29: 793: 779: 330:), while additional pollution control devices were being fitted to the block in 2020. Block A was not originally constructed with an FGD scrubber but one was later retrofitted to it (which also necessitated the construction of a new flue stack). It along with other pollution control devices (including an 382:
On March 13th, 2023, a crane on the pier collapsed as a result of strong winds. One person was hurt and two were killed. Their corpses were found several days later. As a result, it was impossible to supply the power plant by ship and it was necessary to deliver coal to the plant by truck, requiring
394:
Phase D expansion consisting of additional coal units at the site was approved in 2008. However, several subsequent objections and the greatly increased availability of domestically-produced natural gas in Israel as an alternative to imported coal starting in the early 2010s led to the plan's
399:
of land originally reserved for phase D expansion at the site will be returned by the IEC to the State of Israel in 2020. If built, Phase D would have increased plant generation capacity by an additional 1,250 MW.
378:
On May 8th, 1998, nine workers were killed during construction work on the chimney of Unit B. Five others were rescued by a helicopter of the Special Rescue Tactical Unit (669) of the Israeli Air Force.
287:
in terms of generation capacity. It accounts for about fifteen percent of the IEC's total capacity. The power station is situated close to the sea since its cooling system uses sea water.
295:
The power station has a total installed capacity of 2,250 MW. It is arranged in two blocks, each containing two power generating units. Two 550 MW boilers were supplied by
416: 819: 814: 674: 362:
power station near Hadera. Phase A became operational in 1990. Phase B was finished in 2000. Coal was transported to the station by freight trains from the
489: 824: 65: 366:
until an on-site deepwater coal pier was completed in 2000. On 7 October 2023, the power plant was attacked by rockets, presumably by
28: 220: 447: 506: 482: 331: 751: 666: 759: 694: 419: 276: 120: 709: 620: 571: 538: 515: 475: 704: 327: 314:
The power station consumes 18,240 tonnes of coal per day, and 330 tonnes of cooling water per hour.
656: 296: 191: 579: 725: 597: 551: 280: 105: 546: 699: 561: 556: 300: 186: 199: 730: 252: 498: 272: 448:"BREAKING: Israel's second largest powerplant, Rotenberg, has been attacked by rockets" 363: 432: 808: 798: 784: 755: 248: 638: 589: 323: 358:
Construction began in the early 1980s, after completion of the first phase of the
386:
On May 21st, 2024, a worker received an electric shock and died five days later.
774: 602: 523: 359: 284: 80: 67: 778: 648: 630: 612: 308: 181: 256: 205: 53: 229: 304: 260: 176: 43: 467: 396: 367: 244: 135: 471: 336: 433:"חברת החשמל לישראל - עמוד הבית (Israel Electric Company)" 718: 687: 665: 647: 629: 611: 588: 570: 537: 514: 505: 216: 211: 198: 149: 141: 131: 126: 116: 104: 96: 59: 49: 39: 21: 350:reduction) became operational in December 2018. 299:(ABB) and two 575 MW boilers were supplied by 483: 8: 675:Kokhav Hayarden Pumped Storage Power Station 303:. Turbines and generators were supplied by 511: 490: 476: 468: 18: 16:Coal-fired power plant in Ashkelon, Israel 743: 409: 271:The Rutenberg power station, named for 221:Related media on Commons 7: 820:Buildings and structures in Ashkelon 815:Coal-fired power stations in Israel 14: 791: 777: 127:Thermal power station 27: 322:Block B was constructed with a 279:(IEC). Rutenberg is the newest 275:, is owned and operated by the 395:cancellation. As a result, 60 1: 825:1990 establishments in Israel 667:Pumped-storage hydroelectric 383:170 truck journeys per day. 760:Status of the Golan Heights 695:Israel Electric Corporation 688:Companies and organizations 277:Israel Electric Corporation 121:Israel Electric Corporation 841: 752:Israeli-occupied territory 710:Energix Renewable Energies 739: 731:Economy of Israel: Energy 226: 158: 154: 35: 26: 705:Enlight Renewable Energy 173:Make and model 241:Rutenberg Power Station 200:Nameplate capacity 22:Rutenberg Power Station 297:Combustion Engineering 192:Combustion Engineering 163:Units operational 726:Solar power in Israel 281:thermal power station 150:Power generation 81:31.62750°N 34.51611°E 452:X (formerly Twitter) 301:Babcock & Wilcox 187:Babcock & Wilcox 106:Commission date 700:Arava Power Company 417:Installed Capacity. 390:Cancelled expansion 212:External links 142:Cooling source 77: /  283:in Israel and the 86:31.62750; 34.51611 772: 771: 683: 682: 318:Pollution control 237: 236: 132:Primary fuel 832: 801: 796: 795: 794: 787: 782: 781: 763: 748: 512: 499:Energy in Israel 492: 485: 478: 469: 462: 461: 459: 458: 446:DD Geopolitics. 443: 437: 436: 429: 423: 414: 349: 347: 346: 273:Pinhas Rutenberg 251:situated on the 230:edit on Wikidata 92: 91: 89: 88: 87: 82: 78: 75: 74: 73: 70: 31: 19: 840: 839: 835: 834: 833: 831: 830: 829: 805: 804: 797: 792: 790: 783: 776: 773: 768: 767: 766: 750:Located in the 749: 745: 735: 714: 679: 661: 643: 625: 613:Oil shale-fired 607: 584: 566: 533: 501: 496: 466: 465: 456: 454: 445: 444: 440: 431: 430: 426: 415: 411: 406: 392: 376: 356: 345: 340: 339: 338: 335: 320: 293: 269: 233: 190: 185: 180: 168:2 × 575 MW 167: 166:2 × 550 MW 111: 85: 83: 79: 76: 71: 68: 66: 64: 63: 17: 12: 11: 5: 838: 836: 828: 827: 822: 817: 807: 806: 803: 802: 788: 770: 769: 765: 764: 742: 741: 740: 737: 736: 734: 733: 728: 722: 720: 716: 715: 713: 712: 707: 702: 697: 691: 689: 685: 684: 681: 680: 678: 677: 671: 669: 663: 662: 660: 659: 653: 651: 645: 644: 642: 641: 635: 633: 627: 626: 624: 623: 617: 615: 609: 608: 606: 605: 600: 594: 592: 586: 585: 583: 582: 576: 574: 568: 567: 565: 564: 559: 554: 549: 543: 541: 535: 534: 532: 531: 526: 520: 518: 509: 507:Power stations 503: 502: 497: 495: 494: 487: 480: 472: 464: 463: 438: 424: 408: 407: 405: 402: 391: 388: 375: 372: 364:Port of Ashdod 355: 352: 341: 319: 316: 292: 291:Technical data 289: 285:second largest 268: 265: 235: 234: 227: 224: 223: 218: 214: 213: 209: 208: 202: 196: 195: 174: 170: 169: 164: 160: 159: 156: 155: 152: 151: 147: 146: 143: 139: 138: 133: 129: 128: 124: 123: 118: 114: 113: 112:2000 (block B) 110:1990 (block A) 108: 102: 101: 98: 94: 93: 61: 57: 56: 51: 47: 46: 41: 37: 36: 33: 32: 24: 23: 15: 13: 10: 9: 6: 4: 3: 2: 837: 826: 823: 821: 818: 816: 813: 812: 810: 800: 799:Israel portal 789: 786: 785:Energy portal 780: 775: 761: 757: 756:Golan Heights 753: 747: 744: 738: 732: 729: 727: 724: 723: 721: 717: 711: 708: 706: 703: 701: 698: 696: 693: 692: 690: 686: 676: 673: 672: 670: 668: 664: 658: 657:Golan Heights 655: 654: 652: 650: 646: 640: 637: 636: 634: 632: 628: 622: 619: 618: 616: 614: 610: 604: 601: 599: 596: 595: 593: 591: 587: 581: 578: 577: 575: 573: 569: 563: 560: 558: 555: 553: 550: 548: 545: 544: 542: 540: 536: 530: 527: 525: 522: 521: 519: 517: 513: 510: 508: 504: 500: 493: 488: 486: 481: 479: 474: 473: 470: 453: 449: 442: 439: 434: 428: 425: 421: 418: 413: 410: 403: 401: 398: 389: 387: 384: 380: 373: 371: 369: 365: 361: 353: 351: 348: 344: 333: 329: 325: 317: 315: 312: 310: 306: 302: 298: 290: 288: 286: 282: 278: 274: 266: 264: 262: 258: 254: 253:Mediterranean 250: 246: 242: 231: 225: 222: 219: 215: 210: 207: 203: 201: 197: 193: 188: 183: 178: 175: 172: 171: 165: 162: 161: 157: 153: 148: 144: 140: 137: 134: 130: 125: 122: 119: 115: 109: 107: 103: 99: 95: 90: 62: 58: 55: 52: 48: 45: 42: 38: 34: 30: 25: 20: 746: 621:Mishor Rotem 528: 455:. Retrieved 451: 441: 427: 412: 393: 385: 381: 377: 357: 342: 321: 313: 294: 270: 240: 238: 758:; see also 334:system for 267:Description 249:power plant 100:Operational 84: / 60:Coordinates 809:Categories 649:Wind farms 524:Orot Rabin 516:Coal-fired 457:2023-10-07 404:References 360:Orot Rabin 305:GEC-Alstom 184:(turbines) 179:(turbines) 177:GEC-Alstom 72:34°30′58″E 69:31°37′39″N 572:Oil-fired 539:Gas-fired 529:Rutenberg 374:Incidents 255:coast in 194:(boilers) 189:(boilers) 719:See also 631:Sea wave 324:scrubber 257:Ashkelon 145:Seawater 117:Owner(s) 54:Ashkelon 50:Location 754:of the 598:Ashalim 552:Reading 354:History 247:-fired 217:Commons 40:Country 603:Ketura 547:Eshkol 422:(2009) 397:dunams 261:Israel 204:2,250 97:Status 44:Israel 590:Solar 580:Haifa 562:Dalia 557:Dorad 368:Hamas 326:(for 243:is a 228:[ 307:and 245:coal 239:The 136:Coal 639:SDE 420:IEC 332:SCR 328:FGD 309:ABB 182:ABB 811:: 450:. 370:. 337:NO 311:. 263:. 259:, 206:MW 762:. 491:e 484:t 477:v 460:. 435:. 343:x 232:]

Index


Israel
Ashkelon
31°37′39″N 34°30′58″E / 31.62750°N 34.51611°E / 31.62750; 34.51611
Commission date
Israel Electric Corporation
Coal
GEC-Alstom
ABB
Babcock & Wilcox
Combustion Engineering
Nameplate capacity
MW
Related media on Commons
edit on Wikidata
coal
power plant
Mediterranean
Ashkelon
Israel
Pinhas Rutenberg
Israel Electric Corporation
thermal power station
second largest
Combustion Engineering
Babcock & Wilcox
GEC-Alstom
ABB
scrubber
FGD

Text is available under the Creative Commons Attribution-ShareAlike License. Additional terms may apply.