Project 10510 icebreaker

Source 📝

24: 547:, had to be re-contracted to a domestic supplier who cannot deliver them to the shipyard before August 2025. As a result of various delays and challenges, the cost of the first Project 10510 icebreaker is expected to increase by 40–60% and the delivery of the vessel will slip beyond the December 2027 deadline. In May 2024, the 383:. As traditional icebreaker-led convoys were seen preferable over independently-operating ships, the principal characteristics such as a beam of 40–42 metres (131–138 ft) and capability of breaking up to 3.5 metres (11 ft) thick ice were specified with escorting of large-tonnage vessels in mind. 477:
signed a governmental order allocating 125.57 billion rubles of federal money for financing the construction of the first Project 10510 icebreaker for Rosatom from 2020 onwards and commissioning it by 2027. Previously, the funding for the construction of the icebreaker had been excluded from the
386:
In the late 2000s, increasing shipping activity in the Russian Arctic and the prospect of turning the Northern Sea Route into a year-round shortcut between Western Europe and Asia called for the development of more powerful icebreakers. The 110-megawatt icebreaker, now referred to simply as "Leader"
349:
As of 2024, the lead vessel of the series is under construction and expected to be commissioned by 2030, three years after the original planned delivery in 2027. Initially there were plans to build two additional sister ships by 2033, but in February 2023 it was reported that only one Project 10510
576:
collaborated with Central Design Bureau "Iceberg" to develop futuristic visions on what the next-generation nuclear-powered icebreaker could look like. While these sleek yacht-like design studies have been sometimes incorrectly thought to represent the actual Project 10510 icebreaker design, the
374:
icebreakers, the proposed icebreaking vessels included two distinct nuclear-powered icebreaker designs: a 60-megawatt dual-draft line icebreaker and a 110-megawatt "leader-icebreaker". The latter's primary mission would be to ensure reliable year-round shipping in the Russian Arctic, including
1358: 1244: 426:
tonnes year-round along the entire Northern Sea Route. With a propulsion power of 120 megawatts, the icebreaker would be capable of maintaining an average escort speed of 10–11 knots (19–20 km/h; 12–13 mph) in 2-metre (6.6 ft) ice.
417:
began developing the vessel concept in co-operation with Central Design Bureau "Iceberg". The result, Project 10510, was a nuclear-powered icebreaker design intended for escorting cargo ships and tankers with a beam of 50 metres (160 ft) and
978: 484:
In February 2023 it was reported that an update of Russia's arctic strategy provided for only one Project 10510 vessel to be built before 2035. The emphasis will instead shift to two additional Project 22220 icebreakers.
1179:"Prime Minister Vladimir Putin attends a United Russia party interregional conference, Strategy of Social and Economic Development for Russia's Northwestern Regions to 2020. The Programme for 2011-2012, in Cherepovets" 568:
Project 10510 icebreakers are 209 metres (686 ft) long and have a beam of 47.7 metres (156 ft). They draw 13 metres (43 ft) of water and have a displacement of about 69,700 tonnes (68,600 long tons).
465:
were largely dismissed. In September 2018, Zvezda was officially selected as the sole builder of the Project 10510 icebreakers. In February 2019, CEO of Zvezda, Sergei Tseluyko, confirmed during an interview with
23: 592:
with a thermal output of 315 megawatts each. Four electrically driven shafts with a combined capacity of 120 megawatts (161,000 hp) allow the vessel to break up to 4-metre-thick (13 ft) ice.
1571: 805:"Постановление Правительства Российской Федерации от 15.01.2020 № 11 "Об осуществлении бюджетных инвестиций в строительство головного атомного ледокола проекта 10510 "Лидер"" 1044: 953: 405:
mentioned the construction of 110-megawatt nuclear-powered icebreakers "here in the northwestern shipyards in Russia" in his speech at the interregional conference of
1564: 573: 1402: 548: 445:, declared itself as the only Russian shipyard with the necessary competence to construct nuclear-powered icebreakers, the newly constructed 1816: 1557: 478:
2017–2025 state program for the development of the Arctic as funding had been cut from 209.7 billion to 50.9 billion rubles.
481:
On 23 April 2020, Atomflot and Zvezda signed the shipbuilding contract for the construction of the first Project 10510 icebreaker.
359: 1531: 535:% and the large steel castings such as rudder horns and propeller shaft brackets, originally ordered from the Ukrainian company 367: 363: 1806: 1067: 804: 1735: 414: 1652: 1075:
Proceedings of the 13th International Conference on Port and Ocean Engineering under Arctic Conditions, 1995 (POAC'95)
544: 366:
developed a number of "icebreaker type size series" for a long-term fleet renewal program initiated shortly after the
1288: 954:"Moscow lowers ambitions in nuclear icebreaker program, will not build fleet of new super-powerful vessels after all" 395:), was seen as the key for ensuring that large container ships could transit the northern passage in just ten days. 1580: 1509: 335: 1123: 493:
The steel cutting for the first Project 10510 icebreaker began at Zvezda on 6 July 2020. The vessel will be named
1728: 1714: 1691: 1615: 500: 1703: 1684: 1607: 627: 495: 442: 435: 399: 339: 70: 1811: 1767: 1721: 1673: 1660: 1622: 1439: 770: 746: 454: 388: 319: 536: 1644: 1636: 453:
in the Russian Far East was also seen as a serious contender. However, proposals to build the vessel at
832:"RUB 127.57 billion of federal budget allocations approved for construction of Leader-class icebreaker" 922: 863:[The release date of the nuclear-powered icebreaker Rossiya has been pushed back to 2030]. 1380: 1742: 1487: 1005: 419: 376: 1223:"Atomflot is interested in prompt construction of new 120 MW Leader-class icebreaker (graphics)" 1101: 1045:"Leader project: Аtomflot and shipbuilder Zvezda sign nuclear icebreaker construction contract" 918: 1629: 586: 380: 188: 761: 737: 733: 725: 717: 310: 589: 474: 446: 431: 371: 191: 49: 1178: 552: 402: 213: 1403:"Contract for world's largest icebreaker signed in Murmansk-Vladivostok video meeting" 1267:"Baltiysky Zavod claims to be the only shipyard able to build Leader-class icebreaker" 1245:"Russia's Iceberg Design Bureau Developing Several Nuclear-Powered Icebreakers - TASS" 979:"Zvezda Shipyard Selected as Sole Builder of Project 10510 Leader Nuclear Icebreakers" 1800: 1750: 1359:"Russia to Build Three Nuclear-Powered Project 10510 Leader Icebreakers by 2024-2025" 757: 450: 406: 80: 59: 379:
as well as transportation of raw materials and natural resources produced from the
1426: 577:
actual design is a departure from the more angular previous nuclear icebreakers.
1333:"Гендиректор "Звезды": начнем строить новый атомный ледокол "Лидер" в 2020 году" 508: 410: 269: 1488:"Курсовые проекты "мухинцев": ледоколы от Павла Томашевского и Руслана Штепина" 1078: 1549: 1201:"ЦНИИ им. Крылова начал работу по созданию ледокола "Лидер" мощностью 110 Мвт" 893: 540: 516: 343: 135: 1068:"Perspective types of Arctic icebreakers and their principal characteristics" 1774: 1128:Общероссийская газета независимых журналистских расследований «Наша версия» 470:
that the plan is to build three Project 10510 icebreakers at the shipyard.
1066:
Tsoy, L.G.; Stoyanov, I.A.; Mikhailichenko, V.V.; Livshits, S.G. (1995),
1465: 860: 1310: 1149: 29: 1332: 1266: 1222: 831: 462: 338:. Designed in the 2010s, when built in the 2020s, it would supersede 332: 473:
On 15 January 2020, shortly before resigning, then Prime Minister
458: 1200: 1381:"Госпрограмму по развитию Арктики предложили сократить вчетверо" 1336: 467: 1553: 297:, also known through the Russian type size series designations 861:"Срок выпуска атомного ледокола «Россия» сдвинули на 2030 год" 1150:"Экспериментальный высоко коширотный транзитный рейс 1978 г." 1427:На Дальнем Востоке заложили головной атомный ледокол "Лидер" 1311:"On construction of Leader type icebreaker of Project 10510" 948: 946: 944: 942: 940: 555:, confirmed that the delivery has been postponed to 2030. 919:"Три ледокола "Лидер" введут в эксплуатацию до 2033 года" 1440:"The EMSS will recover and return to full-fledged work" 1289:"В Керчи собираются построить ледокол нового поколения" 775: 751: 324: 16:
Planned series of Russian nuclear-powered icebreakers
855: 853: 851: 849: 1760: 1702: 1672: 1606: 1587: 894:"Началось строительство головного ледокола "Лидер"" 888: 886: 884: 882: 826: 824: 822: 807:(in Russian). Government of Russia. 15 January 2020 1532:"Russia Announces Plans for Space-Age Icebreakers" 1039: 1037: 1035: 1033: 1031: 1029: 1027: 973: 971: 756:), propulsion power (110 or 120 megawatts), and 913: 911: 1422: 1420: 1565: 1077:, vol. 1, pp. 13–26, archived from 716:The type size series designation "LK-110Ya" ( 8: 1510:"Monster icebreaker for transpolar shipping" 896:(in Russian). Sudostroenie.info. 6 July 2020 799: 797: 360:Central Marine Research and Design Institute 1572: 1558: 1550: 228: 1203:(in Russian). PortNews. 13 September 2011 1102:"Атомные ледоколы по проектам "айсберга"" 707:About US$ 2 billion or 1.85 billion euro. 574:Saint Petersburg Art and Industry Academy 507:that was in service in 1985–2013. It was 206: 1512:. The Barents Observer. 31 December 2015 1490:(in Russian). cardesign.ru. 29 July 2015 1181:. Government of Russia. 5 September 2011 1159:(in Russian). ЗАО «ОВИЗО». 7 August 2010 599: 1468:(in Russian). Kommersant. 28 March 2023 1130:(in Russian). ООО «Диалан». 14 May 2009 793: 703: 701: 697: 1291:(in Russian). КрымPRESS. 26 April 2017 1104:(in Russian). Avtonews. 3 October 2008 1000: 998: 996: 685:Cancelled or delayed until after 2035 667:Cancelled or delayed until after 2035 18: 1405:. The Barents Observer. 23 April 2020 1006:"ПРоссийский атомный ледокол "Лидер"" 981:. Navy Recognition. 18 September 2018 549:First Deputy Prime Minister of Russia 7: 1361:. Navy Recognition. 6 September 2017 1247:. Navy Recognition. 11 December 2015 956:. The Barents Observer. 1 March 2023 760:of the Russian word for "nuclear" ( 585:The icebreakers are powered by two 350:vessel would be built before 2035. 1534:. Maritime Executive. 1 March 2018 520:reported that the construction of 14: 499:, a name previously given to the 430:While the Saint Petersburg-based 342:as the largest and most powerful 1787:* Under construction or on order 1383:(in Russian). RBC. 11 March 2017 145:69,700 tonnes (68,600 long tons) 22: 539:whose production facilities in 527:s hull had progressed only by 5 368:dissolution of the Soviet Union 364:Central Design Bureau "Iceberg" 1: 447:shipbuilding complex "Zvezda" 1225:. PortNews. 27 November 2015 684: 682: 680: 678: 675: 673: 666: 664: 662: 660: 657: 655: 648: 643: 641: 638: 635: 632: 620: 617: 614: 611: 608: 605: 415:Krylov State Research Center 1817:Nuclear-powered icebreakers 1581:Nuclear-powered icebreakers 1269:. PortNews. 9 December 2015 834:. PortNews. 17 January 2020 776: 752: 572:In 2015, students from the 545:Russian invasion of Ukraine 531:% instead of the planned 15 434:, builder of the preceding 336:nuclear-powered icebreakers 325: 272:(44 km/h; 28 mph) 1833: 1429:// РИА Новости, 05.07.2021 354:Background and development 331:), is a planned series of 1785: 1313:. PortNews. 14 March 2018 867:(in Russian). 20 May 2024 765: 741: 729: 721: 443:Project 22220 icebreakers 370:. In addition to smaller 340:Project 22220 icebreakers 314: 161:47.7 m (156 ft) 126: 40: 28:Scale model presented by 21: 1047:. Rosatom. 23 April 2020 646:2030 (current estimate) 543:were damaged during the 398:In September 2011, then 375:transit cargo along the 177:20.3 m (67 ft) 153:209 m (686 ft) 127:General characteristics 736:word for "icebreaker" ( 564:General characteristics 461:in the Russian-annexed 455:Zaliv Shipbuilding Yard 104:2030 (current estimate) 1589:Project 10510 "Leader" 413:. Shortly afterwards, 391:from the Russian word 243:Nuclear-turbo-electric 169:13 m (43 ft) 1807:Icebreakers of Russia 1466:""Россия" не сдается" 1789:No longer in service 644:2027 (original plan) 581:Power and propulsion 305:or the project name 101:2027 (original plan) 1444:Energomashspetsstal 649:Under construction 537:Energomashspetsstal 358:In the late 1980s, 37: 1339:. 18 February 2019 925:. 23 December 2019 724:) and "LK-120Ya" ( 420:deadweight tonnage 377:Northern Sea Route 36: 1794: 1793: 1446:. 18 January 2023 1157:Атомная стратегия 1012:. 18 January 2020 774: 750: 732:) comes from the 689: 688: 505:-class icebreaker 381:continental shelf 362:(CNIIMF) and the 323: 292: 291: 35: 1824: 1574: 1567: 1560: 1551: 1544: 1543: 1541: 1539: 1528: 1522: 1521: 1519: 1517: 1506: 1500: 1499: 1497: 1495: 1484: 1478: 1477: 1475: 1473: 1462: 1456: 1455: 1453: 1451: 1436: 1430: 1424: 1415: 1414: 1412: 1410: 1399: 1393: 1392: 1390: 1388: 1377: 1371: 1370: 1368: 1366: 1355: 1349: 1348: 1346: 1344: 1329: 1323: 1322: 1320: 1318: 1307: 1301: 1300: 1298: 1296: 1285: 1279: 1278: 1276: 1274: 1263: 1257: 1256: 1254: 1252: 1241: 1235: 1234: 1232: 1230: 1219: 1213: 1212: 1210: 1208: 1197: 1191: 1190: 1188: 1186: 1175: 1169: 1168: 1166: 1164: 1154: 1146: 1140: 1139: 1137: 1135: 1120: 1114: 1113: 1111: 1109: 1098: 1092: 1091: 1090: 1089: 1083: 1072: 1063: 1057: 1056: 1054: 1052: 1041: 1022: 1021: 1019: 1017: 1010:naukatehnika.com 1002: 991: 990: 988: 986: 975: 966: 965: 963: 961: 950: 935: 934: 932: 930: 915: 906: 905: 903: 901: 890: 877: 876: 874: 872: 857: 844: 843: 841: 839: 828: 817: 816: 814: 812: 801: 781: 779: 769: 767: 758:the first letter 755: 745: 743: 734:Russian language 731: 723: 714: 708: 705: 600: 590:nuclear reactors 534: 530: 526: 511:on 5 July 2021. 425: 330: 318: 316: 257: 253: 249: 230: 227: 223: 219: 208: 205: 201: 197: 192:nuclear reactors 38: 26: 19: 1832: 1831: 1827: 1826: 1825: 1823: 1822: 1821: 1797: 1796: 1795: 1790: 1788: 1781: 1756: 1737:Sovetskiy Soyuz 1698: 1668: 1602: 1583: 1578: 1548: 1547: 1537: 1535: 1530: 1529: 1525: 1515: 1513: 1508: 1507: 1503: 1493: 1491: 1486: 1485: 1481: 1471: 1469: 1464: 1463: 1459: 1449: 1447: 1438: 1437: 1433: 1425: 1418: 1408: 1406: 1401: 1400: 1396: 1386: 1384: 1379: 1378: 1374: 1364: 1362: 1357: 1356: 1352: 1342: 1340: 1331: 1330: 1326: 1316: 1314: 1309: 1308: 1304: 1294: 1292: 1287: 1286: 1282: 1272: 1270: 1265: 1264: 1260: 1250: 1248: 1243: 1242: 1238: 1228: 1226: 1221: 1220: 1216: 1206: 1204: 1199: 1198: 1194: 1184: 1182: 1177: 1176: 1172: 1162: 1160: 1152: 1148: 1147: 1143: 1133: 1131: 1122: 1121: 1117: 1107: 1105: 1100: 1099: 1095: 1087: 1085: 1081: 1070: 1065: 1064: 1060: 1050: 1048: 1043: 1042: 1025: 1015: 1013: 1004: 1003: 994: 984: 982: 977: 976: 969: 959: 957: 952: 951: 938: 928: 926: 917: 916: 909: 899: 897: 892: 891: 880: 870: 868: 859: 858: 847: 837: 835: 830: 829: 820: 810: 808: 803: 802: 795: 790: 785: 784: 715: 711: 706: 699: 694: 645: 598: 583: 566: 561: 532: 528: 524: 514:In March 2023, 491: 475:Dmitry Medvedev 432:Baltic Shipyard 423: 387:(or "Lider" as 372:diesel-electric 356: 255: 251: 247: 225: 221: 217: 214:turbogenerators 203: 199: 195: 182:Installed power 50:Zvezda shipyard 32: 17: 12: 11: 5: 1830: 1828: 1820: 1819: 1814: 1812:Proposed ships 1809: 1799: 1798: 1792: 1791: 1786: 1783: 1782: 1780: 1779: 1772: 1764: 1762: 1758: 1757: 1755: 1754: 1747: 1740: 1733: 1726: 1719: 1711: 1709: 1700: 1699: 1697: 1696: 1689: 1681: 1679: 1670: 1669: 1667: 1666: 1658: 1650: 1642: 1634: 1627: 1620: 1612: 1610: 1604: 1603: 1601: 1600: 1593: 1591: 1585: 1584: 1579: 1577: 1576: 1569: 1562: 1554: 1546: 1545: 1523: 1501: 1479: 1457: 1431: 1416: 1394: 1372: 1350: 1324: 1302: 1280: 1258: 1236: 1214: 1192: 1170: 1141: 1115: 1093: 1058: 1023: 992: 967: 936: 907: 878: 845: 818: 792: 791: 789: 786: 783: 782: 709: 696: 695: 693: 690: 687: 686: 683: 681: 679: 677: 674: 672: 669: 668: 665: 663: 661: 659: 656: 654: 651: 650: 647: 642: 640: 637: 634: 631: 623: 622: 619: 616: 613: 610: 607: 604: 597: 596:Ships in class 594: 582: 579: 565: 562: 560: 557: 553:Denis Manturov 490: 487: 403:Vladimir Putin 400:Prime Minister 355: 352: 346:in the world. 290: 289: 286: 282: 281: 278: 274: 273: 266: 262: 261: 260: 259: 246:Four shafts (4 244: 239: 235: 234: 233: 232: 210: 183: 179: 178: 175: 171: 170: 167: 163: 162: 159: 155: 154: 151: 147: 146: 143: 139: 138: 133: 129: 128: 124: 123: 120: 116: 115: 112: 108: 107: 106: 105: 102: 97: 93: 92: 89: 85: 84: 83:125.57 billion 78: 74: 73: 68: 64: 63: 57: 53: 52: 47: 43: 42: 41:Class overview 34: 33: 27: 15: 13: 10: 9: 6: 4: 3: 2: 1829: 1818: 1815: 1813: 1810: 1808: 1805: 1804: 1802: 1784: 1778: 1777: 1773: 1771: 1770: 1766: 1765: 1763: 1759: 1753: 1752: 1751:50 Let Pobedy 1748: 1746: 1745: 1741: 1739: 1738: 1734: 1732: 1731: 1727: 1725: 1724: 1720: 1718: 1717: 1713: 1712: 1710: 1708: 1706: 1701: 1695: 1694: 1690: 1688: 1687: 1683: 1682: 1680: 1678: 1676: 1671: 1664: 1663: 1659: 1656: 1655: 1651: 1648: 1647: 1643: 1640: 1639: 1635: 1633: 1632: 1628: 1626: 1625: 1621: 1619: 1618: 1614: 1613: 1611: 1609: 1608:Project 22220 1605: 1598: 1595: 1594: 1592: 1590: 1586: 1582: 1575: 1570: 1568: 1563: 1561: 1556: 1555: 1552: 1533: 1527: 1524: 1511: 1505: 1502: 1489: 1483: 1480: 1467: 1461: 1458: 1445: 1441: 1435: 1432: 1428: 1423: 1421: 1417: 1404: 1398: 1395: 1382: 1376: 1373: 1360: 1354: 1351: 1338: 1334: 1328: 1325: 1312: 1306: 1303: 1290: 1284: 1281: 1268: 1262: 1259: 1246: 1240: 1237: 1224: 1218: 1215: 1202: 1196: 1193: 1180: 1174: 1171: 1158: 1151: 1145: 1142: 1129: 1125: 1119: 1116: 1103: 1097: 1094: 1084:on 2021-07-30 1080: 1076: 1069: 1062: 1059: 1046: 1040: 1038: 1036: 1034: 1032: 1030: 1028: 1024: 1011: 1007: 1001: 999: 997: 993: 980: 974: 972: 968: 955: 949: 947: 945: 943: 941: 937: 924: 920: 914: 912: 908: 895: 889: 887: 885: 883: 879: 866: 862: 856: 854: 852: 850: 846: 833: 827: 825: 823: 819: 806: 800: 798: 794: 787: 778: 772: 763: 759: 754: 748: 739: 735: 727: 719: 713: 710: 704: 702: 698: 691: 671: 670: 653: 652: 630: 629: 625: 624: 618:Commissioned 602: 601: 595: 593: 591: 588: 580: 578: 575: 570: 563: 558: 556: 554: 550: 546: 542: 538: 523: 519: 518: 512: 510: 506: 504: 498: 497: 488: 486: 482: 479: 476: 471: 469: 464: 460: 456: 452: 451:Bolshoy Kamen 448: 444: 440: 438: 433: 428: 421: 416: 412: 408: 407:United Russia 404: 401: 396: 394: 390: 384: 382: 378: 373: 369: 365: 361: 353: 351: 347: 345: 341: 337: 334: 329: 328: 321: 312: 308: 304: 300: 296: 295:Project 10510 287: 284: 283: 279: 276: 275: 271: 267: 264: 263: 245: 242: 241: 240: 237: 236: 215: 211: 193: 190: 186: 185: 184: 181: 180: 176: 173: 172: 168: 165: 164: 160: 157: 156: 152: 149: 148: 144: 141: 140: 137: 134: 131: 130: 125: 121: 118: 117: 113: 110: 109: 103: 100: 99: 98: 95: 94: 90: 87: 86: 82: 79: 76: 75: 72: 71:Project 22220 69: 66: 65: 61: 60:FSUE Atomflot 58: 55: 54: 51: 48: 45: 44: 39: 31: 25: 20: 1775: 1768: 1749: 1743: 1736: 1729: 1722: 1715: 1704: 1692: 1685: 1674: 1661: 1653: 1645: 1637: 1630: 1623: 1616: 1596: 1588: 1536:. Retrieved 1526: 1514:. Retrieved 1504: 1492:. Retrieved 1482: 1470:. Retrieved 1460: 1448:. Retrieved 1443: 1434: 1407:. Retrieved 1397: 1385:. Retrieved 1375: 1363:. Retrieved 1353: 1341:. Retrieved 1327: 1315:. Retrieved 1305: 1293:. Retrieved 1283: 1271:. Retrieved 1261: 1249:. Retrieved 1239: 1227:. Retrieved 1217: 1205:. Retrieved 1195: 1183:. Retrieved 1173: 1161:. Retrieved 1156: 1144: 1132:. Retrieved 1127: 1118: 1106:. Retrieved 1096: 1086:, retrieved 1079:the original 1074: 1061: 1049:. Retrieved 1014:. Retrieved 1009: 983:. Retrieved 958:. Retrieved 927:. Retrieved 898:. Retrieved 869:. Retrieved 864: 836:. Retrieved 809:. Retrieved 712: 639:5 July 2021 626: 606:Yard number 584: 571: 567: 521: 515: 513: 502: 494: 492: 489:Construction 483: 480: 472: 436: 429: 397: 392: 385: 357: 348: 326: 306: 302: 298: 294: 293: 142:Displacement 609:IMO number 411:Cherepovets 344:icebreakers 67:Preceded by 1801:Categories 1662:Stalingrad 1538:18 January 1516:18 January 1494:18 January 1387:18 January 1365:18 January 1343:18 January 1317:18 January 1295:18 January 1273:18 January 1251:18 January 1229:18 January 1207:18 January 1185:18 January 1163:18 January 1134:18 January 1124:"Ледокома" 1108:18 January 1088:2020-01-18 1016:18 January 985:18 January 929:18 January 865:Kommersant 838:18 January 811:18 January 788:References 612:Laid down 541:Kramatorsk 517:Kommersant 422:of 100,000 238:Propulsion 136:Icebreaker 96:In service 1776:Sevmorput 1654:Leningrad 777:yadernoye 771:romanized 747:romanized 615:Launched 509:laid down 389:romanized 320:romanized 277:Endurance 62:(planned) 56:Operators 1646:Chukotka 1638:Yakutiya 1472:28 March 1450:28 March 1409:24 April 1051:26 April 676:9945942 658:9945930 636:9911238 587:RITM-400 441:and the 303:LK-120Ya 299:LK-110Ya 280:8 months 189:RITM-400 119:Building 46:Builders 1730:Rossiya 1716:Arktika 1705:Arktika 1693:Vaygach 1617:Arktika 1597:Rossiya 960:5 March 773::  766:ядерное 762:Russian 753:ledokol 749::  742:ледокол 738:Russian 730:ЛК-120Я 726:Russian 722:ЛК-110Я 718:Russian 628:Rossiya 621:Status 522:Rossiya 503:Arktika 496:Rossiya 437:Arktika 333:Russian 322::  311:Russian 111:Planned 30:Rosatom 1686:Taymyr 1675:Taymyr 923:Zvezda 900:6 July 871:20 May 559:Design 533:  529:  501:third 463:Crimea 424:  307:Leader 256:  252:  248:  226:  222:  218:  204:  200:  196:  150:Length 1769:Lenin 1761:Other 1744:Yamal 1723:Sibir 1707:class 1677:class 1624:Sibir 1153:(PDF) 1082:(PDF) 1071:(PDF) 692:Notes 603:Name 525:' 459:Kerch 439:class 393:Лидер 327:Lider 315:Лидер 270:knots 265:Speed 212:Four 174:Depth 166:Draft 91:2020– 88:Built 1631:Ural 1540:2020 1518:2020 1496:2020 1474:2023 1452:2023 1411:2020 1389:2020 1367:2020 1345:2020 1337:TASS 1319:2020 1297:2020 1275:2020 1253:2020 1231:2020 1209:2020 1187:2020 1165:2020 1136:2020 1110:2020 1053:2020 1018:2020 987:2020 962:2023 931:2020 902:2020 873:2024 840:2020 813:2020 633:056 468:TASS 301:and 285:Crew 187:Two 158:Beam 132:Type 77:Cost 457:in 449:in 409:in 288:127 268:24 258:MW) 229:MWe 207:MWt 202:315 81:RUB 1803:: 1442:. 1419:^ 1335:. 1155:. 1126:. 1073:, 1026:^ 1008:. 995:^ 970:^ 939:^ 921:. 910:^ 881:^ 848:^ 821:^ 796:^ 780:). 768:, 764:: 744:, 740:: 728:: 720:: 700:^ 551:, 317:, 313:: 254:30 224:37 216:(4 194:(2 1665:* 1657:* 1649:* 1641:* 1599:* 1573:e 1566:t 1559:v 1542:. 1520:. 1498:. 1476:. 1454:. 1413:. 1391:. 1369:. 1347:. 1321:. 1299:. 1277:. 1255:. 1233:. 1211:. 1189:. 1167:. 1138:. 1112:. 1055:. 1020:. 989:. 964:. 933:. 904:. 875:. 842:. 815:. 309:( 250:× 231:) 220:× 209:) 198:× 122:1 114:1

Index


Rosatom
Zvezda shipyard
FSUE Atomflot
Project 22220
RUB
Icebreaker
RITM-400
nuclear reactors
turbogenerators
knots
Russian
romanized
Russian
nuclear-powered icebreakers
Project 22220 icebreakers
icebreakers
Central Marine Research and Design Institute
Central Design Bureau "Iceberg"
dissolution of the Soviet Union
diesel-electric
Northern Sea Route
continental shelf
romanized
Prime Minister
Vladimir Putin
United Russia
Cherepovets
Krylov State Research Center
deadweight tonnage

Text is available under the Creative Commons Attribution-ShareAlike License. Additional terms may apply.