Knowledge (XXG)

Reventazón Dam

Source 📝

29: 42: 376: 677: 404: 390: 362:. To produce electricity, water from the reservoir is diverted about 3 km (1.9 mi) to the northeast where it reaches the power station along the Reventazón River. Due to its environmental features, like offset habitats and migration corridors for jaguars and many other species, the project could be a model for other future hydroelectric power plants. 49: 357:
power. The US$ 1.4 billion project and largest power station in the country has an installed capacity of 305.5 MW and is expected to provide power for 525,000 homes. Construction on the dam began in 2009. At a height of 130 metres (430 ft) and with a structural volume of 9,000,000 m
453: 564: 727: 732: 650: 152: 41: 643: 248: 93: 722: 419: 636: 28: 591: 439: 686: 717: 330: 519: 691: 475: 409: 618: 613: 520:"Reventazón - A new butterfly valve for the penstock of the largest hydropower project in Costa Rica" 608: 663: 497: 334: 178: 314: 381: 342: 80: 288: 359: 711: 681: 354: 298: 603: 395: 350: 307: 403: 628: 476:"Costa Rica's president inaugurates Central America's largest hydropower plant" 541: 371: 346: 263: 250: 108: 95: 565:
The Next Frontier of Hydropower Sustainability: Planning at the System Scale
563:
Joerg Hartmann; David Harrison; Je Opperman; Roger Gill (18 November 2013).
389: 338: 76: 353:
on 16 September 2016, and its primary purpose is the production of
304: 632: 659: 165: 454:"View of the hydroelectric dam on the Reventazon River" 358:(12,000,000 cu yd), it is the largest dam in 313: 297: 287: 279: 242: 237: 229: 221: 213: 208: 200: 192: 184: 174: 164: 159: 148: 140: 132: 124: 87: 72: 64: 21: 644: 500:. Inter-America Development Bank. 22 May 2012 204:9,000,000 m (12,000,000 cu yd) 8: 337:about 8 km (5.0 mi) southwest of 733:Hydroelectric power stations in Costa Rica 728:Buildings and structures in Limón Province 651: 637: 629: 27: 18: 217:118,000,000 m (96,000 acre⋅ft) 56:Location of Reventazón Dam in Costa Rica 431: 153:Instituto Costarricense de Electricidad 48: 7: 420:List of power stations in Costa Rica 170:Embankment, concrete-face rock-fill 14: 675: 402: 388: 374: 47: 40: 16:Dam in Siquirres, Limón Province 498:"Reventazón Hydropower Project" 225:7 km (2.7 sq mi) 1: 723:Concrete-face rock-fill dams 619:GPX (secondary coordinates) 331:concrete-face rock-fill dam 238:Reventazón Hydropower Plant 749: 196:527 m (1,729 ft) 670: 614:GPX (primary coordinates) 589:Map all coordinates using 264:10.0832833°N 83.5613750°W 109:10.0655694°N 83.5802194°W 35: 26: 597:Download coordinates as: 188:130 m (430 ft) 456:. Ezequiel Becerra. AFP 410:Renewable energy portal 315:Installed capacity 293:Conventional, diversion 269:10.0832833; -83.5613750 233:8 km (5.0 mi) 133:Construction began 114:10.0655694; -83.5802194 544:(in Spanish). Pedregal 542:"Project of the Month" 609:GPX (all coordinates) 166:Type of dam 280:Commission date 260: /  230:Maximum length 214:Total capacity 105: /  718:Dams in Costa Rica 705: 704: 382:Costa Rica portal 323: 322: 222:Surface area 160:Dam and spillways 144:16 September 2016 141:Opening date 740: 680: 679: 678: 664:Reventazón River 653: 646: 639: 630: 580: 579: 577: 575: 569: 560: 554: 553: 551: 549: 538: 532: 531: 529: 527: 516: 510: 509: 507: 505: 494: 488: 487: 485: 483: 472: 466: 465: 463: 461: 450: 444: 443: 436: 412: 407: 406: 398: 393: 392: 384: 379: 378: 377: 335:Reventazón River 275: 274: 272: 271: 270: 265: 261: 258: 257: 256: 253: 179:Reventazón River 120: 119: 117: 116: 115: 110: 106: 103: 102: 101: 98: 51: 50: 44: 31: 19: 748: 747: 743: 742: 741: 739: 738: 737: 708: 707: 706: 701: 676: 674: 666: 657: 627: 626: 625: 624: 623: 584: 583: 573: 571: 567: 562: 561: 557: 547: 545: 540: 539: 535: 525: 523: 518: 517: 513: 503: 501: 496: 495: 491: 481: 479: 474: 473: 469: 459: 457: 452: 451: 447: 438: 437: 433: 428: 416: 415: 408: 401: 394: 387: 380: 375: 373: 368: 360:Central America 268: 266: 262: 259: 254: 251: 249: 247: 246: 201:Dam volume 113: 111: 107: 104: 99: 96: 94: 92: 91: 60: 59: 58: 57: 54: 53: 52: 17: 12: 11: 5: 746: 744: 736: 735: 730: 725: 720: 710: 709: 703: 702: 700: 699: 694: 689: 684: 671: 668: 667: 658: 656: 655: 648: 641: 633: 622: 621: 616: 611: 606: 600: 594: 587: 586: 585: 582: 581: 570:(Report). 16pp 555: 533: 511: 489: 478:. China.org.cn 467: 445: 430: 429: 427: 424: 423: 422: 414: 413: 399: 385: 370: 369: 367: 364: 343:Limón Province 327:Reventazón Dam 321: 320: 317: 311: 310: 301: 295: 294: 291: 285: 284: 281: 277: 276: 244: 240: 239: 235: 234: 231: 227: 226: 223: 219: 218: 215: 211: 210: 206: 205: 202: 198: 197: 194: 190: 189: 186: 182: 181: 176: 172: 171: 168: 162: 161: 157: 156: 150: 146: 145: 142: 138: 137: 134: 130: 129: 126: 122: 121: 89: 85: 84: 81:Limón Province 74: 70: 69: 66: 62: 61: 55: 46: 45: 39: 38: 37: 36: 33: 32: 24: 23: 22:Reventazón Dam 15: 13: 10: 9: 6: 4: 3: 2: 745: 734: 731: 729: 726: 724: 721: 719: 716: 715: 713: 698: 695: 693: 690: 688: 685: 683: 673: 672: 669: 665: 661: 654: 649: 647: 642: 640: 635: 634: 631: 620: 617: 615: 612: 610: 607: 605: 602: 601: 599: 598: 593: 592:OpenStreetMap 590: 566: 559: 556: 543: 537: 534: 521: 515: 512: 499: 493: 490: 477: 471: 468: 455: 449: 446: 441: 435: 432: 425: 421: 418: 417: 411: 405: 400: 397: 391: 386: 383: 372: 365: 363: 361: 356: 355:hydroelectric 352: 348: 344: 340: 336: 332: 328: 318: 316: 312: 309: 306: 302: 300: 296: 292: 290: 286: 282: 278: 273: 255:83°33′40.95″W 245: 241: 236: 232: 228: 224: 220: 216: 212: 207: 203: 199: 195: 191: 187: 183: 180: 177: 173: 169: 167: 163: 158: 154: 151: 147: 143: 139: 135: 131: 127: 123: 118: 100:83°34′48.79″W 90: 86: 82: 78: 75: 71: 67: 63: 43: 34: 30: 25: 20: 696: 596: 595: 588: 574:17 September 572:. Retrieved 558: 546:. Retrieved 536: 524:. Retrieved 514: 502:. Retrieved 492: 482:17 September 480:. Retrieved 470: 460:17 September 458:. Retrieved 448: 440:"Reventazón" 434: 396:Water portal 326: 324: 308:Francis-type 252:10°4′59.82″N 97:10°3′56.05″N 548:20 December 526:20 December 504:20 December 351:inaugurated 267: / 243:Coordinates 112: / 88:Coordinates 712:Categories 697:Reventazón 426:References 347:Costa Rica 68:Costa Rica 692:Angostura 522:. Andritz 349:. It was 339:Siquirres 209:Reservoir 77:Siquirres 366:See also 319:305.5 MW 299:Turbines 175:Impounds 149:Owner(s) 73:Location 687:La Joya 662:on the 333:on the 303:4 × 74 125:Purpose 65:Country 193:Length 185:Height 682:Cachí 568:(PDF) 329:is a 155:(ICE) 128:Power 660:Dams 576:2016 550:2014 528:2014 506:2014 484:2016 462:2016 325:The 289:Type 283:2016 136:2009 604:KML 341:in 714:: 345:, 305:MW 79:, 652:e 645:t 638:v 578:. 552:. 530:. 508:. 486:. 464:. 442:. 83:,

Index


Reventazón Dam is located in Costa Rica
Siquirres
Limón Province
10°3′56.05″N 83°34′48.79″W / 10.0655694°N 83.5802194°W / 10.0655694; -83.5802194
Instituto Costarricense de Electricidad
Type of dam
Reventazón River
10°4′59.82″N 83°33′40.95″W / 10.0832833°N 83.5613750°W / 10.0832833; -83.5613750
Type
Turbines
MW
Francis-type
Installed capacity
concrete-face rock-fill dam
Reventazón River
Siquirres
Limón Province
Costa Rica
inaugurated
hydroelectric
Central America
Costa Rica portal
icon
Water portal
icon
Renewable energy portal
List of power stations in Costa Rica
"Reventazón"
"View of the hydroelectric dam on the Reventazon River"

Text is available under the Creative Commons Attribution-ShareAlike License. Additional terms may apply.