236:
410:): when there is too much supply, the devices absorb the excess, and frequency goes above the scheduled rate, conversely, too much demand causes the generator to deliver extra electricity through slowing down, with frequency slightly decreasing, not requiring an intervention from the operator. There are obvious limits to this "immediate control", so a
330:
305:
of 30 MW, unit C will be kept in reserve. The area under the dispatch curve to the left of this line represents the cost per hour of operation (ignoring the startup costs, $ 30 * 120 + $ 60 * 30 = $ 5,400 per hour), the incremental cost of the next MWh of electricity ($ 60 in the example, represented
286:
of electricity, ignoring the startup costs). For cost-based decisions, the units in the merit order are sorted by the increasing marginal cost. The graph on the right describes an extremely simplified system, with three committed generator units (fully dispatchable, with constant per-MWh cost):
357:
change is controlled in real-time by the central operator issuing directives to market participants that submit in advance bids for the increase/decrease in the power levels. Due to the centralized nature of redispatch, there is no delay to negotiate terms of contracts; the cost incurred are
341:, unit B will operate at variable power, and unit C will need to be turned on and off, providing the "intermediate" or "cycling" capacity. If the demand goes above 200 MW only occasionally, the unit C will be idle most of the time and will be considered a
345:(a "peaker"). Since a peaker might run for just tens of hours per year, the cost of peaker-produced electricity can be very high in order to recover the capital investment and fixed costs (see the right side of a hypothetical full-scale dispatch curve).
374:. At this stage the goal is reliability ("security") of the supply. The practical electric networks are too complex to perform the calculations by hand, so from the 1920s the calculations were automated, at first in the form of specially-built
562:
the action (temporarily setting the frequency to 60.02 Hz or 59.98 Hz) is initiated when the time offset reaches 10 seconds and ceases once the offset reaches 6 seconds. Time control is performed either by a computer
430:
is engaged automatically within seconds after the frequency disturbance. Primary control stabilizes the situation, but does not return the conditions to the normal and is applied both to the generation side (where the
136:
take a very long time to start, while hydroelectric plants require planning of water resources usage way in advance, therefore commitment decisions for these are made weeks or even months before prior to the delivery.
317:
In real systems the cost per MWh usually is not constant, and the lines of the dispatch curve are therefore not horizontal (typically the marginal cost of power increases with the dispatch level, although for the
121:
for the next day is not certain, its sources are thus non-dispatchable. This variability, coupled with uncertain future power demand and the need to accommodate possible generation and
211:
or even commit more generation units, primarily to ensure the reliability of the supply while still trying to minimize the costs. At the same time, operator must ensure that enough
104:
1174:
1156:
1138:
661:
182:
thermal units might have limits on minimum uptime (once switched on, cannot be turned off quickly) and downtime (once stopped, cannot be quickly restarted again);
1147:
496:
is used to restore the system frequency after a disturbance, with adjustments made by the balancing authority control computer (this is typically referred to as
397:
69:"). In an electrical grid the task of real-time balancing is performed by a regional-based control center, run by an electric utility in the traditional (
1129:
508:
and non-spinning reserves, with balancing services deployed within minutes after disturbance (hydropower plants are capable of an even faster reaction).
1120:
546:
accumulates between the official time and the time measured in the AC cycles. In the US, the average 60 Hz frequency is maintained within each
1165:
1228:
192:
there is usually a single crew at the plant that needs to be present during a thermal unit start-up, so only one unit can be started at a time.
74:
1193:
1090:
1034:
1005:
867:
1218:
57:(e.g., changes in demand or equipment failures) in order to provide reliable electric supply of acceptable quality. The corresponding
301:
At the expected demand is 150 MW (a vertical line on the graph), unit A will be engaged at full 120 MW power, unit B will run at the
1233:
629:
167:
Unit commitment is more complex than the shorter-time-frame operations, since unit availability is subject to multiple constraints:
414:
is built into a typical power grid, spanning reaction intervals from seconds ("primary control") to hours ("time control").
469:
337:
If the minimum level of demand in the example will stay above 120 MW, the unit A will constantly run at full power, providing
148:
of producing the unit electricity and the (quite significant for fossil fuel generation) start-up costs. In a "restructured"
353:
Sometimes the grid constraints change unpredictably and a need arises to change the previously set unit commitments. This
176:
117:
units can produce electricity on demand and thus can be scheduled with accuracy. The production of the weather-dependent
732:
501:
477:
282:
with the interval length corresponding to the maximum power of the unit, Y-axis values represent the marginal cost (per-
109:
Day-ahead operation schedules the generation units that can be called upon to provide the electricity on the next day (
529:
380:
329:
84:
322:
there are multiple cost curves depending on the mode of operation, so the power-cost relationship is not necessarily
358:
allocated either to participants responsible for the disruption based on preestablished tariffs or in equal shares.
1223:
547:
539:
319:
276:, where the X-axis constitutes the system power, intervals for the generation units are placed on this axis in the
118:
122:
1109:
92:
559:
402:
Small mismatches between the total demand and total load are typical and initially are taken care of by the
212:
186:
114:
497:
34:
65:. Electricity is hard to store, so at any moment the supply (generation) shall be balanced with demand ("
1064:
718:
407:
133:
216:
436:
208:
141:
87:, transmission system operators. The other form of balancing resources of multiple power plants is a
70:
248:
342:
79:
810:
794:
473:
453:
447:
371:
323:
149:
58:
291:
unit A can deliver up to 120 MW at the cost of $ 30 per MWh (from 0 to 120 MW of system power);
1189:
1096:
1086:
1040:
1030:
1011:
1001:
873:
863:
855:
802:
726:
635:
625:
619:
465:
432:
393:
269:
126:
17:
504:) and manual actions taken by the balancing authority staff. Secondary control uses both the
164:
is sometimes defined not just by the monetary costs, but also by the environmental concerns.
132:
Some units have unique features that require their commitment much earlier: for example, the
1053:
995:
786:
520:
involves reserve deployment and restoration to handle the current and future contingencies.
505:
367:
172:
129:
that are not expected to produce electricity, but can be dispatched on a very short notice.
375:
153:
38:
829:"Electric generator dispatch depends on system demand and the relative cost of operation"
770:
Bayón, L.; García Nieto, P. J.; Grau, J. M.; Ruiz, M. M.; Suárez, P. M. (19 March 2013).
828:
653:
403:
338:
66:
46:
207:
In the hours prior to the delivery, a system operator might need to deploy additional
1212:
558:) to bring the overall time offset within the predefined limits. For example, in the
145:
814:
710:
244:
1183:
1080:
1024:
790:
567:), or by the monitor requesting balancing authorities to adjust their settings.
294:
unit B can deliver up to 80 MW at $ 60/MWh (from 120 to 200 MW of system power);
278:
202:
161:
654:"U.S. electric system is made up of interconnections and balancing authorities"
1100:
1015:
877:
639:
88:
1044:
1023:
Bhattacharya, Kankar; Bollen, Math H.J.; Daalder, Jaap E. (6 December 2012).
806:
798:
456:
are engaged (load is reduced as procured via reliability services contracts).
297:
unit C is capable of 50 MW at $ 120/MWh (from 200 to 250 MW of system power).
83:
numbered 74 in 2016, the entities responsible for operations are also called
771:
185:"must-run" units have to run due to technical constraints (for example,
538:
is to maintain the long-term frequency at the specified value within a
157:
443:
induction motors self-adjust (lower frequency reduces the energy use);
243:
Graphs are unavailable due to technical issues. There is more info on
171:
demand-supply balance need to be maintained, including the sufficient
468:
of the generators. This is the parameter that is approximated by the
366:
In the minutes prior to the delivery, a system operator is using the
1188:. EPRI power system engineering series. McGraw-Hill Education.
542:. Due to the disturbances, the average frequency drifts, and a
554:, that periodically changes the frequency target of the grid (
283:
229:
1054:"Introduction to System Operation, Optimization, and Control"
601:
599:
597:
144:
the main goal of the unit commitment is to minimize both the
584:
582:
580:
1131:
Reliability
Functional Model Technical Document Version 5.1
179:. The balance need to reflect the transmission constraints;
745:
682:
772:"An economic dispatch algorithm of combined cycle units"
711:"Economic Dispatch and Operations of Electric Utilities"
862:. Springer Science & Business Media. p. 150.
460:
Another term commonly used for the primary control is
105:
Unit commitment problem in electrical power production
994:
Conejo, Antonio J.; Baringo, Luis (5 December 2017).
889:
887:
717:. EME 801 Energy Markets, Policy, and Regulation:
464:(or "beta"). Frequency response also includes the
156:algorithm is utilized, frequently in a form of an
53:describes actions taken in response to unplanned
1175:North American Electric Reliability Corporation
1157:North American Electric Reliability Corporation
1139:North American Electric Reliability Corporation
662:United States Energy Information Administration
757:
384:, replaced by digital computers in the 1960s.
333:Hypothetical dispatch curve (USA, summer 2011)
1110:"Balancing Authority and Regulation Overview"
1079:Wood, Allen J.; Wollenberg, Bruce F. (1984).
779:International Journal of Computer Mathematics
605:
588:
398:Voltage control and reactive power management
306:by a horizontal line on the graph) is called
8:
1182:Kundur, P.; Balu, N.J.; Lauby, M.G. (1994).
91:. The balancing authorities are overseen by
860:Operation of Market-oriented Power Systems
624:. Pearson Education India. pp. 557–.
73:) electricity market. In the restructured
1029:. Springer Science & Business Media.
189:plants must run if their heat is needed);
1121:Western Electricity Coordinating Council
1082:Power Generation, Operation, and Control
858:. In Yong-Hua Song; Xi-Fan Wang (eds.).
328:
1026:Operation of Restructured Power Systems
746:Bhattacharya, Bollen & Daalder 2012
683:Bhattacharya, Bollen & Daalder 2012
576:
724:
142:vertically integrated electric utility
75:North American power transmission grid
705:
703:
7:
977:
965:
953:
941:
929:
917:
905:
893:
694:
63:Power System Operations and Control
1185:Power System Stability and Control
621:Power System Operation and Control
446:under-frequency relays disconnect
406:of the rotating machinery (mostly
310:(thus another name for the curve,
25:
370:algorithms in order to find the
234:
125:failures requires scheduling of
1167:Balancing and Frequency Control
1149:Balancing and Frequency Control
565:Automatic Time Error Correction
41:on the timescale from one day (
854:Yong-Hua Song (31 July 2003).
18:Time control (electrical grid)
1:
1229:Electric power infrastructure
215:are available to prevent the
791:10.1080/00207160.2013.770482
502:automatic generation control
478:automatic generation control
85:independent system operators
530:Time error correction (TEC)
476:(ACE) calculation used for
320:combined cycle power plants
37:to describe the process of
1250:
758:Wood & Wollenberg 1984
540:wide area synchronous grid
527:
439:) and to the load, where:
391:
200:
102:
77:, these centers belong to
45:) to minutes prior to the
1219:Electric power generation
1146:NERC (January 26, 2011).
1085:. John Wiley & Sons.
606:Conejo & Baringo 2017
589:Conejo & Baringo 2017
435:adjusts the power of the
388:Control after disturbance
119:variable renewable energy
1234:Power station technology
731:: CS1 maint: location (
618:S. Sivanagaraju (2009).
550:by a designated entity,
93:reliability coordinators
997:Power System Operations
560:Eastern Interconnection
362:Minutes-ahead operation
213:reactive power reserves
187:combined heat and power
115:dispatchable generation
31:Power system operations
498:load-frequency control
408:synchronous generators
334:
134:nuclear power stations
35:electricity generation
1164:NERC (May 11, 2021).
1065:Iowa State University
719:Penn State University
484:Minutes-after control
418:Seconds-after control
332:
209:supplemental reserves
197:Hours-ahead operation
80:balancing authorities
71:vertically integrated
27:Power plant operation
272:") are based on the
140:For a "traditional"
51:power system control
1052:McCalley, James D.
856:"System Redispatch"
556:scheduled frequency
472:coefficient of the
448:interruptible loads
343:peaking power plant
312:system lambda curve
99:Day-ahead operation
43:day-ahead operation
1128:NERC (July 2018).
474:area control error
462:frequency response
454:ancillary services
372:optimal power flow
335:
150:electricity market
127:operating reserves
59:engineering branch
33:is a term used in
1224:Power engineering
1195:978-0-07-035958-1
1092:978-0-471-09182-0
1036:978-1-4615-1465-7
1007:978-3-319-69407-8
980:, pp. 13–14.
956:, pp. 12–13.
869:978-1-85233-670-7
748:, pp. 47–52.
492:secondary control
466:inertial response
412:control continuum
394:Frequency control
381:network analyzers
355:system redispatch
270:economic dispatch
259:
256:
255:
173:spinning reserves
16:(Redirected from
1241:
1205:
1203:
1202:
1178:
1172:
1160:
1154:
1142:
1136:
1124:
1114:
1104:
1075:
1073:
1071:
1058:
1048:
1019:
981:
975:
969:
963:
957:
951:
945:
939:
933:
927:
921:
915:
909:
903:
897:
891:
882:
881:
851:
845:
844:
842:
840:
835:. 17 August 2012
825:
819:
818:
776:
767:
761:
755:
749:
743:
737:
736:
730:
722:
707:
698:
692:
686:
680:
674:
673:
671:
669:
650:
644:
643:
615:
609:
603:
592:
586:
534:The goal of the
518:tertiary control
512:Tertiary control
495:
494:
429:
428:
376:analog computers
368:power-flow study
268:The decisions ("
263:Dispatch curve.
258:
238:
237:
230:
217:voltage collapse
21:
1249:
1248:
1244:
1243:
1242:
1240:
1239:
1238:
1209:
1208:
1200:
1198:
1196:
1181:
1170:
1163:
1152:
1145:
1134:
1127:
1112:
1107:
1093:
1078:
1069:
1067:
1056:
1051:
1037:
1022:
1008:
993:
990:
985:
984:
976:
972:
964:
960:
952:
948:
940:
936:
928:
924:
916:
912:
904:
900:
892:
885:
870:
853:
852:
848:
838:
836:
827:
826:
822:
774:
769:
768:
764:
756:
752:
744:
740:
723:
709:
708:
701:
693:
689:
681:
677:
667:
665:
652:
651:
647:
632:
617:
616:
612:
604:
595:
587:
578:
573:
548:interconnection
532:
526:
514:
490:
489:
486:
426:primary control
424:
423:
420:
400:
392:Main articles:
390:
364:
351:
266:
265:
264:
261:
260:
252:
239:
235:
225:
205:
199:
154:market clearing
111:unit commitment
107:
101:
39:decision-making
28:
23:
22:
15:
12:
11:
5:
1247:
1245:
1237:
1236:
1231:
1226:
1221:
1211:
1210:
1207:
1206:
1194:
1179:
1161:
1143:
1125:
1105:
1091:
1076:
1049:
1035:
1020:
1006:
989:
986:
983:
982:
970:
958:
946:
934:
922:
910:
898:
883:
868:
846:
820:
785:(2): 269–277.
762:
760:, p. 117.
750:
738:
699:
687:
685:, pp. 54.
675:
664:. 20 July 2016
645:
630:
610:
593:
575:
574:
572:
569:
528:Main article:
525:
522:
513:
510:
485:
482:
470:frequency bias
458:
457:
451:
444:
419:
416:
404:kinetic energy
389:
386:
363:
360:
350:
347:
339:baseload power
303:dispatch level
299:
298:
295:
292:
274:dispatch curve
262:
257:
254:
253:
242:
240:
233:
228:
227:
226:
224:
223:Dispatch curve
221:
201:Main article:
198:
195:
194:
193:
190:
183:
180:
103:Main article:
100:
97:
67:grid balancing
47:power delivery
26:
24:
14:
13:
10:
9:
6:
4:
3:
2:
1246:
1235:
1232:
1230:
1227:
1225:
1222:
1220:
1217:
1216:
1214:
1197:
1191:
1187:
1186:
1180:
1176:
1169:
1168:
1162:
1158:
1151:
1150:
1144:
1140:
1133:
1132:
1126:
1122:
1118:
1111:
1106:
1102:
1098:
1094:
1088:
1084:
1083:
1077:
1066:
1062:
1055:
1050:
1046:
1042:
1038:
1032:
1028:
1027:
1021:
1017:
1013:
1009:
1003:
999:
998:
992:
991:
987:
979:
974:
971:
968:, p. 13.
967:
962:
959:
955:
950:
947:
944:, p. 14.
943:
938:
935:
932:, p. 12.
931:
926:
923:
920:, p. 13.
919:
914:
911:
907:
902:
899:
895:
890:
888:
884:
879:
875:
871:
865:
861:
857:
850:
847:
834:
830:
824:
821:
816:
812:
808:
804:
800:
796:
792:
788:
784:
780:
773:
766:
763:
759:
754:
751:
747:
742:
739:
734:
728:
720:
716:
712:
706:
704:
700:
696:
691:
688:
684:
679:
676:
663:
659:
655:
649:
646:
641:
637:
633:
631:9788131726624
627:
623:
622:
614:
611:
608:, p. 10.
607:
602:
600:
598:
594:
590:
585:
583:
581:
577:
570:
568:
566:
561:
557:
553:
549:
545:
541:
537:
531:
523:
521:
519:
511:
509:
507:
503:
499:
493:
483:
481:
479:
475:
471:
467:
463:
455:
452:
449:
445:
442:
441:
440:
438:
434:
427:
417:
415:
413:
409:
405:
399:
395:
387:
385:
383:
382:
377:
373:
369:
361:
359:
356:
348:
346:
344:
340:
331:
327:
325:
321:
315:
313:
309:
308:system lambda
304:
296:
293:
290:
289:
288:
285:
281:
280:
275:
271:
250:
249:MediaWiki.org
246:
241:
232:
231:
222:
220:
218:
214:
210:
204:
196:
191:
188:
184:
181:
178:
174:
170:
169:
168:
165:
163:
159:
155:
151:
147:
146:marginal cost
143:
138:
135:
130:
128:
124:
120:
116:
112:
106:
98:
96:
94:
90:
86:
82:
81:
76:
72:
68:
64:
60:
56:
52:
48:
44:
40:
36:
32:
19:
1199:. Retrieved
1184:
1166:
1148:
1130:
1116:
1081:
1068:. Retrieved
1060:
1025:
1000:. Springer.
996:
973:
961:
949:
937:
925:
913:
908:, p. 6.
901:
896:, p. 1.
859:
849:
837:. Retrieved
832:
823:
782:
778:
765:
753:
741:
714:
697:, p. 8.
690:
678:
666:. Retrieved
657:
648:
620:
613:
591:, p. 9.
564:
555:
552:time monitor
551:
543:
536:time control
535:
533:
524:Time control
517:
515:
491:
487:
461:
459:
425:
421:
411:
401:
379:
378:, so called
365:
354:
352:
336:
316:
311:
307:
302:
300:
277:
273:
267:
206:
166:
139:
131:
123:transmission
110:
108:
78:
62:
55:disturbances
54:
50:
42:
30:
29:
1061:iastate.edu
437:prime mover
279:merit order
245:Phabricator
203:Merit order
177:contingency
162:merit order
49:. The term
1213:Categories
1201:2023-06-12
1101:1085785794
1016:1015677828
878:1112226019
640:1110238687
571:References
544:time error
349:Redispatch
89:power pool
61:is called
1045:852788650
978:NERC 2011
966:NERC 2011
954:NERC 2011
942:NERC 2021
930:NERC 2021
918:NERC 2021
906:NERC 2021
894:NERC 2021
807:0020-7160
799:1029-0265
695:NERC 2018
324:monotonic
1117:wecc.org
727:cite web
506:spinning
433:governor
988:Sources
833:eia.gov
815:5930756
715:psu.edu
658:eia.gov
247:and on
158:auction
113:). The
1192:
1108:WECC.
1099:
1089:
1070:30 May
1043:
1033:
1014:
1004:
876:
866:
839:30 May
813:
805:
797:
668:31 May
638:
628:
160:; the
1171:(PDF)
1153:(PDF)
1135:(PDF)
1113:(PDF)
1057:(PDF)
811:S2CID
795:eISSN
775:(PDF)
1190:ISBN
1097:OCLC
1087:ISBN
1072:2022
1041:OCLC
1031:ISBN
1012:OCLC
1002:ISBN
874:OCLC
864:ISBN
841:2022
803:ISSN
733:link
670:2022
636:OCLC
626:ISBN
516:The
488:The
422:The
396:and
175:for
787:doi
500:or
326:).
314:).
284:MWh
1215::
1173:.
1155:.
1137:.
1119:.
1115:.
1095:.
1063:.
1059:.
1039:.
1010:.
886:^
872:.
831:.
809:.
801:.
793:.
783:91
781:.
777:.
729:}}
725:{{
713:.
702:^
660:.
656:.
634:.
596:^
579:^
480:.
219:.
152:a
95:.
1204:.
1177:.
1159:.
1141:.
1123:.
1103:.
1074:.
1047:.
1018:.
880:.
843:.
817:.
789::
735:)
721:.
672:.
642:.
563:(
450:;
251:.
20:)
Text is available under the Creative Commons Attribution-ShareAlike License. Additional terms may apply.