This was to initially process existing oxide stockpiles. The Sable processing plant in Zambia was then used to extract copper metal and cobalt salt from the concentrate. Annual production capacity was estimated as 10,000 tonnes of copper cathode and 1,000 tonnes of cobalt carbonate. Phase two involved expanding the concentrator and building a new acid-leaching and SX-EW plant to produce copper and cobalt metal on site. In this phase, which used higher-grade copper ore from the Ruashi mine, capacity increased to 45,000 tonnes of copper cathode and about 3,500 tonnes of cobalt carbonate or metal. Capital costs of phase two were estimated at $ 335 million. Meterox, with debt of $ 2 billion in 2009, was forced to sell other assets in order to fund the phase two expansion.
254:
pits, and had to drill boreholes to gain a predictable supply. In the year ended 30 June 2008, Ruashi produced 10,767 tonnes of copper. Production of copper and cobalt from tailings near the Ruashi Mine continued until December 2008. The second phase, mining the Ruashi ore body, started in the second half of 2008, with refining at the new SX/EW plant. 21,371 tonnes of refined copper were produced in 2009. Planned production levels from 2010 to 2013 were 36,000 tonnes per year of refined copper and 4,500 tonnes per year of contained cobalt. As of 2010 the mine had access to about 13.3 million tons of ore, graded at 2.9% copper and 0.43% cobalt. On this basis, the project had a life of about ten years.
38: 45: 224:(UMHK) discovered the Etoile ore body in 1911, and the Ruashi ore body in 1919. For the next half century both properties were quarried intermittently for their high-grade copper ore. UMHK was nationalized in 1967. Control of all copper and cobalt exploration and production was given to Gécamines, established as the state mining company. 253:
Initial production began in June 2006, processing material from 56 dumps and tailings dams at Ruashi and Etoile. There were delays in ramp-up, mainly caused by a shortage of water. The mine had been taking water from open cast pits. Ruashi had to install pipelines to access water from deeper in the
244:
1,269 drillholes have been sunk on the Ruashi property over the years, and further drilling was conducted in 2003 and in 2005 to confirm asset size estimates. The project was developed in two phases. In the $ 31 million first phase, a concentrator was built at Ruashi using idle plant from O'okiep.
213:
The Ruashi mine is located at an elevation of about 1,285 metres (4,216 ft) above sea level. The climate is sub-tropical, with annual rainfall of about 1,200 millimetres (47 in) falling mostly in the October to March period. Average temperatures are between 17 °C (63 °F) and
214:
24 °C (75 °F), with no marked difference between summer and winter. The region lies in a zone that would naturally be covered by Miombo Woodland, deciduous tropical woodlands. Lying on the edge of Lubumbashi, much of the woodland has been cleared.
549: 37: 335:"SECTION 12 EXECUTIVE SUMMARY OF THE COMPETENT PERSONS' REPORT AND VALUATION STATEMENT OF RUASHI HOLDINGS (PTY) LTD AND RUASHI MINING SPRL IN THE DEMOCRATIC REPUBLIC OF THE CONGO" 63: 511: 398: 429: 554: 334: 232:
The Ruashi mining project is operated by Ruashi Mining, which was originally 80% owned by Metorex of South Africa and 20% by the DRC state-owned
377: 313: 90: 202: 486: 221: 78: 197:
in Katanga Province, Democratic Republic of the Congo. The project includes a plant to concentrate the ore from the Ruashi and
205:(SX-EW) processing plant. As of 2008, annual capacity was estimated to be 10,000 tonnes of copper and 1,000 tonnes of Cobalt. 518: 406: 437: 276: 217: 68: 341: 367: 303: 373: 309: 305:
Minerals Yearbook, 2008, V. 3, Area Reports, International, Africa and the Middle East
543: 460: 233: 166: 154: 198: 194: 105: 92: 190: 149: 134: 130: 399:"Democratic Republic of Congo: Mineral Industry Overview" 193:
that is located about 10 kilometres (6.2 mi) from
550:
Copper mines in the Democratic Republic of the Congo
487:"Metorex chief sings the praises of Ruashi project" 161: 145: 140: 126: 121: 84: 74: 62: 26: 189:is an open-pit copper and cobalt mine operated by 271: 269: 267: 372:. Government Printing Office. pp. 19–6. 308:. Government Printing Office. pp. 11–8. 236:. Ruashi Mining is now 75% owned by Metorex. 8: 369:Minerals Yearbook: Metals And Minerals; 2005 21: 16:Mine in the Democratic Republic of the Congo 220:dug pits and trenches in the area in 1907. 329: 327: 325: 20: 393: 391: 389: 340:. Metorex. 1 January 2010. Archived from 263: 517:. Metorex. 26 May 2010. Archived from 461:"Capital costs may increase at Ruashi" 7: 44: 430:"Metorex sells stake in fluorspar" 14: 512:"Mining Analyst visit to the DRC" 459:Allan Seccombe (2 October 2006). 302:Geological Survey (U.S.) (2010). 203:solvent extraction electrowinning 428:Ines Schumacher (29 July 2009). 366:Us Dept of the Interior (2008). 79:Democratic Republic of the Congo 43: 36: 555:Mining in Haut-Katanga Province 485:Dennis Ndaba (29 August 2008). 277:"Ruashi copper/cobalt project" 1: 222:Union Minière du Haut Katanga 571: 31: 218:Tanganyika Concessions 201:mines, and a modern 102: /  23: 106:11.61667°S 27.55°E 409:on 2 January 2012 379:978-1-4113-1980-6 347:on 12 August 2011 315:978-1-4113-2965-2 283:. 20 October 2006 183: 182: 562: 534: 533: 531: 529: 524:on 25 April 2012 523: 516: 508: 502: 501: 499: 497: 482: 476: 475: 473: 471: 456: 450: 449: 447: 445: 436:. Archived from 425: 419: 418: 416: 414: 405:. Archived from 395: 384: 383: 363: 357: 356: 354: 352: 346: 339: 331: 320: 319: 299: 293: 292: 290: 288: 273: 179: 176: 174: 172: 170: 168: 117: 116: 114: 113: 112: 111:-11.61667; 27.55 107: 103: 100: 99: 98: 95: 47: 46: 40: 24: 570: 569: 565: 564: 563: 561: 560: 559: 540: 539: 538: 537: 527: 525: 521: 514: 510: 509: 505: 495: 493: 484: 483: 479: 469: 467: 458: 457: 453: 443: 441: 440:on 4 April 2012 427: 426: 422: 412: 410: 397: 396: 387: 380: 365: 364: 360: 350: 348: 344: 337: 333: 332: 323: 316: 301: 300: 296: 286: 284: 275: 274: 265: 260: 251: 242: 230: 211: 165: 153: 133: 110: 108: 104: 101: 96: 93: 91: 89: 88: 58: 57: 56: 55: 54: 53: 52: 48: 17: 12: 11: 5: 568: 566: 558: 557: 552: 542: 541: 536: 535: 503: 477: 451: 420: 385: 378: 358: 321: 314: 294: 262: 261: 259: 256: 250: 247: 241: 238: 229: 226: 210: 207: 181: 180: 175:/ruashi-mining 163: 159: 158: 147: 143: 142: 138: 137: 128: 124: 123: 119: 118: 86: 82: 81: 76: 72: 71: 66: 60: 59: 50: 49: 42: 41: 35: 34: 33: 32: 29: 28: 15: 13: 10: 9: 6: 4: 3: 2: 567: 556: 553: 551: 548: 547: 545: 520: 513: 507: 504: 492: 491:Mining Weekly 488: 481: 478: 466: 462: 455: 452: 439: 435: 431: 424: 421: 408: 404: 400: 394: 392: 390: 386: 381: 375: 371: 370: 362: 359: 343: 336: 330: 328: 326: 322: 317: 311: 307: 306: 298: 295: 282: 281:Mining Weekly 278: 272: 270: 268: 264: 257: 255: 248: 246: 239: 237: 235: 227: 225: 223: 219: 215: 208: 206: 204: 200: 196: 192: 188: 178: 169:.metorexgroup 164: 160: 156: 151: 148: 144: 139: 136: 132: 129: 125: 120: 115: 87: 83: 80: 77: 73: 70: 67: 65: 61: 39: 30: 25: 19: 526:. Retrieved 519:the original 506: 494:. Retrieved 490: 480: 468:. Retrieved 464: 454: 442:. Retrieved 438:the original 433: 423: 411:. Retrieved 407:the original 402: 368: 361: 349:. Retrieved 342:the original 304: 297: 285:. Retrieved 280: 252: 243: 231: 216: 212: 186: 184: 69:Haut-Katanga 18: 240:Development 187:Ruashi Mine 109: / 85:Coordinates 51:Ruashi Mine 22:Ruashi Mine 544:Categories 528:8 November 496:8 November 470:8 November 444:8 November 413:8 November 351:8 November 287:8 November 258:References 249:Production 195:Lubumbashi 122:Production 97:27°33′00″E 94:11°37′00″S 234:Gécamines 228:Ownership 155:Gécamines 465:Miningmx 434:Miningmx 209:Location 127:Products 64:Province 27:Location 403:Afribiz 191:Metorex 162:Website 150:Metorex 146:Company 75:Country 376:  312:  199:Etoile 135:Cobalt 131:Copper 522:(PDF) 515:(PDF) 345:(PDF) 338:(PDF) 173:/mine 157:(25%) 152:(75%) 141:Owner 530:2011 498:2011 472:2011 446:2011 415:2011 374:ISBN 353:2011 310:ISBN 289:2011 185:The 171:.com 167:www 546:: 489:. 463:. 432:. 401:. 388:^ 324:^ 279:. 266:^ 532:. 500:. 474:. 448:. 417:. 382:. 355:. 318:. 291:. 177:/

Index

Ruashi Mine is located in Democratic Republic of the Congo
Province
Haut-Katanga
Democratic Republic of the Congo
11°37′00″S 27°33′00″E / 11.61667°S 27.55°E / -11.61667; 27.55
Copper
Cobalt
Metorex
Gécamines
www.metorexgroup.com/mine/ruashi-mining/
Metorex
Lubumbashi
Etoile
solvent extraction electrowinning
Tanganyika Concessions
Union Minière du Haut Katanga
Gécamines



"Ruashi copper/cobalt project"
Minerals Yearbook, 2008, V. 3, Area Reports, International, Africa and the Middle East
ISBN
978-1-4113-2965-2



"SECTION 12 EXECUTIVE SUMMARY OF THE COMPETENT PERSONS' REPORT AND VALUATION STATEMENT OF RUASHI HOLDINGS (PTY) LTD AND RUASHI MINING SPRL IN THE DEMOCRATIC REPUBLIC OF THE CONGO"
the original
Minerals Yearbook: Metals And Minerals; 2005

Text is available under the Creative Commons Attribution-ShareAlike License. Additional terms may apply.