Sheringham Shoal Offshore Wind Farm

Source 📝

26: 604: 686: 2742: 2644: 700: 672: 2632: 2656: 399:
known as Sheringham shoal. The wind farm would be located at water depths of 16 to 22 metres (52 to 72 ft) and consist of somewhere between 45 and 108 turbines. Benefits of the site included low shipping and trawling intensities; lack of any dredging, dumping, oil/gas, or MoD practice areas, and
400:
of cables or pipelines; as well as low visual impact from the coast, and outside any nature conservation areas. The seabed at the wind farm and offshore cable route consisted of mainly gravely sand, overlying chalk. The electrical power export cable was to be connected to a switching station near
509:
compensating for wave oscillations. Delays of several months of the arrival of foundation transport vessels, coupled with wave conditions limiting the operational window of use of the transport vessels, meant that the vessel Svanen was not able to install all the foundations. The delay had an
437:
requires the developer to decommission the wind farm once out of use - the decommissioning plan submitted by the developer included: removal of wind turbines, cutting of foundations at seabed level or lower, whilst interarray cables would be left on the sea bed.
505:, halting installation due to a previously scheduled contract for the installation vessel. The foundations installed by MT Højgaard used a special method: the support of the foundation on the delivery barge had its motion steadied by a 135t sliding support with 657:
The Sheringham Shoal windfarm operates a community benefit fund supporting local charities and community projects. Since its establishment in 2010, the Fund has made grant awards totalling £881,642. The Fund is operated by Norfolk Community Foundation.
528:
The offshore substations were installed in May 2011 by Heerema. The remaining pile foundations, and the transition pieces and offshore substation topsides where installed by Seaway Heavy Lifting between May and August 2011 using the newly built
500:
Onshore work began in 2009, and construction of the offshore part began March 2010. Turbine foundations installation began in June 2010; MT Højgaard installed the substation piles and 17 of the turbine foundations, using the vessel
2694: 586:
was dredged to allow wind-farm maintenance vessels to be based there. A 150 metres (490 ft) pontoon jetty was also built; the work was completed early 2010. An onshore operations base was constructed at
915: 450:
was awarded a €24m contract for the supply and construction of the 145kV export cables, and was awarded a €12m ($ 15.8m) contract in April 2009 to supply 81 km of 36kV inter-array cables.
2687: 1738:
Aldersey-Williams, John; Broadbent, Ian; Strachan, Peter (2019). "Better estimates of LCOE from audited accounts – A new methodology with examples from United Kingdom offshore wind and CCGT".
1921: 2726: 2680: 638:
took over operations and maintenance of the wind farm from Scira. Statoil took over operation from Statkraft, beginning in 2017, while also increasing its share in the proposed
1961: 2605: 2304: 956: 725: 454:
obtained a €50 million contract to supply offshore and onshore substations in late 2008, design and project management of the offshore substations was sub-contracted to
385: 3260: 2029: 1303: 1627: 537:
for the substation installation was cancelled and transferred to Seaway due to the delays. Foundation and transition piece installation was complete by August 2011.
3250: 1914: 3230: 3235: 923: 730: 974: 1787: 899: 2648: 1951: 1907: 433:
The lease on the sea bed given by the Crown Estate has a duration of 50 years, and the (initial) wind farm has an estimated lifespan of 20 years. The
2659: 2344: 3265: 1946: 3245: 574:
in late 2011. The first turbine was installed on 3 July 2011, and began generating in August 2011; installation was complete by July 2012.
1680: 1662: 301: 56: 1153: 25: 338:
off the coast of Norfolk. A lease for use of the sea bed was obtained in 2004 by Scira Offshore Energy (later acquired by Statoil (now
1594: 1208: 513:
Export cable installation began late 2010, under contract to Visser & Smith Marine Contracting. Work was carried out by the ships
3160: 2389: 2354: 1046: 937: 353:
3.6MW turbines (total power 316.8 MW) spread over a 35 km (14 sq mi) area over 17 km (11 mi) from shore.
2565: 2374: 1930: 749: 715: 767: 2259: 1010: 3225: 3092: 3076: 3071: 3055: 2459: 2399: 1028: 785: 346:), the development gained offshore planning consent in 2008, and was constructed 2009–2011, being officially opened in 2012. 1226: 373:
to develop a c. 315MW wind farm. Development work for Econventures was to be carried out by Evelop BV, both subsidiaries of
801: 2334: 2204: 409: 559:
was terminated by mutual agreement after the foundation installation delays. Turbine installation was carried out by the
2977: 2935: 2930: 2925: 2844: 2839: 1941: 408:. Two routes were considered for the export cable, one avoiding the sandbank at Sheringham shoal. The connection to the 611:
The wind farm was operational by late 2011. An official opening took place on September 27, 2012, attended by Norway's
2874: 2434: 2059: 720: 1832: 1698: 1281: 1818: 3186: 2940: 2854: 2495: 2464: 2339: 631: 3155: 2800: 2394: 2349: 2319: 1847: 2834: 2829: 2731: 2505: 2364: 2329: 2269: 2249: 2169: 2089: 2084: 3026: 2961: 2795: 880: 627: 2945: 2859: 2610: 2536: 2244: 2209: 2179: 2079: 2064: 1633: 705: 2849: 3165: 3010: 2703: 2615: 2541: 2429: 2224: 2194: 2174: 2139: 552: 401: 126: 1304:"Seaway Heavy Lifting to Install Subsea Foundations for Offshore Wind Farm on Sheringham Shoal (UK)]" 3121: 2920: 2890: 2869: 2864: 2546: 2480: 2254: 2189: 2154: 2134: 2119: 2094: 639: 603: 427: 426:
acquired 50% of the shareholding in Scira becoming joint (50:50) owners of the development. In 2014 the
395:, just within the 12 nm UK territorial water boundary, and 5 kilometres (3.1 mi) north of the 96: 2587: 369:
site at Sheringham shoal. Econventures together with SLP Energy (Lowestoft, UK) formed a joint venture
3150: 2424: 2239: 2229: 2109: 2074: 434: 1611: 3220: 2779: 2774: 2721: 2409: 2285: 2234: 2199: 2069: 2054: 2049: 2044: 1984: 685: 612: 556: 534: 3255: 2580: 2444: 2324: 2264: 2144: 1765: 592: 405: 350: 245: 165: 2741: 2672: 634:) acquired the electrical transmission assets of the wind farm for £193 million. In August 2013 486: 470: 391:
The planned wind farm was approximately 18 kilometres (11 mi) off the coast of Norfolk at
3191: 2636: 2573: 2490: 2485: 2414: 2404: 957:"24 million Euro submarine power cable contract for the Sheringham Shoal Offshore Wind Farm A" 366: 331: 1865: 381:
took a 50% stake in Scira, acquiring 25% shareholdings from both SLP Energy and Ecocentures.
3240: 2500: 2454: 2449: 2290: 2159: 1755: 1747: 975:"Nexans wins 12 million Euro infield cable contract for Sheringham Shoal Offshore Wind Farm" 588: 482: 1119: 619:. The cost of development has been estimated at 10billion Norwegian krona ($ 1.8 billion). 465:. The two foundations for the substations and foundations for 88 turbines were supplied by 2995: 2707: 2379: 2369: 2164: 2114: 2104: 2009: 506: 645:
By September 2013 the wind farm had generated 1.2TWh in its first year of operation. Its
2750: 2526: 2359: 2149: 2124: 2004: 1999: 691: 677: 646: 466: 413: 261: 237: 1720: 993: 3214: 3040: 2214: 2099: 2019: 1989: 1769: 620: 583: 1834:
Sheringham Shoal Offshore Wind Farm Onshore Grid Connection -Environmental Statement
1011:"Areva T&D to provide substations for StatoilHydro's Sheringham Shoal wind farm" 2991: 2531: 2510: 2384: 1899: 1071: 362: 1121:
Siemens awarded major offshore wind power contract worth more than 450 Million EUR
469:. Manufacture of the turbine monopiles and transition pieces was subcontracted to 2905: 2184: 1751: 699: 378: 901:
Eversheds advises Statkraft on acquisition of 50% of Sheringham Shoal wind farm
3135: 2551: 2419: 2219: 2129: 1969: 667: 560: 497:
obtained a €450 million contract to supply 88 wind turbines to the wind farm.
455: 392: 71: 58: 3106: 635: 423: 396: 343: 335: 157: 2631: 1576: 1558: 1540: 1522: 1504: 1486: 1468: 1450: 1432: 1414: 1396: 1378: 1360: 1339: 1321: 1260: 1242: 1189: 1171: 1135: 1613:
Statkraft: Norway's Crown Prince opens Sheringham Shoal offshore wind farm
1289: 616: 490: 474: 374: 461:
Design work on the turbine and substation foundations was contracted to
310: 2759: 1974: 1109:, § Substations, Inter-Array & Export Cables - Offshore Substation. 494: 478: 462: 339: 142: 121: 1760: 1172:"Construction work begins on Sheringham Shoal Offshore Wind Farm site" 477:. The substation superstructure and foundations were subcontracted to 2014: 1979: 1340:"Foundation installation complete at Sheringham Shoal Wind Farm site" 447: 1209:"Gigantisk rulleskøjte gør det lettere at rejse havmøllefundamenter" 1866:"Sheringham Shoal Offshore Wind Farm, Greater Wash, United Kingdom" 916:"UK Green Investment Bank invests £240m in UK offshore wind sector" 602: 451: 1663:"UK: Ofgem Awards Sheringham Shoal Offshore Transmission Licence" 2814: 1793: 286: 2676: 1903: 1559:"Construction progresses at Scira's new permanent O&M base" 1154:"Construction work began on Sheringham Shoal offshore windfarm" 419:
Planning consent for the wind farm was given on 8 August 2008.
1994: 1415:"New turbine installation vessel to start at Sheringham Shoal" 1211:[Giant roller skate raises wind turbine foundations], 607:
Sheringham Shoal Offshore Wind Farm from Sheringham west cliff
416:
via a 132kV 21.3 kilometres (13.2 mi) underground cable.
1541:"Swaffham company wins wind farm base construction contract" 768:"Crown Estate awards Scira Offshore Energy a Wind Farm Site" 1645: 1643: 1807: 1681:"Statkraft to operate Sheringham Shoal offshore wind farm" 1243:"Trio of vessels to install Sheringham Shoal export cable" 1892: 1322:"Substation and foundation installation contract awarded" 412:
was planned to be made at an electrical substation near
994:"Areva wins €60m Statoil contract for Sheringham Shoal" 582:
As part of the development, the harbour and channel at
1282:"Foundation installation complete at Sheringham Shoal" 544:, and installed under the sea bed by water jetting by 384:
In 2006 Scira submitted a planning application to the
365:
awarded Econventures (Utrecht, NL) the lease of the
3179: 3143: 3134: 3114: 3105: 3085: 3064: 3048: 3039: 3019: 3003: 2990: 2970: 2954: 2913: 2904: 2883: 2822: 2813: 2788: 2767: 2758: 2749: 2714: 2598: 2564: 2519: 2473: 2312: 2303: 2278: 2037: 2028: 1960: 1469:"Turbine installation complete at Sheringham Shoal" 623:is used as the operational base for the wind farm. 510:estimated additional cost of 600 million NOK. 297: 281: 276: 260: 244: 212: 204: 190: 182: 174: 156: 151: 135: 111: 95: 87: 50: 36: 18: 802:"Application for 315 MW off east coast of England" 2606:List of offshore wind farms in the United Kingdom 1029:"Wood Group branches out as winds of change blow" 922:(press release), 27 November 2014, archived from 726:List of offshore wind farms in the United Kingdom 1261:"Sheringham Shoal offshore substations in place" 1190:"First foundation installed at Sheringham Shoal" 1048:SUBSTATION DESIGN FOR SHERINGHAM SHOAL WIND FARM 626:In June 2013 a consortium, "Blue Transmission" ( 430:took a £240 million 20% stake in the wind farm. 866: 2688: 1915: 1433:"First turbine installed at Sheringham Shoal" 8: 2727:Pre-nationalisation electric power companies 1649: 1599:(press release), Statkraft, 22 November 2011 1596:The first energy delivery from offshore wind 731:List of offshore wind farms in the North Sea 555:in December 2010, the initial contract with 1397:"New turbine installation contract awarded" 1379:"Cable laying complete at Sheringham Shoal" 750:"UK Green Light for 15 Offshore Wind Farms" 595:, with building work taking place in 2012. 551:The turbine installation was contracted to 548:. Installation was complete by March 2012. 3140: 3111: 3045: 3000: 2910: 2819: 2764: 2755: 2695: 2681: 2673: 2309: 2034: 1922: 1908: 1900: 1361:"More vessels join Sheringham Shoal fleet" 15: 1952:Offshore wind power in the United Kingdom 1759: 1505:"New outer harbour at Wells taking shape" 1276: 1274: 2345:European Offshore Wind Deployment Centre 1487:"Historic cooperation agreement signed." 904:(press release), Eversheds, 3 April 2009 3261:Energy infrastructure completed in 2012 1699:"Statoil increases in UK offshore wind" 1355: 1353: 1066: 1064: 741: 302:Related media on Commons 1947:Renewable energy in the United Kingdom 3251:Power stations in the East of England 1848:"Sheringham Shoal Offshore Wind Farm" 1523:"Wells Harbour construction complete" 1072:"Sheringham Shoal Offshore Wind Farm" 879:Barclay, Christopher (17 July 2012), 388:for a 108 turbine, 315 MW wind farm. 7: 3231:Offshore wind farms in the North Sea 2655: 1629:Opening of Sheringham Shoal windfarm 1097:, § Turbine, Tower and Substructure. 945:, Statoil, 14 February 2014, §2, p.6 787:Signs offshore wind power deal in UK 3236:Buildings and structures in Norfolk 1789:Sheringham Shoal Offshore Wind Farm 1632:, 27 September 2012, archived from 1228:A 135 ton "shock absorber" on rails 888:, House of Commons Library, §4, p.5 328:Sheringham Shoal Offshore Wind Farm 19:Sheringham Shoal Offshore Wind Farm 1367:(press release), 22 September 2011 1249:(press release), 17 September 2010 992:Berrill, Paul (23 December 2008), 854: 842: 830: 818: 14: 1529:(press release), 16 February 2010 2740: 2654: 2643: 2642: 2630: 1931:Wind power in the United Kingdom 1583:(press release), 18 October 2012 1511:(press release), 4 February 2010 1421:(press release), 7 December 2011 1288:, 24 August 2011, archived from 1207:Krøyer, Kent (9 November 2010), 1106: 1094: 716:Wind power in the United Kingdom 698: 684: 670: 649:has been estimated at £150/MWh. 540:Inter-array cables were laid by 386:Department of Trade and Industry 24: 1831:Royal Haskoning (August 2007), 1610:Statkraft (27 September 2012), 1346:(press release), 23 August 2011 208:35 km (14 sq mi) 3266:2012 establishments in England 1547:(press release), 15 March 2012 1457:(press release), 2 August 2011 1385:(press release), 21 March 2012 1328:(press release), 11 March 2011 1231:, MT Højgaard, 3 November 2010 963:(press release), 16 April 2008 1: 1721:"Sheringham pumps out 1.2TWh" 1577:"Egmere base almost complete" 1565:(press release), 20 June 2012 1493:(press release), 24 June 2009 1475:(press release), 10 July 2012 1196:(press release), 28 June 2010 1178:(press release), 9 March 2010 1142:(press release), 30 June 2009 981:(press release), 2 April 2009 882:Wind Farm consents - offshore 632:Barclays Infrastructure Funds 183:Distance from shore 1942:Energy in the United Kingdom 1439:(press release), 4 July 2011 1267:(press release), 13 May 2011 920:/www.greeninvestmentbank.com 570:, with SEA JACK replaced by 178:15–22 m (49–72 ft) 3246:Round 2 offshore wind farms 1752:10.1016/j.enpol.2018.12.044 721:List of offshore wind farms 533:. A previous contract with 262:Annual net output 3282: 615:and UK Secretary of State 175:Max. water depth 2738: 2624: 1937: 1685:www.windpoweroffshore.com 1451:"First power to the Grid" 1136:"Onshore work commences." 939:Decommissioning Programme 857:, §2.9.1; Fig.2.17, p.70. 307: 221: 217: 32: 23: 2732:Renewable Energy Systems 2506:Sofia Offshore Wind Farm 1870:www.power-technology.com 1616:(press release), Reuters 806:www.windpowermonthly.com 485:(transition pieces) and 234:Make and model 197:107 m (351 ft) 2611:North Sea Offshore Grid 1820:Environmental Statement 1124:, Siemens, 1 April 2009 754:www.maritimejournal.com 706:Renewable energy portal 628:Macquarie Capital Group 246:Nameplate capacity 186:17 km (11 mi) 2704:Electricity generation 2616:Wind power in Scotland 2390:Lynn and Inner Dowsing 1286:www.wellsharbour.co.uk 608: 402:Muckleburgh Collection 226:Units operational 127:Green Investment Group 3226:Wind farms in England 2637:Wind power portal 790:, Hydro, 28 June 2005 640:Dogger Bank Wind Farm 606: 428:Green Investment Bank 371:Scira Offshore Energy 349:The wind farm has 88 269:1,200 GWh (2013) 213:Power generation 2566:Installation vessels 2460:West of Duddon Sands 1667:www.offshorewind.biz 1158:www.offshorewind.biz 998:www.rechargenews.com 867:ES onshore grid 2007 737:References and notes 553:Gulf Marine Services 404:, via landfall near 97:Commission date 2722:Eastern Electricity 2305:Offshore wind farms 2205:Little Cheyne Court 1727:, 27 September 2013 1636:on 17 December 2012 1308:subseaworldnews.com 613:Crown Prince Haakon 591:, 3 miles south of 517:(route clearance), 277:External links 191:Rotor diameter 68: /  2030:Onshore wind farms 1852:www.4coffshore.com 1808:"Sheringham Shoal" 1403:, 22 December 2010 845:, §2.2.1, 2.2.1.4. 774:, 18 December 2003 609: 593:Wells-next-the-Sea 572:Sea Jack Leviathan 351:Siemens Wind Power 72:53.1167°N 1.1333°E 3208: 3207: 3204: 3203: 3200: 3199: 3192:East Anglia Array 3130: 3129: 3101: 3100: 3035: 3034: 2986: 2985: 2900: 2899: 2809: 2808: 2670: 2669: 2560: 2559: 2299: 2298: 2060:Askam and Ireleth 515:Atlantic Guardian 493:(piles). In 2009 367:Round 2 wind farm 332:Round 2 wind farm 318: 317: 3273: 3171:Sheringham Shoal 3141: 3112: 3046: 3001: 2911: 2820: 2765: 2756: 2744: 2697: 2690: 2683: 2674: 2658: 2657: 2646: 2645: 2635: 2634: 2501:Neart Na Gaoithe 2465:Westermost Rough 2440:Sheringham Shoal 2310: 2035: 1924: 1917: 1910: 1901: 1896: 1895: 1893:Official website 1879: 1878: 1876: 1861: 1860: 1858: 1841: 1839: 1827: 1825: 1814: 1803: 1802: 1800: 1774: 1773: 1763: 1735: 1729: 1728: 1717: 1711: 1710: 1708: 1706: 1695: 1689: 1688: 1687:, 15 August 2013 1677: 1671: 1670: 1659: 1653: 1650:Power Technology 1647: 1638: 1637: 1624: 1618: 1617: 1607: 1601: 1600: 1591: 1585: 1584: 1573: 1567: 1566: 1555: 1549: 1548: 1537: 1531: 1530: 1519: 1513: 1512: 1501: 1495: 1494: 1483: 1477: 1476: 1465: 1459: 1458: 1447: 1441: 1440: 1429: 1423: 1422: 1411: 1405: 1404: 1393: 1387: 1386: 1375: 1369: 1368: 1357: 1348: 1347: 1336: 1330: 1329: 1318: 1312: 1311: 1300: 1294: 1293: 1292:on 19 April 2012 1278: 1269: 1268: 1257: 1251: 1250: 1239: 1233: 1232: 1223: 1217: 1216: 1204: 1198: 1197: 1186: 1180: 1179: 1168: 1162: 1161: 1150: 1144: 1143: 1132: 1126: 1125: 1116: 1110: 1104: 1098: 1092: 1086: 1085: 1084: 1082: 1068: 1059: 1058: 1057: 1055: 1043: 1037: 1036: 1033:www.scotsman.com 1025: 1019: 1018: 1017:, 8 January 2009 1007: 1001: 1000: 989: 983: 982: 971: 965: 964: 953: 947: 946: 944: 934: 928: 927: 912: 906: 905: 896: 890: 889: 887: 876: 870: 869:, pp. 2, 7. 864: 858: 852: 846: 840: 834: 828: 822: 816: 810: 809: 798: 792: 791: 782: 776: 775: 764: 758: 757: 756:, 1 January 2004 746: 708: 703: 702: 694: 689: 688: 680: 675: 674: 673: 578:Operations bases 507:hydraulic motors 483:Bladt Industries 322:Wind farm layout 311:edit on Wikidata 293: 290: 288: 240:SWT-3.6-107 (88) 229:88 × 3.6 MW 83: 82: 80: 79: 78: 73: 69: 66: 65: 64: 61: 28: 16: 3281: 3280: 3276: 3275: 3274: 3272: 3271: 3270: 3211: 3210: 3209: 3196: 3175: 3156:Greater Gabbard 3126: 3097: 3081: 3060: 3031: 3015: 2982: 2966: 2950: 2896: 2879: 2805: 2784: 2745: 2736: 2710: 2708:East of England 2701: 2671: 2666: 2629: 2620: 2594: 2556: 2515: 2469: 2370:Hywind Scotland 2350:Greater Gabbard 2295: 2274: 2165:Goonhilly Downs 2024: 2010:Talisman Energy 1956: 1933: 1928: 1891: 1890: 1887: 1882: 1874: 1872: 1864: 1856: 1854: 1846: 1837: 1830: 1823: 1817: 1812:www.scira.co.uk 1806: 1798: 1796: 1786: 1782: 1777: 1737: 1736: 1732: 1719: 1718: 1714: 1704: 1702: 1697: 1696: 1692: 1679: 1678: 1674: 1661: 1660: 1656: 1648: 1641: 1626: 1625: 1621: 1609: 1608: 1604: 1593: 1592: 1588: 1575: 1574: 1570: 1557: 1556: 1552: 1539: 1538: 1534: 1521: 1520: 1516: 1503: 1502: 1498: 1485: 1484: 1480: 1467: 1466: 1462: 1449: 1448: 1444: 1431: 1430: 1426: 1413: 1412: 1408: 1395: 1394: 1390: 1377: 1376: 1372: 1359: 1358: 1351: 1338: 1337: 1333: 1320: 1319: 1315: 1310:, 11 March 2011 1302: 1301: 1297: 1280: 1279: 1272: 1259: 1258: 1254: 1241: 1240: 1236: 1225: 1224: 1220: 1206: 1205: 1201: 1188: 1187: 1183: 1170: 1169: 1165: 1152: 1151: 1147: 1134: 1133: 1129: 1118: 1117: 1113: 1105: 1101: 1093: 1089: 1080: 1078: 1070: 1069: 1062: 1053: 1051: 1045: 1044: 1040: 1027: 1026: 1022: 1009: 1008: 1004: 991: 990: 986: 973: 972: 968: 955: 954: 950: 942: 936: 935: 931: 914: 913: 909: 898: 897: 893: 885: 878: 877: 873: 865: 861: 853: 849: 841: 837: 829: 825: 817: 813: 800: 799: 795: 784: 783: 779: 766: 765: 761: 748: 747: 743: 739: 712: 711: 704: 697: 690: 683: 676: 671: 669: 664: 655: 601: 580: 444: 435:2004 Energy Act 359: 325: 324: 323: 314: 287:sheringhamshoal 285: 272: 256: 200: 170: 152:Wind farm 147: 131: 107: 77:53.1167; 1.1333 76: 74: 70: 67: 62: 59: 57: 55: 54: 46: 12: 11: 5: 3279: 3277: 3269: 3268: 3263: 3258: 3253: 3248: 3243: 3238: 3233: 3228: 3223: 3213: 3212: 3206: 3205: 3202: 3201: 3198: 3197: 3195: 3194: 3189: 3183: 3181: 3177: 3176: 3174: 3173: 3168: 3163: 3161:Gunfleet Sands 3158: 3153: 3147: 3145: 3138: 3132: 3131: 3128: 3127: 3125: 3124: 3118: 3116: 3109: 3103: 3102: 3099: 3098: 3096: 3095: 3089: 3087: 3083: 3082: 3080: 3079: 3074: 3068: 3066: 3062: 3061: 3059: 3058: 3052: 3050: 3043: 3037: 3036: 3033: 3032: 3030: 3029: 3023: 3021: 3017: 3016: 3014: 3013: 3007: 3005: 2998: 2988: 2987: 2984: 2983: 2981: 2980: 2974: 2972: 2968: 2967: 2965: 2964: 2958: 2956: 2952: 2951: 2949: 2948: 2943: 2938: 2936:Little Barford 2933: 2928: 2926:Great Yarmouth 2923: 2917: 2915: 2908: 2902: 2901: 2898: 2897: 2895: 2894: 2887: 2885: 2881: 2880: 2878: 2877: 2872: 2867: 2862: 2857: 2852: 2847: 2845:Little Barford 2842: 2840:Great Yarmouth 2837: 2832: 2826: 2824: 2817: 2811: 2810: 2807: 2806: 2804: 2803: 2798: 2792: 2790: 2786: 2785: 2783: 2782: 2777: 2771: 2769: 2762: 2753: 2751:Power stations 2747: 2746: 2739: 2737: 2735: 2734: 2729: 2724: 2718: 2716: 2712: 2711: 2702: 2700: 2699: 2692: 2685: 2677: 2668: 2667: 2665: 2664: 2652: 2640: 2625: 2622: 2621: 2619: 2618: 2613: 2608: 2602: 2600: 2596: 2595: 2593: 2592: 2585: 2582:MPI Resolution 2578: 2570: 2568: 2562: 2561: 2558: 2557: 2555: 2554: 2549: 2544: 2539: 2534: 2529: 2527:Atlantic Array 2523: 2521: 2517: 2516: 2514: 2513: 2508: 2503: 2498: 2493: 2488: 2483: 2477: 2475: 2471: 2470: 2468: 2467: 2462: 2457: 2452: 2447: 2442: 2437: 2432: 2427: 2422: 2417: 2412: 2407: 2402: 2397: 2392: 2387: 2382: 2377: 2372: 2367: 2365:Humber Gateway 2362: 2357: 2355:Gunfleet Sands 2352: 2347: 2342: 2337: 2332: 2327: 2322: 2316: 2314: 2307: 2301: 2300: 2297: 2296: 2294: 2293: 2288: 2282: 2280: 2276: 2275: 2273: 2272: 2270:Winscales Moor 2267: 2262: 2257: 2252: 2250:Trimdon Grange 2247: 2242: 2237: 2232: 2227: 2222: 2217: 2212: 2207: 2202: 2197: 2192: 2187: 2182: 2177: 2172: 2170:Great Eppleton 2167: 2162: 2157: 2152: 2147: 2142: 2137: 2132: 2127: 2125:Cold Northcott 2122: 2117: 2112: 2107: 2102: 2097: 2092: 2090:Brechfa Forest 2087: 2085:Braes of Doune 2082: 2077: 2072: 2067: 2065:Beinn an Tuirc 2062: 2057: 2052: 2047: 2041: 2039: 2032: 2026: 2025: 2023: 2022: 2017: 2012: 2007: 2005:SSE Renewables 2002: 2000:Siemens Gamesa 1997: 1992: 1987: 1982: 1977: 1972: 1966: 1964: 1958: 1957: 1955: 1954: 1949: 1944: 1938: 1935: 1934: 1929: 1927: 1926: 1919: 1912: 1904: 1898: 1897: 1886: 1885:External links 1883: 1881: 1880: 1862: 1844: 1843: 1842: 1828: 1804: 1783: 1781: 1778: 1776: 1775: 1730: 1712: 1690: 1672: 1669:, 28 June 2013 1654: 1639: 1619: 1602: 1586: 1568: 1550: 1532: 1514: 1496: 1478: 1460: 1442: 1424: 1406: 1388: 1370: 1349: 1331: 1313: 1295: 1270: 1252: 1234: 1218: 1199: 1181: 1163: 1160:, 9 March 2010 1145: 1127: 1111: 1099: 1087: 1060: 1038: 1020: 1002: 984: 979:www.nexans.com 966: 961:www.nexans.com 948: 929: 907: 891: 871: 859: 847: 835: 823: 811: 793: 777: 759: 740: 738: 735: 734: 733: 728: 723: 718: 710: 709: 695: 692:Weather portal 681: 678:England portal 666: 665: 663: 660: 654: 653:Community Fund 651: 647:levelised cost 600: 597: 579: 576: 561:jackup vessels 531:Oleg Strashnov 521:(laying), and 446:In April 2008 443: 440: 414:Salle, Norfolk 406:Weybourne Hope 358: 355: 321: 320: 319: 316: 315: 308: 305: 304: 299: 295: 294: 283: 279: 278: 274: 273: 271: 270: 266: 264: 258: 257: 255: 254: 250: 248: 242: 241: 238:Siemens Gamesa 235: 231: 230: 227: 223: 222: 219: 218: 215: 214: 210: 209: 206: 205:Site area 202: 201: 199: 198: 194: 192: 188: 187: 184: 180: 179: 176: 172: 171: 169: 168: 162: 160: 154: 153: 149: 148: 146: 145: 139: 137: 133: 132: 130: 129: 124: 119: 115: 113: 109: 108: 106: 105: 104:September 2012 101: 99: 93: 92: 89: 85: 84: 52: 48: 47: 45: 44: 43:United Kingdom 40: 38: 34: 33: 30: 29: 21: 20: 13: 10: 9: 6: 4: 3: 2: 3278: 3267: 3264: 3262: 3259: 3257: 3254: 3252: 3249: 3247: 3244: 3242: 3239: 3237: 3234: 3232: 3229: 3227: 3224: 3222: 3219: 3218: 3216: 3193: 3190: 3188: 3185: 3184: 3182: 3178: 3172: 3169: 3167: 3164: 3162: 3159: 3157: 3154: 3152: 3149: 3148: 3146: 3142: 3139: 3137: 3133: 3123: 3120: 3119: 3117: 3113: 3110: 3108: 3104: 3094: 3091: 3090: 3088: 3084: 3078: 3075: 3073: 3070: 3069: 3067: 3063: 3057: 3054: 3053: 3051: 3047: 3044: 3042: 3038: 3028: 3025: 3024: 3022: 3018: 3012: 3009: 3008: 3006: 3002: 2999: 2997: 2993: 2989: 2979: 2978:King's Lynn B 2976: 2975: 2973: 2969: 2963: 2960: 2959: 2957: 2953: 2947: 2944: 2942: 2939: 2937: 2934: 2932: 2929: 2927: 2924: 2922: 2919: 2918: 2916: 2912: 2909: 2907: 2903: 2892: 2889: 2888: 2886: 2882: 2876: 2875:West Thurrock 2873: 2871: 2868: 2866: 2863: 2861: 2858: 2856: 2853: 2851: 2848: 2846: 2843: 2841: 2838: 2836: 2833: 2831: 2828: 2827: 2825: 2821: 2818: 2816: 2812: 2802: 2801:Tilbury Docks 2799: 2797: 2794: 2793: 2791: 2787: 2781: 2778: 2776: 2773: 2772: 2770: 2766: 2763: 2761: 2757: 2754: 2752: 2748: 2743: 2733: 2730: 2728: 2725: 2723: 2720: 2719: 2717: 2713: 2709: 2705: 2698: 2693: 2691: 2686: 2684: 2679: 2678: 2675: 2663: 2662: 2653: 2651: 2650: 2641: 2639: 2638: 2633: 2627: 2626: 2623: 2617: 2614: 2612: 2609: 2607: 2604: 2603: 2601: 2597: 2591: 2590: 2589:MPI Discovery 2586: 2584: 2583: 2579: 2577: 2576: 2575:MPI Adventure 2572: 2571: 2569: 2567: 2563: 2553: 2550: 2548: 2545: 2543: 2540: 2538: 2537:Docking Shoal 2535: 2533: 2530: 2528: 2525: 2524: 2522: 2518: 2512: 2509: 2507: 2504: 2502: 2499: 2497: 2494: 2492: 2489: 2487: 2484: 2482: 2479: 2478: 2476: 2472: 2466: 2463: 2461: 2458: 2456: 2453: 2451: 2448: 2446: 2443: 2441: 2438: 2436: 2433: 2431: 2428: 2426: 2423: 2421: 2418: 2416: 2413: 2411: 2408: 2406: 2403: 2401: 2398: 2396: 2393: 2391: 2388: 2386: 2383: 2381: 2378: 2376: 2375:Kentish Flats 2373: 2371: 2368: 2366: 2363: 2361: 2358: 2356: 2353: 2351: 2348: 2346: 2343: 2341: 2338: 2336: 2333: 2331: 2328: 2326: 2323: 2321: 2318: 2317: 2315: 2311: 2308: 2306: 2302: 2292: 2289: 2287: 2284: 2283: 2281: 2277: 2271: 2268: 2266: 2263: 2261: 2258: 2256: 2253: 2251: 2248: 2246: 2245:Slieve Rushen 2243: 2241: 2238: 2236: 2233: 2231: 2228: 2226: 2223: 2221: 2218: 2216: 2215:Moel Maelogan 2213: 2211: 2210:Milton Keynes 2208: 2206: 2203: 2201: 2198: 2196: 2193: 2191: 2188: 2186: 2183: 2181: 2180:Holmside Hall 2178: 2176: 2173: 2171: 2168: 2166: 2163: 2161: 2158: 2156: 2153: 2151: 2148: 2146: 2143: 2141: 2138: 2136: 2133: 2131: 2128: 2126: 2123: 2121: 2118: 2116: 2113: 2111: 2108: 2106: 2103: 2101: 2100:Carland Cross 2098: 2096: 2093: 2091: 2088: 2086: 2083: 2081: 2080:Blyth Harbour 2078: 2076: 2073: 2071: 2068: 2066: 2063: 2061: 2058: 2056: 2053: 2051: 2048: 2046: 2043: 2042: 2040: 2036: 2033: 2031: 2027: 2021: 2020:ScottishPower 2018: 2016: 2013: 2011: 2008: 2006: 2003: 2001: 1998: 1996: 1993: 1991: 1990:REG WindPower 1988: 1986: 1983: 1981: 1978: 1976: 1973: 1971: 1968: 1967: 1965: 1963: 1959: 1953: 1950: 1948: 1945: 1943: 1940: 1939: 1936: 1932: 1925: 1920: 1918: 1913: 1911: 1906: 1905: 1902: 1894: 1889: 1888: 1884: 1871: 1867: 1863: 1853: 1849: 1845: 1836: 1835: 1829: 1826:, Scira, 2006 1822: 1821: 1816: 1815: 1813: 1809: 1805: 1795: 1791: 1790: 1785: 1784: 1779: 1771: 1767: 1762: 1757: 1753: 1749: 1745: 1741: 1740:Energy Policy 1734: 1731: 1726: 1722: 1716: 1713: 1700: 1694: 1691: 1686: 1682: 1676: 1673: 1668: 1664: 1658: 1655: 1651: 1646: 1644: 1640: 1635: 1631: 1630: 1623: 1620: 1615: 1614: 1606: 1603: 1598: 1597: 1590: 1587: 1582: 1578: 1572: 1569: 1564: 1560: 1554: 1551: 1546: 1542: 1536: 1533: 1528: 1524: 1518: 1515: 1510: 1506: 1500: 1497: 1492: 1488: 1482: 1479: 1474: 1470: 1464: 1461: 1456: 1452: 1446: 1443: 1438: 1434: 1428: 1425: 1420: 1416: 1410: 1407: 1402: 1398: 1392: 1389: 1384: 1380: 1374: 1371: 1366: 1362: 1356: 1354: 1350: 1345: 1341: 1335: 1332: 1327: 1323: 1317: 1314: 1309: 1305: 1299: 1296: 1291: 1287: 1283: 1277: 1275: 1271: 1266: 1262: 1256: 1253: 1248: 1244: 1238: 1235: 1230: 1229: 1222: 1219: 1214: 1210: 1203: 1200: 1195: 1191: 1185: 1182: 1177: 1173: 1167: 1164: 1159: 1155: 1149: 1146: 1141: 1137: 1131: 1128: 1123: 1122: 1115: 1112: 1108: 1103: 1100: 1096: 1091: 1088: 1077: 1073: 1067: 1065: 1061: 1050: 1049: 1042: 1039: 1035:, 2 June 2009 1034: 1030: 1024: 1021: 1016: 1012: 1006: 1003: 999: 995: 988: 985: 980: 976: 970: 967: 962: 958: 952: 949: 941: 940: 933: 930: 926:on 2016-02-17 925: 921: 917: 911: 908: 903: 902: 895: 892: 884: 883: 875: 872: 868: 863: 860: 856: 851: 848: 844: 839: 836: 832: 827: 824: 820: 815: 812: 808:, 1 July 2006 807: 803: 797: 794: 789: 788: 781: 778: 773: 772:www.eeegr.com 769: 763: 760: 755: 751: 745: 742: 736: 732: 729: 727: 724: 722: 719: 717: 714: 713: 707: 701: 696: 693: 687: 682: 679: 668: 661: 659: 652: 650: 648: 643: 641: 637: 633: 629: 624: 622: 621:Wells Harbour 618: 614: 605: 598: 596: 594: 590: 585: 584:Wells Harbour 577: 575: 573: 569: 568:GMS Endeavour 565: 562: 558: 557:Master Marine 554: 549: 547: 546:Toisa Warrior 543: 538: 536: 535:Master Marine 532: 526: 525:(trenching). 524: 520: 516: 511: 508: 504: 498: 496: 492: 488: 484: 480: 476: 472: 468: 464: 459: 457: 453: 449: 441: 439: 436: 431: 429: 425: 420: 417: 415: 411: 410:National Grid 407: 403: 398: 394: 389: 387: 382: 380: 376: 372: 368: 364: 356: 354: 352: 347: 345: 341: 337: 333: 329: 312: 306: 303: 300: 296: 292: 284: 280: 275: 268: 267: 265: 263: 259: 252: 251: 249: 247: 243: 239: 236: 233: 232: 228: 225: 224: 220: 216: 211: 207: 203: 196: 195: 193: 189: 185: 181: 177: 173: 167: 164: 163: 161: 159: 155: 150: 144: 141: 140: 138: 134: 128: 125: 123: 120: 117: 116: 114: 110: 103: 102: 100: 98: 94: 90: 86: 81: 53: 49: 42: 41: 39: 35: 31: 27: 22: 17: 3170: 3166:Scroby Sands 3027:Peterborough 2992:Incinerators 2941:Peterborough 2893:(clean coal) 2855:Peterborough 2796:Peterborough 2660: 2647: 2628: 2588: 2581: 2574: 2542:First Flight 2532:Celtic Array 2511:Triton Knoll 2439: 2430:Scroby Sands 2385:London Array 2225:Ovenden Moor 2195:Langley Park 2175:Hadyard Hill 1873:, retrieved 1869: 1855:, retrieved 1851: 1833: 1819: 1811: 1797:, retrieved 1788: 1743: 1739: 1733: 1724: 1715: 1703:. Retrieved 1693: 1684: 1675: 1666: 1657: 1634:the original 1628: 1622: 1612: 1605: 1595: 1589: 1580: 1571: 1562: 1553: 1544: 1535: 1526: 1517: 1508: 1499: 1490: 1481: 1472: 1463: 1454: 1445: 1436: 1427: 1418: 1409: 1400: 1391: 1382: 1373: 1364: 1343: 1334: 1325: 1316: 1307: 1298: 1290:the original 1285: 1264: 1255: 1246: 1237: 1227: 1221: 1212: 1202: 1193: 1184: 1175: 1166: 1157: 1148: 1139: 1130: 1120: 1114: 1102: 1090: 1079:, retrieved 1075: 1052:, retrieved 1047: 1041: 1032: 1023: 1014: 1005: 997: 987: 978: 969: 960: 951: 938: 932: 924:the original 919: 910: 900: 894: 881: 874: 862: 850: 838: 826: 814: 805: 796: 786: 780: 771: 762: 753: 744: 656: 644: 625: 610: 581: 571: 567: 563: 550: 545: 541: 539: 530: 527: 523:VOS Sympathy 522: 518: 514: 512: 502: 499: 460: 445: 442:Construction 432: 421: 418: 390: 383: 370: 363:Crown Estate 361:In 2004 the 360: 348: 327: 326: 2931:King's Lynn 2547:Navitus Bay 2486:East Anglia 2481:Dogger Bank 2400:North Hoyle 2360:Gwynt y Môr 2255:West Durham 2190:Knabs Ridge 2185:Kilgallioch 2155:Fraisthorpe 2135:Crystal Rig 2120:Coal Clough 2095:Burton Wold 1875:16 February 1857:16 February 1799:16 February 1705:9 September 1581:scira.co.uk 1563:scira.co.uk 1545:scira.co.uk 1527:scira.co.uk 1509:scira.co.uk 1491:scira.co.uk 1473:scira.co.uk 1455:scira.co.uk 1437:scira.co.uk 1419:scira.co.uk 1401:scira.co.uk 1383:scira.co.uk 1365:scira.co.uk 1344:scira.co.uk 1326:scira.co.uk 1265:scira.co.uk 1247:scira.co.uk 1215:(in Danish) 1194:scira.co.uk 1176:scira.co.uk 1140:scira.co.uk 1081:16 February 1054:16 February 1015:tdworld.com 481:(topside), 467:MT Højgaard 375:Econcern BV 253:317 MW 136:Operator(s) 91:Operational 75: / 51:Coordinates 3221:Sheringham 3215:Categories 3151:Blood Hill 3093:Sizewell C 3077:Sizewell A 3056:Sizewell B 2962:Letchworth 2835:Goldington 2830:Cliff Quay 2780:Wissington 2552:Shell Flat 2496:Moray East 2425:Robin Rigg 2420:Rhyl Flats 2335:Burbo Bank 2240:Scout Moor 2230:Pates Hill 2220:Out Newton 2130:Conisholme 2110:Cefn Croes 2075:Blood Hill 1970:Ecotricity 1761:10059/3298 1725:renews.biz 456:Wood Group 393:Sheringham 377:. In 2005 60:53°07′00″N 3256:Statkraft 3122:Tilbury A 2946:Rye House 2865:Tilbury B 2860:Rye House 2715:Companies 2520:Cancelled 2410:Race Bank 2286:Den Brook 2235:Royd Moor 2200:Lindhurst 2070:Black Law 2055:Arecleoch 2050:Ardrossan 2045:Alltwalis 1962:Companies 1770:158158724 1746:: 25–35. 1701:. Statoil 833:, §2.4.2. 821:, §1.3.2. 636:Statkraft 599:Operation 542:Team Oman 519:Team Oman 487:Sif Group 471:Sif Group 424:Statkraft 397:sand bank 344:Statkraft 336:North Sea 63:1°08′00″E 3180:Proposed 3086:Proposed 3072:Bradwell 3011:Thetford 2884:Proposed 2649:Category 2474:Proposed 2445:Teesside 2435:Seagreen 2325:Beatrice 2279:Proposed 2265:Whitelee 2260:Westmill 2145:Delabole 2140:Dagenham 662:See also 617:Ed Davey 564:Sea Jack 491:Smulders 475:Smulders 422:In 2009 166:Offshore 112:Owner(s) 3241:Equinor 3187:Dudgeon 3041:Nuclear 2921:Coryton 2891:Tilbury 2870:Watford 2850:Norwich 2760:Biomass 2706:in the 2661:Commons 2491:Hornsea 2415:Rampion 2405:Ormonde 2340:Dudgeon 1975:Equinor 1840:, Scira 1780:Sources 1076:mth.com 855:ES 2006 843:ES 2006 831:ES 2006 819:ES 2006 495:Siemens 479:Heerema 463:Ramboll 357:History 340:Equinor 298:Commons 282:Website 143:Equinor 122:Equinor 118:Equitix 37:Country 3144:Active 3115:Closed 3065:Closed 3049:Active 3020:Future 3004:Active 2971:Future 2955:Closed 2914:Active 2823:Closed 2789:Future 2768:Active 2455:Walney 2450:Thanet 2395:Methil 2320:Barrow 2313:Active 2291:Viking 2160:Garves 2038:Active 2015:Vestas 1985:Ørsted 1980:Innogy 1768:  1213:ing.dk 589:Egmere 503:Svanen 448:Nexans 342:) and 88:Status 2996:waste 2775:Elean 2599:Other 2380:Lincs 2330:Blyth 2115:Clyde 2105:Carno 1838:(PDF) 1824:(PDF) 1766:S2CID 943:(PDF) 886:(PDF) 452:Areva 379:Hydro 330:is a 309:[ 3136:Wind 2815:Coal 2150:Farr 1877:2016 1859:2016 1801:2016 1794:LORC 1707:2016 1107:Lorc 1095:Lorc 1083:2016 1056:2016 566:and 489:and 473:and 158:Type 3107:Oil 2906:Gas 1995:RWE 1756:hdl 1748:doi 1744:128 334:in 291:.uk 289:.co 3217:: 1868:, 1850:, 1810:, 1792:, 1764:. 1754:. 1742:. 1723:, 1683:, 1665:, 1642:^ 1579:, 1561:, 1543:, 1525:, 1507:, 1489:, 1471:, 1453:, 1435:, 1417:, 1399:, 1381:, 1363:, 1352:^ 1342:, 1324:, 1306:, 1284:, 1273:^ 1263:, 1245:, 1192:, 1174:, 1156:, 1138:, 1074:, 1063:^ 1031:, 1013:, 996:, 977:, 959:, 918:, 804:, 770:, 752:, 642:. 630:, 458:. 2994:/ 2696:e 2689:t 2682:v 1923:e 1916:t 1909:v 1772:. 1758:: 1750:: 1709:. 1652:. 313:]

Index


53°07′00″N 1°08′00″E / 53.1167°N 1.1333°E / 53.1167; 1.1333
Commission date
Equinor
Green Investment Group
Equinor
Type
Offshore
Siemens Gamesa
Nameplate capacity
Annual net output
sheringhamshoal.co.uk
Related media on Commons
edit on Wikidata
Round 2 wind farm
North Sea
Equinor
Statkraft
Siemens Wind Power
Crown Estate
Round 2 wind farm
Econcern BV
Hydro
Department of Trade and Industry
Sheringham
sand bank
Muckleburgh Collection
Weybourne Hope
National Grid
Salle, Norfolk

Text is available under the Creative Commons Attribution-ShareAlike License. Additional terms may apply.