Knowledge (XXG)

Sodo–Moyale–Suswa High Voltage Power Line

Source 📝

289: 307:(CET). CET was also responsible for cross-border cabling and a 40 km (25 mi) section in Kenya, near a place called Logologo, and the converter station in Sodo. In September 2019, it was reported that CET had completed construction of the Ethiopian section of this power line. 548: 643: 502: 525: 331:, measuring 201 kilometres (125 mi). The Kinamba to Suswa section is contracted to Kalpataru Power Transmission Limited, and it measures about 237 kilometres (147 mi). A new 500 kV substation was included in the scope of work. 230:. The power generated in Ethiopia is less expensive than that generated in Kenya, and electricity imports over the interconnector were expected to lower power prices in Kenya and promote industrial growth in the country. 374:"General Procurement Notice – Federal Democratic Republic of Ethiopia and Republic of Kenya – Eastern Africa Power Interconnector – Ethiopia and Kenya Power Systems Interconnection Project – Sector - Energy" 658: 280:, approximately 600 km (373 mi) away, as the crow flies. The power line measures about 1,045 km (649 mi), of which approximately 600 km (373 mi) is in Kenya. 683: 653: 408: 258: 265:, the capital and largest city of Ethiopia. From Sodo, the power line runs in a south-easterly direction for approximately 400 km (249 mi), as the crow flies, to 688: 678: 625: 373: 648: 444: 353: 633: 124: 693: 571: 473: 418: 288: 673: 222:
The power line was constructed to enable Ethiopia to transfer surplus electricity to Kenya, for sale to the countries of the
203: 242: 120: 110: 223: 100: 449: 598: 317:
company, was contracted to build the 195 km (121 mi) section from Elboro to Logologo, in
96: 343: 227: 639:
Ethiopia–Kenya Power Systems Interconnection Project documents (including details, maps, etc.):
324: 310: 413: 296: 478: 348: 328: 318: 234: 277: 667: 474:"Electricity grid takes shapes as countries erect transmission lines across borders" 303:
The contractor for the 457 km (284 mi) of power line inside Ethiopia was
254: 237: 126 billion (approximately US$ 1.26 billion). Funding was sourced from the 262: 292: 238: 649:
Resettlement Action Plan (RAP) Final Report – Ethiopia section, January 2012
572:"Ethiopia: CET opens electricity transmission line linking country to Kenya" 654:
Resettlement Action Plan (RAP) Final Report – Kenya section, February 2012
207: 67: 41: 272:
From Moyale, the power line follows a south-westerly course to end near
644:
Environmental and Social Impact Assessment (ESIA) Summary, August 2011
327:
was responsible for building the section from Logologo to Kinamba in
266: 549:"Distance between Moyale, Kenya and Ketraco Suswa Substation, Kenya" 314: 287: 273: 211: 81: 77: 45: 199: 63: 634:"HVDC link Kenya–Ethiopia – Ground Electrodes Site Selection" 503:"Distance between Addis Ababa, Ethiopia and Sodo, Ethiopia" 261:, about 313 kilometres (194 mi) by road south-west of 334:
The interconnector was put into service in November 2022.
526:"Distance between Sodo, Ethiopia and Moyale, Ethiopia" 445:"Uhuru in deal to speed up Ethiopia-Kenya power line" 599:"1,045km Ethiopia-Kenya Electricity Line Goes Live" 259:
Southern Nations, Nationalities, and Peoples Region
180: 172: 164: 156: 148: 143: 135: 130: 116: 106: 92: 87: 73: 59: 51: 37: 32: 20: 253:The power line starts at Sodo (Wolayta-Sodo), in 27:Map of Sodo–Moyale–Suswa High Voltage Power Line 632:Paulo Edmundo da Fonseca Freire et al. (2015): 409:"Power line to reduce costs by seven shillings" 206:electricity power transmission line connecting 305:China Electric Power Equipment and Technology 8: 684:High-voltage transmission lines in Ethiopia 299:of the line during construction in Ethiopia 354:Loiyangalani-Suswa High Voltage Power Line 269:, at the international border with Kenya. 570:Jean Marie Takouleu (26 September 2019). 192:Sodo–Moyale–Suswa High Voltage Power Line 21:Sodo–Moyale–Suswa High Voltage Power Line 689:High-voltage transmission lines in Kenya 679:Proposed energy infrastructure in Africa 659:Project Appraisal Report, September 2012 438: 436: 365: 125:Kenya Electricity Transmission Company 17: 402: 400: 398: 396: 394: 214:. It was completed in November 2022. 7: 628:South Africa 2015 conference paper: 121:Ethiopian Electric Power Corporation 597:Andeso, Albert (29 November 2022). 472:Senelwa, Kennedy (23 August 2017). 196:Ethiopia–Kenya HVDC Interconnector 14: 547:Globefeed.com (14 March 2018). 524:Globefeed.com (14 March 2018). 501:Globefeed.com (14 March 2018). 407:Muhaita, Abel (2 August 2017). 1: 443:Omondi, George (8 May 2018). 233:The project was budgeted at 245:, the principal financier. 204:high-voltage direct current 168:1,045 km (649 mi) 710: 152:overhead transmission line 417:. Nairobi. Archived from 325:Larsen and Toubro Limited 311:KEC International Limited 25: 694:Ethiopia–Kenya relations 243:African Development Bank 131:Construction information 111:African Development Bank 674:HVDC transmission lines 300: 224:East African Community 101:Government of Ethiopia 450:Business Daily Africa 291: 144:Technical information 88:Ownership information 97:Government of Kenya 344:Energy in Ethiopia 301: 228:Great Lakes Region 188: 187: 52:General direction 701: 614: 613: 611: 609: 594: 588: 587: 585: 583: 567: 561: 560: 558: 556: 544: 538: 537: 535: 533: 521: 515: 514: 512: 510: 498: 492: 491: 489: 487: 469: 463: 462: 460: 458: 440: 431: 430: 428: 426: 421:on 8 August 2017 414:The Star (Kenya) 404: 389: 388: 386: 384: 378: 370: 297:bundle conductor 18: 709: 708: 704: 703: 702: 700: 699: 698: 664: 663: 623: 618: 617: 607: 605: 596: 595: 591: 581: 579: 578:. Paris, France 569: 568: 564: 554: 552: 551:. Globefeed.com 546: 545: 541: 531: 529: 528:. Globefeed.com 523: 522: 518: 508: 506: 505:. Globefeed.com 500: 499: 495: 485: 483: 479:The EastAfrican 471: 470: 466: 456: 454: 442: 441: 434: 424: 422: 406: 405: 392: 382: 380: 376: 372: 371: 367: 362: 349:Energy in Kenya 340: 329:Laikipia County 319:Marsabit County 286: 251: 220: 157:Type of current 28: 12: 11: 5: 707: 705: 697: 696: 691: 686: 681: 676: 666: 665: 662: 661: 656: 651: 646: 637: 636: 622: 621:External links 619: 616: 615: 589: 576:Afrik21.africa 562: 539: 516: 493: 464: 432: 390: 364: 363: 361: 358: 357: 356: 351: 346: 339: 336: 285: 282: 278:Kajiado County 250: 247: 219: 216: 186: 185: 182: 178: 177: 174: 170: 169: 166: 162: 161: 158: 154: 153: 150: 146: 145: 141: 140: 137: 133: 132: 128: 127: 118: 114: 113: 108: 104: 103: 94: 90: 89: 85: 84: 75: 71: 70: 61: 57: 56: 55:North to South 53: 49: 48: 39: 35: 34: 30: 29: 26: 23: 22: 13: 10: 9: 6: 4: 3: 2: 706: 695: 692: 690: 687: 685: 682: 680: 677: 675: 672: 671: 669: 660: 657: 655: 652: 650: 647: 645: 642: 641: 640: 635: 631: 630: 629: 627: 620: 604: 600: 593: 590: 577: 573: 566: 563: 550: 543: 540: 527: 520: 517: 504: 497: 494: 481: 480: 475: 468: 465: 452: 451: 446: 439: 437: 433: 420: 416: 415: 410: 403: 401: 399: 397: 395: 391: 375: 369: 366: 359: 355: 352: 350: 347: 345: 342: 341: 337: 335: 332: 330: 326: 322: 320: 316: 312: 308: 306: 298: 294: 290: 283: 281: 279: 275: 270: 268: 264: 260: 256: 248: 246: 244: 240: 236: 231: 229: 225: 217: 215: 213: 209: 205: 201: 197: 193: 183: 179: 175: 171: 167: 163: 159: 155: 151: 147: 142: 139:November 2022 138: 134: 129: 126: 122: 119: 115: 112: 109: 105: 102: 98: 95: 91: 86: 83: 79: 76: 72: 69: 65: 62: 58: 54: 50: 47: 43: 40: 36: 31: 24: 19: 16: 638: 624: 608:14 September 606:. Retrieved 602: 592: 580:. Retrieved 575: 565: 553:. Retrieved 542: 530:. Retrieved 519: 507:. Retrieved 496: 484:. Retrieved 477: 467: 455:. Retrieved 448: 423:. Retrieved 419:the original 412: 381:. Retrieved 368: 333: 323: 309: 304: 302: 284:Construction 271: 255:Wolaita Zone 252: 232: 221: 195: 191: 189: 173:Power rating 165:Total length 136:Commissioned 15: 263:Addis Ababa 198:) is a 500 668:Categories 379:. afdb.org 360:References 313:(KEC), an 239:World Bank 181:DC voltage 582:28 August 482:. Nairobi 453:. Nairobi 383:14 August 555:14 March 532:14 March 509:14 March 486:14 March 425:14 March 338:See also 241:and the 226:and the 218:Overview 208:Ethiopia 202:bipolar 117:Operator 107:Partners 68:Ethiopia 42:Ethiopia 33:Location 293:Lineman 176:2000 MW 38:Country 315:Indian 267:Moyale 184:500 kV 123:& 99:& 44:& 626:CIGRÉ 457:8 May 377:(PDF) 295:on a 276:, in 274:Suswa 249:Route 212:Kenya 210:with 93:Owner 82:Kenya 78:Suswa 46:Kenya 610:2024 584:2021 557:2018 534:2018 511:2018 488:2018 459:2018 427:2018 385:2018 194:(or 190:The 160:HVDC 149:Type 64:Sodo 60:From 235:KSh 670:: 603:CK 601:. 574:. 476:. 447:. 435:^ 411:. 393:^ 321:. 257:, 200:kV 80:, 74:To 66:, 612:. 586:. 559:. 536:. 513:. 490:. 461:. 429:. 387:.

Index

Ethiopia
Kenya
Sodo
Ethiopia
Suswa
Kenya
Government of Kenya
Government of Ethiopia
African Development Bank
Ethiopian Electric Power Corporation
Kenya Electricity Transmission Company
kV
high-voltage direct current
Ethiopia
Kenya
East African Community
Great Lakes Region
KSh
World Bank
African Development Bank
Wolaita Zone
Southern Nations, Nationalities, and Peoples Region
Addis Ababa
Moyale
Suswa
Kajiado County

Lineman
bundle conductor
KEC International Limited

Text is available under the Creative Commons Attribution-ShareAlike License. Additional terms may apply.