PGI contributed technical knowledge as well as a portion of the Tiwi field's exploration and development. NPC would construct and run the geothermal power stations. The first two units were put into service in 1979. Units 3 through 6 would be operational from 1980 to 1982.
248:(Unocal) to form the Philippine Geothermal, Inc. (PGI) which is intended as a joint venture for the exploration and development of geothermal energy. A service contract was made with the state-owned
491:
297:
460:
501:
274:
The Tiwi
Geothermal Field is divided into four geographical areas: Naglagbong, Kapipihan, Matalibong, and Bariis. At one point it had six units and a 330-MW capacity.
266:
In
January 2023, a new binary cycle power plant within the Tiwi Geothermal Power Plant broke ground. It will add 17-MW capacity to the existing geothermal complex.
68:
496:
427:
376:
350:
402:
453:
245:
249:
108:
241:
The
Commission on Volcanology conducted an exploration of the Tiwi geothermal field from 1964 to 1968.
233:
184:
327:
277:
As of
December 2021, the Tiwi geothermal facility has four units and a capacity of 234-MW.
263:
in 2009. The company would own and operate the plant under its subsidiary AP Renewables.
485:
260:
131:
121:
147:
222:
214:
56:
42:
83:
70:
199:
27:
190:
298:"List of Existing Power Plants (Grid-connected) as of December 2021"
232:
218:
52:
351:"Aboitiz group bags Tiwi-Makban power complex with $ 447-M bid"
454:"Tiwi Geothermal Power Plant Complex Rehabilitation Project"
377:"Aboitiz Power pays full P12.12 billion for Tiwi-Makban"
428:"AboitizPower expects 17 MW more from Tiwi geothermal"
403:"Powering up communities for cleaner, better future"
330:. National Geothermal Association of the Philippines
244:
The
Philippine government in early 1971 invited the
183:
154:
142:
137:
127:
117:
107:
99:
62:
48:
38:
20:
259:The geothermal field would then be acquired by
8:
492:Geothermal power stations in the Philippines
17:
213:is a 234-MW geothermal power station in
502:Energy infrastructure completed in 1979
375:Gatdula, Donnabelle (October 2, 2009).
286:
322:
320:
318:
349:Gatdula, Donnabelle (July 31, 2008).
292:
290:
7:
401:Macapagal, Jed (January 29, 2023).
138:Geothermal power station
466:from the original on March 8, 2012
14:
497:Buildings and structures in Albay
26:
246:Union Oil Company of California
1:
252:(NPC) on September 10, 1971.
237:Pilot geothermal plant. 1970
211:Tiwi Geothermal Power Plant
21:Tiwi Geothermal Power Plant
518:
250:National Power Corporation
196:
163:
159:
146:Flash steam (existing) /
34:
25:
407:Malaya Business Insights
84:13.465694°N 123.649472°E
185:Nameplate capacity
303:. Department of Energy
238:
168:Units operational
236:
155:Power generation
89:13.465694; 123.649472
109:Commission date
381:The Philippine Star
80: /
434:. January 17, 2023
239:
176:Units planned
207:
206:
509:
476:
475:
473:
471:
465:
458:
450:
444:
443:
441:
439:
424:
418:
417:
415:
413:
398:
392:
391:
389:
387:
372:
366:
365:
363:
361:
346:
340:
339:
337:
335:
324:
313:
312:
310:
308:
302:
294:
200:edit on Wikidata
95:
94:
92:
91:
90:
85:
81:
78:
77:
76:
73:
30:
18:
517:
516:
512:
511:
510:
508:
507:
506:
482:
481:
480:
479:
469:
467:
463:
456:
452:
451:
447:
437:
435:
426:
425:
421:
411:
409:
400:
399:
395:
385:
383:
374:
373:
369:
359:
357:
348:
347:
343:
333:
331:
326:
325:
316:
306:
304:
300:
296:
295:
288:
283:
272:
231:
203:
88:
86:
82:
79:
74:
71:
69:
67:
66:
12:
11:
5:
515:
513:
505:
504:
499:
494:
484:
483:
478:
477:
445:
419:
393:
367:
341:
314:
285:
284:
282:
279:
271:
268:
230:
227:
205:
204:
197:
194:
193:
187:
181:
180:
177:
173:
172:
169:
165:
164:
161:
160:
157:
156:
152:
151:
144:
140:
139:
135:
134:
129:
125:
124:
119:
115:
114:
111:
105:
104:
101:
97:
96:
64:
60:
59:
50:
46:
45:
40:
36:
35:
32:
31:
23:
22:
13:
10:
9:
6:
4:
3:
2:
514:
503:
500:
498:
495:
493:
490:
489:
487:
462:
455:
449:
446:
433:
432:BusinessWorld
429:
423:
420:
408:
404:
397:
394:
382:
378:
371:
368:
356:
352:
345:
342:
329:
323:
321:
319:
315:
299:
293:
291:
287:
280:
278:
275:
269:
267:
264:
262:
261:Aboitiz Power
257:
253:
251:
247:
242:
235:
228:
226:
224:
220:
216:
212:
201:
195:
192:
188:
186:
182:
178:
175:
174:
170:
167:
166:
162:
158:
153:
149:
145:
141:
136:
133:
132:AP Renewables
130:
126:
123:
122:AP Renewables
120:
116:
112:
110:
106:
102:
98:
93:
75:123°38′58.1″E
65:
61:
58:
54:
51:
47:
44:
41:
37:
33:
29:
24:
19:
16:
468:. Retrieved
448:
436:. Retrieved
431:
422:
410:. Retrieved
406:
396:
384:. Retrieved
380:
370:
358:. Retrieved
355:ABS-CBN News
354:
344:
332:. Retrieved
305:. Retrieved
276:
273:
265:
258:
254:
243:
240:
210:
208:
148:Binary cycle
72:13°27′56.5″N
15:
223:Philippines
128:Operator(s)
103:Operational
87: /
63:Coordinates
57:Philippines
43:Philippines
486:Categories
281:References
270:Facilities
470:March 24,
150:(planned)
461:Archived
438:April 9,
412:April 9,
386:April 9,
360:April 9,
334:April 9,
307:April 9,
118:Owner(s)
49:Location
229:History
171:4 units
39:Country
328:"Tiwi"
179:1 unit
100:Status
464:(PDF)
457:(PDF)
301:(PDF)
219:Albay
198:[
53:Albay
472:2011
440:2023
414:2023
388:2023
362:2023
336:2023
309:2023
215:Tiwi
209:The
189:234
143:Type
113:1979
488::
459:.
430:.
405:.
379:.
353:.
317:^
289:^
225:.
221:,
217:,
191:MW
55:,
474:.
442:.
416:.
390:.
364:.
338:.
311:.
202:]
Text is available under the Creative Commons Attribution-ShareAlike License. Additional terms may apply.