Polavaram Project

Source 📝

1142:
feasible located in upstream of Polavaram site where the river passes through deep gorges of Papi hill range. The width of river is about 300 m only in the rocky gorge stretch. Thirty years back, this alternative was found technologically challenging task to connect the reservoir with the irrigation canals via tunnels across the ghat area. Also, costly underground hydro electric station is mandated compared to river bed based hydro electric station. When the project was actually taken up in the year 2004, the old finalised designs at Polavaram site are adopted without re-examining the latest cost of upstream alternate site in view of state of the art construction technology of tunnels and underground hydroelectric station. The progress up to the year 2012 in construction of dam structures and the hydro electric station is almost nil. The alternate site located in the gorge stretch is still worth of re-examination to reduce the ever-increasing cost of Polavaram dam.
1246:. Uttarandhra Sujala Sravanthi lift irrigation scheme will also use the Godavari water and a sanction of ₹2,114 crores was made in 2017 for its first phase. All the irrigated lands under these lift schemes can be supplied from Polavaram right and left canals by gravity flow when Polavaram reservoir level is above the canal's full supply level of 41.15 m MSL. However these lift stations are to be operated every year during the dry season to draw water from the substantial dead storage available behind the flood gates of the Polavaram dam. So these lift schemes are not for few years operation till the Polavaram dam is constructed but for permanent operation regularly for at least four months in every year. Nearly 80 tmcft live storage capacity available to Andhra Pradesh in 1094: 2350:(GWDT) award. The agreement allows Andhra Pradesh to construct the Polavaram reservoir with full reservoir level (FRL) at 150 feet above the mean sea level (MSL). Odisha approached Supreme Court against the design discharge capacity of the Polavaram dam spillway stating that it should be designed for five million cusecs (cubic feet per second) which is the estimated probable maximum flood (PMF) once in 1000 years duration. Odisha argues that otherwise there would be additional submergence above 150  ft MSL in its territory during peak floods. The recorded maximum flood is 3.0 million cusecs in the year 1986 during the last 115 years. 1159: 6572: 2162:
sea level by pumping fresh water from the coastal reservoir to the 1000 m gap between the dikes. The higher level water barrier between the two dikes eliminates any seawater seepage into the coastal reservoir by establishing freshwater seepage to the sea. The rainwater falling on the coastal reservoir area and runoff water from its catchment area is adequate to cater to the seepage and evaporation losses from the coastal reservoir. The 180 km long, 1000 m gap between the two dikes is also used as deep water mega harbor for shipping, ship breaking, ship building, etc. For shipping purpose, the
1461: 6586: 283: 2394:(tri-junction point of Andhra Pradesh, Odisha and Chhattisgarh borders). When this project is constructed, the land submergence would be more than that of Polavaram backwaters. It would be better for Odisha and Chhattisgarh to enter into an agreement with Andhra Pradesh to shift the location of this Hydro electricity project further downstream in Andhra Pradesh territory to harness Sileru river water also for hydroelectricity generation. This joint project of the three states would eliminate the backwaters issue of the Polavaram dam. 1262:
48 vents to enable discharge of 5,000,000 cu ft/s (140,000 m/s) of water. The spillway is located on the right bank of the river for which nearly 5.5 km long and 1.0 km wide approach and spill channels up to river bed level is envisaged involving nearly 70 million cubic meters earth/rock excavation which is nearly 2/3rd of the project's total earthwork. The maximum flood level at Polavaram is 28 metres (92 ft) MSL and lowest water level is 10.9 metres (36 ft) MSL. Two
6579: 762:, then Chief Engineer in the Presidency's irrigation department, made the first survey of the project site and made a definitive proposal for a reservoir at Polavaram. Sri Iyer not only envisaged cultivation of 350,000 acres (140,000 ha) over two crop seasons through this project, but also planned for a 40 MW hydroelectric plant within the project. The project, when it was conceived in 1946–47, was estimated to cost Rs 129 crore. 1920: 1557:
by Polavaram right bank canal from Polavaram reservoir to Prakasam barrage across Krishna river is not exceeding 80 tmcft at 75% dependability. When additional Godavari water exceeding 80 tmcft is transferred from Polavaram reservoir, Karnataka and Maharashtra are entitled with additional water from the unallocated Krishna river waters in the same proportion (i.e. 21:14:45) provided all the following conditions are satisfied.
2453: 2335:, union government has taken the responsibility of taking all clearances and approvals for the project execution and also declared the project as national project. The states also allege that public hearing in the effected areas are not held. Under section 90 (3) of the Andhra Pradesh Reorganisation Act, 2014, Telangana state has already given the approval in all respects to the Polavaram project. 2411:
CWPRS, Pune to study the impact of Backwater due to increase of 36 lakh cusecs to 50 lakh cusecs of spillway design discharge, it is to ascertain the safety of important temple town like Bhadrachalam, Mining areas and heavy water Plant. Orissa also insisted on backwater studies. The matter is before Supreme court. Proceedings are going on. Supreme Court identified 13 issues to settle the dispute.
84: 2439: 43: 186: 6565: 7699: 2425: 290: 793:. In December 2017, it was reported that the project contractor, Transstroy was seeking a deadline extension and a budget escalation. Transstroy was reported to have its ₹4,300 crore loan turn NPA in July 2015. In January 2018, the state government signed a new contract for the project spillway, spill channel and stilling basin concrete work with 267: 2378:
by the flood waters originating in Madhya Pradesh, Maharashtra, Odisha and Chhattisgarh states. The land submergence due to the Polavaram dam in Odisha and Chhattisgarh states is a fraction of the Andhra Pradesh area which is affected by the floods in the Godavari River. During the years from 1953 to 2011, Andhra Pradesh suffered nearly
1271:, each having 80 Megawatt capacity, were to be installed. Without removing the upper and lower coffer dams after the construction of the ECRF dam, the 960 MW hydropower plant can not be commissioned as they are blocking the water passages of the powerhouse. The right canal connecting to Krishna River in upstream of 1267:(56 ft) MSL, the spillway related rock excavation is reduced by 70% leading to substantial cost reduction in the project's head works cost. Ultimately, the material of cofferdams would be excavated and reused for the peripheral portions of the main earth-cum-rock fill dam. On the left side of the river, 12 2153:
town. A flood canal (1.5 km long) from this barrage would feed Godavari river water to the coastal reservoir. With 70 tmcft live storage above the full supply level of its canals and another 100 tmcft above the spillway sill level, Polavaram reservoir will assist in moderating the Godavari flood
2357:
The location of Polavaram dam is in the plain area at approximately 10 km downstream from the 50 km long narrow gorge in the Papi Hills. It is also to be ascertained whether the higher backwater level during the PMF in Godavari river is solely due to the presence of long narrow gorge which
2353:
The projected back water level build-up at Konta due to PMF in Godavari river after construction of the Polavaram project with the designed maximum water level (measured at dam point) shall be cross-checked with the level that can occur at Konta in Sabari basin from the PMF generated in the upstream
2330:
Odisha and Chhattisgarh have filed a petition in the Supreme Court against the Project which has probability of temporarily submerging large areas of its state and allege that union government are going ahead with the project without the necessary permissions from Environment Ministry. Under section
2161:
high, is in the form of two parallel dikes separated by 1000 meters gap. The main purpose of the twin dikes is to prevent any sea water seepage into the coastal reservoir as its water level is below the sea water level. The water level between the dikes is always maintained at a minimum of 2 m above
2377:
to utilize the allocated share of Godavari waters. This underutilization of water is the main reason for the very high flood flows at the Polavaram dam site. The vast area in excess of 10,000 square km up to sea are frequently flooded (at least once in a decade) by Godavari floods in Andhra Pradesh
1910:
river and Eluru canal to Prakasam barrage pond. The last portion of the Polavaram right bank canal is nothing but Budameru/ Velagaleru flood diversion canal which has flow limitation of 10,000 cusecs. Thus water flow from Polavaram right bank canal to Krishna River can be enhanced by constructing a
1556:
As per the inter state agreements dated 4 August 1978 (page 89) and 29 January 1979 (page 101) with Andhra Pradesh, the states of Karnataka and Maharashtra are entitled to use 21 tmcft and 14 tmcft respectively out of the unallocated waters of Krishna river when Godavari water transferred in a year
1261:
which is the first of its kind in India. The purpose of diaphragm wall is to secure the river bed stability for withstanding the water pressure across the dam. The project would constitute an earth-cum-rock fill dam of 2,310 metres (7,580 ft) length, spillway of 907 metres (2,976 ft) with
784:
has refused to be sworn in unless an ordinance is issued merging seven mandals of Khammam district with divided Andhra Pradesh, stating only then can the Polavaram Project be completed without further delay in future. The Polavaram Project Authority was constituted by the Union Cabinet in May 2014
2397:
The 200  km long stretch of the Sabari river forming boundary between Chhattisgarh and Odisha drops by 2.25 meters per km length on average. This stretch of the river has substantial hydroelectricity generation potential by building medium head (< 20 m) barrages in series to minimize land
2382:
55,800 crore which is 26% of total flood damage in India. It is justified to raise the FRL of Polavaram dam further on this ground alone. One single criterion shall be applied by the tribunals/courts for all the submerged lands whether they are related to reservoir projects construction or due to
2361:
It is purely an academic interest showing concern for the few thousand hectares of farm/forest land submerged by the backwater level build-up once in five hundred or thousand years (against the permitted norm of once in 25 years) without showing concern for the thousands of square kilometers land
1476:
An expenditure of ₹16,035.88 crores has been incurred on the project from April 2014 to December 2022. A sum of ₹13,226.04 crores has been released by the centre for the execution of the project since April 2014. Bills amounting to ₹2,390.27 crores were rejected for reimbursement by the Polavaram
2410:
In July 2018, a two-member bench of the Supreme Court asked Andhra Pradesh, Telangana, Odisha and Chhattisgarh governments to frame the issues for arguments. Telangana said to the court it is in-principle agree for the project but the center should take up study by neutral central institute like
1582:
the water releases from the Nagarjunasagar dam for the requirements of Krishna delta. Thus Andhra Pradesh need not share with other states the water transferred via Krishna river or any reservoir located on Krishna river for the water needs of any of its area (including Krishna basin) other than
1472:
In January 2018, it was reported that the project cost had escalated to ₹58,319 crore. In June 2018, The Water Ministry sanctioned ₹417.44 crore as grant-in-aid under the Accelerated Irrigation Benefit Programme under the Pradhan Mantri Krishi Sinchayi Yojana (PMKSY) towards the project. By June
2300:
Meanwhile, work on the project began in April 2006 and was expected to be completed by February 2007. After 30% work of excavation work on the canals and 15% of the spillway works had been completed, the work was halted in May 2006 to seek clearance from the Ministry of Forests and Environment.
1141:
into plains covered with deep alluvial sandy strata. At Polavaram, the river width is about 1500 m. In view of large depth of excavation which is more than 30 m deep, to reach hard rock at this dam site, the dam project was not found economical to take up. However, a lucrative alternate site is
1105:
each. During the monsoon months (July to October), nearly 360 tmcft of Godavari flood flows at the rate of 3 tmcft per day can be diverted into the canals. At least another 190 tmcft water from the water stored in the Polavaram reservoir along with lean season inflows, excluding the downstream
2253:
The proposed project would displace 276 villages and 44,574 families spread across Andhra Pradesh state mainly. Tribals constitute 50% of such a displaced population. Human rights activists came out against the project because of these reasons. In addition, one activist pointed out that this
785:
and the construction of project head works were taken up earnestly. The Naidu government has acquired the complete lands that required across the right canal by solving court petition issues of farmers who lost their agricultural lands from both districts of West Godavari and Krishna and the
1266:
are planned, one up to 41 metres (135 ft) MSL, to facilitate faster pace of work on earth-cum-rock fill dam to complete the first phase of the project by June 2018. With coffer dams inclusion and the bed level of the approach and discharge canals of the spillway increased to 17 metres
1989:
up to the depth of 20 meters from the coast line. Water can be pumped from this artificial freshwater lagoon throughout the year for meeting agriculture, etc. needs. Also top surface of the dike can be used as coastal road & rail rout. The proposed dikes would be similar to the
1468:
In its 2018 budget, Andhra Pradesh allocated ₹9000 crores to the project. In June 2018, the Central Government approved ₹1,400 crores which had been sanctioned in January, but not released, through Extra Budgetary Resources raised by NABARD. These funds were from outside the LTIF.
1600:, a new lift project construction with greenfield alignment was started in the first phase of Godavari Penna River linking project by having five step ladder pumping stages and a gravity canals to transfer 7,000 cusecs of Godavari water from Prakasam Barrage back waters into the 1574:
Thus Andhra Pradesh is entitled to transfer Godavari water in excess of 80 tmcft in three out of four years (below 75% dependability) reducing the water releases from Nagarjunasagar dam for Krishna delta requirements and need not share water with other states beyond 80 tmcft.
797:
By June 2018, 1,10,355 acres of the required 1,68,213 acres had been acquired. On June 11, 2018, the Polavaram diaphragm wall was completed marking a significant milestone in the project construction. On January 7, 2019, The Polavaram project in Andhra Pradesh entered the
1068:
rivers of India. This exercise, with a combined network of 30 river-links and a total length of 14,900 kilometres (9,300 mi) at an estimated cost of US$ 120 billion (in 1999), would be the largest ever infrastructure project in the world. In this project's case, the
1569:
for the Krishna delta requirements. Krishna delta is the area located down stream of Prakasam barrage which is part of Krishna basin. It does not include adjacent coastal river basins which are being irrigated by the Krishna waters from the Prakasam
1807:
dam will be executed to feed Godavari water diverted from Polavaram Dam to some of the existing command area (situated below 60 m MSL) under Nagarjuna Sagar right bank canal to facilitate extension of Nagarjuna Sagar right bank canal connecting to
2198:, Cudapah, Ananthapur and Chittoor are drought prone and do not have adequate water sources for irrigating the dry lands to the extent of 10,000,000 acres. Water from this coastal reservoir would be pumped uplands to Ramathirtham water tank (near 1173:
The project reservoir has live storage 75.2 tmcft at canal's full supply level of 41.15 metres (135 ft) MSL and gross storage 194 tmcft thereby enabling irrigation of 23,20,000 acres (including stabilisation of existing irrigated lands) in
806:. The project beat the existing record of 21,580 cubic meters which was achieved by Abdul Wahid Bin Shabib, RALS Contracting LLC and Alfa Eng. Consultant (all UAE), in Dubai between May 18 and 20 in 2017. The Chief minister of Andhra Pradesh 1457:(LTIF) under the Pradhan Mantri Krishi Sinchayee Yojana (PMKSY). NABARD provided a loan of ₹2,981.54 crores during 2016-17 and ₹979.36 crores during 2017-18 under the LTIF to the National Water Development Authority (NWDA) for the project. 1699:
via existing Somasila Swarnamukhi link canal. GoAP can also provide water to Tamil Nadu with this Godavari water and retained water in Krishna River (15 TMC allocation of Krishna water to Telugu Ganga) will be used for other projects in
2190:
sand and clay from the nearby shallow sea bed to reduce the construction cost. Nearly 1850 tmcft of water of Godavari and Krishna flood waters can be utilized for irrigation, etc. requirements with this freshwater coastal reservoir.
2679: 2383:
river floods (i.e. non-utilization of river water). Upstream states shall not take granted that downstream state areas are permitted to be flooded /inundated by the river flood water without offering agreeable relief/comforts.
2661: 965:
Blocking the natural course of the Godavari by raising the upper coffer dam level above the crest level (17.3 m MSL) of river sluice vertical gates (10 nos) provided in the spillway to divert the Godavari water through these
1089:
are drained unutilised into Bay of Bengal. Based on the estimated water requirements in 2025, the Study recommended that sizeable surplus water was to be transferred from the Godavari River basin to the Krishna River basin.
4426: 2354:
of Konta when the downstream main Godavari is not under spate. Then only enhanced submergence during the PMF of the Godavari river in Odisha and Chhattisgarh states can be assessed due to the Polavaram dam construction.
1057: 1275:(173 kilometres (107 mi) long) discharges 17,500 cu ft/s (500 m/s) at head works and left canal (182 kilometres (113 mi) long) discharges 17,500 cu ft/s (500 m/s) of water. 1149:
bedrock in Polavaram Project. Khondalites, which are feldspar-rich, often contain soft graphite, hard garnet, etc. in addition to other minerals. Khondalites are highly weathered and hence unsuitable at dam site.
1874:(FRL 75 m MSL) irrigating lands en route along Krishna river in Guntur district. During drought years, the water transferred by this canal to Nagarjuna Sagar tail pond is further lifted to Nagarjuna Sagar and 1561:
The additional Godavari water from Polavaram project should be transferred to the Krishna river in the upstream of Prakasam barrage. Such additional Godavari water quantity to be shared is decided based on 75%
2229:) which is at 85 m msl. From this water tank, dry lands in Prakasam and Nellore districts up to Tamil Nadu border can be brought under irrigation by gravity canals. From this canal, water would be further 2014:. The earth bunds / dikes located on sea bed at 20 meters below the sea level, is lesser challenging technically when compared to Saemangeum Seawall project which is having 36 meters average water depth. 2174:
with rail and road links. The coastal reservoir whose full reservoir water level (FRL) is at 0.0 m msl, would also reduce drastically the cyclone damage and flooding in coastal areas of West Godavari,
1202:
districts of Andhra Pradesh. The silt free dead storage water of nearly 100 tmcft above the spillway crest level 24.5 metres (80 ft) MSL, can also be used in downstream lift irrigation projects (
2386:
Odisha and Chhattisgarh entered into an agreement (clause 3e, Annexure F, Page 159 of original GWDT) to construct a Hydro electricity project at Konta / Motu just upstream of the confluence point of
1137:
The dam could not be taken up for construction during the last century on techno-economical grounds. The proposed dam site at Polavaram is located where the river emerges from the last range of the
4985: 773:
performs bhoomi pooja with the estimation cost of 8,261 cr and the administrative sanction was accorded for construction of right and left canals at a cost of Rs 1,320 crore and Rs 1,353 crore.
3533: 7834: 7829: 5070: 3346: 1711:
with 700 TMC capacity reservoir is possible using of flood water of Krishna River and Godavari River diverted with this lift project. It will submerge nearly 300Sq KM of land at FRL 260m
4551: 2687: 7809: 5579: 2861: 4430: 2365:
Thirty-two years have passed after the GWDT award in 1980, Maharashtra, Odisha and Chhattisgarh have not made serious efforts to harness the major Godavari tributaries such as
3321: 3017: 1110:
water requirements, can be diverted into these canals. Thus the total annual water utilization capacity of the Polavaram project is 550 tmcft. The water storage available in
1723:
power generation. Flood water of Krishna River will be pumped to Palnadu Sagar. The water stored in Palnadu Sagar will be used for irrigation and drinking in drought years.
4098: 3493: 1016:
Completion of inspection and field investigation of damaged diaphragm wall during the 2020 Godavari floods and the decision was given to rectify the damage that took place.
7844: 4859: 1687:
with 400 km canal as part of national river linking program. With help from the Indian Government, AP Govt can construct a new canal up to Somasila Dam as per DPR of
4905: 1898:
by raising its embankments for augmenting water transfer to meet shortages in the Krishna river basin and the needed environmental flows downstream of Prakasam barrage.
2992: 2939: 2182:
and Prakasam districts. It would also greatly improve the irrigated coastal land drainage in these districts. The coastal reservoir area can also be used for locating
2105:), is highly suitable for creating the freshwater coastal reservoir. The average width of the sea up to 20 m depth is nearly 16 km wide and the length of the sea 3089: 2068: 2024: 4772: 3863: 2967: 5017: 4683: 4619: 4594: 2402:
in Odisha can also be diverted to Sabari river via Jouranala through which Indravati River flood waters naturally overflow into Sabari basin for power generation.
2560: 7668: 6204: 6169: 6079: 3772:"Refer PPT files dated 22 May 2017 '11. CHLIS P (NSP)' for Chintalapudi lift, '10. TLIS PPT' For Tadipudi lift and '6. PPT ON PPLIS' for Purushothapatnam lift)" 4498: 4195: 2109:
is nearly 200 km. The area of the coastal reservoir would be nearly 2900 km. A barrage would be constructed across the Vashista Godavari river (near
1836:(FRL 53.34 m MSL) to store Godavari water in Pulichintala reservoir during drought years and to irrigate low lands along Krishna river up to Pulichintala dam. 1664:. As water supply from Nagarjuna Sagar Left Bank Canal is highly erratic, Muktyala Lift Irrigation scheme is proposed by drawing water from the back waters of 4800: 4144: 2281:
4,500 crore forest management plan and rehabilitation and resettlement proposal covering 59,756 hectares that were being lost under the project. In addition,
2112: 5424: 4393: 3185: 2835: 2710: 5572: 4007: 1625: 282: 4995: 2327:
remained steadfast in his demand for compensation and rehabilitation of tribals of his state who would be displaced due to the submerging of their land.
1325:
and West Godavari districts drawing Godavari River water from the backwaters of Polavaram reservoir. This is a joint project between Andhra Pradesh and
4220: 3299: 7457: 3534:"Benefits of Irrigation Water Transfer in the National River Linking Project: A Case Study of the Godavari (Polavaram)-Krishna Link in Andhra Pradesh" 5536: 5080: 2792: 6660: 6370: 2201: 1842: 1775: 1737: 3572: 1632:
right canal.It will shorten the length of this lift project canal, Pressure Main and fewer lift stages and also enables the lifting of water up to
2332: 790: 4076: 2338:
In June 2018, it was reported that Naveen Patnaik, Chief Minister of Odisha had written to the Central Government to halt the Polavaram Project.
2308:
also expressed its concern on the submerging of its land and decided to study this together with the officials from Andhra Pradesh. In response,
1284: 4523: 4169: 2245:
period. The total cost to Andhra Pradesh state would be less than ₹1,00,000 crores which is nearly ₹1,00,000 per acre of newly irrigated lands.
7814: 7328: 5565: 5345: 4851: 2346:
Odisha, Chhattisgarh and Andhra Pradesh entered into an agreement (clause vi of final order, page 80 of original GWDT) which was made part of
4572: 3841: 2887: 7413: 2195: 996:
All the 48 barrage gates are fully erected and water can be stored in the reservoir to the extent permitted by the upper coffer dam design.
5232: 5200: 5168: 5135: 5102: 5038: 4245: 1939:
could be constructed along the sea coast to store the Krishna & Godavari river flood waters for creating additional irrigated area in
4123: 3792: 2170:
fitted with twin gates for access to the open sea. The top surface of the inner dike would serve as access to the mainland from the mega
7799: 6610: 6545: 6469: 4704: 2479: 1906:
A 25 MW hydropower station can be established utilising Polavaram right bank canal water near Vijayawada city by transferring water via
3689: 3457: 2277:
secured the environmental clearance from the central agency in 2005. This clearance was obtained after the state government prepared a
339: 196: 7468: 7383: 6665: 4315: 3065: 1203: 786: 101: 56: 3912: 7768: 7661: 7378: 7318: 3549: 3509: 1883: 1278: 1211: 715: 319: 239: 221: 167: 70: 4705:"Efficacy of coastal reservoirs to address India's water shortage by impounding excess river flood waters near the coast (page 49)" 789:
has been launched in order to pump the Godavari river water and sent to Krishna river. In June, the state was bifurcated under the
2241:. This gravity canal would also be extended further to transfer 350 tmcft water up to the Kavery river in Tamil Nadu state during 7581: 7358: 7036: 6771: 5733: 4371: 4347: 2347: 2309: 6571: 148: 7804: 6650: 3716: 3394: 1879: 1158: 7473: 1894:
to Nagarjuna Sagar tail pond. Ultimately the Polavaram right bank canal would be remodelled to enhance its capacity to 50,000
1624:
back waters into newly created Vykuntapuram Barrage pond and the second lift stage from Vykuntapuram Barrage pond to existing
120: 7363: 7074: 6925: 2230: 1126: 105: 3369: 1093: 2913: 7051: 6109: 4936: 3955: 3721: 1234:. GoAP announced the decision to construct Purushothapatnam lift irrigation scheme to transfer water at the rate of 3,500 1125:
green or renewable electricity annually. Polavaram reservoir will also create the potential to install nearly 1,58,000 MW
803: 794: 3668: 758:
In July 1941, the first conceptual proposal for the project was mooted by the erstwhile Madras Presidency. Diwan Bahadur
127: 7824: 7819: 7654: 7388: 7343: 7323: 6585: 6505: 6363: 6199: 2274: 416: 7478: 2735: 2567: 7763: 7462: 7451: 7368: 6134: 5600: 3417: 2817: 1243: 3820: 1649: 1578:
The above interstate water sharing agreement does not cover the Godavari water transferred to Krishna river which is
1218:
during the summer months. Chintalapudi lift / Jalleru project will supply water to irrigate most of the highlands in
4659: 5723: 5718: 5697: 1882:
for use in all the projects receiving water from these reservoirs. This high level lift canal is an alternative to
134: 31: 7483: 94: 7333: 7266: 7021: 6530: 6164: 5623: 2474: 1871: 1454: 739: 707: 7338: 4884: 2061:) where Vashista Godavari, the right side branch of the Godavari river, is joining the sea and the mouth of the 6244: 6139: 4452: 2321: 1688: 1060:, was designed to overcome the deficit in water in the country. As a part of this plan, surplus water from the 1053: 7713: 4959: 4751: 2616: 116: 1450:
The revised cost of the total project including the 960 MW power station is 47,726 crores at 2017-18 prices.
7839: 7271: 6356: 6234: 4055: 2458: 2358:
is acting as a natural dam/barrier or further enhanced by the presence of the downstream Polavaram barrage.
2313: 2267: 770: 731: 3891: 1460: 1250:
basin can also augment the water availability additionally to the Polavaram project during the dry season.
976:
Godavari water flows diverted fully through the river sluice gates of the spillway via the approach channel
7703: 7514: 7393: 7348: 7297: 7281: 7089: 7084: 7001: 5512: 2294: 2258:
said that the project not only will displace several thousands of families, it will also submerge several
2167: 2163: 1191: 799: 776:
After decades of delay, the main Polavaram Dam construction began under the next successive government of
759: 699: 62: 5264: 4266: 6670: 6189: 6144: 4287: 1833: 1617: 730:
States. It gives major boost to tourism sector in Godavari Districts as the reservoir covers the famous
477: 7728: 3494:"Analysis of the Inter-basin Water Transfer Scheme in India: A Case Study of the Godavari-Krishna Link" 1477:
Project Authority (PPA). Bills amounting to ₹548 crores have been received by the PPA for examination.
7748: 2254:
interlinking of the rivers will harm the interests of the region in the state. Environmental activist
443:
Concrete spill way (1128 m), Non over flow concrete dam (140 m) & Earth cum rock fill dam (2454 m)
7758: 7753: 7743: 7733: 7723: 7548: 7509: 7418: 7170: 7046: 6675: 6615: 6119: 5891: 5856: 3618: 3597: 2494: 2289:
25,000 provided by other states. Despite this clearance, the project faced political roadblocks. The
1829: 1731: 1665: 1657: 1609: 807: 781: 777: 7738: 5491: 1620:. It is more economical to construct first stage pump house of this lift project to lift water from 7778: 7504: 7215: 7026: 7016: 7006: 6996: 6966: 6902: 6874: 6811: 6786: 6766: 6640: 6337: 6281: 6265: 6159: 6094: 5966: 5666: 2504: 2238: 1672: 1641: 1629: 1601: 1597: 1566: 1223: 1215: 1107: 747: 735: 711: 5851: 5446: 4928: 1923:
Godavari delta (top river) and Krishna River delta (bottom river in the image) extending into the
1210:, Chintalapudi lift, Thorrigedda lift, Pushkara lift, Purushothapatnam lift, Venkatanagaram lift, 7185: 7099: 6981: 6976: 6892: 6645: 6635: 6306: 6301: 6296: 6229: 6224: 6089: 6084: 6037: 5901: 5702: 5075: 4990: 4777: 4624: 3868: 3797: 2662:"Andhra Pradesh "Polavaram" Will Be The Last Project With National Project Status: Nitin Gadkari" 2509: 2362:
submerged in the area downstream of the dam with a river flood of magnitude five million cusecs.
2263: 2242: 2007: 614: 6578: 5926: 5242: 5210: 5178: 5145: 5112: 5048: 4828: 718:(i.e. approx 150 km back from Polavaram dam on main river side) and approx 115 km on 141: 7398: 7276: 7094: 7031: 6986: 6971: 6859: 6836: 6826: 6801: 6796: 6776: 6655: 6464: 6239: 6194: 6027: 6022: 6017: 6012: 5971: 5831: 5801: 5776: 5766: 5676: 4401: 3545: 3505: 3418:"Modeling water supply and demand scenarios: the Godavari-krishna inter-basin transfer, India" 2062: 1952: 1940: 1932: 1817: 1696: 1691:
program specifications. Thus the Godavari River water will travel up to Somasila Dam and then
766: 743: 738:
are under construction on left side of the river. It is located 40 km to the upstream of
5881: 4708: 3744: 3644: 3464: 3018:"Andhra Pradesh: Polavaram project enters Guinness Book of World Record for concrete pouring" 769:
laid the foundation stone for the prestigious Polavaram irrigation project. In the year 2004
640: 7245: 7056: 7041: 7011: 6897: 6841: 6685: 6680: 6630: 6625: 6184: 5976: 5756: 5681: 5651: 5613: 5404: 4872: 3432: 2529: 2175: 1991: 1972: 1964: 1944: 1825: 1821: 1720: 1653: 1621: 1272: 1175: 1065: 953: 5320: 4322: 2680:"Telangana government to study Polavaram backwaters, says Bhadrachalam Temple under threat" 2285:
40,000 was to be allotted for each dwelling to be constructed for the displaced as against
7646: 7605: 7499: 7373: 7302: 7240: 7220: 7149: 6991: 6920: 6831: 6821: 6816: 6806: 6781: 6761: 6510: 6479: 6443: 6438: 6413: 6286: 5991: 5986: 5936: 5751: 5746: 2469: 2399: 2374: 2370: 2179: 1948: 1716: 1637: 5296: 1329:
states. This project was shelved and merged with another project by the Telangana state.
4660:"Multipurpose Freshwater Coastal Reservoirs and Their Role in Mitigating Climate Change" 1919: 1321:
is under construction to supply irrigation water for 200,000 acres in Khammam, Krishna,
7685: 7601: 7225: 7180: 7175: 7154: 7079: 7066: 6961: 6943: 6869: 6864: 6851: 6723: 6713: 6484: 6408: 6403: 6382: 6379: 6332: 6327: 6063: 5896: 5806: 5796: 5791: 5771: 5671: 5641: 5592: 5393:"Study on Backwater Effect Due to Polavaram Dam Project under Different Return Periods" 4034: 3212:
Polavaram Cofferdam Construction Completed Successfully Before Target Date | ABN Telugu
2524: 2484: 2324: 2259: 2183: 2158: 1712: 1322: 1268: 1258: 1254: 1219: 1183: 1070: 703: 695: 691: 624: 548: 492: 451: 426: 327: 323: 3234:
AP CM Chandrababu Naidu Lay Foundation Stone For Polavaram Spill Channel Work | AP24x7
3161:
Jet Grouting Works Completed | in Polavaram Project | Gates to be Arranged in December
7793: 7718: 7681: 7630: 7620: 7610: 7230: 7190: 6791: 6743: 6733: 6728: 6605: 6600: 6550: 6535: 6459: 6423: 6291: 6214: 6154: 6129: 5916: 5876: 5861: 5841: 5836: 5608: 4752:"Coastal reservoirs strategy for water resource development-a review of future trend" 3771: 3645:"Salient design data of Polavaram project, National Water Development Authority, GoI" 2234: 1968: 1924: 1875: 1809: 1676: 1645: 1633: 1231: 1187: 1179: 1138: 1122: 1082: 1074: 597: 374: 5537:"As Odisha challenges national status for Polavaram, SC issues notice to Andhra, TS" 5370: 3573:"CAG says Andhra's Pattiseema project is a waste of public money, in damning report" 7708: 7408: 6912: 6525: 6474: 6433: 6418: 6209: 6104: 6058: 6053: 5951: 5946: 5941: 5886: 5816: 5661: 5656: 5646: 5636: 5470: 4427:"Muktyala Lift Irrigation scheme to be completed in a year, says Chandrababu Naidu" 3066:"AP CM Chandrababu Naidu to lay stone for Polavaram spillway concrete works today." 2444: 2430: 2391: 2387: 2366: 2317: 2255: 1956: 1804: 1680: 1481:
Funding (Rs Crores) by Polavaram Project Authority (PPA) to AP state since 2014-15
1247: 1195: 1111: 723: 719: 382: 1981:
coastal reservoirs can be established in the shallow sea area by constructing sea
1453:
In December 2016, NABARD handed over ₹1,981 crores, as part of its loan from the
7635: 7615: 7544: 7538: 7353: 7200: 7134: 6753: 6620: 6540: 6520: 6515: 6428: 6322: 6124: 6114: 5996: 5956: 5931: 5906: 5846: 5811: 5761: 5741: 5588: 5557: 4524:"New barrage between Pulichintala dam and Prakasam barrage across Krishna river" 3956:"L&T Geostructure-Bauer Joint Venture has secured an order worth 422 crores" 2993:"Naidu inaugurates diaphragm wall pylon of Polavaram project; 55% work complete" 2519: 2514: 2499: 2452: 2186:
power plants to generate the needed water pumping power. The dikes are built by
2011: 2003: 1999: 1978: 1701: 1692: 1684: 1605: 1238:
to Polavaram left bank canal and further pumping at the rate of 1,400 cusecs to
1227: 845: 662: 606: 83: 2595: 7403: 6703: 6500: 6249: 5981: 5871: 5826: 3979: 3277: 3254: 3232: 3210: 3159: 3137: 3115: 3043: 2640: 2420: 2320:
would be affected by the construction. The problem continued until 2010, when
2297:
were troubled with the issue of submerging agricultural lands by the project.
1960: 1891: 1708: 1661: 1239: 1207: 1199: 1146: 1118: 1114:
basin is used as usual for the full water requirements of the Godavari Delta.
687: 378: 4405: 4124:"Long Term Irrigation Fund (LTIF) - long term benefits for Indian irrigation" 3745:"Indirasagar (Polavaram) Project reservoir, Ministry of water resources, GoI" 3348:
Polavaram Irrigation Project: 'Rs 2,000 crore needed to repair diaphragm wall
2216: 2203: 2128: 2114: 2084: 2070: 2040: 2026: 1857: 1844: 1790: 1777: 1752: 1739: 1300: 1286: 461:
39.28 m (129 ft) up to top of earth dam above the lowest river bed.
354: 341: 17: 7625: 7428: 7235: 6953: 6935: 6718: 6564: 6219: 6099: 5961: 5866: 5237: 5205: 5173: 5140: 5107: 5043: 4805: 4684:"My first job is to bring Godavari, Krishna water to TN, says Nitin Gadkari" 4528: 4477: 4012: 2767: 2742: 2489: 2438: 2150: 1995: 1887: 1766: 1613: 1326: 1263: 1163: 1061: 7567:
Excessive silting of reservoirs due to deforestation and mining activities
3395:"Why India's $ 168 billion river-linking project is a disaster-in-waiting" 7597: 7423: 7139: 6708: 6174: 6032: 5631: 4552:"Experts find new route to divert Godavari water to Krishna basin viable" 3139:
CM Chandrababu Started Jet Grouting Works in Polavaram Project | TV5 News
2187: 1986: 1907: 1813: 603: 3538:
Strategic Analysis of the National River Linking Project (NRLP) on India
3498:
Strategic Analysis of the National River Linking Project (NRLP) on India
3436: 3186:"AP CM Chandrababu Naidu lays foundation stone for Polavaram coffer dam" 1719:
will take and release water into Nagarjuna Sagar right canal along with
1652:
to Vykuntapuram Barrage pond to deliver the Polavaram right main canal/
810:
unveiled the first crest gate of Polavaram project on 24 December 2018.
7561: 7557: 7205: 7195: 7144: 6149: 5821: 5786: 5781: 3984: 1707:
In future a new massive dam named Palnadu Sagar across hill range near
1648:. It is even more economical, if we construct a new gravity canal from 1226:
in AP facilitating 40 tmcft saved Krishna river water for diversion to
582: 5409: 5392: 4927:
S., Laxman Rao; Priya Deshingkar; John Farrington (30 December 2006).
266: 7129: 7124: 7119: 6884: 5921: 5911: 4372:"CM to lay foundation for linking of Godavari-Penna rivers on Monday" 3934: 2822:
Ministry of Water Resources, River Development and Ganga Rejuvenation
2305: 2290: 2171: 1253:
The dam construction involves the building of a 1.5-m-thick concrete
727: 1963:
under interstate rivers linking project This project is similar to
1608:
by utilizing 73 tmcft of Godavari water. With FRL 25M newly created
1565:
The transferred water shall also displace the water discharges from
4960:"Polavaram project will spell doom for tribals: Human Rights Forum" 3322:"Andhra Pradesh: Work on lower cofferdam at Polavaram project over" 2641:"Indirasagar (Polavaram) Project, Ministry of water resources, GoI" 1628:/ Pulichintala Project and later lift stages from K.L Rao Sagar to 7698: 7210: 5492:"Middle Kolab (25 MW) and Lower Kolab (12 MW) hydropower stations" 4906:"India is not running out of water, water is running out of India" 2273:
Sixty-four years after the initial conception of the project, the
2106: 2018: 1982: 1936: 1918: 1895: 1459: 1235: 1167: 1157: 1102: 1092: 1086: 1078: 540: 528: 516: 488: 309: 195:
may be in need of reorganization to comply with Knowledge (XXG)'s
6348: 4035:"Refer ongoing major projects, Indira Dummugudem lift irrigation" 7250: 5269: 5018:"AP farmers get compensation, business picks up in Bhadrachalam" 4730: 1839:
Another high level lift canal from above Krishna river location
7650: 6352: 5561: 4170:"Central nod to Rs 1,400-crore financing for Polavaram project" 7677: 4773:"Reservoir in sea to end Bengaluru's drinking water problems?" 3117:
Diaphragm wall construction of Polavaram project was completed
438: 179: 77: 36: 2968:"Polavaram project will be completed by December 2019: AP CM" 2862:"90,000 acres land acquired for Polavaram irrigation project" 4499:"AP contemplates Rs 80,000 crore Godavari-Pennar river link" 4099:"NABARD hands over Rs 1,981 cr cheque for Polavaram project" 2154:
water to make adequate water flow to the coastal reservoir.
1257:
up to depths from 40 to 120 m below the river bed under the
1222:
and NTR districts including the existing command area under
1772:
A low level lift canal from the Krishna river located near
1081:
of underutilised water from Godavari River flowed into the
5425:"Polavaram had scant impact on Bhadrachalam floods: Study" 4731:"International Association for Coastal Reservoir Research" 4316:""Godavari Water Disputes Tribunal final report, page 52"" 3690:"Engineering Geology of dams; by Siva Bharatha Murthy . T" 3090:"Chandrababu lays foundation for Polavaram diaphragm wall" 1660:
pond since canal level is 33 m MSL at Ambapuram hill near
802:
by pouring 32,100 cubic meters of concrete in 24 hours by
5321:"The Andhra Pradesh Reorganisation (Amendment) Act, 2014" 4478:"Clipping of Andhra Jyothy Telugu Daily - Andhra Pradesh" 3864:"Vizac city arms itself to battle water woes this summer" 3301:
First Fruits of Polavaram Project to reach Godavari Delta
2237:
mountains to irrigate vast area in Chittoor, Cudapah and
1077:
basin is considered to be a deficit one. As of 2008, 644
5297:"The Andhra Pradesh Reorganisation Act, 2014, 6 of 2014" 4620:"Centre's plan to link Godavari, Cauvery irks Telangana" 4595:"AP government not utilising Pulichintala Project fully" 4394:"Naidu lays foundation stone for barrage across Krishna" 2940:"All Polavaram details available on website: Government" 5169:"Polavaram project works come to a grinding halt again" 4246:"Polavaram project likely to be completed by March '24" 4145:"AP budget allocates Rs 9,000 cr for Polavaram project" 3669:"Irrigation projects status in Andhra Pradesh, AP Govt" 1832:. A branch from this lift canal is also extended up to 1769:
to receive Godavari water diverted from Polavaram dam.
203: 4801:"Gadkari moots Vodarevu for locating port in Prakasam" 1890:
region which would transfer Godavari river water from
1596:
To stabilize the existing irrigated ayacut area under
4829:"Green Power Island: A blue battery for green energy" 3492:
Luna, Bharati; B. K. Anand; Vladmir Smakhtin (2009).
2711:"Over 60,000 acres yet to be acquired for Polavaram" 1955:
districts and further transfer of Godavari water to
1765:
in the upstream of Prakasam barrage with FRL at 25m
7590: 7574: 7553:
Frequent floods in tail end area of the river basin
7527: 7492: 7444: 7437: 7311: 7290: 7259: 7163: 7112: 7065: 6952: 6934: 6911: 6883: 6850: 6752: 6742: 6694: 6593: 6493: 6452: 6396: 6389: 6315: 6274: 6258: 6072: 6046: 6005: 5732: 5711: 5690: 5622: 5599: 1734:would be constructed on Krishna river located near 1473:2018, ₹13,000 crore had been spent on the project. 1342: 623: 613: 596: 588: 578: 573: 565: 557: 547: 535: 523: 511: 503: 498: 483: 473: 465: 457: 447: 437: 432: 422: 412: 404: 396: 388: 370: 333: 315: 305: 259: 108:. Unsourced material may be challenged and removed. 7835:Buildings and structures in East Godavari district 7830:Buildings and structures in West Godavari district 4196:"Polavaram dam project cost soars to Rs 58,319 cr" 4008:"Polavaram: The cofferdam which will act as a dam" 3935:"Reservoir Levels, Storages and Equivalent Energy" 3598:"Monthly water flow data of Godavari at Polavaram" 3045:CM to launch first crest gate of Polavaram project 2914:"Transstroy buys luxury cars, soon turns NPA" 1097:Polavaram project Canal view near Talupulamma Lova 780:. After 2014 elections, then Chief Minister-elect 3892:"Babu Jagjeevana Ram Uttarndhra Sujala Sravanthi" 3717:"YSR performs bhoomi pooja for Polavaram project" 3532:Amarasinghe, Upali A.; Sharma, Bharat R. (2008). 3416:L., Bharati; V. U. Smakhtin; B. K. Anand (2009). 2836:"Polavaram row: 36 L/acre for Krishna dist ryots" 1145:The spillway and non-overflow dam are founded on 1101:The capacity of right and left canals are 17,500 7556:Alkali salts / high pH water run off from ash / 3913:"Konathala praises Naidu, hesitant to join TDP!" 2166:outer dike facing the sea is envisaged with few 1073:basin is considered as a surplus one, while the 4056:"Physical and financial progress (page 5 of 5)" 2017:The sea area up to 20 meters depth adjacent to 765:In 1980, then Chief Minister of Andhra Pradesh 297:Location of Polavaram Project in Andhra Pradesh 7810:Hydroelectric power stations in Andhra Pradesh 5391:c r, Amarnath; Thatikonda, Shashidhar (2020). 5201:"Orissa for joint survey on Polavaram project" 206:to make improvements to the overall structure. 7662: 6364: 5573: 5513:"Middle Kolab Hydro Electric Project, 285 MW" 5447:"State wise flood damage statistics in India" 1338:Financial progress status as on 30 June 2024 1127:high head pumped-storage hydroelectric plants 734:, Polavaram hydro electric project (HEP) and 714:. Its reservoir back water spreads up to the 8: 5371:"Detailed report on Polavaram Project, GoAP" 5295:Ministry of Law and Justice (1 March 2014). 4221:"Polavaramprojectgets ₹417 cr. grant-in-aid" 4077:"Revised cost estimate of Polavaram Project" 3487: 3485: 3370:"Interlinking of rivers: an idea with flaws" 3368:Koshy, Jacob; Bansal, Samarth (7 May 2016). 1870:up to 90 m MSL would be constructed to join 1242:for feeding Yeleru canal which is supplying 722:side. Thus back water spreads into parts of 27:Dam in Eluru district, Andhra Pradesh, India 5233:"Polavaram: no submergence in other States" 3256:River sluice gates of the Polavaram Project 2157:The offshore earth dam extending up to 8 m 71:Learn how and when to remove these messages 7669: 7655: 7647: 7441: 6749: 6393: 6371: 6357: 6349: 5580: 5566: 5558: 5103:"CPI(M) plans Chalo Assembly on Polavaram" 4929:"Tribal Land Alienation in Andhra Pradesh" 1816:reservoir for serving irrigation needs in 1336: 1121:plant (960 MW) will generate 2.29 billion 817: 531:(above 25.4 m msl crest level of spillway) 265: 256: 7845:Proposed infrastructure in Andhra Pradesh 5408: 5136:"Work on Polavaram project in full swing" 4392:Srinivas, Rajulapudi (14 February 2019). 3842:"MEIL successfully executed PLIS Phase 2" 2888:"Transstroy sets new terms for Polavaram" 2709:Rao, G. Venkataramana (12 January 2018). 2194:Vast lands in the districts of Prakasam, 553:307,800 km (118,800 sq mi) 289: 240:Learn how and when to remove this message 222:Learn how and when to remove this message 168:Learn how and when to remove this message 7354:RattanIndia Nashik Thermal Power Station 6661:Godavari River Basin Irrigation Projects 4310: 4308: 3639: 3637: 3635: 1479: 1279:Indira Dummugudem lift irrigation scheme 5471:"24 MW Sukuma Hydro Project near Konta" 4614: 4612: 3711: 3709: 2555: 2553: 2551: 2549: 2547: 2545: 2541: 2333:Andhra Pradesh Reorganisation Act, 2014 686:is an under construction multi-purpose 7329:Chandrapur Super Thermal Power Station 5290: 5288: 4654: 4652: 3766: 3764: 3592: 3590: 1026:Repair works of damaged diaphragm wall 7560:dumps of coal fired power stations / 4862:from the original on 18 December 2013 4850:Brown, Lester R. (29 November 2013). 4006:Rao, G. Venkataramana (8 June 2017). 3179: 3177: 2962: 2960: 2793:"Proposed in 1941, but still a dream" 2736:"Agitation against Polavaram, SANDRP" 2590: 2588: 2270:, and several hectares of farm land. 1056:, which works under the aegis of the 254:Dam in Eluru district, Andhra Pradesh 7: 5071:"TRS stalls Assembly over Polavaram" 106:adding citations to reliable sources 6611:Kaleshwaram Lift Irrigation Project 4348:"Lower Krishna basin watershed map" 2480:Interstate River Water Disputes Act 1937:Tmcft (thousand million cubic feet) 1064:rivers is to be transferred to the 7469:Hyderabad-Godavari Valley Railways 7384:Ramagundam B Thermal Power Station 6666:Pattiseema Lift Irrigation Project 5209:. 15 November 2006. Archived from 5134:G. V., Ramana Rao (8 April 2006). 5079:. 17 February 2006. Archived from 5039:"Polavaram project gets clearance" 3279:Polavaram Project Full Information 2596:"Polavaram hydro electric project" 2561:"Polavaram project studies by NGT" 2398:submergence. The surplus water of 2316:clarified that neither Odisha nor 1612:pond will have back waters beyond 1518:Funds released by PPA to AP state 1058:Indian Ministry of Water Resources 848:of earth cum rock fill (ECRF) dam 787:Pattiseema Lift Irrigation Project 25: 7319:Khaparkheda Thermal Power Station 5265:"Polavaram dam: Andhra vs Orissa" 5111:. 9 February 2006. Archived from 5047:. 26 October 2005. Archived from 4994:. 25 October 2005. Archived from 4852:"India's dangerous 'food bubble'" 4573:"Need to advance kharif stressed" 2406:Dispute with Odisha and Telangana 2021:line between the locations (near 1803:at 20 m MSL in the downstream of 986:Upper coffer dam works completed. 791:Andhra Pradesh Reorganisation Act 561:600 km (230 sq mi) 52:This article has multiple issues. 7697: 7582:Godavari Water Disputes Tribunal 7474:Visakhapatnam–Vijayawada section 7414:Shendra – Bidkin Industrial Park 7359:Kothagudem Thermal Power Station 6584: 6577: 6570: 6563: 5346:"Odisha seeks to halt Polavaram" 4986:"Green signal for Polavaram dam" 2451: 2437: 2423: 2348:Godavari Water Disputes Tribunal 2310:Chief Minister of Andhra Pradesh 2096:Western tip of Coastal reservoir 2052:Eastern tip of Coastal reservoir 1006:Lower coffer dam works completed 840:mostly completed as of May 2021 706:. The project has been accorded 288: 281: 271:Polavaram Project circa Nov 2020 184: 82: 41: 7547:in the river basin upstream of 6651:Devadula lift irrigation scheme 5241:. 28 March 2007. Archived from 3980:"3D views of Polavaram project" 3619:"UTILISATION OF GODAVARI WATER" 3184:Sarma, Ch R. S. (8 June 2017). 2342:Interstate river water disputes 1668:on left bank of Krishna river. 93:needs additional citations for 60:or discuss these issues on the 7545:High alkalinity of river water 7364:Kakatiya Thermal Power Station 3821:"Tadipudi Lift Station L00054" 1884:Dummugudem to Sagar lift canal 1727:Godavari Krishna River linking 892:Spill channel concreting work 800:Guinness Book of World Records 1: 7815:Inter-state disputes in India 4937:Economic and Political Weekly 3793:"Pattiseema project advanced" 2818:"Polavaram Project Authority" 1915:Fresh water coastal reservoir 1830:Chennai drinking water supply 1715:.Palnadu Sagar spillway with 566:Maximum water depth 469:3,722 m (12,211 ft) 7389:Tiroda Thermal Power Station 7344:Nashik Thermal Power Station 7324:Koradi Thermal Power Station 5167:G., Nagaraja (18 May 2006). 3458:""Godavari river basin map"" 2291:Communist Party of India (M) 2275:Government of Andhra Pradesh 1671:There is a proposal to link 1592:Godavari Penna River linking 903:Right bank canal head works 417:Government of Andhra Pradesh 7399:Heavy Water Plant, Manuguru 7369:Parli Thermal Power Station 2617:"List of national projects" 2233:up to 600 m msl across the 1602:Nagarjuna sagar right canal 1598:Nagarjuna sagar right canal 1464:Polavaram canal near Eluru. 1085:. But as of 2017 over 3000 913:Left bank canal head works 712:Central Government of India 619:960 MW (under construction) 7861: 7800:Dams on the Godavari River 7532:productivity & ecology 7530:river basin's sustainable 7339:Lanco Vidarbha Power Plant 6561: 2304:The neighbouring state of 1880:pumped storage hydro units 1638:Reversible Reverse turbine 881:Lower coffer dam grouting 870:Upper coffer dam grouting 834:Spill way concreting work 32:Polavaram (disambiguation) 29: 7692: 7334:Wardha Warora Power Plant 7267:Godavari Valley Coalfield 6275:Ports (existing/proposed) 6165:Nagarjuna Sagar tail pond 4885:"Ramathirtham Dam D06139" 4267:"Annual Report (2022-23)" 2475:Polavaram, Eluru district 2140:Vashista Godavari barrage 1935:of storage capacity 1000 1872:Nagarjuna Sagar tail pond 1656:waters directly into the 1455:Long Term Irrigation Fund 1434: 1420: 1406: 1392: 1378: 1364: 1350: 1345: 1224:Nagarjunasagar left canal 954:Hydroelectric power plant 746:City and 25 km from 740:Sir Arthur Cotton Barrage 633: 569:32.08 m at FRL 150 ft msl 276: 264: 2322:Chief Minister of Odisha 2262:sites, coal deposits, a 1689:Indian Rivers Inter-link 1654:Budameru diversion canal 1552:Interstate water sharing 933:Right bank canal works 7479:Bilaspur–Nagpur section 7272:Wardha Valley Coalfield 7037:Jayashankar Bhupalpally 4964:The Hindu Business Line 2459:Renewable energy portal 2314:Y. S. Rajasekhara Reddy 2268:Papikonda National Park 1945:Potti Sriramulu Nellore 1822:Potti Sriramulu Nellore 943:Left bank canal works 771:Y. S. Rajasekhara Reddy 732:Papikonda National Park 615:Installed capacity 397:Construction began 7805:Dams in Andhra Pradesh 7515:Godavari Fourth Bridge 7394:Butibori Power Project 7349:Dhariwal Power Station 7298:Krishna Godavari Basin 7282:Pench Kanhan Coalfield 5724:Krishna delta mangrove 4503:The New Indian Express 4103:The New Indian Express 2944:The New Indian Express 2797:The New Indian Express 2684:The New Indian Express 2295:Bharat Rashtra Samithi 1928: 1465: 1170: 1098: 760:L. Venkatakrishna Iyer 700:East Godavari District 625:Annual generation 536:Inactive capacity 484:Spillway capacity 7769:Dummugudem (proposed) 7484:Nagpur–Hyderabad line 7445:Highways and railways 7075:Alluri Sitharama Raju 6671:Sitamma Sagar Barrage 4293:. Government of India 3722:The Financial Express 2918:The Financial Express 2231:pumped to the uplands 2217:15.62694°N 79.81306°E 2129:16.32806°N 81.72083°E 2085:15.56917°N 80.23028°E 2041:16.32194°N 81.70611°E 1922: 1858:16.71389°N 80.14000°E 1791:16.71389°N 80.14000°E 1753:16.57806°N 80.41194°E 1618:Pulichinthala Project 1587:Future potential uses 1463: 1301:17.56361°N 81.24694°E 1161: 1096: 1054:River-Linking Project 938:2016 (90% completed) 439:Type of dam 355:17.28917°N 81.65139°E 7774:Polavaram (proposed) 7528:Pollution concerns, 7510:Godavari Arch Bridge 7419:Ballarpur Industries 7171:Indo-Aryan languages 7052:Bhadradri Kothagudem 6676:Tummidihetti Barrage 6616:Sriram Sagar Project 3094:www.thehansindia.com 2772:polavaram.cgg.gov.in 2573:on 16 September 2020 2495:Sriram Sagar Project 2239:Ananthapur districts 2151:Antervedi Pallipalem 1876:Srisailam reservoirs 1828:districts including 1732:Vykuntapuram barrage 1666:Vykuntapuram barrage 1658:Vykuntapuram barrage 1610:Vykuntapuram Barrage 808:N. Chandrababu Naidu 804:Navayuga Engineering 795:Navayuga Engineering 782:N. Chandrababu Naidu 778:N. Chandrababu Naidu 589:Commission date 524:Active capacity 408:2029 July (Expected) 102:improve this article 30:For other uses, see 7825:Irrigation in India 7820:Irrigation projects 7764:Sripada Yellampalli 7714:Nandur Madhameshwar 7505:Old Godavari Bridge 7493:Bridges on Godavari 7216:Dravidian languages 6641:Dowleswaram Barrage 6282:Dugarajapatnam Port 6266:National Waterway 4 5667:Kalingapatnam Beach 5213:on 27 November 2007 5148:on 28 February 2008 4809:. 27 September 2018 3437:10.2166/wp.2009.109 3397:. 18 September 2015 2768:"Polavaram Project" 2505:Icchampally Project 2213: /  2124: /  2080: /  2036: /  1911:25 MW power plant. 1854: /  1787: /  1749: /  1673:Nagarjuna Sagar Dam 1642:Nagarjuna Sagar Dam 1567:Nagarjuna Sagar Dam 1482: 1339: 1296: /  1244:water to Vizag city 1232:Srisailam reservoir 1216:Dowleswaram Barrage 960:Under construction 948:Under construction 928:Under construction 918:Under construction 908:Under construction 898:Under construction 887:Under construction 819: 748:Rajahmundry Airport 736:National Waterway 4 549:Catchment area 512:Total capacity 507:Polavaram Reservoir 351: /  204:editing the article 117:"Polavaram Project" 7164:Languages / people 6697:features / regions 6646:Balimela Reservoir 6636:Neher water system 6307:Visakhapatnam Port 6302:Machilipatnam Port 6297:Krishnapatnam Port 5703:Narava Gedda creek 5350:The Times of India 5245:on 8 November 2012 5115:on 7 February 2008 5083:on 3 November 2012 5076:The Times of India 5051:on 28 October 2005 4998:on 3 November 2012 4991:The Times of India 4778:The Times of India 4625:The Times of India 4575:. 19 December 2018 4328:on 12 January 2011 4200:The Times of India 4174:The Indian Express 3872:. 16 February 2018 3869:The Times of India 3801:. 17 November 2015 3798:The Times of India 3470:on 12 October 2013 3328:, 17 February 2023 3326:The Times of India 2894:. 13 December 2017 2866:The Economic Times 2840:The Times of India 2690:on 3 February 2019 2510:Balimela Reservoir 2264:wildlife sanctuary 2243:South-west monsoon 2222:15.62694; 79.81306 2134:16.32806; 81.72083 2090:15.56917; 80.23028 2046:16.32194; 81.70611 2008:Saemangeum Seawall 1929: 1878:with the existing 1863:16.71389; 80.14000 1796:16.71389; 80.14000 1758:16.57806; 80.41194 1480: 1466: 1421:Total civil works 1337: 1306:17.56361; 81.24694 1171: 1099: 923:Navigation tunnel 818: 543:(below 25.4 m msl) 474:Spillway type 392:Under construction 360:17.28917; 81.65139 7787: 7786: 7644: 7643: 7523: 7522: 7277:Kamptee Coalfield 7108: 7107: 6656:Upper Dudhana Dam 6559: 6558: 6453:Minor tributaries 6397:Major tributaries 6346: 6345: 6028:Mallela Theertham 5677:Manginapudi Beach 5410:10.3390/w12020576 5273:. 4 November 2010 5181:on 6 October 2008 4856:Los Angeles Times 4453:"Welcome To NWDA" 3725:. 9 November 2004 3096:. 1 February 2017 2063:Gundlakamma River 1933:coastal reservoir 1902:25 MW power plant 1834:Pulichinthala dam 1697:Chittoor district 1646:Srisailam project 1634:Srisailam Project 1616:up to the toe of 1549: 1548: 1448: 1447: 1435:Overall progress 1379:Right main canal 1351:Main dam package 1154:Technical details 1045: 1044: 1011:17 February 2023 865:October 29, 2018 837:30 December 2016 767:Tanguturi Anjaiah 744:Rajamahendravaram 716:Dummugudem Anicut 684:Polavaram Project 680: 679: 558:Surface area 519:at FRL 150 ft msl 433:Dam and spillways 405:Opening date 260:Polavaram Project 250: 249: 242: 232: 231: 224: 197:layout guidelines 178: 177: 170: 152: 75: 16:(Redirected from 7852: 7704:Gautami Godavari 7702: 7701: 7671: 7664: 7657: 7648: 7442: 7291:Oil / gas fields 7022:Rajanna Sircilla 6750: 6686:Sadarmat Barrage 6681:Sammakka Barrage 6631:Singur Reservoir 6626:Upper Wardha Dam 6588: 6581: 6574: 6567: 6394: 6373: 6366: 6359: 6350: 6259:Inland waterways 5691:Estuaries/creeks 5682:Rushikonda Beach 5652:Suryalanka Beach 5582: 5575: 5568: 5559: 5553: 5552: 5550: 5548: 5533: 5527: 5526: 5524: 5522: 5517: 5509: 5503: 5502: 5500: 5498: 5488: 5482: 5481: 5479: 5477: 5467: 5461: 5460: 5458: 5456: 5451: 5443: 5437: 5436: 5434: 5432: 5421: 5415: 5414: 5412: 5388: 5382: 5381: 5379: 5377: 5367: 5361: 5360: 5358: 5356: 5342: 5336: 5335: 5333: 5331: 5325: 5317: 5311: 5310: 5308: 5306: 5301: 5292: 5283: 5282: 5280: 5278: 5261: 5255: 5254: 5252: 5250: 5229: 5223: 5222: 5220: 5218: 5197: 5191: 5190: 5188: 5186: 5177:. Archived from 5164: 5158: 5157: 5155: 5153: 5144:. Archived from 5131: 5125: 5124: 5122: 5120: 5099: 5093: 5092: 5090: 5088: 5067: 5061: 5060: 5058: 5056: 5035: 5029: 5028: 5026: 5024: 5014: 5008: 5007: 5005: 5003: 4982: 4976: 4975: 4973: 4971: 4956: 4950: 4949: 4947: 4945: 4933: 4924: 4918: 4917: 4915: 4913: 4902: 4896: 4895: 4893: 4891: 4881: 4875: 4871: 4869: 4867: 4847: 4841: 4840: 4838: 4836: 4825: 4819: 4818: 4816: 4814: 4797: 4791: 4790: 4788: 4786: 4769: 4763: 4762: 4760: 4758: 4748: 4742: 4741: 4739: 4737: 4727: 4721: 4720: 4718: 4716: 4707:. Archived from 4701: 4695: 4694: 4692: 4690: 4680: 4674: 4673: 4671: 4669: 4664: 4656: 4647: 4644: 4638: 4637: 4635: 4633: 4616: 4607: 4606: 4604: 4602: 4597:. 16 August 2018 4591: 4585: 4584: 4582: 4580: 4569: 4563: 4562: 4560: 4558: 4548: 4542: 4541: 4539: 4537: 4532:. 4 January 2016 4520: 4514: 4513: 4511: 4509: 4495: 4489: 4488: 4486: 4484: 4474: 4468: 4467: 4465: 4463: 4449: 4443: 4442: 4440: 4438: 4429:. Archived from 4423: 4417: 4416: 4414: 4412: 4389: 4383: 4382: 4380: 4378: 4368: 4362: 4361: 4359: 4357: 4352: 4344: 4338: 4337: 4335: 4333: 4327: 4321:. Archived from 4320: 4312: 4303: 4302: 4300: 4298: 4292: 4284: 4278: 4277: 4275: 4273: 4263: 4257: 4256: 4254: 4252: 4242: 4236: 4235: 4233: 4231: 4217: 4211: 4210: 4208: 4206: 4192: 4186: 4185: 4183: 4181: 4166: 4160: 4159: 4157: 4155: 4141: 4135: 4134: 4128: 4120: 4114: 4113: 4111: 4109: 4095: 4089: 4088: 4086: 4084: 4073: 4067: 4066: 4064: 4062: 4052: 4046: 4045: 4043: 4041: 4031: 4025: 4024: 4022: 4020: 4003: 3997: 3996: 3994: 3992: 3976: 3970: 3969: 3967: 3965: 3960: 3952: 3946: 3945: 3943: 3941: 3931: 3925: 3924: 3922: 3920: 3909: 3903: 3902: 3900: 3898: 3888: 3882: 3881: 3879: 3877: 3860: 3854: 3853: 3851: 3849: 3838: 3832: 3831: 3829: 3827: 3817: 3811: 3810: 3808: 3806: 3789: 3783: 3782: 3780: 3778: 3768: 3759: 3758: 3756: 3754: 3749: 3741: 3735: 3734: 3732: 3730: 3713: 3704: 3703: 3701: 3699: 3694: 3686: 3680: 3679: 3677: 3675: 3665: 3659: 3658: 3656: 3654: 3649: 3641: 3630: 3629: 3627: 3625: 3615: 3609: 3608: 3606: 3604: 3594: 3585: 3584: 3582: 3580: 3569: 3563: 3562: 3560: 3558: 3529: 3523: 3522: 3520: 3518: 3489: 3480: 3479: 3477: 3475: 3469: 3463:. Archived from 3462: 3454: 3448: 3447: 3445: 3443: 3422: 3413: 3407: 3406: 3404: 3402: 3391: 3385: 3384: 3382: 3380: 3365: 3359: 3358: 3357: 3355: 3343: 3337: 3336: 3335: 3333: 3318: 3312: 3311: 3310: 3308: 3296: 3290: 3289: 3288: 3286: 3274: 3268: 3267: 3266: 3264: 3251: 3245: 3244: 3243: 3241: 3229: 3223: 3222: 3221: 3219: 3207: 3201: 3200: 3198: 3196: 3181: 3172: 3171: 3170: 3168: 3156: 3150: 3149: 3148: 3146: 3134: 3128: 3127: 3126: 3124: 3112: 3106: 3105: 3103: 3101: 3086: 3080: 3079: 3077: 3075: 3062: 3056: 3055: 3054: 3052: 3040: 3034: 3033: 3031: 3029: 3024:. 7 January 2019 3014: 3008: 3007: 3005: 3003: 2989: 2983: 2982: 2980: 2978: 2964: 2955: 2954: 2952: 2950: 2936: 2930: 2929: 2927: 2925: 2910: 2904: 2903: 2901: 2899: 2892:Deccan Chronicle 2884: 2878: 2877: 2875: 2873: 2858: 2852: 2851: 2849: 2847: 2832: 2826: 2825: 2814: 2808: 2807: 2805: 2803: 2789: 2783: 2782: 2780: 2778: 2764: 2758: 2757: 2755: 2753: 2747: 2741:. Archived from 2740: 2732: 2726: 2725: 2723: 2721: 2706: 2700: 2699: 2697: 2695: 2686:. Archived from 2676: 2670: 2669: 2658: 2652: 2651: 2649: 2647: 2637: 2631: 2630: 2628: 2626: 2621: 2613: 2607: 2606: 2604: 2602: 2592: 2583: 2582: 2580: 2578: 2572: 2566:. Archived from 2565: 2557: 2530:Vamsadhara River 2461: 2456: 2455: 2447: 2442: 2441: 2433: 2428: 2427: 2426: 2388:Sileru tributary 2381: 2288: 2284: 2280: 2228: 2227: 2225: 2224: 2223: 2218: 2214: 2211: 2210: 2209: 2206: 2148: 2147: 2145: 2144: 2143: 2141: 2136: 2135: 2130: 2125: 2122: 2121: 2120: 2117: 2104: 2103: 2101: 2100: 2099: 2097: 2092: 2091: 2086: 2081: 2078: 2077: 2076: 2073: 2060: 2059: 2057: 2056: 2055: 2053: 2048: 2047: 2042: 2037: 2034: 2033: 2032: 2029: 1992:land reclamation 1973:Gulf of Khambhat 1965:Kalpasar Project 1869: 1868: 1866: 1865: 1864: 1859: 1855: 1852: 1851: 1850: 1847: 1802: 1801: 1799: 1798: 1797: 1792: 1788: 1785: 1784: 1783: 1780: 1764: 1763: 1761: 1760: 1759: 1754: 1750: 1747: 1746: 1745: 1742: 1721:Hydroelectricity 1622:Prakasam Barrage 1483: 1443: 1442: 1429: 1428: 1415: 1414: 1401: 1400: 1393:Left main canal 1387: 1386: 1373: 1372: 1359: 1358: 1340: 1320: 1319: 1317: 1316: 1315: 1313: 1308: 1307: 1302: 1297: 1294: 1293: 1292: 1289: 1273:Prakasam Barrage 1240:Yeleru reservoir 1162:Aqueduct across 991:31 January 2022 862:January 8, 2018 851:1 February 2017 829:Completion Date 820: 708:National project 676: 675: 672: 670: 668: 666: 664: 659: 656: 654: 652: 650: 648: 646: 644: 642: 629:2.29 billion kWh 609:(left bank side) 366: 365: 363: 362: 361: 356: 352: 349: 348: 347: 344: 292: 291: 285: 269: 257: 245: 238: 227: 220: 216: 213: 207: 188: 187: 180: 173: 166: 162: 159: 153: 151: 110: 86: 78: 67: 45: 44: 37: 21: 7860: 7859: 7855: 7854: 7853: 7851: 7850: 7849: 7790: 7789: 7788: 7783: 7696: 7688: 7675: 7645: 7640: 7586: 7570: 7531: 7529: 7519: 7500:Godavari Bridge 7488: 7433: 7429:NALCO Damanjodi 7374:NTPC Ramagundam 7307: 7303:Ravva oil field 7286: 7255: 7159: 7104: 7061: 6948: 6930: 6907: 6879: 6846: 6738: 6696: 6690: 6589: 6583: 6582: 6576: 6575: 6569: 6568: 6555: 6494:Sub-tributaries 6489: 6448: 6385: 6377: 6347: 6342: 6311: 6287:Gangavaram Port 6270: 6254: 6068: 6042: 6001: 5728: 5707: 5698:Krishna estuary 5686: 5618: 5595: 5586: 5556: 5546: 5544: 5541:The News Minute 5535: 5534: 5530: 5520: 5518: 5515: 5511: 5510: 5506: 5496: 5494: 5490: 5489: 5485: 5475: 5473: 5469: 5468: 5464: 5454: 5452: 5449: 5445: 5444: 5440: 5430: 5428: 5423: 5422: 5418: 5390: 5389: 5385: 5375: 5373: 5369: 5368: 5364: 5354: 5352: 5344: 5343: 5339: 5329: 5327: 5323: 5319: 5318: 5314: 5304: 5302: 5299: 5294: 5293: 5286: 5276: 5274: 5263: 5262: 5258: 5248: 5246: 5231: 5230: 5226: 5216: 5214: 5199: 5198: 5194: 5184: 5182: 5166: 5165: 5161: 5151: 5149: 5133: 5132: 5128: 5118: 5116: 5101: 5100: 5096: 5086: 5084: 5069: 5068: 5064: 5054: 5052: 5037: 5036: 5032: 5022: 5020: 5016: 5015: 5011: 5001: 4999: 4984: 4983: 4979: 4969: 4967: 4958: 4957: 4953: 4943: 4941: 4931: 4926: 4925: 4921: 4911: 4909: 4908:. 26 March 2017 4904: 4903: 4899: 4889: 4887: 4883: 4882: 4878: 4865: 4863: 4849: 4848: 4844: 4834: 4832: 4827: 4826: 4822: 4812: 4810: 4799: 4798: 4794: 4784: 4782: 4781:. 8 August 2017 4771: 4770: 4766: 4756: 4754: 4750: 4749: 4745: 4735: 4733: 4729: 4728: 4724: 4714: 4712: 4711:on 26 July 2018 4703: 4702: 4698: 4688: 4686: 4682: 4681: 4677: 4667: 4665: 4662: 4658: 4657: 4650: 4646:refer talk page 4645: 4641: 4631: 4629: 4618: 4617: 4610: 4600: 4598: 4593: 4592: 4588: 4578: 4576: 4571: 4570: 4566: 4556: 4554: 4550: 4549: 4545: 4535: 4533: 4522: 4521: 4517: 4507: 4505: 4497: 4496: 4492: 4482: 4480: 4476: 4475: 4471: 4461: 4459: 4451: 4450: 4446: 4436: 4434: 4425: 4424: 4420: 4410: 4408: 4391: 4390: 4386: 4376: 4374: 4370: 4369: 4365: 4355: 4353: 4350: 4346: 4345: 4341: 4331: 4329: 4325: 4318: 4314: 4313: 4306: 4296: 4294: 4290: 4286: 4285: 4281: 4271: 4269: 4265: 4264: 4260: 4250: 4248: 4244: 4243: 4239: 4229: 4227: 4219: 4218: 4214: 4204: 4202: 4194: 4193: 4189: 4179: 4177: 4168: 4167: 4163: 4153: 4151: 4143: 4142: 4138: 4126: 4122: 4121: 4117: 4107: 4105: 4097: 4096: 4092: 4082: 4080: 4075: 4074: 4070: 4060: 4058: 4054: 4053: 4049: 4039: 4037: 4033: 4032: 4028: 4018: 4016: 4005: 4004: 4000: 3990: 3988: 3978: 3977: 3973: 3963: 3961: 3958: 3954: 3953: 3949: 3939: 3937: 3933: 3932: 3928: 3918: 3916: 3911: 3910: 3906: 3896: 3894: 3890: 3889: 3885: 3875: 3873: 3862: 3861: 3857: 3847: 3845: 3840: 3839: 3835: 3825: 3823: 3819: 3818: 3814: 3804: 3802: 3791: 3790: 3786: 3776: 3774: 3770: 3769: 3762: 3752: 3750: 3747: 3743: 3742: 3738: 3728: 3726: 3715: 3714: 3707: 3697: 3695: 3692: 3688: 3687: 3683: 3673: 3671: 3667: 3666: 3662: 3652: 3650: 3647: 3643: 3642: 3633: 3623: 3621: 3617: 3616: 3612: 3602: 3600: 3596: 3595: 3588: 3578: 3576: 3571: 3570: 3566: 3556: 3554: 3552: 3531: 3530: 3526: 3516: 3514: 3512: 3491: 3490: 3483: 3473: 3471: 3467: 3460: 3456: 3455: 3451: 3441: 3439: 3420: 3415: 3414: 3410: 3400: 3398: 3393: 3392: 3388: 3378: 3376: 3367: 3366: 3362: 3353: 3351: 3345: 3344: 3340: 3331: 3329: 3320: 3319: 3315: 3306: 3304: 3298: 3297: 3293: 3284: 3282: 3276: 3275: 3271: 3262: 3260: 3253: 3252: 3248: 3239: 3237: 3231: 3230: 3226: 3217: 3215: 3209: 3208: 3204: 3194: 3192: 3183: 3182: 3175: 3166: 3164: 3158: 3157: 3153: 3144: 3142: 3136: 3135: 3131: 3122: 3120: 3114: 3113: 3109: 3099: 3097: 3088: 3087: 3083: 3073: 3071: 3064: 3063: 3059: 3050: 3048: 3042: 3041: 3037: 3027: 3025: 3016: 3015: 3011: 3001: 2999: 2991: 2990: 2986: 2976: 2974: 2966: 2965: 2958: 2948: 2946: 2938: 2937: 2933: 2923: 2921: 2912: 2911: 2907: 2897: 2895: 2886: 2885: 2881: 2871: 2869: 2868:. 3 August 2015 2860: 2859: 2855: 2845: 2843: 2834: 2833: 2829: 2816: 2815: 2811: 2801: 2799: 2791: 2790: 2786: 2776: 2774: 2766: 2765: 2761: 2751: 2749: 2748:on 26 June 2015 2745: 2738: 2734: 2733: 2729: 2719: 2717: 2708: 2707: 2703: 2693: 2691: 2678: 2677: 2673: 2666:All India Times 2660: 2659: 2655: 2645: 2643: 2639: 2638: 2634: 2624: 2622: 2619: 2615: 2614: 2610: 2600: 2598: 2594: 2593: 2586: 2576: 2574: 2570: 2563: 2559: 2558: 2543: 2539: 2534: 2470:Musunuri Nayaks 2465: 2464: 2457: 2450: 2443: 2436: 2429: 2424: 2422: 2417: 2408: 2400:Indravati River 2379: 2375:Pranahita River 2371:Indravati River 2344: 2286: 2282: 2278: 2251: 2221: 2219: 2215: 2212: 2207: 2204: 2202: 2200: 2199: 2139: 2137: 2133: 2131: 2127: 2126: 2123: 2118: 2115: 2113: 2111: 2110: 2095: 2093: 2089: 2087: 2083: 2082: 2079: 2074: 2071: 2069: 2067: 2066: 2051: 2049: 2045: 2043: 2039: 2038: 2035: 2030: 2027: 2025: 2023: 2022: 1917: 1904: 1862: 1860: 1856: 1853: 1848: 1845: 1843: 1841: 1840: 1812:feeder canal / 1795: 1793: 1789: 1786: 1781: 1778: 1776: 1774: 1773: 1757: 1755: 1751: 1748: 1743: 1740: 1738: 1736: 1735: 1729: 1717:Francis Turbine 1640:pump houses in 1630:Nagarjuna sagar 1594: 1589: 1583:Krishna delta. 1554: 1486:Financial year 1444: 1440: 1439: 1430: 1426: 1425: 1416: 1412: 1411: 1402: 1398: 1397: 1388: 1384: 1383: 1374: 1370: 1369: 1365:Connectivities 1360: 1356: 1355: 1335: 1311: 1309: 1305: 1303: 1299: 1298: 1295: 1290: 1287: 1285: 1283: 1282: 1212:Chagalnadu lift 1204:Pattiseema lift 1156: 1135: 1129:in the future. 1050: 816: 756: 690:project on the 661: 639: 638: 637: 359: 357: 353: 350: 345: 342: 340: 338: 337: 301: 300: 299: 298: 295: 294: 293: 272: 255: 246: 235: 234: 233: 228: 217: 211: 208: 202:Please help by 201: 189: 185: 174: 163: 157: 154: 111: 109: 99: 87: 46: 42: 35: 28: 23: 22: 15: 12: 11: 5: 7858: 7856: 7848: 7847: 7842: 7840:Godavari basin 7837: 7832: 7827: 7822: 7817: 7812: 7807: 7802: 7792: 7791: 7785: 7784: 7782: 7781: 7776: 7771: 7766: 7761: 7756: 7751: 7746: 7741: 7736: 7731: 7726: 7721: 7716: 7711: 7706: 7693: 7690: 7689: 7686:Godavari River 7676: 7674: 7673: 7666: 7659: 7651: 7642: 7641: 7639: 7638: 7633: 7628: 7623: 7618: 7613: 7608: 7594: 7592: 7588: 7587: 7585: 7584: 7578: 7576: 7575:Related topics 7572: 7571: 7569: 7568: 7565: 7564:ore enrichment 7554: 7551: 7549:Pochampadu dam 7542: 7535: 7533: 7525: 7524: 7521: 7520: 7518: 7517: 7512: 7507: 7502: 7496: 7494: 7490: 7489: 7487: 7486: 7481: 7476: 7471: 7466: 7460: 7455: 7448: 7446: 7439: 7435: 7434: 7432: 7431: 7426: 7421: 7416: 7411: 7406: 7401: 7396: 7391: 7386: 7381: 7376: 7371: 7366: 7361: 7356: 7351: 7346: 7341: 7336: 7331: 7326: 7321: 7315: 7313: 7309: 7308: 7306: 7305: 7300: 7294: 7292: 7288: 7287: 7285: 7284: 7279: 7274: 7269: 7263: 7261: 7257: 7256: 7254: 7253: 7248: 7243: 7238: 7233: 7228: 7223: 7218: 7213: 7208: 7203: 7198: 7193: 7188: 7183: 7178: 7173: 7167: 7165: 7161: 7160: 7158: 7157: 7152: 7147: 7142: 7137: 7132: 7127: 7122: 7116: 7114: 7110: 7109: 7106: 7105: 7103: 7102: 7097: 7092: 7087: 7082: 7077: 7071: 7069: 7067:Andhra Pradesh 7063: 7062: 7060: 7059: 7054: 7049: 7044: 7039: 7034: 7029: 7024: 7019: 7014: 7009: 7004: 6999: 6994: 6989: 6984: 6979: 6974: 6969: 6964: 6958: 6956: 6950: 6949: 6947: 6946: 6940: 6938: 6932: 6931: 6929: 6928: 6923: 6917: 6915: 6909: 6908: 6906: 6905: 6900: 6895: 6889: 6887: 6881: 6880: 6878: 6877: 6872: 6867: 6862: 6856: 6854: 6852:Madhya Pradesh 6848: 6847: 6845: 6844: 6839: 6834: 6829: 6824: 6819: 6814: 6809: 6804: 6799: 6794: 6789: 6784: 6779: 6774: 6769: 6764: 6758: 6756: 6747: 6740: 6739: 6737: 6736: 6731: 6726: 6724:Deccan Plateau 6721: 6716: 6714:Coastal Andhra 6711: 6706: 6700: 6698: 6692: 6691: 6689: 6688: 6683: 6678: 6673: 6668: 6663: 6658: 6653: 6648: 6643: 6638: 6633: 6628: 6623: 6618: 6613: 6608: 6603: 6597: 6595: 6594:Dams, barrages 6591: 6590: 6562: 6560: 6557: 6556: 6554: 6553: 6548: 6543: 6538: 6533: 6528: 6523: 6518: 6513: 6508: 6503: 6497: 6495: 6491: 6490: 6488: 6487: 6482: 6477: 6472: 6467: 6462: 6456: 6454: 6450: 6449: 6447: 6446: 6441: 6436: 6431: 6426: 6421: 6416: 6411: 6406: 6400: 6398: 6391: 6387: 6386: 6378: 6376: 6375: 6368: 6361: 6353: 6344: 6343: 6341: 6340: 6335: 6330: 6328:Nagarjunakonda 6325: 6319: 6317: 6313: 6312: 6310: 6309: 6304: 6299: 6294: 6289: 6284: 6278: 6276: 6272: 6271: 6269: 6268: 6262: 6260: 6256: 6255: 6253: 6252: 6247: 6242: 6237: 6232: 6227: 6222: 6217: 6212: 6207: 6202: 6197: 6192: 6187: 6182: 6177: 6175:Penna Ahobilam 6172: 6170:Nellore anicut 6167: 6162: 6157: 6152: 6147: 6142: 6137: 6132: 6127: 6122: 6117: 6112: 6107: 6102: 6097: 6092: 6087: 6082: 6076: 6074: 6070: 6069: 6067: 6066: 6064:Kondakarla Ava 6061: 6056: 6050: 6048: 6044: 6043: 6041: 6040: 6035: 6030: 6025: 6020: 6015: 6009: 6007: 6003: 6002: 6000: 5999: 5994: 5989: 5984: 5979: 5974: 5969: 5964: 5959: 5954: 5949: 5944: 5939: 5934: 5929: 5924: 5919: 5914: 5909: 5904: 5899: 5894: 5889: 5884: 5879: 5874: 5869: 5864: 5859: 5857:Mahendratanaya 5854: 5849: 5844: 5839: 5834: 5829: 5824: 5819: 5814: 5809: 5804: 5799: 5794: 5789: 5787:Garibula Gedda 5784: 5779: 5774: 5769: 5764: 5759: 5754: 5752:Borramma Gedda 5749: 5744: 5738: 5736: 5730: 5729: 5727: 5726: 5721: 5715: 5713: 5709: 5708: 5706: 5705: 5700: 5694: 5692: 5688: 5687: 5685: 5684: 5679: 5674: 5672:Bheemili Beach 5669: 5664: 5659: 5654: 5649: 5644: 5642:Vodarevu Beach 5639: 5634: 5628: 5626: 5620: 5619: 5617: 5616: 5611: 5605: 5603: 5597: 5596: 5593:Andhra Pradesh 5587: 5585: 5584: 5577: 5570: 5562: 5555: 5554: 5543:. 24 July 2018 5528: 5504: 5483: 5462: 5438: 5427:. 22 July 2022 5416: 5383: 5362: 5337: 5326:. 17 July 2014 5312: 5284: 5256: 5224: 5192: 5159: 5126: 5094: 5062: 5030: 5009: 4977: 4951: 4919: 4897: 4876: 4842: 4820: 4792: 4764: 4743: 4722: 4696: 4675: 4648: 4639: 4628:. 8 March 2018 4608: 4586: 4564: 4543: 4515: 4490: 4469: 4444: 4418: 4384: 4363: 4339: 4304: 4279: 4258: 4237: 4212: 4187: 4161: 4136: 4115: 4090: 4068: 4047: 4026: 3998: 3971: 3947: 3926: 3904: 3883: 3855: 3844:. 23 July 2018 3833: 3812: 3784: 3760: 3736: 3705: 3681: 3660: 3631: 3610: 3586: 3564: 3550: 3524: 3510: 3481: 3449: 3408: 3386: 3360: 3338: 3313: 3291: 3269: 3246: 3224: 3202: 3173: 3151: 3129: 3107: 3081: 3057: 3035: 3009: 2984: 2956: 2931: 2920:. 13 July 2015 2905: 2879: 2853: 2842:. 19 June 2015 2827: 2809: 2784: 2759: 2727: 2701: 2671: 2653: 2632: 2608: 2584: 2540: 2538: 2535: 2533: 2532: 2527: 2525:Nagavali River 2522: 2517: 2512: 2507: 2502: 2497: 2492: 2487: 2485:Water security 2482: 2477: 2472: 2466: 2463: 2462: 2448: 2434: 2419: 2418: 2416: 2413: 2407: 2404: 2343: 2340: 2325:Naveen Patnaik 2260:archaeological 2250: 2247: 2184:floating solar 1931:A fresh water 1916: 1913: 1903: 1900: 1728: 1725: 1593: 1590: 1588: 1585: 1580:not displacing 1572: 1571: 1563: 1562:dependability. 1553: 1550: 1547: 1546: 1543: 1540: 1537: 1534: 1531: 1528: 1525: 1522: 1519: 1515: 1514: 1511: 1508: 1505: 1502: 1499: 1496: 1493: 1490: 1487: 1446: 1445: 1438: 1436: 1432: 1431: 1424: 1422: 1418: 1417: 1410: 1408: 1404: 1403: 1396: 1394: 1390: 1389: 1382: 1380: 1376: 1375: 1368: 1366: 1362: 1361: 1354: 1352: 1348: 1347: 1344: 1334: 1331: 1269:water turbines 1255:diaphragm wall 1220:Eluru district 1184:Eluru district 1155: 1152: 1134: 1133:Alternate site 1131: 1108:Godavari Delta 1071:Godavari River 1049: 1046: 1043: 1042: 1040: 1037: 1033: 1032: 1030: 1027: 1023: 1022: 1019: 1017: 1013: 1012: 1009: 1007: 1003: 1002: 999: 997: 993: 992: 989: 987: 983: 982: 979: 977: 973: 972: 969: 967: 962: 961: 958: 956: 950: 949: 946: 944: 940: 939: 936: 934: 930: 929: 926: 924: 920: 919: 916: 914: 910: 909: 906: 904: 900: 899: 896: 893: 889: 888: 885: 882: 878: 877: 874: 871: 867: 866: 863: 860: 856: 855: 852: 849: 846:Diaphragm Wall 842: 841: 838: 835: 831: 830: 827: 824: 815: 812: 755: 752: 710:status by the 704:Andhra Pradesh 696:Eluru District 692:Godavari River 678: 677: 631: 630: 627: 621: 620: 617: 611: 610: 600: 594: 593: 590: 586: 585: 580: 576: 575: 571: 570: 567: 563: 562: 559: 555: 554: 551: 545: 544: 537: 533: 532: 525: 521: 520: 513: 509: 508: 505: 501: 500: 496: 495: 485: 481: 480: 478:Chute spillway 475: 471: 470: 467: 463: 462: 459: 455: 454: 452:Godavari River 449: 445: 444: 441: 435: 434: 430: 429: 427:Andhra Pradesh 424: 420: 419: 414: 410: 409: 406: 402: 401: 398: 394: 393: 390: 386: 385: 372: 368: 367: 335: 331: 330: 328:Andhra Pradesh 324:Eluru district 317: 313: 312: 307: 303: 302: 296: 287: 286: 280: 279: 278: 277: 274: 273: 270: 262: 261: 253: 248: 247: 230: 229: 192: 190: 183: 176: 175: 90: 88: 81: 76: 50: 49: 47: 40: 26: 24: 14: 13: 10: 9: 6: 4: 3: 2: 7857: 7846: 7843: 7841: 7838: 7836: 7833: 7831: 7828: 7826: 7823: 7821: 7818: 7816: 7813: 7811: 7808: 7806: 7803: 7801: 7798: 7797: 7795: 7780: 7777: 7775: 7772: 7770: 7767: 7765: 7762: 7760: 7757: 7755: 7752: 7750: 7747: 7745: 7742: 7740: 7737: 7735: 7732: 7730: 7727: 7725: 7722: 7720: 7717: 7715: 7712: 7710: 7707: 7705: 7700: 7695: 7694: 7691: 7687: 7683: 7679: 7672: 7667: 7665: 7660: 7658: 7653: 7652: 7649: 7637: 7634: 7632: 7629: 7627: 7624: 7622: 7619: 7617: 7614: 7612: 7609: 7607: 7603: 7599: 7596: 7595: 7593: 7589: 7583: 7580: 7579: 7577: 7573: 7566: 7563: 7559: 7555: 7552: 7550: 7546: 7543: 7541:in reservoirs 7540: 7537: 7536: 7534: 7526: 7516: 7513: 7511: 7508: 7506: 7503: 7501: 7498: 7497: 7495: 7491: 7485: 7482: 7480: 7477: 7475: 7472: 7470: 7467: 7464: 7461: 7459: 7456: 7453: 7450: 7449: 7447: 7443: 7440: 7436: 7430: 7427: 7425: 7422: 7420: 7417: 7415: 7412: 7410: 7407: 7405: 7402: 7400: 7397: 7395: 7392: 7390: 7387: 7385: 7382: 7380: 7377: 7375: 7372: 7370: 7367: 7365: 7362: 7360: 7357: 7355: 7352: 7350: 7347: 7345: 7342: 7340: 7337: 7335: 7332: 7330: 7327: 7325: 7322: 7320: 7317: 7316: 7314: 7310: 7304: 7301: 7299: 7296: 7295: 7293: 7289: 7283: 7280: 7278: 7275: 7273: 7270: 7268: 7265: 7264: 7262: 7258: 7252: 7249: 7247: 7244: 7242: 7239: 7237: 7234: 7232: 7229: 7227: 7224: 7222: 7219: 7217: 7214: 7212: 7209: 7207: 7204: 7202: 7199: 7197: 7194: 7192: 7189: 7187: 7184: 7182: 7179: 7177: 7174: 7172: 7169: 7168: 7166: 7162: 7156: 7153: 7151: 7148: 7146: 7143: 7141: 7138: 7136: 7133: 7131: 7128: 7126: 7123: 7121: 7118: 7117: 7115: 7111: 7101: 7098: 7096: 7093: 7091: 7090:East Godavari 7088: 7086: 7085:West Godavari 7083: 7081: 7078: 7076: 7073: 7072: 7070: 7068: 7064: 7058: 7055: 7053: 7050: 7048: 7045: 7043: 7040: 7038: 7035: 7033: 7030: 7028: 7025: 7023: 7020: 7018: 7015: 7013: 7010: 7008: 7005: 7003: 7002:Komaram Bheem 7000: 6998: 6995: 6993: 6990: 6988: 6985: 6983: 6980: 6978: 6975: 6973: 6970: 6968: 6965: 6963: 6960: 6959: 6957: 6955: 6951: 6945: 6942: 6941: 6939: 6937: 6933: 6927: 6924: 6922: 6919: 6918: 6916: 6914: 6910: 6904: 6901: 6899: 6896: 6894: 6891: 6890: 6888: 6886: 6882: 6876: 6873: 6871: 6868: 6866: 6863: 6861: 6858: 6857: 6855: 6853: 6849: 6843: 6840: 6838: 6835: 6833: 6830: 6828: 6825: 6823: 6820: 6818: 6815: 6813: 6810: 6808: 6805: 6803: 6800: 6798: 6795: 6793: 6790: 6788: 6785: 6783: 6780: 6778: 6775: 6773: 6770: 6768: 6765: 6763: 6760: 6759: 6757: 6755: 6751: 6748: 6745: 6741: 6735: 6734:Eastern Ghats 6732: 6730: 6729:Western Ghats 6727: 6725: 6722: 6720: 6717: 6715: 6712: 6710: 6707: 6705: 6702: 6701: 6699: 6695:Geographical 6693: 6687: 6684: 6682: 6679: 6677: 6674: 6672: 6669: 6667: 6664: 6662: 6659: 6657: 6654: 6652: 6649: 6647: 6644: 6642: 6639: 6637: 6634: 6632: 6629: 6627: 6624: 6622: 6619: 6617: 6614: 6612: 6609: 6607: 6606:Majalgaon Dam 6604: 6602: 6601:Jayakwadi Dam 6599: 6598: 6596: 6592: 6587: 6580: 6573: 6566: 6552: 6549: 6547: 6544: 6542: 6539: 6537: 6534: 6532: 6529: 6527: 6524: 6522: 6519: 6517: 6514: 6512: 6509: 6507: 6504: 6502: 6499: 6498: 6496: 6492: 6486: 6483: 6481: 6478: 6476: 6473: 6471: 6468: 6466: 6463: 6461: 6458: 6457: 6455: 6451: 6445: 6442: 6440: 6437: 6435: 6432: 6430: 6427: 6425: 6422: 6420: 6417: 6415: 6412: 6410: 6407: 6405: 6402: 6401: 6399: 6395: 6392: 6388: 6384: 6381: 6374: 6369: 6367: 6362: 6360: 6355: 6354: 6351: 6339: 6336: 6334: 6331: 6329: 6326: 6324: 6321: 6320: 6318: 6314: 6308: 6305: 6303: 6300: 6298: 6295: 6293: 6292:Kakinada Port 6290: 6288: 6285: 6283: 6280: 6279: 6277: 6273: 6267: 6264: 6263: 6261: 6257: 6251: 6248: 6246: 6243: 6241: 6238: 6236: 6233: 6231: 6228: 6226: 6223: 6221: 6218: 6216: 6213: 6211: 6208: 6206: 6205:Sangam anicut 6203: 6201: 6198: 6196: 6193: 6191: 6190:Pulichinthala 6188: 6186: 6183: 6181: 6178: 6176: 6173: 6171: 6168: 6166: 6163: 6161: 6158: 6156: 6153: 6151: 6148: 6146: 6143: 6141: 6138: 6136: 6133: 6131: 6128: 6126: 6123: 6121: 6118: 6116: 6113: 6111: 6108: 6106: 6105:Gotta barrage 6103: 6101: 6098: 6096: 6093: 6091: 6088: 6086: 6083: 6081: 6078: 6077: 6075: 6071: 6065: 6062: 6060: 6057: 6055: 6052: 6051: 6049: 6045: 6039: 6036: 6034: 6031: 6029: 6026: 6024: 6021: 6019: 6016: 6014: 6011: 6010: 6008: 6004: 5998: 5995: 5993: 5990: 5988: 5985: 5983: 5980: 5978: 5975: 5973: 5970: 5968: 5965: 5963: 5960: 5958: 5955: 5953: 5950: 5948: 5945: 5943: 5940: 5938: 5935: 5933: 5930: 5928: 5925: 5923: 5920: 5918: 5915: 5913: 5910: 5908: 5905: 5903: 5900: 5898: 5895: 5893: 5890: 5888: 5885: 5883: 5880: 5878: 5875: 5873: 5870: 5868: 5865: 5863: 5860: 5858: 5855: 5853: 5850: 5848: 5845: 5843: 5840: 5838: 5835: 5833: 5830: 5828: 5825: 5823: 5820: 5818: 5815: 5813: 5810: 5808: 5805: 5803: 5800: 5798: 5795: 5793: 5790: 5788: 5785: 5783: 5780: 5778: 5775: 5773: 5770: 5768: 5765: 5763: 5760: 5758: 5755: 5753: 5750: 5748: 5745: 5743: 5740: 5739: 5737: 5735: 5731: 5725: 5722: 5720: 5717: 5716: 5714: 5710: 5704: 5701: 5699: 5696: 5695: 5693: 5689: 5683: 5680: 5678: 5675: 5673: 5670: 5668: 5665: 5663: 5660: 5658: 5655: 5653: 5650: 5648: 5645: 5643: 5640: 5638: 5635: 5633: 5630: 5629: 5627: 5625: 5621: 5615: 5612: 5610: 5609:Bay of Bengal 5607: 5606: 5604: 5602: 5598: 5594: 5590: 5583: 5578: 5576: 5571: 5569: 5564: 5563: 5560: 5542: 5538: 5532: 5529: 5514: 5508: 5505: 5493: 5487: 5484: 5472: 5466: 5463: 5448: 5442: 5439: 5426: 5420: 5417: 5411: 5406: 5402: 5398: 5394: 5387: 5384: 5372: 5366: 5363: 5351: 5347: 5341: 5338: 5322: 5316: 5313: 5298: 5291: 5289: 5285: 5272: 5271: 5266: 5260: 5257: 5244: 5240: 5239: 5234: 5228: 5225: 5212: 5208: 5207: 5202: 5196: 5193: 5180: 5176: 5175: 5170: 5163: 5160: 5147: 5143: 5142: 5137: 5130: 5127: 5114: 5110: 5109: 5104: 5098: 5095: 5082: 5078: 5077: 5072: 5066: 5063: 5050: 5046: 5045: 5040: 5034: 5031: 5019: 5013: 5010: 4997: 4993: 4992: 4987: 4981: 4978: 4966:. 19 May 2005 4965: 4961: 4955: 4952: 4939: 4938: 4930: 4923: 4920: 4907: 4901: 4898: 4886: 4880: 4877: 4874: 4861: 4857: 4853: 4846: 4843: 4830: 4824: 4821: 4808: 4807: 4802: 4796: 4793: 4780: 4779: 4774: 4768: 4765: 4753: 4747: 4744: 4732: 4726: 4723: 4710: 4706: 4700: 4697: 4685: 4679: 4676: 4661: 4655: 4653: 4649: 4643: 4640: 4627: 4626: 4621: 4615: 4613: 4609: 4596: 4590: 4587: 4574: 4568: 4565: 4553: 4547: 4544: 4531: 4530: 4525: 4519: 4516: 4504: 4500: 4494: 4491: 4479: 4473: 4470: 4458: 4454: 4448: 4445: 4433:on 6 May 2019 4432: 4428: 4422: 4419: 4407: 4403: 4399: 4395: 4388: 4385: 4373: 4367: 4364: 4349: 4343: 4340: 4324: 4317: 4311: 4309: 4305: 4289: 4283: 4280: 4268: 4262: 4259: 4247: 4241: 4238: 4226: 4222: 4216: 4213: 4201: 4197: 4191: 4188: 4176:. 2 June 2018 4175: 4171: 4165: 4162: 4150: 4149:@businessline 4146: 4140: 4137: 4132: 4125: 4119: 4116: 4104: 4100: 4094: 4091: 4078: 4072: 4069: 4057: 4051: 4048: 4036: 4030: 4027: 4015: 4014: 4009: 4002: 3999: 3987: 3986: 3981: 3975: 3972: 3957: 3951: 3948: 3936: 3930: 3927: 3915:. 3 June 2017 3914: 3908: 3905: 3893: 3887: 3884: 3871: 3870: 3865: 3859: 3856: 3843: 3837: 3834: 3822: 3816: 3813: 3800: 3799: 3794: 3788: 3785: 3773: 3767: 3765: 3761: 3746: 3740: 3737: 3724: 3723: 3718: 3712: 3710: 3706: 3691: 3685: 3682: 3670: 3664: 3661: 3646: 3640: 3638: 3636: 3632: 3620: 3614: 3611: 3599: 3593: 3591: 3587: 3574: 3568: 3565: 3553: 3551:9789290906940 3547: 3543: 3539: 3535: 3528: 3525: 3513: 3511:9789290907190 3507: 3503: 3499: 3495: 3488: 3486: 3482: 3466: 3459: 3453: 3450: 3438: 3434: 3430: 3426: 3419: 3412: 3409: 3396: 3390: 3387: 3375: 3371: 3364: 3361: 3350: 3349: 3342: 3339: 3327: 3323: 3317: 3314: 3303: 3302: 3295: 3292: 3281: 3280: 3273: 3270: 3258: 3257: 3250: 3247: 3236: 3235: 3228: 3225: 3214: 3213: 3206: 3203: 3191: 3190:@businessline 3187: 3180: 3178: 3174: 3163: 3162: 3155: 3152: 3141: 3140: 3133: 3130: 3119: 3118: 3111: 3108: 3095: 3091: 3085: 3082: 3070: 3067: 3061: 3058: 3047: 3046: 3039: 3036: 3023: 3022:indianexpress 3019: 3013: 3010: 2998: 2994: 2988: 2985: 2973: 2972:@businessline 2969: 2963: 2961: 2957: 2945: 2941: 2935: 2932: 2919: 2915: 2909: 2906: 2893: 2889: 2883: 2880: 2867: 2863: 2857: 2854: 2841: 2837: 2831: 2828: 2823: 2819: 2813: 2810: 2798: 2794: 2788: 2785: 2773: 2769: 2763: 2760: 2744: 2737: 2731: 2728: 2716: 2712: 2705: 2702: 2689: 2685: 2681: 2675: 2672: 2667: 2663: 2657: 2654: 2642: 2636: 2633: 2618: 2612: 2609: 2597: 2591: 2589: 2585: 2569: 2562: 2556: 2554: 2552: 2550: 2548: 2546: 2542: 2536: 2531: 2528: 2526: 2523: 2521: 2518: 2516: 2513: 2511: 2508: 2506: 2503: 2501: 2498: 2496: 2493: 2491: 2488: 2486: 2483: 2481: 2478: 2476: 2473: 2471: 2468: 2467: 2460: 2454: 2449: 2446: 2440: 2435: 2432: 2421: 2414: 2412: 2405: 2403: 2401: 2395: 2393: 2389: 2384: 2376: 2372: 2368: 2363: 2359: 2355: 2351: 2349: 2341: 2339: 2336: 2334: 2328: 2326: 2323: 2319: 2315: 2311: 2307: 2302: 2298: 2296: 2292: 2276: 2271: 2269: 2265: 2261: 2257: 2249:Controversies 2248: 2246: 2244: 2240: 2236: 2232: 2226: 2197: 2192: 2189: 2185: 2181: 2177: 2173: 2169: 2165: 2160: 2155: 2152: 2146: 2108: 2102: 2064: 2058: 2020: 2015: 2013: 2009: 2005: 2001: 1997: 1993: 1988: 1984: 1980: 1976: 1974: 1970: 1969:Narmada River 1966: 1962: 1958: 1954: 1950: 1946: 1942: 1938: 1934: 1926: 1925:Bay of Bengal 1921: 1914: 1912: 1909: 1901: 1899: 1897: 1893: 1889: 1885: 1881: 1877: 1873: 1867: 1837: 1835: 1831: 1827: 1823: 1819: 1815: 1811: 1806: 1800: 1770: 1768: 1762: 1733: 1726: 1724: 1722: 1718: 1714: 1710: 1705: 1703: 1698: 1694: 1690: 1686: 1682: 1678: 1677:Krishna River 1674: 1669: 1667: 1663: 1659: 1655: 1651: 1650:Ibrahimpatnam 1647: 1643: 1639: 1636:via Existing 1635: 1631: 1627: 1626:K.L Rao sagar 1623: 1619: 1615: 1611: 1607: 1603: 1599: 1591: 1586: 1584: 1581: 1576: 1568: 1564: 1560: 1559: 1558: 1551: 1544: 1541: 1538: 1535: 1532: 1529: 1526: 1523: 1520: 1517: 1516: 1512: 1509: 1506: 1503: 1500: 1497: 1494: 1491: 1488: 1485: 1484: 1478: 1474: 1470: 1462: 1458: 1456: 1451: 1437: 1433: 1423: 1419: 1409: 1405: 1395: 1391: 1381: 1377: 1367: 1363: 1353: 1349: 1341: 1332: 1330: 1328: 1324: 1318: 1280: 1276: 1274: 1270: 1265: 1260: 1256: 1251: 1249: 1245: 1241: 1237: 1233: 1229: 1225: 1221: 1217: 1213: 1209: 1208:Tadipudi lift 1205: 1201: 1197: 1193: 1192:Visakhapatnam 1189: 1188:East Godavari 1185: 1181: 1180:West Godavari 1177: 1169: 1165: 1160: 1153: 1151: 1148: 1143: 1140: 1139:Eastern Ghats 1132: 1130: 1128: 1124: 1120: 1115: 1113: 1109: 1104: 1095: 1091: 1088: 1084: 1083:Bay of Bengal 1080: 1076: 1075:Krishna River 1072: 1067: 1063: 1059: 1055: 1047: 1041: 1038: 1035: 1034: 1031: 1028: 1025: 1024: 1021:5 March 2023 1020: 1018: 1015: 1014: 1010: 1008: 1005: 1004: 1001:30 June 2022 1000: 998: 995: 994: 990: 988: 985: 984: 981:11 June 2021 980: 978: 975: 974: 970: 968: 964: 963: 959: 957: 955: 952: 951: 947: 945: 942: 941: 937: 935: 932: 931: 927: 925: 922: 921: 917: 915: 912: 911: 907: 905: 902: 901: 897: 895:Apr 23, 2018 894: 891: 890: 886: 884:June 8, 2017 883: 880: 879: 875: 873:June 8, 2017 872: 869: 868: 864: 861: 859:Jet Grouting 858: 857: 854:11 June 2018 853: 850: 847: 844: 843: 839: 836: 833: 832: 828: 825: 822: 821: 813: 811: 809: 805: 801: 796: 792: 788: 783: 779: 774: 772: 768: 763: 761: 753: 751: 749: 745: 741: 737: 733: 729: 725: 721: 717: 713: 709: 705: 701: 697: 693: 689: 685: 674: 658: 636: 632: 628: 626: 622: 618: 616: 612: 608: 605: 601: 599: 595: 591: 587: 584: 581: 577: 574:Power Station 572: 568: 564: 560: 556: 552: 550: 546: 542: 538: 534: 530: 526: 522: 518: 514: 510: 506: 502: 497: 494: 490: 486: 482: 479: 476: 472: 468: 464: 460: 456: 453: 450: 446: 442: 440: 436: 431: 428: 425: 421: 418: 415: 411: 407: 403: 399: 395: 391: 387: 384: 380: 376: 375:Hydroelectric 373: 369: 364: 336: 332: 329: 325: 321: 318: 314: 311: 308: 304: 284: 275: 268: 263: 258: 252: 244: 241: 226: 223: 215: 205: 199: 198: 193:This article 191: 182: 181: 172: 169: 161: 150: 147: 143: 140: 136: 133: 129: 126: 122: 119: –  118: 114: 113:Find sources: 107: 103: 97: 96: 91:This article 89: 85: 80: 79: 74: 72: 65: 64: 59: 58: 53: 48: 39: 38: 33: 19: 18:Polavaram Dam 7773: 7759:Sriram Sagar 7591:Other basins 7424:HAL Sunabeda 7409:Shendra MIDC 6913:Chhattisgarh 6179: 6090:Brahmamsagar 6059:Kolleru Lake 6054:Pulicat Lake 6038:Ubbalamadugu 5902:Narava Gedda 5662:Mypadu Beach 5657:Baruva Beach 5647:Uppada Beach 5637:Yarada Beach 5545:. Retrieved 5540: 5531: 5519:. Retrieved 5507: 5495:. Retrieved 5486: 5474:. Retrieved 5465: 5453:. Retrieved 5441: 5429:. Retrieved 5419: 5400: 5396: 5386: 5374:. Retrieved 5365: 5353:. Retrieved 5349: 5340: 5328:. Retrieved 5315: 5303:. Retrieved 5275:. Retrieved 5268: 5259: 5247:. Retrieved 5243:the original 5236: 5227: 5215:. Retrieved 5211:the original 5204: 5195: 5183:. Retrieved 5179:the original 5172: 5162: 5150:. Retrieved 5146:the original 5139: 5129: 5117:. Retrieved 5113:the original 5106: 5097: 5085:. Retrieved 5081:the original 5074: 5065: 5053:. Retrieved 5049:the original 5042: 5033: 5021:. Retrieved 5012: 5000:. Retrieved 4996:the original 4989: 4980: 4968:. Retrieved 4963: 4954: 4942:. Retrieved 4935: 4922: 4910:. Retrieved 4900: 4888:. Retrieved 4879: 4864:. Retrieved 4855: 4845: 4833:. Retrieved 4831:. 7 May 2013 4823: 4813:28 September 4811:. Retrieved 4804: 4795: 4783:. Retrieved 4776: 4767: 4755:. Retrieved 4746: 4734:. Retrieved 4725: 4713:. Retrieved 4709:the original 4699: 4687:. Retrieved 4678: 4666:. Retrieved 4642: 4630:. Retrieved 4623: 4599:. Retrieved 4589: 4577:. Retrieved 4567: 4555:. Retrieved 4546: 4534:. Retrieved 4527: 4518: 4506:. Retrieved 4502: 4493: 4481:. Retrieved 4472: 4460:. Retrieved 4456: 4447: 4435:. Retrieved 4431:the original 4421: 4409:. Retrieved 4397: 4387: 4375:. Retrieved 4366: 4354:. Retrieved 4342: 4330:. Retrieved 4323:the original 4295:. Retrieved 4288:"GWDT Award" 4282: 4270:. Retrieved 4261: 4249:. Retrieved 4240: 4228:. Retrieved 4224: 4215: 4203:. Retrieved 4199: 4190: 4178:. Retrieved 4173: 4164: 4152:. Retrieved 4148: 4139: 4130: 4118: 4106:. Retrieved 4102: 4093: 4081:. Retrieved 4071: 4059:. Retrieved 4050: 4038:. Retrieved 4029: 4017:. Retrieved 4011: 4001: 3989:. Retrieved 3983: 3974: 3962:. Retrieved 3950: 3938:. Retrieved 3929: 3917:. Retrieved 3907: 3895:. Retrieved 3886: 3874:. Retrieved 3867: 3858: 3846:. Retrieved 3836: 3824:. Retrieved 3815: 3803:. Retrieved 3796: 3787: 3775:. Retrieved 3751:. Retrieved 3739: 3727:. Retrieved 3720: 3696:. Retrieved 3684: 3672:. Retrieved 3663: 3651:. Retrieved 3622:. Retrieved 3613: 3601:. Retrieved 3577:. Retrieved 3575:. April 2017 3567: 3555:. Retrieved 3541: 3537: 3527: 3515:. Retrieved 3501: 3497: 3472:. Retrieved 3465:the original 3452: 3440:. Retrieved 3428: 3425:Water Policy 3424: 3411: 3399:. Retrieved 3389: 3377:. Retrieved 3373: 3363: 3352:, retrieved 3347: 3341: 3330:, retrieved 3325: 3316: 3305:, retrieved 3300: 3294: 3283:, retrieved 3278: 3272: 3261:, retrieved 3255: 3249: 3238:, retrieved 3233: 3227: 3216:, retrieved 3211: 3205: 3193:. Retrieved 3189: 3165:, retrieved 3160: 3154: 3143:, retrieved 3138: 3132: 3121:, retrieved 3116: 3110: 3098:. Retrieved 3093: 3084: 3072:. Retrieved 3068: 3060: 3049:, retrieved 3044: 3038: 3026:. Retrieved 3021: 3012: 3000:. Retrieved 2996: 2987: 2975:. Retrieved 2971: 2947:. Retrieved 2943: 2934: 2922:. Retrieved 2917: 2908: 2896:. Retrieved 2891: 2882: 2870:. Retrieved 2865: 2856: 2844:. Retrieved 2839: 2830: 2821: 2812: 2800:. Retrieved 2796: 2787: 2775:. Retrieved 2771: 2762: 2750:. Retrieved 2743:the original 2730: 2718:. Retrieved 2714: 2704: 2692:. Retrieved 2688:the original 2683: 2674: 2665: 2656: 2644:. Retrieved 2635: 2623:. Retrieved 2611: 2599:. Retrieved 2575:. Retrieved 2568:the original 2445:Water portal 2431:India portal 2409: 2396: 2392:Sabari River 2385: 2367:Sabari River 2364: 2360: 2356: 2352: 2345: 2337: 2329: 2318:Chhattisgarh 2303: 2299: 2272: 2256:Medha Patkar 2252: 2193: 2156: 2016: 1998:area called 1977: 1957:Kavery river 1930: 1905: 1838: 1805:Pulichintala 1771: 1730: 1706: 1681:Somasila Dam 1670: 1595: 1579: 1577: 1573: 1555: 1475: 1471: 1467: 1452: 1449: 1312:Rudrammakota 1281:starting at 1277: 1252: 1248:Sileru river 1214:, etc.) and 1196:Vizianagaram 1172: 1144: 1136: 1116: 1112:Sileru river 1100: 1051: 1039:yet to start 1029:8 March 2023 971:27 May 2021 876:Jan 8, 2018 775: 764: 757: 724:Chhattisgarh 720:Sabari River 683: 681: 634: 383:water supply 251: 236: 218: 209: 194: 164: 155: 145: 138: 131: 124: 112: 100:Please help 95:verification 92: 68: 61: 55: 54:Please help 51: 7779:Dowleswaram 7539:Algal bloom 7135:Rajahmundry 7047:Mahabubabad 6754:Maharashtra 6621:Nizam Sagar 6465:Kinnerasani 6338:Hope island 6323:Sriharikota 6200:Rajolibanda 6145:Mudasarlova 6110:Gundlakamma 6095:Dowleswaram 6023:Kailasakona 6018:Ethipothala 5997:Yerrakaluva 5972:Tungabhadra 5957:Swarnamukhi 5922:Pedda Gedda 5832:Kinnerasani 5822:Kandivalasa 5802:Gundlakamma 5777:Chitravathi 5767:Champavathi 5747:Bendi Gedda 5589:Hydrography 4940:: 5401–5407 4579:25 December 4557:21 February 4457:nwda.gov.in 4079:(in Telugu) 3805:17 November 3698:17 February 3653:17 February 3544:: 173–193. 3431:: 140–153. 3332:22 February 3259:(in Telugu) 3240:24 February 3195:24 February 3145:24 February 3100:24 February 2997:India Today 2802:24 February 2777:24 February 2646:17 December 2520:Palar River 2515:Jalaput Dam 2500:Nizam Sagar 2235:Seshachalam 2220: / 2132: / 2088: / 2044: / 2012:South Korea 2004:Netherlands 2000:Delta Works 1979:Fresh water 1886:planned in 1861: / 1794: / 1756: / 1702:Rayalaseema 1693:Swarnamukhi 1685:Penna River 1675:across the 1606:Nekarikallu 1304: / 1228:Rayalaseema 826:Start Date 607:Kaplan-type 579:Operator(s) 423:Operator(s) 358: / 334:Coordinates 212:August 2018 7794:Categories 7739:Vishnupuri 7465:(old NH 7) 7454:(old NH 5) 7404:Waluj MIDC 7379:NTPC Mauda 7312:Industries 7260:Coalfields 7027:Hanamkonda 7017:Peddapalli 7007:Karimnagar 6997:Mancherial 6967:Sangareddy 6903:Malkangiri 6875:Chhindwara 6812:Chandrapur 6787:Gadchiroli 6772:Aurangabad 6767:Ahmednagar 6704:Marathwada 6240:Veligonda 6230:Thotapalli 6120:Jeedipalli 6006:Waterfalls 5977:Vamsadhara 5807:Jhanjavati 5614:Coromandel 5521:4 December 5403:(2): 576. 5277:4 November 5249:4 November 5217:4 November 5185:4 November 5152:4 November 5119:4 November 5087:4 November 5055:4 November 5002:4 November 4970:4 November 4944:4 November 4890:13 October 4536:11 January 4508:6 February 4377:4 December 3940:27 January 3729:4 November 3557:4 November 3517:4 November 3474:30 January 3167:29 October 2720:12 January 2537:References 2331:90 of the 2208:79°48′47″E 2205:15°37′37″N 2164:breakwater 2138: ( 2119:81°43′15″E 2116:16°19′41″N 2094: ( 2075:80°13′49″E 2072:15°34′09″N 2050: ( 2031:81°42′22″E 2028:16°19′19″N 1961:Tamil Nadu 1892:Dummugudem 1849:80°08′24″E 1846:16°42′50″N 1782:80°08′24″E 1779:16°42′50″N 1744:80°24′43″E 1741:16°34′41″N 1709:Bollapalle 1662:Vijayawada 1407:LA&RR 1310: ( 1291:81°14′49″E 1288:17°33′49″N 1264:cofferdams 1200:Srikakulam 1147:Khondalite 1119:hydropower 1066:peninsular 823:Milestone 688:irrigation 671:/polavaram 491:at 140 ft 487:3,600,000 379:irrigation 346:81°39′05″E 343:17°17′21″N 128:newspapers 57:improve it 7729:Jogladevi 7719:Jayakwadi 7606:Baitarani 7438:Transport 7236:Kannadiga 7186:Khandeshi 7100:Konaseema 6982:Kamareddy 6977:Nizamabad 6954:Telangana 6936:Karnataka 6893:Kalahandi 6746:districts 6719:Konaseema 6511:Bindusara 6480:Sindphana 6439:Wainganga 6414:Indravati 6235:Veligallu 6220:Sunkesula 6215:Srisailam 6185:Prakasham 6180:Polavaram 6160:Nagarjuna 6155:Mylavaram 6150:Mid Penna 6130:Kandaleru 6100:Gandikota 6080:Alaganoor 5987:Vedavathi 5962:Tammileru 5937:Ponnaiyar 5927:Peddavagu 5817:Kandaleru 5547:23 August 5497:4 January 5455:4 January 5355:23 August 5238:The Hindu 5206:The Hindu 5174:The Hindu 5141:The Hindu 5108:The Hindu 5044:The Hindu 4806:The Hindu 4601:17 August 4529:The Hindu 4483:4 October 4462:4 October 4406:0971-751X 4398:The Hindu 4332:18 August 4272:10 August 4230:23 August 4225:The Hindu 4205:23 August 4180:23 August 4154:23 August 4108:23 August 4083:8 October 4061:10 August 4013:The Hindu 3964:7 January 3674:1 October 3504:: 63–78. 3374:The Hindu 3218:8 January 3069:ap7am.com 3051:8 January 3028:8 January 3002:23 August 2977:23 August 2949:23 August 2924:23 August 2898:23 August 2715:The Hindu 2577:1 October 2490:Steel dam 1996:North Sea 1985:/ bunds/ 1971:water in 1967:to store 1888:Telangana 1810:Kandaleru 1614:Pokkunuru 1545:1,671.23 1343:Progress 1333:Financing 1327:Telangana 1259:earth dam 1164:Tammileru 1062:Himalayan 1052:National 651:/WebPages 499:Reservoir 320:Polavaram 158:June 2021 63:talk page 7749:Balegaon 7709:Gangapur 7682:Barrages 7602:Brahmani 7598:Mahanadi 7458:old NH 6 7140:Warangal 7095:Kakinada 7032:Warangal 6987:Adilabad 6972:Siddipet 6860:Balaghat 6837:Buldhana 6827:Yavatmal 6802:Bhandara 6797:Amravati 6777:Parbhani 6744:Riparian 6709:Vidarbha 6506:Banganga 6485:Taliperu 6444:Penganga 6409:Pranhita 6404:Godavari 6380:Godavari 6245:Veligodu 6225:Tatipudi 6210:Somasila 6140:Meghadri 6085:Balimela 6033:Talakona 5897:Nagavali 5867:Mandavya 5812:Kaivalya 5797:Gosthani 5792:Godavari 5772:Cheyyeru 5757:Budameru 5632:RK Beach 5476:29 April 5330:1 August 4860:Archived 4356:21 March 4297:21 March 3991:17 April 3442:7 August 2872:17 April 2846:17 April 2625:17 March 2415:See also 2188:dredging 1987:causeway 1953:Chittoor 1941:Prakasam 1908:Budameru 1818:Prakasam 1814:Somasila 1704:region. 1570:barrage. 1530:1,992.56 1036:ECRF dam 814:Progress 673:_project 647:/WPSCore 602:12 × 80 598:Turbines 448:Impounds 413:Owner(s) 316:Location 7754:Babhali 7744:Devapur 7734:Mangrul 7724:Apegaon 7684:on the 7631:Krishna 7621:Narmada 7611:Damodar 7562:bauxite 7558:red mud 7246:Multani 7206:Bhunjia 7196:Banjari 7176:Marathi 7145:Koraput 7057:Khammam 7042:Jangaon 7012:Jagtial 6926:Bijapur 6898:Koraput 6842:Hingoli 6551:Shivana 6536:Nasardi 6460:Pravara 6424:Manjira 6333:Bhavani 6316:Islands 6195:Raiwada 6135:Kanithi 6125:Kalyani 6115:Jalaput 5967:Tandava 5917:Papagni 5882:Murredu 5877:Munneru 5872:Manneru 5862:Maldevi 5842:Krishna 5837:Koringa 5827:Kalangi 5719:Coringa 5712:Marshes 5624:Beaches 5601:Coastal 5431:25 July 5376:17 June 5305:12 July 5023:16 June 4873:Alt URL 4866:13 July 4835:13 July 4785:9 March 4757:9 March 4632:9 March 4437:4 March 4411:1 March 4251:6 March 4040:19 July 3985:YouTube 3876:5 March 3848:27 July 3826:19 July 3354:6 March 3307:14 June 3285:14 June 3123:11 June 3074:3 April 2196:Nellore 2176:Krishna 2149:) near 1949:Cudapah 1826:Chittur 1683:across 1542:1,876.7 1539:2,234.2 1527:2,514.7 1176:Krishna 1048:Purpose 754:History 694:in the 663:apgenco 649:/Common 635:Website 583:APGENCO 504:Creates 371:Purpose 306:Country 142:scholar 7241:Duruwa 7231:Telugu 7221:Kolami 7150:Bastar 7130:Nanded 7125:Nagpur 7120:Nashik 7113:Cities 6992:Nirmal 6921:Bastar 6885:Odisha 6832:Washim 6822:Nagpur 6817:Wardha 6807:Gondia 6782:Nanded 6762:Nashik 6526:Kanhan 6475:Sileru 6434:Wardha 6429:Manair 6419:Sabari 6390:Rivers 6250:Yeleru 6013:Duduma 5992:Yeleru 5982:Varaha 5952:Sarada 5947:Sileru 5942:Sabari 5912:Paleru 5892:Nagari 5887:Nadari 5852:Madala 5782:Galeru 5762:Bahuda 5734:Rivers 4912:9 July 4736:9 July 4715:9 July 4689:26 May 4668:23 May 4404:  4131:NABARD 4019:9 June 3919:7 June 3897:7 June 3777:3 June 3624:24 May 3603:24 May 3579:24 May 3548:  3508:  3401:24 May 3379:24 May 3263:28 May 2601:3 July 2306:Odisha 2180:Guntur 2172:harbor 2065:(near 1896:cusecs 1513:22-23 1236:cusecs 1103:cusecs 966:gates. 728:Odisha 655:/Index 489:cusecs 466:Length 458:Height 389:Status 381:& 144:  137:  130:  123:  115:  7636:Penna 7463:NH 44 7452:NH 16 7211:Hindi 7181:Bhili 7155:Bidar 7080:Eluru 6962:Medak 6944:Bidar 6870:Betul 6865:Seoni 6546:Purna 6541:Pench 6531:Kolar 6521:Kadva 6516:Darna 6470:Purna 6383:basin 6047:Lakes 5932:Penna 5907:Palar 5847:Kundu 5742:Arani 5516:(PDF) 5450:(PDF) 5397:Water 5324:(PDF) 5300:(PDF) 4932:(PDF) 4663:(PDF) 4351:(PDF) 4326:(PDF) 4319:(PDF) 4291:(PDF) 4127:(PDF) 3959:(PDF) 3753:7 May 3748:(PDF) 3693:(PDF) 3648:(PDF) 3468:(PDF) 3461:(PDF) 3421:(PDF) 2752:7 May 2746:(PDF) 2739:(PDF) 2694:4 May 2620:(PDF) 2571:(PDF) 2564:(PDF) 2390:with 2312:Late 2168:locks 2107:dikes 2019:coast 1983:dikes 1975:sea. 1604:near 1536:1,780 1533:1,385 1510:21–22 1507:20–21 1504:19–20 1501:18–19 1498:17–18 1495:16–17 1492:15–16 1489:14–15 1441:49.83 1427:76.88 1413:22.55 1399:72.60 1385:92.75 1371:61.66 1357:75.75 1323:Eluru 1230:from 1168:Eluru 1166:near 1087:tmcft 1079:tmcft 669:/Main 657:.aspx 653:/Home 541:tmcft 529:tmcft 517:tmcft 310:India 149:JSTOR 135:books 7680:and 7678:Dams 7616:Kosi 7251:Urdu 7226:Goni 7201:Odia 7191:Andh 6792:Beed 6501:Adan 6073:Dams 5549:2018 5523:2017 5499:2015 5478:2013 5457:2013 5433:2022 5378:2014 5357:2018 5332:2014 5307:2016 5279:2010 5270:NDTV 5251:2010 5219:2010 5187:2010 5154:2010 5121:2010 5089:2010 5057:2010 5025:2017 5004:2010 4972:2010 4946:2010 4914:2018 4892:2015 4868:2014 4837:2015 4815:2018 4787:2018 4759:2018 4738:2018 4717:2018 4691:2019 4670:2023 4634:2018 4603:2018 4581:2018 4559:2021 4538:2016 4510:2019 4485:2016 4464:2016 4439:2019 4413:2019 4402:ISSN 4379:2018 4358:2016 4334:2014 4299:2015 4274:2024 4253:2023 4232:2018 4207:2018 4182:2018 4156:2018 4110:2018 4085:2020 4063:2024 4042:2015 4021:2017 3993:2017 3966:2016 3942:2019 3921:2017 3899:2017 3878:2018 3850:2018 3828:2015 3807:2015 3779:2017 3755:2014 3731:2010 3700:2013 3676:2013 3655:2013 3626:2017 3605:2021 3581:2017 3559:2010 3546:ISBN 3519:2010 3506:ISBN 3476:2012 3444:2013 3403:2017 3381:2017 3356:2023 3334:2023 3309:2021 3287:2021 3265:2021 3242:2020 3220:2018 3197:2020 3169:2018 3147:2020 3125:2018 3102:2020 3076:2019 3053:2020 3030:2019 3004:2018 2979:2018 2951:2018 2926:2018 2900:2018 2874:2020 2848:2020 2804:2020 2779:2020 2754:2014 2722:2018 2696:2019 2648:2013 2627:2016 2603:2021 2579:2020 2373:and 2293:and 1824:and 1679:and 1644:and 1198:and 1117:The 726:and 698:and 682:The 665:.gov 643:.gov 592:2026 527:175 515:194 400:2004 121:news 7626:Son 5591:of 5405:doi 3433:doi 2266:in 2159:msl 2010:in 2006:or 2002:in 1994:of 1959:in 1767:MSL 1713:MSL 1695:in 1524:590 1521:245 1123:kWh 742:in 702:in 667:.in 645:.in 641:ppa 539:19 493:msl 104:by 7796:: 5539:. 5401:12 5399:. 5395:. 5348:. 5287:^ 5267:. 5235:. 5203:. 5171:. 5138:. 5105:. 5073:. 5041:. 4988:. 4962:. 4934:. 4858:. 4854:. 4803:. 4775:. 4651:^ 4622:. 4611:^ 4526:. 4501:. 4455:. 4400:. 4396:. 4307:^ 4223:. 4198:. 4172:. 4147:. 4129:. 4101:. 4010:. 3982:. 3866:. 3795:. 3763:^ 3719:. 3708:^ 3634:^ 3589:^ 3540:. 3536:. 3500:. 3496:. 3484:^ 3429:11 3427:. 3423:. 3372:. 3324:, 3188:. 3176:^ 3092:. 3020:. 2995:. 2970:. 2959:^ 2942:. 2916:. 2890:. 2864:. 2838:. 2820:. 2795:. 2770:. 2713:. 2682:. 2664:. 2587:^ 2544:^ 2369:, 2178:, 1951:, 1947:, 1943:, 1820:, 1346:% 1206:, 1194:, 1190:, 1186:, 1182:, 1178:, 750:. 660:, 604:MW 377:, 326:, 322:, 66:. 7670:e 7663:t 7656:v 7604:– 7600:– 6372:e 6365:t 6358:v 5581:e 5574:t 5567:v 5551:. 5525:. 5501:. 5480:. 5459:. 5435:. 5413:. 5407:: 5380:. 5359:. 5334:. 5309:. 5281:. 5253:. 5221:. 5189:. 5156:. 5123:. 5091:. 5059:. 5027:. 5006:. 4974:. 4948:. 4916:. 4894:. 4870:. 4839:. 4817:. 4789:. 4761:. 4740:. 4719:. 4693:. 4672:. 4636:. 4605:. 4583:. 4561:. 4540:. 4512:. 4487:. 4466:. 4441:. 4415:. 4381:. 4360:. 4336:. 4301:. 4276:. 4255:. 4234:. 4209:. 4184:. 4158:. 4133:. 4112:. 4087:. 4065:. 4044:. 4023:. 3995:. 3968:. 3944:. 3923:. 3901:. 3880:. 3852:. 3830:. 3809:. 3781:. 3757:. 3733:. 3702:. 3678:. 3657:. 3628:. 3607:. 3583:. 3561:. 3542:2 3521:. 3502:5 3478:. 3446:. 3435:: 3405:. 3383:. 3199:. 3104:. 3078:. 3032:. 3006:. 2981:. 2953:. 2928:. 2902:. 2876:. 2850:. 2824:. 2806:. 2781:. 2756:. 2724:. 2698:. 2668:. 2650:. 2629:. 2605:. 2581:. 2380:₹ 2287:₹ 2283:₹ 2279:₹ 2142:) 2098:) 2054:) 1927:. 1314:) 243:) 237:( 225:) 219:( 214:) 210:( 200:. 171:) 165:( 160:) 156:( 146:· 139:· 132:· 125:· 98:. 73:) 69:( 34:. 20:)

Index

Polavaram Dam
Polavaram (disambiguation)
improve it
talk page
Learn how and when to remove these messages

verification
improve this article
adding citations to reliable sources
"Polavaram Project"
news
newspapers
books
scholar
JSTOR
Learn how and when to remove this message
layout guidelines
editing the article
Learn how and when to remove this message
Learn how and when to remove this message

Polavaram Project is located in Andhra Pradesh
India
Polavaram
Eluru district
Andhra Pradesh
17°17′21″N 81°39′05″E / 17.28917°N 81.65139°E / 17.28917; 81.65139
Hydroelectric
irrigation
water supply

Text is available under the Creative Commons Attribution-ShareAlike License. Additional terms may apply.