated 2468:Elevated 2441:Phase-2B 2429:Elevated 2383:Elevated 2358:Elevated 2333:Elevated 2308:Elevated 2283:Elevated 2277:ಮಾರತಹಳ್ಳಿ 2258:Elevated 2233:Elevated 2208:Elevated 2196:Bellandur 2183:Elevated 2139:Elevated 2095:Elevated 2068:Elevated 1994:Phase-2A 1986:Blue Line 1884:IL&FS 1541:Blue Line 1532:Tendering 1450:Pink Line 1422:Karnataka 1418:Bangalore 1406:Blue Line 1191:Doddajala 1100:Yelahanka 883:Pink Line 466:Bellandur 211:Character 190:Technical 69:Karnataka 65:Bangalore 35:Blue Line 4504:See also 4481:Depot(s) 4327:Nagawara 4299:Horamavu 4283:Phase-2B 4199:Ibbaluru 4159:Phase-2A 3279:Archived 3075:Red Line 3039:See also 2988:Proposed 2956:ದೊಡ್ಡಜಾಲ 2931:ಚಿಕ್ಕಜಾಲ 2913:No Scope 2837:No Scope 2757:Proposed 2750:Red Line 2662:ಕೆಂಪಾಪುರ 2581:Nagawara 2481:Horamavu 2177:Proposed 2170:Red Line 2158:ಇಬ್ಬಲೂರು 2152:Ibbaluru 2133:Proposed 2126:Red Line 1965:Stations 1900:Phase-2B 1874:Phase-2A 1551:Section 993:Red Line 869:Nagawara 763:Horamavu 444:Ibbaluru 243: in 147:Depot(s) 101:Stations 40:Overview 4535:italics 4096:12 June 3032:Island 2889:Island 2864:Island 2817:Island 2792:Island 2738:Planned 2706:ಹೆಬ್ಬಾಳ 2700:Hebbala 2681:Planned 2487:ಹೊರಮಾವು 2026:Kannada 2021:English 1954:Siemens 1937:Funding 1839:Siemens 1817:Vossloh 1554:Length 1472:History 1002:Planned 238:⁄ 182:2026-06 180: ( 170:2026-06 168: ( 155:History 122:Service 112:Website 76:Termini 71:, India 4363:Hebbal 4067:  3432:  3206:  2620:Island 2618:& 2587:ನಾಗವಾರ 1853:Total 1712:RITES 1587:Afcons 1563:Award 974:Hebbal 294:Legend 286: 137:System 61:Locale 4187:Agara 2997:Side 2965:Side 2940:Side 2855:ಯಲಹಂಕ 2767:Side 2690:Side 2646:Side 2571:Side 2546:Side 2521:Side 2496:Side 2471:Side 2386:Side 2361:Side 2336:Side 2311:Side 2302:ಇಸ್ರೋ 2286:Side 2261:Side 2236:Side 2211:Side 2186:Side 2142:Side 2108:Agara 2098:Side 1426:India 1008: 985: 898: 875: 422:Agara 377: 354: 131:Metro 53:Owner 4239:ISRO 4098:2024 4076:2021 4065:ISSN 4043:2021 4017:2020 3868:2020 3842:2020 3817:2020 3791:2020 3765:2021 3740:2021 3732:mint 3711:2020 3682:2020 3653:2020 3623:2020 3597:2020 3568:2020 3539:2020 3514:2020 3488:2020 3467:2020 3441:2020 3430:ISSN 3408:2020 3382:2020 3356:2020 3331:2020 3305:2020 3261:2020 3235:help 3215:2024 3204:ISSN 2616:Side 2433:Side 2296:ISRO 2072:Side 1843:RVNL 1795:BEML 1692:NCC 1666:NCC 1640:NCC 1462:CBTC 1436:and 1404:The 554:ISRO 260:750 127:Type 3002:32 2970:31 2945:30 2920:29 2894:28 2869:27 2844:26 2822:25 2797:24 2772:23 2741:); 2695:22 2651:21 2626:20 2576:19 2551:18 2526:17 2501:16 2476:15 2451:14 2391:13 2366:12 2341:11 2316:10 2114:ಅಗರ 1961:. 1845:JV 1408:or 4552:: 4059:. 4033:. 4008:. 3948:. 3916:. 3884:. 3858:. 3833:. 3807:. 3781:. 3756:. 3730:. 3719:^ 3702:. 3690:^ 3673:. 3661:^ 3639:. 3613:. 3587:. 3576:^ 3558:. 3547:^ 3530:. 3504:. 3458:. 3424:. 3398:. 3372:. 3347:. 3321:. 3295:. 3277:. 3251:. 3227:: 3225:}} 3221:{{ 3202:. 3198:. 3151:. 3133:. 3115:. 2991:) 2760:) 2684:) 2609:) 2291:9 2266:8 2241:7 2216:6 2191:5 2180:) 2147:4 2136:) 2103:3 2078:2 2065:) 2032:1 2003:# 1841:– 1424:, 1420:, 265:DC 245:) 106:32 90:/ 67:, 4490:■ 4373:■ 4368:■ 4356:■ 4351:■ 4332:■ 4272:■ 4204:■ 4192:■ 4173:■ 4130:e 4123:t 4116:v 4100:. 4078:. 4045:. 4019:. 3870:. 3844:. 3819:. 3793:. 3767:. 3742:. 3713:. 3684:. 3655:. 3625:. 3599:. 3570:. 3541:. 3516:. 3490:. 3469:. 3443:. 3410:. 3384:. 3358:. 3333:. 3307:. 3263:. 3237:) 3217:. 3183:. 3169:. 2754:( 2735:( 2678:( 2603:( 2174:( 2130:( 2059:( 1927:₹ 1861:₹ 1831:₹ 1809:₹ 1787:₹ 1765:₹ 1745:₹ 1725:₹ 1705:₹ 1685:₹ 1659:₹ 1633:₹ 1607:₹ 1579:₹ 262:V 240:2 236:1 233:+ 231:8 227:( 206:2 184:) 172:) 20:)

Index

Kempapura metro station
Bangalore
Karnataka
Central Silk Board
Krishnarajapura
KIAL Terminals
bmrc.co.in
Metro
Namma Metro
Track gauge
standard gauge
Electrification
V
DC
third rail
Legend
Central Silk Board
Yellow Line
HSR Layout
Agara
Ibbaluru
Bellandur
Kadubeesanahalli
Kodibeesanahalli
Marathahalli
ISRO
Doddanekundi
DRDO Sports Complex
Sarasvathi Nagar
Krishnarajapura