serving the Klang Valley load center. Its operating regime is of two shift cycles, operating between 12 and 16 hours daily mainly to meet the load demand during peak hours and stabilize the grid line voltage. The machine can be put on commercial loading within 30 minutes upon request from Malaysia's
241:
Originally known as Serdang Power Station, it was built in 1993 with a generating capacity of 625 MW. The power station was part of TNB's plan to increase power generation capacity to meet Malaysia's rising electricity demand in the early 1990s.
232:
PJPS is located near Putrajaya, the administrative center of Malaysia. For this reason, the station has been identified as a lead station for restoration of Putrajaya Island in the event of interruption of electricity.
313: 360: 355: 375: 350: 229:(TNB). It is under the management of TNB's Generation Division whose core business is generating electricity by operating and maintaining power plants. 345: 261:
The storage tanks at PJPS were built by Mechmar Keppel Engineering Sdn Bhd, a local company owned by Singapore's Keppel Integrated Engineering.
370: 273: 64: 365: 226: 133: 104: 254: 225:. Previously known as Serdang Power Station, PJPS is one of seven thermal power stations owned by 159: 52: 246: 214: 120: 199: 339: 210: 207: 79: 66: 222: 218: 42: 293: 180: 250: 264:
Its name was changed to Putrajaya Power Station on 15 February 2006.
245:
The gas turbine plant consists of two units of 110MW
158: 153: 145: 140: 129: 113: 103: 95: 58: 48: 38: 30: 21: 8: 361:Natural gas-fired power stations in Malaysia 16:Power station in Sepang, Selangor, Malaysia 18: 356:Energy infrastructure completed in 1993 285: 376:20th-century architecture in Malaysia 7: 351:Buildings and structures in Selangor 253:135MW V94.2 Ratio model. PJPS is a 274:List of power stations in Malaysia 249:Frame 9E model and three units of 14: 314:"KIE's Malaysian unit wins deal" 141:Thermal power station 346:1993 establishments in Malaysia 258:National Load Dispatch Center. 1: 204:Stesen Janaelektrik Putrajaya 392: 371:Power stations in Malaysia 294:"TNB Generation Division" 177: 80:2.9673523°N 101.6817337°E 26: 192:Putrajaya Power Station 160:Nameplate capacity 22:Putrajaya Power Station 227:Tenaga Nasional Berhad 203: 134:Tenaga Nasional Berhad 85:2.9673523; 101.6817337 154:Power generation 34:Serdang Power Station 136:(TNB) (1993-present) 105:Commission date 320:. 28 September 1993 255:peaking power plant 76: /  318:The Straits Times 188: 187: 146:Primary fuel 53:Serdang, Selangor 383: 330: 329: 327: 325: 310: 304: 303: 301: 300: 290: 247:General Electric 181:edit on Wikidata 91: 90: 88: 87: 86: 81: 77: 74: 73: 72: 69: 19: 391: 390: 386: 385: 384: 382: 381: 380: 366:Sepang District 336: 335: 334: 333: 323: 321: 312: 311: 307: 298: 296: 292: 291: 287: 282: 270: 239: 215:Sepang District 184: 173: 125: 121:Tenaga Nasional 84: 82: 78: 75: 70: 67: 65: 63: 62: 17: 12: 11: 5: 389: 387: 379: 378: 373: 368: 363: 358: 353: 348: 338: 337: 332: 331: 305: 284: 283: 281: 278: 277: 276: 269: 266: 238: 235: 186: 185: 178: 175: 174: 172: 171: 168: 164: 162: 156: 155: 151: 150: 147: 143: 142: 138: 137: 131: 127: 126: 124: 123: 117: 115: 111: 110: 107: 101: 100: 97: 93: 92: 60: 56: 55: 50: 46: 45: 40: 36: 35: 32: 28: 27: 24: 23: 15: 13: 10: 9: 6: 4: 3: 2: 388: 377: 374: 372: 369: 367: 364: 362: 359: 357: 354: 352: 349: 347: 344: 343: 341: 319: 315: 309: 306: 295: 289: 286: 279: 275: 272: 271: 267: 265: 262: 259: 256: 252: 248: 243: 236: 234: 230: 228: 224: 220: 216: 212: 211:power station 209: 205: 201: 197: 193: 182: 176: 169: 166: 165: 163: 161: 157: 152: 148: 144: 139: 135: 132: 128: 122: 119: 118: 116: 112: 108: 106: 102: 98: 94: 89: 61: 57: 54: 51: 47: 44: 41: 37: 33: 31:Official name 29: 25: 20: 322:. Retrieved 317: 308: 297:. Retrieved 288: 263: 260: 244: 240: 231: 195: 191: 189: 208:gas turbine 170:625 MW 167:252 MW 130:Operator(s) 99:Operational 83: / 71:101°40′54″E 59:Coordinates 340:Categories 299:2009-02-13 280:References 68:2°58′02″N 324:20 April 268:See also 223:Malaysia 219:Selangor 114:Owner(s) 49:Location 43:Malaysia 251:Siemens 237:History 206:) is a 39:Country 96:Status 200:Malay 179:[ 326:2024 196:PJPS 190:The 109:1993 213:in 149:Gas 342:: 316:. 221:, 217:, 202:: 198:; 328:. 302:. 194:( 183:]

Index

Malaysia
Serdang, Selangor
2°58′02″N 101°40′54″E / 2.9673523°N 101.6817337°E / 2.9673523; 101.6817337
Commission date
Tenaga Nasional
Tenaga Nasional Berhad
Nameplate capacity
edit on Wikidata
Malay
gas turbine
power station
Sepang District
Selangor
Malaysia
Tenaga Nasional Berhad
General Electric
Siemens
peaking power plant
List of power stations in Malaysia
"TNB Generation Division"
"KIE's Malaysian unit wins deal"
Categories
1993 establishments in Malaysia
Buildings and structures in Selangor
Energy infrastructure completed in 1993
Natural gas-fired power stations in Malaysia
Sepang District
Power stations in Malaysia
20th-century architecture in Malaysia

Text is available under the Creative Commons Attribution-ShareAlike License. Additional terms may apply.