337:
to the driving lanes and bend mid-way. The upper portion of the pylon anchors the back-stay cables as well as the main-span cables and the self-weight of the pylon balances out the self-weight of the superstructure through the eccentric location of its center of gravity with respect to the pivot point of the pylon footing, reducing the load on back-stay cables which are fewer in number converged from the main-span cables. The bridge is 675 meters long and 35.2 meters wide. Built on the Yamuna river, this bridge connects east Delhi to Wazirabad. Tourists can be transported to the top of the main pillar, which is 154 m high, from where distant views of North Delhi can be seen.
295: 33: 336:
in which cables are in a combination of radial and semi-harp arrangement; cables are spaced apart on the pylon, like the harp design, but connected to one point or a number of closely spaced points on the deck. The dynamically shaped pylon consists of 2 inclined columns, which are rigidly connected
315:
was financially restricted and it was very difficult for it to fund the extra rising budget. Work finally started in 2010. A fresh deadline of end 2016 was set in 2013. The bridge was finally inaugurated on 4 November 2018 by the then Chief Minister of Delhi
310:
finalised the draft plan for this bridge. However, construction of the bridge was delayed due to multiple reasons, mainly lack of manpower and financial difficulties. When the project started, its final cost was Rs. 1518.37 crore The
453: 306:
bridge when their bus plunged into the river. Since then, the Delhi government had plans to build another parallel wide bridge nearby to alleviate traffic congestion. By the end of 1998, the
118: 633: 506: 467: 484: 584: 770: 406: 207: 286:
with its 154-metre high viewing box, which acts as selfie points for visitors. It shortens the travel time between north and northeast Delhi.
617: 531: 329: 259: 134: 760: 431: 43: 342: 197: 50: 609:
International Conference on Suspension, Cable Supported, and Cable Stayed Bridges: November 19–21, 1999, Hyderabad
765: 657: 690: 606:
T.K. Bandyopadhyay; Alok Baishya (2000). P. Dayaratnam; G.P. Garg; G.V. Ratnam; R.N. Raghavan (eds.).
294: 333: 312: 307: 275: 613: 607: 570: 267: 317: 32: 282:
of the Signature bridge is the tallest structure in Delhi and is double the height of
754: 468:"As Delhi's Signature Bridge opens, rush to ease on Ring Road and National Highway-9" 202: 716: 348: 220: 454:"154-metre high viewing box, selfie points: Delhi's Signature Bridge opens today" 634:"'Delhi's Eiffel Tower': Signature Bridge inaugurated, opens to public tomorrow" 283: 271: 65: 52: 303: 263: 86: 373:
Total length of bridge: 675 m (incl. 100 m west extension)
585:"Delhi's Signature Bridge To Have Selfie Spots, Glass Viewing Deck" 293: 279: 100: 96: 485:"নজির গড়ে দেশের বুকে তৈরি হচ্ছে প্রথম 'অ্যাসমিট্রিক্যাল' ব্রিজ" 507:"More funds for Signature Bridge may help it meet latest dead" 302:
In 1997, 28 school students died in an accident on the narrow
352: 745: 364:
Total length of infrastructure project: 6 km (approx.)
432:"Signature Bridge To Be Ready By October: Arvind Kejriwal" 200:, Tensa India, Construma Consultancy (Structural Design) 119:
Delhi Tourism and Transportation Development Corporation
243: 235: 227: 214: 193: 185: 180: 172: 164: 156: 148: 140: 130: 125: 114: 106: 92: 81: 42: 23: 532:"Delhi government clears signature bridge project" 526: 524: 651: 649: 647: 645: 643: 612:. Universities Press (India). pp. 282, 373. 189:Ratan J. Batliboi - Architects Pvt Ltd, Mumbai 37:The Signature Bridge during construction phase 479: 477: 8: 20: 746:Department of Delhi Transport Corporation 407:"New deadline, Signature Bridge style..." 361:Height of pylon: 165 m above ground 534:. www.theweekendleader.com. 6 July 2018 398: 691:"Tensa India Signature Bridge details" 426: 424: 266:river at Shourya section, connecting 7: 223:, Tensa India and Construtora Cidade 665:Steel Structure an dmetal buildings 565: 563: 561: 559: 557: 555: 553: 551: 549: 330:Cantilever spar cable-stayed bridge 274:. It is India's first asymmetrical 260:cantilever spar cable-stayed bridge 135:Cantilever spar cable-stayed bridge 717:"Project India Cidade Construdora" 379:Structural steel pylon: 5800 tonne 14: 382:Structural steel deck: 7400 tonne 31: 487:. kolkata24x7.com. 6 July 2018 1: 771:Cable-stayed bridges in India 509:. Times of India. 7 July 2018 347:Contractor: Joint venture of 658:"Cover Story: Yamuna Bridge" 571:"Yamuna Bridge at Wazirabad" 370:Deck surface: 25,000 m 434:. www.ndtv.com. 6 July 2018 409:Times of India. 4 July 2018 343:Schlaich Bergermann Partner 198:Schlaich Bergermann Partner 787: 388:Closed foundation: 16 nos. 320:after a number of delays. 152:675 metres (2,215 ft) 761:Bridges over Yamuna River 248: 160:35.2 metres (115 ft) 30: 656:Gammon (February 2011). 355:& Construtora Cidade 341:Structural Design Firm: 298:The old wazirabad bridge 176:251 metres (823 ft) 168:165 metres (541 ft) 587:. NDTV. 3 November 2018 385:Open foundation: 6 nos. 358:Main span: 251 m 299: 290:Background and History 18:Bridge in Delhi, India 376:Side spans: 36 m 297: 194:Engineering design by 723:. Cidade Construdora 334:Cable-stayed bridge 276:cable-stayed bridge 205:(Wind Tunnel Study) 66:28.7053°N 77.2340°E 62: /  300: 228:Construction start 144:Steel and Concrete 619:978-81-7371-271-5 252: 251: 778: 766:Bridges in Delhi 733: 732: 730: 728: 713: 707: 706: 704: 702: 687: 681: 680: 678: 676: 662: 653: 638: 637: 630: 624: 623: 603: 597: 596: 594: 592: 581: 575: 574: 567: 544: 543: 541: 539: 528: 519: 518: 516: 514: 503: 497: 496: 494: 492: 481: 472: 471: 464: 458: 457: 450: 444: 443: 441: 439: 428: 419: 418: 416: 414: 403: 328:The bridge is a 313:Delhi government 308:Delhi government 262:which spans the 256:Signature Bridge 239:4 November 2018 217: 210:(Seismic Design) 110:Signature Bridge 77: 76: 74: 73: 72: 71:28.7053; 77.2340 67: 63: 60: 59: 58: 55: 35: 25:Signature Bridge 21: 786: 785: 781: 780: 779: 777: 776: 775: 751: 750: 742: 737: 736: 726: 724: 715: 714: 710: 700: 698: 689: 688: 684: 674: 672: 660: 655: 654: 641: 632: 631: 627: 620: 605: 604: 600: 590: 588: 583: 582: 578: 569: 568: 547: 537: 535: 530: 529: 522: 512: 510: 505: 504: 500: 490: 488: 483: 482: 475: 466: 465: 461: 452: 451: 447: 437: 435: 430: 429: 422: 412: 410: 405: 404: 400: 395: 326: 318:Arvind Kejriwal 292: 215: 206: 201: 126:Characteristics 70: 68: 64: 61: 56: 53: 51: 49: 48: 38: 26: 19: 12: 11: 5: 784: 782: 774: 773: 768: 763: 753: 752: 749: 748: 741: 740:External links 738: 735: 734: 721:ccidade.com.br 708: 695:tensaindia.com 682: 639: 625: 618: 598: 576: 573:. 6 July 2018. 545: 520: 498: 473: 459: 445: 420: 397: 396: 394: 391: 390: 389: 386: 383: 380: 377: 374: 371: 368: 365: 362: 359: 356: 345: 325: 322: 291: 288: 250: 249: 246: 245: 241: 240: 237: 233: 232: 229: 225: 224: 218: 216:Constructed by 212: 211: 195: 191: 190: 187: 183: 182: 178: 177: 174: 170: 169: 166: 162: 161: 158: 154: 153: 150: 146: 145: 142: 138: 137: 132: 128: 127: 123: 122: 116: 112: 111: 108: 104: 103: 94: 90: 89: 83: 79: 78: 46: 40: 39: 36: 28: 27: 24: 17: 13: 10: 9: 6: 4: 3: 2: 783: 772: 769: 767: 764: 762: 759: 758: 756: 747: 744: 743: 739: 722: 718: 712: 709: 697:. Tensa India 696: 692: 686: 683: 670: 666: 659: 652: 650: 648: 646: 644: 640: 635: 629: 626: 621: 615: 611: 610: 602: 599: 586: 580: 577: 572: 566: 564: 562: 560: 558: 556: 554: 552: 550: 546: 533: 527: 525: 521: 508: 502: 499: 486: 480: 478: 474: 469: 463: 460: 455: 449: 446: 433: 427: 425: 421: 408: 402: 399: 392: 387: 384: 381: 378: 375: 372: 369: 366: 363: 360: 357: 354: 350: 346: 344: 340: 339: 338: 335: 331: 323: 321: 319: 314: 309: 305: 296: 289: 287: 285: 281: 277: 273: 269: 265: 261: 257: 247: 242: 238: 234: 230: 226: 222: 219: 213: 209: 204: 203:Wacker Neuson 199: 196: 192: 188: 184: 179: 175: 171: 167: 163: 159: 155: 151: 147: 143: 139: 136: 133: 129: 124: 120: 117: 115:Maintained by 113: 109: 107:Official name 105: 102: 98: 95: 91: 88: 84: 80: 75: 47: 45: 41: 34: 29: 22: 16: 725:. Retrieved 720: 711: 699:. Retrieved 694: 685: 673:. Retrieved 668: 664: 628: 608: 601: 589:. Retrieved 579: 536:. Retrieved 511:. Retrieved 501: 489:. Retrieved 462: 448: 436:. Retrieved 411:. Retrieved 401: 367:Lanes: 2 x 4 349:Gammon India 332:, a type of 327: 301: 255: 253: 221:Gammon India 173:Longest span 149:Total length 15: 353:Tensa India 284:Qutub Minar 208:IIT Roorkee 69: / 44:Coordinates 755:Categories 727:4 November 701:4 November 675:4 November 591:4 November 393:References 272:East Delhi 57:77°14′02″E 54:28°42′19″N 304:Wazirabad 268:Wazirabad 186:Architect 244:Location 141:Material 324:Details 181:History 121:(DTTDC) 82:Crosses 671:(4): 7 616:  538:7 July 513:7 July 491:6 July 438:6 July 413:7 July 278:. The 264:Yamuna 236:Opened 165:Height 131:Design 93:Locale 87:Yamuna 85:River 661:(PDF) 280:pylon 258:is a 157:Width 101:India 97:Delhi 729:2018 703:2018 677:2018 614:ISBN 593:2018 540:2018 515:2018 493:2018 440:2018 415:2018 254:The 231:2010 270:to 757:: 719:. 693:. 667:. 663:. 642:^ 548:^ 523:^ 476:^ 423:^ 351:, 99:, 731:. 705:. 679:. 669:1 636:. 622:. 595:. 542:. 517:. 495:. 470:. 456:. 442:. 417:.

Index


Coordinates
28°42′19″N 77°14′02″E / 28.7053°N 77.2340°E / 28.7053; 77.2340
Yamuna
Delhi
India
Delhi Tourism and Transportation Development Corporation
Cantilever spar cable-stayed bridge
Schlaich Bergermann Partner
Wacker Neuson
IIT Roorkee
Gammon India
cantilever spar cable-stayed bridge
Yamuna
Wazirabad
East Delhi
cable-stayed bridge
pylon
Qutub Minar

Wazirabad
Delhi government
Delhi government
Arvind Kejriwal
Cantilever spar cable-stayed bridge
Cable-stayed bridge
Schlaich Bergermann Partner
Gammon India
Tensa India
"New deadline, Signature Bridge style..."