289:
307:(CET). CET was also responsible for cross-border cabling and a 40 km (25 mi) section in Kenya, near a place called Logologo, and the converter station in Sodo. In September 2019, it was reported that CET had completed construction of the Ethiopian section of this power line.
548:
643:
502:
525:
331:, measuring 201 kilometres (125 mi). The Kinamba to Suswa section is contracted to Kalpataru Power Transmission Limited, and it measures about 237 kilometres (147 mi). A new 500 kV substation was included in the scope of work.
230:. The power generated in Ethiopia is less expensive than that generated in Kenya, and electricity imports over the interconnector were expected to lower power prices in Kenya and promote industrial growth in the country.
374:"General Procurement Notice – Federal Democratic Republic of Ethiopia and Republic of Kenya – Eastern Africa Power Interconnector – Ethiopia and Kenya Power Systems Interconnection Project – Sector - Energy"
658:
280:, approximately 600 km (373 mi) away, as the crow flies. The power line measures about 1,045 km (649 mi), of which approximately 600 km (373 mi) is in Kenya.
683:
653:
408:
258:
265:, the capital and largest city of Ethiopia. From Sodo, the power line runs in a south-easterly direction for approximately 400 km (249 mi), as the crow flies, to
688:
678:
625:
373:
648:
444:
353:
633:
124:
693:
571:
473:
418:
288:
673:
222:
The power line was constructed to enable
Ethiopia to transfer surplus electricity to Kenya, for sale to the countries of the
203:
242:
120:
110:
223:
100:
449:
598:
317:
company, was contracted to build the 195 km (121 mi) section from Elboro to
Logologo, in
96:
343:
227:
639:
Ethiopia–Kenya Power
Systems Interconnection Project documents (including details, maps, etc.):
324:
310:
413:
296:
478:
348:
328:
318:
234:
277:
667:
474:"Electricity grid takes shapes as countries erect transmission lines across borders"
303:
The contractor for the 457 km (284 mi) of power line inside
Ethiopia was
254:
237: 126 billion (approximately US$ 1.26 billion). Funding was sourced from the
262:
292:
238:
649:
Resettlement Action Plan (RAP) Final Report – Ethiopia section, January 2012
572:"Ethiopia: CET opens electricity transmission line linking country to Kenya"
654:
Resettlement Action Plan (RAP) Final Report – Kenya section, February 2012
207:
67:
41:
272:
From Moyale, the power line follows a south-westerly course to end near
644:
Environmental and Social Impact
Assessment (ESIA) Summary, August 2011
327:
was responsible for building the section from
Logologo to Kinamba in
266:
549:"Distance between Moyale, Kenya and Ketraco Suswa Substation, Kenya"
314:
287:
273:
211:
81:
77:
45:
199:
63:
634:"HVDC link Kenya–Ethiopia – Ground Electrodes Site Selection"
503:"Distance between Addis Ababa, Ethiopia and Sodo, Ethiopia"
261:, about 313 kilometres (194 mi) by road south-west of
334:
The interconnector was put into service in
November 2022.
526:"Distance between Sodo, Ethiopia and Moyale, Ethiopia"
445:"Uhuru in deal to speed up Ethiopia-Kenya power line"
599:"1,045km Ethiopia-Kenya Electricity Line Goes Live"
259:
Southern
Nations, Nationalities, and Peoples Region
180:
172:
164:
156:
148:
143:
135:
130:
116:
106:
92:
87:
73:
59:
51:
37:
32:
20:
253:The power line starts at Sodo (Wolayta-Sodo), in
27:Map of Sodo–Moyale–Suswa High Voltage Power Line
632:Paulo Edmundo da Fonseca Freire et al. (2015):
409:"Power line to reduce costs by seven shillings"
206:electricity power transmission line connecting
305:China Electric Power Equipment and Technology
8:
684:High-voltage transmission lines in Ethiopia
299:of the line during construction in Ethiopia
354:Loiyangalani-Suswa High Voltage Power Line
269:, at the international border with Kenya.
570:Jean Marie Takouleu (26 September 2019).
192:Sodo–Moyale–Suswa High Voltage Power Line
21:Sodo–Moyale–Suswa High Voltage Power Line
689:High-voltage transmission lines in Kenya
679:Proposed energy infrastructure in Africa
659:Project Appraisal Report, September 2012
438:
436:
365:
125:Kenya Electricity Transmission Company
17:
402:
400:
398:
396:
394:
214:. It was completed in November 2022.
7:
628:South Africa 2015 conference paper:
121:Ethiopian Electric Power Corporation
597:Andeso, Albert (29 November 2022).
472:Senelwa, Kennedy (23 August 2017).
196:Ethiopia–Kenya HVDC Interconnector
14:
547:Globefeed.com (14 March 2018).
524:Globefeed.com (14 March 2018).
501:Globefeed.com (14 March 2018).
407:Muhaita, Abel (2 August 2017).
1:
443:Omondi, George (8 May 2018).
233:The project was budgeted at
245:, the principal financier.
204:high-voltage direct current
168:1,045 km (649 mi)
710:
152:overhead transmission line
417:. Nairobi. Archived from
325:Larsen and Toubro Limited
311:KEC International Limited
25:
694:Ethiopia–Kenya relations
243:African Development Bank
131:Construction information
111:African Development Bank
674:HVDC transmission lines
300:
224:East African Community
101:Government of Ethiopia
450:Business Daily Africa
291:
144:Technical information
88:Ownership information
97:Government of Kenya
344:Energy in Ethiopia
301:
228:Great Lakes Region
188:
187:
52:General direction
701:
614:
613:
611:
609:
594:
588:
587:
585:
583:
567:
561:
560:
558:
556:
544:
538:
537:
535:
533:
521:
515:
514:
512:
510:
498:
492:
491:
489:
487:
469:
463:
462:
460:
458:
440:
431:
430:
428:
426:
421:on 8 August 2017
414:The Star (Kenya)
404:
389:
388:
386:
384:
378:
370:
297:bundle conductor
18:
709:
708:
704:
703:
702:
700:
699:
698:
664:
663:
623:
618:
617:
607:
605:
596:
595:
591:
581:
579:
578:. Paris, France
569:
568:
564:
554:
552:
551:. Globefeed.com
546:
545:
541:
531:
529:
528:. Globefeed.com
523:
522:
518:
508:
506:
505:. Globefeed.com
500:
499:
495:
485:
483:
479:The EastAfrican
471:
470:
466:
456:
454:
442:
441:
434:
424:
422:
406:
405:
392:
382:
380:
376:
372:
371:
367:
362:
349:Energy in Kenya
340:
329:Laikipia County
319:Marsabit County
286:
251:
220:
157:Type of current
28:
12:
11:
5:
707:
705:
697:
696:
691:
686:
681:
676:
666:
665:
662:
661:
656:
651:
646:
637:
636:
622:
621:External links
619:
616:
615:
589:
576:Afrik21.africa
562:
539:
516:
493:
464:
432:
390:
364:
363:
361:
358:
357:
356:
351:
346:
339:
336:
285:
282:
278:Kajiado County
250:
247:
219:
216:
186:
185:
182:
178:
177:
174:
170:
169:
166:
162:
161:
158:
154:
153:
150:
146:
145:
141:
140:
137:
133:
132:
128:
127:
118:
114:
113:
108:
104:
103:
94:
90:
89:
85:
84:
75:
71:
70:
61:
57:
56:
55:North to South
53:
49:
48:
39:
35:
34:
30:
29:
26:
23:
22:
13:
10:
9:
6:
4:
3:
2:
706:
695:
692:
690:
687:
685:
682:
680:
677:
675:
672:
671:
669:
660:
657:
655:
652:
650:
647:
645:
642:
641:
640:
635:
631:
630:
629:
627:
620:
604:
600:
593:
590:
577:
573:
566:
563:
550:
543:
540:
527:
520:
517:
504:
497:
494:
481:
480:
475:
468:
465:
452:
451:
446:
439:
437:
433:
420:
416:
415:
410:
403:
401:
399:
397:
395:
391:
375:
369:
366:
359:
355:
352:
350:
347:
345:
342:
341:
337:
335:
332:
330:
326:
322:
320:
316:
312:
308:
306:
298:
294:
290:
283:
281:
279:
275:
270:
268:
264:
260:
256:
248:
246:
244:
240:
236:
231:
229:
225:
217:
215:
213:
209:
205:
201:
197:
193:
183:
179:
175:
171:
167:
163:
159:
155:
151:
147:
142:
139:November 2022
138:
134:
129:
126:
122:
119:
115:
112:
109:
105:
102:
98:
95:
91:
86:
83:
79:
76:
72:
69:
65:
62:
58:
54:
50:
47:
43:
40:
36:
31:
24:
19:
16:
638:
624:
608:14 September
606:. Retrieved
602:
592:
580:. Retrieved
575:
565:
553:. Retrieved
542:
530:. Retrieved
519:
507:. Retrieved
496:
484:. Retrieved
477:
467:
455:. Retrieved
448:
423:. Retrieved
419:the original
412:
381:. Retrieved
368:
333:
323:
309:
304:
302:
284:Construction
271:
255:Wolaita Zone
252:
232:
221:
195:
191:
189:
173:Power rating
165:Total length
136:Commissioned
15:
263:Addis Ababa
198:) is a 500
668:Categories
379:. afdb.org
360:References
313:(KEC), an
239:World Bank
181:DC voltage
582:28 August
482:. Nairobi
453:. Nairobi
383:14 August
555:14 March
532:14 March
509:14 March
486:14 March
425:14 March
338:See also
241:and the
226:and the
218:Overview
208:Ethiopia
202:bipolar
117:Operator
107:Partners
68:Ethiopia
42:Ethiopia
33:Location
293:Lineman
176:2000 MW
38:Country
315:Indian
267:Moyale
184:500 kV
123:&
99:&
44:&
626:CIGRÉ
457:8 May
377:(PDF)
295:on a
276:, in
274:Suswa
249:Route
212:Kenya
210:with
93:Owner
82:Kenya
78:Suswa
46:Kenya
610:2024
584:2021
557:2018
534:2018
511:2018
488:2018
459:2018
427:2018
385:2018
194:(or
190:The
160:HVDC
149:Type
64:Sodo
60:From
235:KSh
670::
603:CK
601:.
574:.
476:.
447:.
435:^
411:.
393:^
321:.
257:,
200:kV
80:,
74:To
66:,
612:.
586:.
559:.
536:.
513:.
490:.
461:.
429:.
387:.
Text is available under the Creative Commons Attribution-ShareAlike License. Additional terms may apply.