Knowledge (XXG)

Paulo Afonso Hydroelectric Complex

Source 📝

395:
the spillway. The spillway is composed of eight floodgates and has a maximum discharge capacity of 10,000 cubic metres per second (350,000 cu ft/s). The dam withholds a 127,500,000 cubic metres (103,400 acre⋅ft) capacity reservoir with a surface area of 12.9 kilometres (8.0 mi). The reservoir receives water through a channel that originates near the southern end of the Appolonius Sales Reservoir and continues south, skirting the city. The PA IV power house is also underground and is 210 metres (690 ft) long, 52 metres (171 ft) high and 24 metres (79 ft) wide. It contains six 410.4 megawatts (550,400 hp) MW generators for an installed capacity of 2,462.4 megawatts (3,302,100 hp). Each generator is a SíncronoVertical-type manufactured by Siemens and utilizes vertical shaft Francis turbines that were manufactured by Voith.
286:
October 21 that year. Another generator was commissioned in 1972 and the final two in 1974, the last of which on August 5. In 1971, construction had moved to the Apollonius Sales (Moxotó) Dam and power plant 4 kilometres (2.5 mi) upstream from the falls. In 1977, construction was completed and its four generators went online in April of that year. In 1972, construction began on the final dam and power plant, PA IV, 2 kilometres (1.2 mi) southwest of the falls. Construction was complete in 1979 and its first generator commissioned on December 1. Two more generators were commissioned in 1980, two in 1981 and the final on May 28, 1983.
354:, the Delmiro Gouveia Dam supports Paulo Afonso I, II and III. The dam is 20 metres (66 ft) high, 4,707 metres (15,443 ft) long and is a concrete gravity type. The reservoir formed by the dam has a 26,000,000 cubic metres (21,000 acre⋅ft) capacity and surface area of 4.8 square kilometres (1.9 sq mi). The dam has one uncontrolled spillway and a controlled spillway on its outer linings while also supporting four controlled spillways on the front of the falls. These four surface spillways when open, discharge water below and essentially recreate the falls. 335: 370:. PA II is a 104-metre (341 ft) long, 36-metre (118 ft) high and 18-metre (59 ft) wide power house. It contains six Vertical Sync-type generators with Francis turbines. Two of the generators are 70 megawatts (94,000 hp), one is 75 megawatts (101,000 hp) and the remaining three are 176 megawatts (236,000 hp), for a total installing capacity of 443 megawatts (594,000 hp) MW. The generators were manufactured by 437: 307:. The dam creates a 1,200,000,000 cubic metres (970,000 acre⋅ft) capacity reservoir with a surface area of 100 square kilometres (39 sq mi) and catchment area of 630,000 square kilometres (240,000 sq mi). The dam and its reservoir are primarily intended to regulate water flow to PA I, II and III 4 km downstream. On the dam's west side, it supports a 20 423: 409: 29: 343: 273:) was formed in 1945. On May 23, 1944, construction on Paulo Afonso I had been authorized with two generators. Construction began in 1948; workers and engineers experienced difficulty diverting the river, transporting the turbines to the site while in midst of dangerous work conditions. Tunnels and a cavern had to be excavated for Brazil's first 394:
The Paulo Afonso Dam located 2 kilometres (1.2 mi) southwest of the falls is 35 metres (115 ft) high and 7,430 metres (24,380 ft) long. The dam is an earth and rock-fill type but is 1,053 metres (3,455 ft) in length of concrete structures which include the power plant's intake and
357:
All three power plants are about 82 metres (269 ft) underground and adjacent to one another. PA I lies in the center and is housed in a 60-metre (200 ft) long, 31-metre (102 ft) high and 15-metre (49 ft) wide cavern. It contains three 60 megawatts (80,000 hp) generators with
285:
By 1961, PA II was complete and on October 24 that year, its first generator was commissioned. PA II's five other generators became operational between 1962 and December 18, 1967. Construction on PA III started soon after in 1967 and was complete in 1971 with its first generator commissioned on
281:
inaugurated PA I. Previously, in 1953, CHESF negotiated with the government for a third generating unit at PA I and the excavation of another underground power plant for the future PA II adjacent to PA I on the falls. The third generator at PA I was commissioned on September 18, 1955, and
240:. Constructed in succession between 1948 and 1979, the dams support the Paulo Afonso I, II, III, IV and Apollonius Sales (Moxotó) power plants which contain a total of 23 generators with an installed capacity of 4,279.6 megawatts (5,739,000 hp). 260:
for power production and the first hydroelectric power plant in northeastern Brazil. Construction of the power plant was intended to spur economic growth in the area and soon after another hydroelectric plant was constructed upstream near
243:
PA I was the first large power plant constructed in Brazil and the complex constitutes the densest area of dams in Brazil. The complex provides electricity to areas in northeastern Brazil and is the main tourist attraction in the region.
922: 749: 716: 683: 650: 617: 471: 302:
The Apolônio Sales Dam and power plant were originally known as Moxotó but were renamed after Apolônio Sales, the founder of CHESF. The dam is a 30 metres (98 ft) high, 2,825 metres (9,268 ft) long rock and earth-fill
382:. PA III's power house is 127 metres (417 ft) long, 46 metres (151 ft) high and 18 metres (59 ft) wide. It contains four 198.55 megawatts (266,260 hp) Vertical Sync-type generators manufactured by 532: 919: 757: 724: 691: 658: 625: 479: 852: 314:
with a 28,000 cubic metres per second (990,000 cu ft/s) capacity. The power plant is located on the east side of the dam near the reservoir's shore and contains four
780: 971: 966: 961: 956: 951: 68: 547: 946: 182: 845: 809: 269:
for economic development in the semi-arid region. They began to plan the river's development and the Companhia Hidro-Elétrica do São Francisco (
981: 838: 976: 277:. Due to the depth and strength of the river near the falls, it was not diverted until 1954. On January 15, 1955, Brazilian President 386:
for an installed capacity of 795.2 megawatts (1,066,400 hp). Each generator utilizes a Francis turbine manufactured by Voith.
452: 362:, for an installed capacity of 180 megawatts (240,000 hp). The generators are Vertical Sync-type and were manufactured by 363: 289:
Construction of the dams caused a loss of 1,600 hectares (4,000 acres) of land along with displacing 52,000 people.
274: 813: 442: 941: 865: 266: 221: 986: 108: 278: 326:
of 100 megawatts (130,000 hp) for a total installed capacity of 400 megawatts (540,000 hp).
315: 334: 861: 351: 323: 257: 237: 164: 876: 830: 886: 265:. By the 1940s Brazil's Ministry of Agriculture recognized the importance of harnessing the 926: 371: 359: 236:. The complex exploits an 80-metre (260 ft) natural gap on the river, known as the 881: 319: 304: 262: 935: 896: 414: 253: 214: 136: 590: 428: 225: 56: 901: 568: 436: 217: 787: 404: 367: 83: 70: 422: 308: 311: 252:
On January 23, 1913, the 1.1 MW Angiquinho Hydroelectric Plant, built by
191: 28: 383: 375: 342: 502: 233: 46: 753: 720: 687: 654: 621: 475: 379: 341: 333: 270: 229: 121: 781:"Hydropower Dams and Social Impacts: A Sociological Perspective" 834: 210: 205:(Complexo Hidrelétrico de Paulo Afonso), also known as the 810:"Hydroelectric power plants are built into the vegetation" 472:"Paulo Afonso Hydroelectric Complex - Generation System" 533:"UMA CONTRIBUIÇÃO À HISTORIOGRAFIA DE BASE LOCAL E" 178: 173: 163: 142: 132: 127: 117: 107: 99: 62: 52: 42: 21: 282:construction of PA II began that year as well. 540:Rios Eletrônica – Revista Científica da FASETE 846: 8: 920:CHESF - Paulo Afonso Hydroelectric Complex 853: 839: 831: 256:Delmiro Gouveia, was the first use of the 18: 808:Fernandes, Adriana (December 16, 2005). 717:"Description Advantage Appolonius Sales" 684:"Description Advantage Paulo Afonso III" 526: 524: 522: 520: 338:Overhead of the complex, click to expand 972:Energy infrastructure completed in 1977 967:Energy infrastructure completed in 1983 962:Energy infrastructure completed in 1974 957:Energy infrastructure completed in 1967 952:Energy infrastructure completed in 1955 750:"Description Advantage Paulo Afonso IV" 744: 742: 678: 676: 651:"Description Advantage Paulo Afonso II" 463: 183:Related media on Commons 645: 643: 618:"Description Advantage Paulo Afonso I" 612: 610: 608: 562: 560: 7: 711: 709: 366:. The turbines were manufactured by 33:A view of Paulo Afonso I, II and III 501:Campos Ferreira, Omar (June 2002). 169:4,279.6 MW (5,739,000 hp) 203:Paulo Afonso Hydroelectric Complex 22:Paulo Afonso Hydroelectric Complex 14: 591:"About the Flag of Paulo Afonso" 453:List of power stations in Brazil 435: 421: 407: 350:Situated directly on top of the 128:Thermal power station 27: 947:Dams on the São Francisco River 531:Muccini, Sandra (August 2007). 503:"The Brazilian Electric System" 16:Brazilian hydroelectric project 569:"Blogging in Brazil: Day nine" 567:Cabral, Paulo (July 3, 2003). 1: 982:1955 establishments in Brazil 812:. Ecotourism. Archived from 1003: 977:Underground power stations 368:Dominion Engineering Works 872: 188: 151: 147: 38: 26: 443:Renewable energy portal 346:Generator hall of PA II 330:Paulo Afonso I, II, III 322:. Each generator has a 298:Apolônio Sales (Moxotó) 275:underground power plant 209:, is a system of three 165:Nameplate capacity 133:Turbine technology 505:. Economy & Energy 378:while the turbines by 347: 339: 248:Background and history 156:Units operational 345: 337: 143:Power generation 207:Paulo Afonso Complex 109:Commission date 84:9.39694°S 38.20222°W 866:São Francisco River 779:Cernea, Michael M. 760:on 23 November 2015 727:on 23 November 2015 694:on 10 December 2015 661:on 24 November 2015 628:on 23 November 2015 546:(1). Archived from 267:São Francisco River 222:São Francisco River 174:External links 89:-9.39694; -38.20222 80: /  925:2011-07-06 at the 862:Hydroelectric dams 352:Paulo Afonso Falls 348: 340: 324:nameplate capacity 258:Paulo Afonso Falls 238:Paulo Afonso Falls 910: 909: 752:(in Portuguese). 719:(in Portuguese). 686:(in Portuguese). 653:(in Portuguese). 620:(in Portuguese). 542:(in Portuguese). 474:(in Portuguese). 224:near the city of 199: 198: 994: 855: 848: 841: 832: 826: 825: 823: 821: 805: 799: 798: 796: 794: 785: 776: 770: 769: 767: 765: 756:. Archived from 746: 737: 736: 734: 732: 723:. Archived from 713: 704: 703: 701: 699: 690:. Archived from 680: 671: 670: 668: 666: 657:. Archived from 647: 638: 637: 635: 633: 624:. Archived from 614: 603: 602: 600: 598: 587: 581: 580: 578: 576: 564: 555: 554: 552: 537: 528: 515: 514: 512: 510: 498: 492: 491: 489: 487: 478:. Archived from 468: 445: 440: 439: 431: 426: 425: 417: 412: 411: 410: 360:Francis turbines 192:edit on Wikidata 95: 94: 92: 91: 90: 85: 81: 78: 77: 76: 73: 31: 19: 1002: 1001: 997: 996: 995: 993: 992: 991: 932: 931: 927:Wayback Machine 916: 911: 906: 868: 859: 829: 819: 817: 807: 806: 802: 792: 790: 783: 778: 777: 773: 763: 761: 748: 747: 740: 730: 728: 715: 714: 707: 697: 695: 682: 681: 674: 664: 662: 649: 648: 641: 631: 629: 616: 615: 606: 596: 594: 589: 588: 584: 574: 572: 566: 565: 558: 550: 535: 530: 529: 518: 508: 506: 500: 499: 495: 485: 483: 470: 469: 465: 461: 449: 448: 441: 434: 427: 420: 413: 408: 406: 401: 392: 390:Paulo Afonso IV 372:S. Morgan Smith 332: 320:Kaplan turbines 300: 295: 279:João Café Filho 250: 195: 88: 86: 82: 79: 74: 71: 69: 67: 66: 34: 17: 12: 11: 5: 1000: 998: 990: 989: 984: 979: 974: 969: 964: 959: 954: 949: 944: 934: 933: 930: 929: 915: 914:External links 912: 908: 907: 905: 904: 899: 894: 889: 884: 879: 873: 870: 869: 860: 858: 857: 850: 843: 835: 828: 827: 816:on 7 July 2012 800: 771: 738: 705: 672: 639: 604: 582: 556: 553:on 2012-03-12. 516: 493: 482:on 6 July 2011 462: 460: 457: 456: 455: 447: 446: 432: 418: 403: 402: 400: 397: 391: 388: 331: 328: 305:embankment dam 299: 296: 294: 293:Specifications 291: 249: 246: 197: 196: 189: 186: 185: 180: 176: 175: 171: 170: 167: 161: 160: 157: 153: 152: 149: 148: 145: 144: 140: 139: 134: 130: 129: 125: 124: 119: 115: 114: 111: 105: 104: 101: 97: 96: 64: 60: 59: 54: 50: 49: 44: 40: 39: 36: 35: 32: 24: 23: 15: 13: 10: 9: 6: 4: 3: 2: 999: 988: 985: 983: 980: 978: 975: 973: 970: 968: 965: 963: 960: 958: 955: 953: 950: 948: 945: 943: 942:Dams in Bahia 940: 939: 937: 928: 924: 921: 918: 917: 913: 903: 900: 898: 895: 893: 890: 888: 885: 883: 880: 878: 875: 874: 871: 867: 863: 856: 851: 849: 844: 842: 837: 836: 833: 815: 811: 804: 801: 789: 782: 775: 772: 759: 755: 751: 745: 743: 739: 726: 722: 718: 712: 710: 706: 693: 689: 685: 679: 677: 673: 660: 656: 652: 646: 644: 640: 627: 623: 619: 613: 611: 609: 605: 592: 586: 583: 570: 563: 561: 557: 549: 545: 541: 534: 527: 525: 523: 521: 517: 504: 497: 494: 481: 477: 473: 467: 464: 458: 454: 451: 450: 444: 438: 433: 430: 424: 419: 416: 415:Brazil portal 405: 398: 396: 389: 387: 385: 381: 377: 373: 369: 365: 361: 355: 353: 344: 336: 329: 327: 325: 321: 317: 313: 310: 306: 297: 292: 290: 287: 283: 280: 276: 272: 268: 264: 259: 255: 254:industrialist 247: 245: 241: 239: 235: 231: 227: 223: 219: 216: 215:hydroelectric 212: 208: 204: 193: 187: 184: 181: 177: 172: 168: 166: 162: 158: 155: 154: 150: 146: 141: 138: 137:Hydroelectric 135: 131: 126: 123: 120: 116: 112: 110: 106: 102: 98: 93: 65: 61: 58: 55: 51: 48: 45: 41: 37: 30: 25: 20: 987:Paulo Afonso 892:Paulo Afonso 891: 887:Luiz Gonzaga 820:10 September 818:. Retrieved 814:the original 803: 793:10 September 791:. Retrieved 774: 764:10 September 762:. Retrieved 758:the original 731:10 September 729:. Retrieved 725:the original 698:10 September 696:. Retrieved 692:the original 665:10 September 663:. Retrieved 659:the original 632:10 September 630:. Retrieved 626:the original 597:10 September 595:. Retrieved 585: 575:10 September 573:. Retrieved 548:the original 543: 539: 509:10 September 507:. Retrieved 496: 486:10 September 484:. Retrieved 480:the original 466: 429:Water portal 393: 364:Westinghouse 356: 349: 318:, each with 301: 288: 284: 251: 242: 226:Paulo Afonso 218:power plants 206: 202: 200: 57:Paulo Afonso 877:Três Marias 593:. CRW Flags 263:Petrolândia 103:Operational 87: / 63:Coordinates 936:Categories 882:Sobradinho 788:World Bank 571:. BBC News 459:References 316:generators 75:38°12′08″W 309:floodgate 213:and five 113:1954–1979 72:9°23′49″S 923:Archived 399:See also 312:spillway 118:Owner(s) 53:Location 864:on the 384:Siemens 376:Hitachi 220:on the 179:Commons 43:Country 897:Moxotó 234:Brazil 100:Status 47:Brazil 902:Xingó 784:(PDF) 754:CHESF 721:CHESF 688:CHESF 655:CHESF 622:CHESF 551:(PDF) 536:(PDF) 476:CHESF 380:Voith 271:CHESF 230:Bahia 190:[ 122:CHESF 822:2010 795:2010 766:2010 733:2010 700:2010 667:2010 634:2010 599:2010 577:2010 511:2010 488:2010 374:and 211:dams 201:The 228:in 938:: 786:. 741:^ 708:^ 675:^ 642:^ 607:^ 559:^ 538:. 519:^ 232:, 159:23 854:e 847:t 840:v 824:. 797:. 768:. 735:. 702:. 669:. 636:. 601:. 579:. 544:1 513:. 490:. 194:]

Index


Brazil
Paulo Afonso
9°23′49″S 38°12′08″W / 9.39694°S 38.20222°W / -9.39694; -38.20222
Commission date
CHESF
Hydroelectric
Nameplate capacity
Related media on Commons
edit on Wikidata
dams
hydroelectric
power plants
São Francisco River
Paulo Afonso
Bahia
Brazil
Paulo Afonso Falls
industrialist
Paulo Afonso Falls
Petrolândia
São Francisco River
CHESF
underground power plant
João Café Filho
embankment dam
floodgate
spillway
generators
Kaplan turbines