337:
to the driving lanes and bend mid-way. The upper portion of the pylon anchors the back-stay cables as well as the main-span cables and the self-weight of the pylon balances out the self-weight of the superstructure through the eccentric location of its center of gravity with respect to the pivot point of the pylon footing, reducing the load on back-stay cables which are fewer in number converged from the main-span cables. The bridge is 675 meters long and 35.2 meters wide. Built on the Yamuna river, this bridge connects east Delhi to
Wazirabad. Tourists can be transported to the top of the main pillar, which is 154 m high, from where distant views of North Delhi can be seen.
295:
33:
336:
in which cables are in a combination of radial and semi-harp arrangement; cables are spaced apart on the pylon, like the harp design, but connected to one point or a number of closely spaced points on the deck. The dynamically shaped pylon consists of 2 inclined columns, which are rigidly connected
315:
was financially restricted and it was very difficult for it to fund the extra rising budget. Work finally started in 2010. A fresh deadline of end 2016 was set in 2013. The bridge was finally inaugurated on 4 November 2018 by the then Chief
Minister of Delhi
310:
finalised the draft plan for this bridge. However, construction of the bridge was delayed due to multiple reasons, mainly lack of manpower and financial difficulties. When the project started, its final cost was Rs. 1518.37 crore The
453:
306:
bridge when their bus plunged into the river. Since then, the Delhi government had plans to build another parallel wide bridge nearby to alleviate traffic congestion. By the end of 1998, the
118:
633:
506:
467:
484:
584:
770:
406:
207:
286:
with its 154-metre high viewing box, which acts as selfie points for visitors. It shortens the travel time between north and northeast Delhi.
617:
531:
329:
259:
134:
760:
431:
43:
342:
197:
50:
609:
International
Conference on Suspension, Cable Supported, and Cable Stayed Bridges: November 19–21, 1999, Hyderabad
765:
657:
690:
606:
T.K. Bandyopadhyay; Alok
Baishya (2000). P. Dayaratnam; G.P. Garg; G.V. Ratnam; R.N. Raghavan (eds.).
294:
333:
312:
307:
275:
613:
607:
570:
267:
317:
32:
282:
of the
Signature bridge is the tallest structure in Delhi and is double the height of
754:
468:"As Delhi's Signature Bridge opens, rush to ease on Ring Road and National Highway-9"
202:
716:
348:
220:
454:"154-metre high viewing box, selfie points: Delhi's Signature Bridge opens today"
634:"'Delhi's Eiffel Tower': Signature Bridge inaugurated, opens to public tomorrow"
283:
271:
65:
52:
303:
263:
86:
373:
Total length of bridge: 675 m (incl. 100 m west extension)
585:"Delhi's Signature Bridge To Have Selfie Spots, Glass Viewing Deck"
293:
279:
100:
96:
485:"নজির গড়ে দেশের বুকে তৈরি হচ্ছে প্রথম 'অ্যাসমিট্রিক্যাল' ব্রিজ"
507:"More funds for Signature Bridge may help it meet latest dead"
302:
In 1997, 28 school students died in an accident on the narrow
352:
745:
364:
Total length of infrastructure project: 6 km (approx.)
432:"Signature Bridge To Be Ready By October: Arvind Kejriwal"
200:, Tensa India, Construma Consultancy (Structural Design)
119:
Delhi
Tourism and Transportation Development Corporation
243:
235:
227:
214:
193:
185:
180:
172:
164:
156:
148:
140:
130:
125:
114:
106:
92:
81:
42:
23:
532:"Delhi government clears signature bridge project"
526:
524:
651:
649:
647:
645:
643:
612:. Universities Press (India). pp. 282, 373.
189:Ratan J. Batliboi - Architects Pvt Ltd, Mumbai
37:The Signature Bridge during construction phase
479:
477:
8:
20:
746:Department of Delhi Transport Corporation
407:"New deadline, Signature Bridge style..."
361:Height of pylon: 165 m above ground
534:. www.theweekendleader.com. 6 July 2018
398:
691:"Tensa India Signature Bridge details"
426:
424:
266:river at Shourya section, connecting
7:
223:, Tensa India and Construtora Cidade
665:Steel Structure an dmetal buildings
565:
563:
561:
559:
557:
555:
553:
551:
549:
330:Cantilever spar cable-stayed bridge
274:. It is India's first asymmetrical
260:cantilever spar cable-stayed bridge
135:Cantilever spar cable-stayed bridge
717:"Project India Cidade Construdora"
379:Structural steel pylon: 5800 tonne
14:
382:Structural steel deck: 7400 tonne
31:
487:. kolkata24x7.com. 6 July 2018
1:
771:Cable-stayed bridges in India
509:. Times of India. 7 July 2018
347:Contractor: Joint venture of
658:"Cover Story: Yamuna Bridge"
571:"Yamuna Bridge at Wazirabad"
370:Deck surface: 25,000 m
434:. www.ndtv.com. 6 July 2018
409:Times of India. 4 July 2018
343:Schlaich Bergermann Partner
198:Schlaich Bergermann Partner
787:
388:Closed foundation: 16 nos.
320:after a number of delays.
152:675 metres (2,215 ft)
761:Bridges over Yamuna River
248:
160:35.2 metres (115 ft)
30:
656:Gammon (February 2011).
355:& Construtora Cidade
341:Structural Design Firm:
298:The old wazirabad bridge
176:251 metres (823 ft)
168:165 metres (541 ft)
587:. NDTV. 3 November 2018
385:Open foundation: 6 nos.
358:Main span: 251 m
299:
290:Background and History
18:Bridge in Delhi, India
376:Side spans: 36 m
297:
194:Engineering design by
723:. Cidade Construdora
334:Cable-stayed bridge
276:cable-stayed bridge
205:(Wind Tunnel Study)
66:28.7053°N 77.2340°E
62: /
300:
228:Construction start
144:Steel and Concrete
619:978-81-7371-271-5
252:
251:
778:
766:Bridges in Delhi
733:
732:
730:
728:
713:
707:
706:
704:
702:
687:
681:
680:
678:
676:
662:
653:
638:
637:
630:
624:
623:
603:
597:
596:
594:
592:
581:
575:
574:
567:
544:
543:
541:
539:
528:
519:
518:
516:
514:
503:
497:
496:
494:
492:
481:
472:
471:
464:
458:
457:
450:
444:
443:
441:
439:
428:
419:
418:
416:
414:
403:
328:The bridge is a
313:Delhi government
308:Delhi government
262:which spans the
256:Signature Bridge
239:4 November 2018
217:
210:(Seismic Design)
110:Signature Bridge
77:
76:
74:
73:
72:
71:28.7053; 77.2340
67:
63:
60:
59:
58:
55:
35:
25:Signature Bridge
21:
786:
785:
781:
780:
779:
777:
776:
775:
751:
750:
742:
737:
736:
726:
724:
715:
714:
710:
700:
698:
689:
688:
684:
674:
672:
660:
655:
654:
641:
632:
631:
627:
620:
605:
604:
600:
590:
588:
583:
582:
578:
569:
568:
547:
537:
535:
530:
529:
522:
512:
510:
505:
504:
500:
490:
488:
483:
482:
475:
466:
465:
461:
452:
451:
447:
437:
435:
430:
429:
422:
412:
410:
405:
404:
400:
395:
326:
318:Arvind Kejriwal
292:
215:
206:
201:
126:Characteristics
70:
68:
64:
61:
56:
53:
51:
49:
48:
38:
26:
19:
12:
11:
5:
784:
782:
774:
773:
768:
763:
753:
752:
749:
748:
741:
740:External links
738:
735:
734:
721:ccidade.com.br
708:
695:tensaindia.com
682:
639:
625:
618:
598:
576:
573:. 6 July 2018.
545:
520:
498:
473:
459:
445:
420:
397:
396:
394:
391:
390:
389:
386:
383:
380:
377:
374:
371:
368:
365:
362:
359:
356:
345:
325:
322:
291:
288:
250:
249:
246:
245:
241:
240:
237:
233:
232:
229:
225:
224:
218:
216:Constructed by
212:
211:
195:
191:
190:
187:
183:
182:
178:
177:
174:
170:
169:
166:
162:
161:
158:
154:
153:
150:
146:
145:
142:
138:
137:
132:
128:
127:
123:
122:
116:
112:
111:
108:
104:
103:
94:
90:
89:
83:
79:
78:
46:
40:
39:
36:
28:
27:
24:
17:
13:
10:
9:
6:
4:
3:
2:
783:
772:
769:
767:
764:
762:
759:
758:
756:
747:
744:
743:
739:
722:
718:
712:
709:
697:. Tensa India
696:
692:
686:
683:
670:
666:
659:
652:
650:
648:
646:
644:
640:
635:
629:
626:
621:
615:
611:
610:
602:
599:
586:
580:
577:
572:
566:
564:
562:
560:
558:
556:
554:
552:
550:
546:
533:
527:
525:
521:
508:
502:
499:
486:
480:
478:
474:
469:
463:
460:
455:
449:
446:
433:
427:
425:
421:
408:
402:
399:
392:
387:
384:
381:
378:
375:
372:
369:
366:
363:
360:
357:
354:
350:
346:
344:
340:
339:
338:
335:
331:
323:
321:
319:
314:
309:
305:
296:
289:
287:
285:
281:
277:
273:
269:
265:
261:
257:
247:
242:
238:
234:
230:
226:
222:
219:
213:
209:
204:
203:Wacker Neuson
199:
196:
192:
188:
184:
179:
175:
171:
167:
163:
159:
155:
151:
147:
143:
139:
136:
133:
129:
124:
120:
117:
115:Maintained by
113:
109:
107:Official name
105:
102:
98:
95:
91:
88:
84:
80:
75:
47:
45:
41:
34:
29:
22:
16:
725:. Retrieved
720:
711:
699:. Retrieved
694:
685:
673:. Retrieved
668:
664:
628:
608:
601:
589:. Retrieved
579:
536:. Retrieved
511:. Retrieved
501:
489:. Retrieved
462:
448:
436:. Retrieved
411:. Retrieved
401:
367:Lanes: 2 x 4
349:Gammon India
332:, a type of
327:
301:
255:
253:
221:Gammon India
173:Longest span
149:Total length
15:
353:Tensa India
284:Qutub Minar
208:IIT Roorkee
69: /
44:Coordinates
755:Categories
727:4 November
701:4 November
675:4 November
591:4 November
393:References
272:East Delhi
57:77°14′02″E
54:28°42′19″N
304:Wazirabad
268:Wazirabad
186:Architect
244:Location
141:Material
324:Details
181:History
121:(DTTDC)
82:Crosses
671:(4): 7
616:
538:7 July
513:7 July
491:6 July
438:6 July
413:7 July
278:. The
264:Yamuna
236:Opened
165:Height
131:Design
93:Locale
87:Yamuna
85:River
661:(PDF)
280:pylon
258:is a
157:Width
101:India
97:Delhi
729:2018
703:2018
677:2018
614:ISBN
593:2018
540:2018
515:2018
493:2018
440:2018
415:2018
254:The
231:2010
270:to
757::
719:.
693:.
667:.
663:.
642:^
548:^
523:^
476:^
423:^
351:,
99:,
731:.
705:.
679:.
669:1
636:.
622:.
595:.
542:.
517:.
495:.
470:.
456:.
442:.
417:.
Text is available under the Creative Commons Attribution-ShareAlike License. Additional terms may apply.