Knowledge (XXG)

Domingo Faustino Sarmiento Railway

Source 📝

586:
Interior and Transport, the first stage was to cost 11·5bn pesos, removing many level crossings which would "avoid many accidents and much loss of life". The new underground alignment would increase the service frequency to every 3 minutes, increasing capacity from 100 million to 280 million passenger-journeys a year. The tunnel segment would have 13 underground stations. Drilling took place for a few months in 2012, was suspended, resumed in 2016, and suspended again in July 2019 due to lack of funds; as of January 2020 the government is studying its options regarding contract cancellation. During the construction, service on the surface line will continue.
574: 483: 532: 49: 1228: 229: 1238: 585:
The performance of the Sarmiento line was to be greatly improved by drilling a new tunnel. Under plans announced in 2006, a 33 km tunnel would be bored between Moreno and Caballito in order to replace the surface alignment of the Sarmiento commuter route. According to the Minister of the
505:
There were four daily services every 40 minutes. The length of the branch was 7.5 km with no stations between terminus, that allowed trains to run at 30 km/h. The most part of the voyage was underground. Finally, this branch was closed on 1 January 1951 due to the very few number of
396:
people from the "Sociedad del Camino de Hierro de Buenos Aires al Oeste". Initially a State company, this railway had been the first of Argentina, inaugurated on 29 August 1857. During its first years the service covered a 10 km path from the Plaza Del Parque station (where the
424:'s speech). Therefore, the BAWR was sold to British company "The Buenos Aires Western Railway Limited", mostly known for its Spanish form "Ferrocarril del Oeste". Once it was given to the British, the railway continued expanding along the country, reaching the 459:, beginning contacts with the Government of Argentina to sell their railway lines that still operated in the country. As a result, the railway assets were acquired by the State of Argentina between 1 November 1947 and 1 March 1948. President 522:
In 1951 the Liniers-Ingeniero Brian freight branch was definitely closed. The Perito Moreno Highway would be later built over the tracks. Other branches closed were Villa Luro-Versalles (on 5 October 1952) and the "Basílica de Luján"
1065: 466:
That same year, a decree by the presidency stated that the railway lines would be named with names of national heroes or notable people of Argentina. The Ferrocarril del Oeste received the name "
1096: 558:
made their debut on the rail. The works on Once took a long time, having finished in 1972. Three years later the Floresta station (the first terminus of the railway) was also remodeled.
470:", honoring the memory of educator and former President of Argentina born in San Juan Province (one of the regions served by the railway). The branch Darragueira-Huinca Renancó of 724: 795: 565:
railway system, creating the "Línea Metropolitana", formed by the respective suburban rail lines. This lasted only 5 years, having been dissolved before the end of the decade.
506:
passengers transported. The causes of the lack of passengers were the few daily services and the risk of accidents although the most important reason for the closure was the
420:
In 1887 the Argentine state and provincial governments sold all the public companies, with the argument "The State is the worst administrator" (according to then president
1267: 668: 1272: 490:
On 3 March 1949, a new service was opened on the initiative of Secretary of Transport Juan Castro. It was run through a tunnel by wooden-bodied coaches between
752: 764: 928: 788: 471: 365: 156: 514:
that offered a similar service but adding the possibility to combine with other services such as the branch to Moreno in Once de Septiembre station.
1262: 1147: 1142: 654: 1241: 1231: 1193: 1172: 781: 262: 989: 964: 734: 414: 1203: 823: 547:
district, having been the first in Argentina. In 1955 the works to improve the Once de Septiembre station began. One year later a new
270: 1198: 1157: 818: 364:
of 2012, the government revoked its contract with TBA and the services were taken over by a newly created state-owned company,
361: 297: 959: 938: 665: 1162: 833: 729: 912: 417:
so both companies were involved in a hard competition to extend their rails to the southwest territory of Buenos Aires.
389: 324: 334:
When Ferrocarriles Argentinos was dissolved and the long-distance services closed by the government of Argentina (with
1137: 969: 804: 507: 1127: 1101: 1041: 999: 933: 467: 250: 1167: 1122: 1021: 974: 697: 511: 372: 328: 266: 683: 1031: 843: 491: 421: 202: 90: 1213: 1208: 1152: 1132: 1056: 540: 402: 357: 1036: 410: 339: 289: 161: 100: 460: 451:
After a brief period of prosperity during the decade of 1920, the situation becomes critical with the
897: 828: 610: 606: 562: 544: 455:
and the economic depression. By 1945 the British and French companies were seriously affected by the
406: 281: 125: 1046: 984: 943: 862: 622: 618: 573: 53: 1075: 902: 548: 882: 474:, that had been administrated by the Great Western Railway) was also added to the FC Sarmiento. 368:, which later renewed the urban parts of the network with new rolling stock and infrastructure. 655:"El Gobierno le quitó a TBA la concesión de los trenes Sarmiento y Mitre", Infobae, 24 May 2012 531: 48: 867: 495: 482: 429: 425: 301: 293: 108: 104: 1091: 1026: 979: 578: 433: 305: 112: 1106: 672: 354: 146: 398: 360:(TBA), which was widely criticized due to the poor conditions of its services. After the 371:
The interurban service of Ferrocarril Sarmiento is second in number of passengers after
907: 887: 600: 57: 31: 1256: 1188: 1009: 853: 499: 258: 30:
This article is about the national railway company. For the commuter rail line, see
1070: 892: 494:
and the recently inaugurated "1° de Marzo" station, located on the crossing of the
456: 335: 320: 285: 274: 228: 338:
as president), the freight lines of the FC Sarmiento were given in concession to
17: 994: 441: 346:, a state-owned company established by the government of Buenos Aires Province. 343: 197: 327:
on 13 February 1947. The state-owned company created with the nationalization,
249:), named after the former Argentine president, statesman, educator, and author 1013: 872: 773: 635: 581:"Argentina", brought to the country to build the underground route of the line 452: 393: 561:
During the 80s the Government of Argentina reorganized the railway system of
877: 265:
of the Argentine railway network in 1948. The six companies were managed by
254: 463:
sign the agreement whereby the government took over all the railway line.
409:
Partido. The railway expanded its service to the most productive zones of
702: 555: 698:"El soterramiento del tren Sarmiento, la obra maldita de Buenos Aires" 349:
The urban and suburban services were operated by transitional company
350: 530: 481: 445: 437: 342:. On the other hand, some passenger services were taken over by 777: 269:
which was later broken up during the process of railway
543:
were installed on the Boyacá street level crossing of
311:
The railway was created after the nationalization of
666:"Transfirieron a SOFSE las líneas Mitre y Sarmiento" 413:. During this period, the BAWR's main rival was the 331:
took over all the English and French railway lines.
1181: 1115: 1084: 1055: 1008: 952: 921: 852: 811: 196: 191: 173: 168: 152: 142: 137: 118: 96: 86: 78: 70: 65: 41: 551:system was installed on the Once-Moreno branch. 388:The Ferrocarril Sarmiento was the successor of 725:"Ceremony marks start of Sarmiento tunnelling" 444:frustrated the plans to cross to neighborhood 789: 353:until they were given in concession to local 8: 436:Provinces. By 1914 the line extended to the 796: 782: 774: 216: 748: 746: 744: 257:railway divisions formed after President 572: 1268:Rail transport in Buenos Aires Province 684:Después de Sarmiento, el turno de Mitre 647: 218: 554:On 30 June 1956, the first coaches by 472:Bahía Blanca and North Western Railway 247:Ferrocarril Domingo Faustino Sarmiento 38: 1273:5 ft 6 in gauge railways in Argentina 288:to the west through the provinces of 7: 1237: 535:Toshiba units ran for over 50 years 486:1 de Marzo station in Puerto Madero 415:Buenos Aires Great Southern Railway 323:lines on the British-owned company 392:, a company founded by a group of 280:The principal lines departed from 243:Domingo Faustino Sarmiento Railway 42:Domingo Faustino Sarmiento Railway 25: 1236: 1227: 1226: 765:Buenos Aires - Bragado / Pehuajó 498:railway and Cangallo street, in 253:, is one of the six state-owned 227: 47: 1263:Railway companies of Argentina 753:Horario trenes Línea Sarmiento 478:Branch Caballito-Puerto Madero 1: 733:. 5 July 2012. Archived from 730:Railway Gazette International 390:Buenos Aires Western Railway 325:Buenos Aires Western Railway 27:Railway company in Argentina 805:Rail transport in Argentina 179:; 76 years ago 1289: 1199:Neuquén–Cipolletti bridges 1102:Red de Expresos Regionales 598: 541:electronic warning devices 468:Domingo Faustino Sarmiento 251:Domingo Faustino Sarmiento 29: 1222: 990:Tren Solar de la Quebrada 686:– Pagina/12, 22 July 2014 273:beginning in 1991 during 215: 46: 1022:Buenos Aires Underground 512:Buenos Aires Underground 401:is located nowadays) to 373:Ferrocarril General Roca 329:Ferrocarriles Argentinos 313:5 ft 6 in 267:Ferrocarriles Argentinos 209:5 ft 6 in 1148:Cdoro. Rivadavia (1960) 1143:Cdoro. Rivadavia (1953) 696:Centenera, Mar (2020). 671:19 January 2014 at the 91:Government of Argentina 1214:Transport in Argentina 1209:Yerba Buena Steam Tram 582: 536: 487: 358:Trenes de Buenos Aires 970:Ecológico de la Selva 934:De los Pueblos Libres 576: 534: 485: 440:but the beginning of 411:Buenos Aires Province 340:Ferroexpreso Pampeano 162:Ferroexpreso Pampeano 74:Ferrocarril Sarmiento 54:Current rolling stock 1173:Villa Soldati (1962) 1059:lines and facilities 1032:Metrotranvía Mendoza 898:Santa Fe Urban Train 767:on Trenes Argentinos 755:on Trenes Argentinos 737:on 23 December 2015. 563:Greater Buenos Aires 422:Miguel Juárez Celman 282:Once railway station 1037:BA Historic Tramway 929:Posadas-Encarnación 569:Sarmiento tunneling 1097:High-speed railway 1076:Rio Turbio Railway 903:Tren al Desarrollo 583: 549:railway signalling 539:In 1953 the first 537: 488: 461:Juan Domingo Perón 407:San José de Flores 245:(FCDFS) (Spanish: 58:commuter rail line 1250: 1249: 1168:Sa Pereira (1978) 1123:Altamirano (1964) 1071:Patio Parada yard 975:Del Fin del Mundo 965:Capilla del Señor 939:Salta-Antofagasta 615:Moreno – Mercedes 595:Metropolitan area 518:Branches closures 496:Buenos Aires Port 446:Republic of Chile 239: 238: 235: 234: 157:Trenes Argentinos 18:Sarmiento Railway 16:(Redirected from 1280: 1240: 1239: 1230: 1229: 1128:Benavidez (1970) 1066:Decauville lines 1047:Tranvía del Este 1027:Tren de la Costa 913:University Train 798: 791: 784: 775: 768: 762: 756: 750: 739: 738: 721: 715: 714: 712: 710: 693: 687: 681: 675: 663: 657: 652: 579:drilling machine 318: 314: 231: 217: 210: 205: 187: 185: 180: 51: 39: 21: 1288: 1287: 1283: 1282: 1281: 1279: 1278: 1277: 1253: 1252: 1251: 1246: 1218: 1194:Nationalization 1177: 1138:Castelar (2013) 1133:Brandsen (1981) 1111: 1107:Rosario Tramway 1080: 1051: 1004: 960:Avellaneda Park 948: 917: 848: 807: 802: 772: 771: 763: 759: 751: 742: 723: 722: 718: 708: 706: 695: 694: 690: 682: 678: 673:Wayback Machine 664: 660: 653: 649: 644: 631: 603: 597: 592: 571: 529: 520: 480: 405:, then part of 386: 381: 355:private company 316: 312: 277:'s presidency. 263:nationalisation 222: 208: 203: 183: 181: 178: 160: 133: 111: 107: 103: 61: 35: 28: 23: 22: 15: 12: 11: 5: 1286: 1284: 1276: 1275: 1270: 1265: 1255: 1254: 1248: 1247: 1245: 1244: 1234: 1223: 1220: 1219: 1217: 1216: 1211: 1206: 1201: 1196: 1191: 1185: 1183: 1182:Related topics 1179: 1178: 1176: 1175: 1170: 1165: 1160: 1155: 1150: 1145: 1140: 1135: 1130: 1125: 1119: 1117: 1113: 1112: 1110: 1109: 1104: 1099: 1094: 1088: 1086: 1082: 1081: 1079: 1078: 1073: 1068: 1062: 1060: 1053: 1052: 1050: 1049: 1044: 1039: 1034: 1029: 1024: 1018: 1016: 1006: 1005: 1003: 1002: 997: 992: 987: 985:De las Sierras 982: 977: 972: 967: 962: 956: 954: 950: 949: 947: 946: 941: 936: 931: 925: 923: 919: 918: 916: 915: 910: 908:Tren del Valle 905: 900: 895: 890: 885: 880: 875: 870: 865: 863:Belgrano Norte 859: 857: 850: 849: 847: 846: 841: 836: 831: 826: 821: 815: 813: 812:Main divisions 809: 808: 803: 801: 800: 793: 786: 778: 770: 769: 757: 740: 716: 688: 676: 658: 646: 645: 643: 640: 639: 638: 630: 627: 626: 625: 616: 613: 601:Sarmiento Line 599:Main article: 596: 593: 591: 590:Train services 588: 570: 567: 528: 525: 519: 516: 479: 476: 385: 382: 380: 377: 237: 236: 233: 232: 224: 223: 220: 213: 212: 200: 194: 193: 189: 188: 175: 171: 170: 166: 165: 154: 150: 149: 144: 140: 139: 135: 134: 132: 131: 128: 122: 120: 116: 115: 98: 94: 93: 88: 84: 83: 80: 76: 75: 72: 68: 67: 63: 62: 52: 44: 43: 32:Sarmiento Line 26: 24: 14: 13: 10: 9: 6: 4: 3: 2: 1285: 1274: 1271: 1269: 1266: 1264: 1261: 1260: 1258: 1243: 1235: 1233: 1225: 1224: 1221: 1215: 1212: 1210: 1207: 1205: 1204:Privatization 1202: 1200: 1197: 1195: 1192: 1190: 1187: 1186: 1184: 1180: 1174: 1171: 1169: 1166: 1164: 1161: 1159: 1156: 1154: 1153:Flores (2011) 1151: 1149: 1146: 1144: 1141: 1139: 1136: 1134: 1131: 1129: 1126: 1124: 1121: 1120: 1118: 1114: 1108: 1105: 1103: 1100: 1098: 1095: 1093: 1092:Córdoba Metro 1090: 1089: 1087: 1083: 1077: 1074: 1072: 1069: 1067: 1064: 1063: 1061: 1058: 1054: 1048: 1045: 1043: 1040: 1038: 1035: 1033: 1030: 1028: 1025: 1023: 1020: 1019: 1017: 1015: 1011: 1010:Rapid transit 1007: 1001: 998: 996: 993: 991: 988: 986: 983: 981: 978: 976: 973: 971: 968: 966: 963: 961: 958: 957: 955: 951: 945: 942: 940: 937: 935: 932: 930: 927: 926: 924: 922:International 920: 914: 911: 909: 906: 904: 901: 899: 896: 894: 891: 889: 886: 884: 881: 879: 876: 874: 871: 869: 866: 864: 861: 860: 858: 855: 854:Commuter rail 851: 845: 842: 840: 837: 835: 832: 830: 827: 825: 822: 820: 817: 816: 814: 810: 806: 799: 794: 792: 787: 785: 780: 779: 776: 766: 761: 758: 754: 749: 747: 745: 741: 736: 732: 731: 726: 720: 717: 705: 704: 699: 692: 689: 685: 680: 677: 674: 670: 667: 662: 659: 656: 651: 648: 641: 637: 633: 632: 629:Long distance 628: 624: 620: 617: 614: 612: 608: 605: 604: 602: 594: 589: 587: 580: 575: 568: 566: 564: 559: 557: 552: 550: 546: 542: 533: 526: 524: 517: 515: 513: 509: 503: 501: 500:Puerto Madero 497: 493: 484: 477: 475: 473: 469: 464: 462: 458: 454: 449: 447: 443: 439: 435: 431: 427: 423: 418: 416: 412: 408: 404: 400: 395: 391: 383: 378: 376: 374: 369: 367: 363: 362:rail disaster 359: 356: 352: 347: 345: 341: 337: 332: 330: 326: 322: 317:1,676 mm 309: 307: 303: 299: 295: 291: 287: 283: 278: 276: 272: 271:privatisation 268: 264: 260: 256: 252: 248: 244: 230: 226: 225: 219: 214: 206: 204:1,676 mm 201: 199: 195: 190: 176: 172: 167: 163: 158: 155: 151: 148: 145: 141: 136: 129: 127: 124: 123: 121: 117: 114: 110: 106: 102: 99: 95: 92: 89: 85: 81: 77: 73: 69: 64: 59: 55: 50: 45: 40: 37: 33: 19: 980:De las Nubes 868:Belgrano Sur 838: 760: 735:the original 728: 719: 707:. Retrieved 701: 691: 679: 661: 650: 584: 577:Head of the 560: 553: 538: 521: 504: 489: 465: 457:World War II 450: 419: 399:Teatro Colón 387: 370: 348: 336:Carlos Menem 333: 310: 290:Buenos Aires 286:Buenos Aires 279: 275:Carlos Menem 246: 242: 240: 159:(passengers) 101:Buenos Aires 36: 1163:Once (2013) 1158:Once (2012) 1000:Villa Elisa 995:La Trochita 944:Transandine 442:World War I 403:La Floresta 344:Ferrobaires 321:broad gauge 198:Track gauge 153:Operator(s) 71:Native name 1257:Categories 1014:Light rail 883:San Martín 834:San Martín 709:15 January 642:References 453:1929 crash 384:Background 259:Juan Perón 147:Inter-city 1189:Mitre Law 1116:Accidents 953:Touristic 888:Sarmiento 839:Sarmiento 492:Caballito 255:Argentine 221:Route map 192:Technical 164:(freight) 1232:Category 1085:Projects 1042:Premetro 819:Belgrano 669:Archived 527:Advances 430:San Luis 426:La Pampa 302:San Luis 294:La Pampa 109:San Luis 105:La Pampa 66:Overview 1242:Commons 1057:Freight 893:Urquiza 844:Urquiza 703:El Pais 636:Pehuajó 634:Once – 556:Toshiba 434:Mendoza 394:porteño 379:History 306:Mendoza 298:Córdoba 182: ( 169:History 138:Service 119:Termini 113:Mendoza 56:of the 611:Moreno 545:Flores 508:Line A 351:FEMESA 174:Opened 97:Locale 82:Active 79:Status 873:Mitre 856:lines 824:Mitre 623:Lobos 619:Merlo 438:Andes 366:SOFSE 87:Owner 1012:and 878:Roca 829:Roca 711:2020 607:Once 432:and 304:and 241:The 184:1948 177:1948 143:Type 130:Toay 126:Once 510:of 284:in 261:'s 1259:: 743:^ 727:. 700:. 621:– 609:– 502:. 448:. 428:, 375:. 319:) 308:. 300:, 296:, 292:, 797:e 790:t 783:v 713:. 315:( 211:) 207:( 186:) 60:. 34:. 20:)

Index

Sarmiento Railway
Sarmiento Line

Current rolling stock
commuter rail line
Government of Argentina
Buenos Aires
La Pampa
San Luis
Mendoza
Once
Inter-city
Trenes Argentinos
Ferroexpreso Pampeano
Track gauge
1,676 mm

Domingo Faustino Sarmiento
Argentine
Juan Perón
nationalisation
Ferrocarriles Argentinos
privatisation
Carlos Menem
Once railway station
Buenos Aires
Buenos Aires
La Pampa
Córdoba
San Luis

Text is available under the Creative Commons Attribution-ShareAlike License. Additional terms may apply.