33: 358: 372: 322:
a contract for two new gas compression stations and the upgrading of the existing compressor stations allowing to increase the capacity of Tunisian section by 6.5 bcm. The royalties for the gas transport received by Tunisia are 5.25 — 6.75 percent value of the transported gas. The offshore
323:
section across Channel of Sicily consists three lines with diameter of 20 inches (510 mm) and two lines with diameter of 26 inches (660 mm). In Italy, the diameter of two lines varies between 42 inches (1,070 mm) and 48 inches (1,220 mm).
313:
The Algerian section consists of a compressor station and two lines with 48 inches (1,220 mm) diameter. The Tunisian section consists of three compressor stations and two lines of 48 inches (1,220 mm) diameter. In 2007, SCOGAT
338:. The Tunisian section is owned by the state-owned Sotugat (Société Tunisienne du Gazoduc Trans-tunisien) and operated by TTPC (Eni group, 100%). The section across the Channel of Sicily is operated by TMPC, a joint venture of 32: 251:
The pipeline from Algeria to Italy was proposed in 1960s. A preliminary feasibility study was conducted in 1969 and the first route survey in 1970. In 1974–75, technical tests of laying pipes in the
446: 258:
The first phase of pipeline was constructed in 1978–1983 and second phase in 1991–1994. The capacity of the pipeline was doubled in 1994. In 2000, the gas pipeline was named after
652: 692: 435: 667: 662: 702: 697: 657: 613: 687: 285:
field in Algeria and runs 550 kilometres (340 mi) to the Tunisian border. In Tunisia, the pipeline runs for 370 kilometres (230 mi) to
707: 496: 326:
In 2012 the capacity of the pipeline increased from 30.2 billion cubic meter (bcm) of natural gas per year up to 33.5 bcm by 2012.
682: 672: 568: 273:, which was expected to increase transport capacity by 7 billion cubic metres per annum (250 billion cubic feet per annum). 537: 400: 301:
in Sicily. From there, the pipeline continues 340 kilometres (210 mi) in Sicily, 15 kilometres (9.3 mi) across the
505: 405: 38: 461: 436:"Algerian Gas to Europe: The Transmed Pipeline and Early Spanish Gas Import Projects. Working Paper #27" 563: 395: 305:
and 1,055 kilometres (656 mi) in Italian mainland to northern Italy with a branch to Slovenia.
442: 509: 589: 558: 302: 294: 252: 99: 298: 270: 474: 17: 262:. In the fall of 1997, a terrorist attack severed the pipeline in Algeria for five days. 533: 282: 81: 646: 377: 363: 343: 259: 677: 265:
On February 28, 2010, a new 549-kilometre (341 mi) section was completed in
286: 266: 128: 353: 628: 615: 371: 335: 152: 138: 240: 109: 290: 228: 224: 95: 85: 59: 55: 255:
were carried out. In 1977, supply and transit agreements were signed.
385: 319: 232: 293:
region, after which it crosses the 155-kilometre (96 mi)-wide
590:"Eni to invest 330 mln eur to hike Transmed gas pipeline capacity" 390: 236: 113: 63: 239:. An extension of the TransMed pipeline delivers Algerian gas to 339: 142: 334:
Algerian section is operated by Algerian state-owned company
445:; Program on Energy and Sustainable Development: 9–11. 316:
Société pour la Construction du Gazoduc Transtunisien
342:and Sonatrach. The Italian section is operated by 198: 180: 172: 167: 159: 148: 134: 124: 119: 105: 91: 77: 69: 51: 46: 25: 16:"Transmed" redirects here. Not to be confused with 534:"Algeria opens new Trans-Med gas pipeline section" 498:International Pipelines across the Mediterranean 184:30.2 billion cubic metres per annum (1.07 8: 37:Trans-Mediterranean (in purple) and future 504:. Cross Border Gas Trade Issues Workshop. 490: 488: 486: 484: 31: 653:Energy infrastructure completed in 1983 429: 427: 425: 423: 421: 417: 470: 459: 22: 693:Pipelines under the Mediterranean Sea 7: 441:. Geopolitics of Natural Gas Study. 559:"Saipem lifts deals worth $ 1.3bn" 14: 318:) awarded the Italian contractor 223:) is a natural gas pipeline from 668:Natural gas pipelines in Tunisia 663:Natural gas pipelines in Algeria 567:. NHST Media Group. 2007-02-16. 495:Domenico Dispenza (2002-03-26). 370: 356: 571:from the original on 2012-02-15 540:from the original on 2011-06-17 449:from the original on 2014-02-24 703:1983 establishments in Tunisia 698:1983 establishments in Algeria 658:Natural gas pipelines in Italy 536:. Magharebia.com. 2010-03-01. 199: 1: 281:The pipeline begins from the 176:2,475 km (1,538 mi) 708:1983 establishments in Italy 213:Trans-Mediterranean Pipeline 26:Trans-Mediterranean Pipeline 506:International Energy Agency 434:Hayes, Mark H. (May 2004). 401:Maghreb–Europe Gas Pipeline 39:Trans-Saharan gas pipelines 724: 406:Trans-Saharan gas pipeline 221:Enrico Mattei gas pipeline 15: 688:Algeria–Tunisia relations 30: 683:Algeria–Italy relations 673:Italy–Tunisia relations 235:and thence to mainland 469:Cite journal requires 202:of compressor stations 309:Technical description 168:Technical information 396:Greenstream pipeline 629:44.6080°N 11.5004°E 625: /  443:Stanford University 297:. It landfalls in 194: cu ft/a) 120:General information 303:Strait of Messina 295:Channel of Sicily 253:Mediterranean Sea 209: 208: 181:Maximum discharge 100:Mediterranean Sea 70:General direction 715: 640: 639: 637: 636: 635: 634:44.6080; 11.5004 630: 626: 623: 622: 621: 618: 605: 604: 602: 601: 586: 580: 579: 577: 576: 555: 549: 548: 546: 545: 530: 524: 523: 521: 520: 514: 508:. Archived from 503: 492: 479: 478: 472: 467: 465: 457: 455: 454: 440: 431: 380: 375: 374: 366: 361: 360: 359: 299:Mazara del Vallo 271:Tebessa Province 201: 190: 189: 35: 23: 723: 722: 718: 717: 716: 714: 713: 712: 643: 642: 633: 631: 627: 624: 619: 616: 614: 612: 611: 609: 608: 599: 597: 588: 587: 583: 574: 572: 564:Upstream Online 557: 556: 552: 543: 541: 532: 531: 527: 518: 516: 512: 501: 494: 493: 482: 468: 458: 452: 450: 438: 433: 432: 419: 414: 376: 369: 362: 357: 355: 352: 332: 311: 279: 249: 187: 185: 155:, Sergaz, TMPC, 42: 21: 18:Transmedicalism 12: 11: 5: 721: 719: 711: 710: 705: 700: 695: 690: 685: 680: 675: 670: 665: 660: 655: 645: 644: 607: 606: 581: 550: 525: 480: 471:|journal= 416: 415: 413: 410: 409: 408: 403: 398: 393: 388: 382: 381: 367: 351: 348: 331: 328: 310: 307: 278: 275: 248: 245: 207: 206: 203: 196: 195: 182: 178: 177: 174: 170: 169: 165: 164: 161: 157: 156: 150: 146: 145: 136: 132: 131: 126: 122: 121: 117: 116: 107: 103: 102: 93: 92:Passes through 89: 88: 79: 75: 74: 71: 67: 66: 53: 49: 48: 44: 43: 36: 28: 27: 13: 10: 9: 6: 4: 3: 2: 720: 709: 706: 704: 701: 699: 696: 694: 691: 689: 686: 684: 681: 679: 676: 674: 671: 669: 666: 664: 661: 659: 656: 654: 651: 650: 648: 641: 638: 595: 591: 585: 582: 570: 566: 565: 560: 554: 551: 539: 535: 529: 526: 515:on 2017-10-27 511: 507: 500: 499: 491: 489: 487: 485: 481: 476: 463: 448: 444: 437: 430: 428: 426: 424: 422: 418: 411: 407: 404: 402: 399: 397: 394: 392: 389: 387: 384: 383: 379: 378:Energy portal 373: 368: 365: 364:Africa portal 354: 349: 347: 345: 344:Snam Rete Gas 341: 337: 329: 327: 324: 321: 317: 308: 306: 304: 300: 296: 292: 288: 284: 276: 274: 272: 268: 263: 261: 260:Enrico Mattei 256: 254: 246: 244: 242: 238: 234: 230: 226: 222: 218: 214: 204: 197: 193: 183: 179: 175: 171: 166: 162: 158: 154: 151: 147: 144: 140: 137: 133: 130: 127: 123: 118: 115: 111: 108: 104: 101: 97: 94: 90: 87: 83: 80: 76: 72: 68: 65: 61: 57: 54: 50: 45: 40: 34: 29: 24: 19: 610: 598:. Retrieved 596:. 2005-05-24 593: 584: 573:. Retrieved 562: 553: 542:. Retrieved 528: 517:. Retrieved 510:the original 497: 462:cite journal 451:. Retrieved 333: 325: 315: 312: 280: 264: 257: 250: 220: 216: 212: 210: 191: 160:Commissioned 632: / 287:El Haouaria 283:Hassi R'mel 267:Bir El Ater 141:, Sotugat, 129:natural gas 82:Hassi R'Mel 73:south-north 647:Categories 620:11°30′01″E 617:44°36′29″N 600:2009-07-29 575:2008-03-11 544:2012-10-11 519:2009-07-29 453:2014-02-26 412:References 336:Sonatrach 330:Operators 289:, in the 153:Sonatrach 139:Sonatrach 569:Archived 538:Archived 447:Archived 350:See also 241:Slovenia 217:TransMed 149:Operator 135:Partners 110:Minerbio 47:Location 41:(in red) 291:Cap Bon 247:History 229:Tunisia 225:Algeria 219:; also 96:Tunisia 86:Algeria 60:Tunisia 56:Algeria 52:Country 594:Forbes 386:Medgaz 320:Saipem 233:Sicily 173:Length 513:(PDF) 502:(PDF) 439:(PDF) 391:GALSI 277:Route 237:Italy 114:Italy 64:Italy 475:help 227:via 211:The 163:1983 125:Type 78:From 678:Eni 340:Eni 231:to 200:No. 143:Eni 649:: 592:. 561:. 483:^ 466:: 464:}} 460:{{ 420:^ 346:. 269:, 243:. 188:10 112:, 106:To 98:, 84:, 62:, 58:, 603:. 578:. 547:. 522:. 477:) 473:( 456:. 314:( 215:( 205:9 192:^ 186:Ă— 20:.

Index

Transmedicalism
Trans-Mediterranean (in purple) and future Trans-Saharan gas pipelines (in red)
Trans-Saharan gas pipelines
Algeria
Tunisia
Italy
Hassi R'Mel
Algeria
Tunisia
Mediterranean Sea
Minerbio
Italy
natural gas
Sonatrach
Eni
Sonatrach
Algeria
Tunisia
Sicily
Italy
Slovenia
Mediterranean Sea
Enrico Mattei
Bir El Ater
Tebessa Province
Hassi R'mel
El Haouaria
Cap Bon
Channel of Sicily
Mazara del Vallo

Text is available under the Creative Commons Attribution-ShareAlike License. Additional terms may apply.

↑