Trebinje-1 Hydroelectric Power Station

Source šŸ“

45: 400:
in the power line or transformer field. With two transmission lines in the direction of TS Mostar 3 and one in the direction of HPP Perućica, the plant is connected to the 220 kV network, via 400/220 kV transformers with a 400 MVA autotransformer and 220/110 kV with a 150 MVA autotransformer with a 400 kV network and a 110 kV network. . The center of the technical information system of the TrebiÅ”njica Hydroelectric Power Plant and the hub of the radio and HF telecommunication systems are located in the switchyard.
466: 391:
waters during operation is carried out by an open side overflow of two fields with two segmental closures, which is located on the left side of the dam. A bypass tunnel at the bottom of the right side of the dam can also be used for the eventual need for urgent emptying of the reservoir. 2 main outlets pass through the body of the dam, each with a diameter of 2.5 meters, symmetrically placed on the axis of the dam.
494: 52: 480: 29: 399:
Electric energy produced in HPP Trebinje I and HPP Dubrovnik is transmitted with two connecting transmission lines each to the 220 kV busbars of the Trebinje plant. The 220 kV plant was built with two bus systems using the mixed phase method. The connecting field enables the replacement of any switch
390:
The hydroelectric power plant is from the Pribran region and uses the water of the reservoir Bileć Lake. The Grančarevo arch dam is double-curved with a perimeter joint. The excavation of the foundation of the dam is 230,000 m3, and the volume of embedded concrete is 376,000 m3. Evacuation of large
408:
The machine hall is located 35 meters downstream from the dam, from which it is separated only by the plateau of the 220 kV outlet from the power plant. It consists of turbine and generator space, rooms for diffuser shutters, control, assembly platform, as well as auxiliary rooms.
425:
Building is 123 m in height and 439 meters in length in crown. Thickness of the dam at the bottom is 27 and at the top 4.60 meters. Reservoir volume is 1280 hm3 of surface area, at full capacity is 2764 ha. Maximum height difference, the
725: 705: 44: 715: 730: 710: 382:
power generation at Trebinje-1 HPP. The dam was completed in 1967 and its 180 MW power station, A smaller 8 MW power station, Treblinje-2, was completed downstream in 1979.
417:
Number of aggregates installed is 3, powered with 3 x60 MW (180 MW) Francis turbines; network voltage is 220 kV, with average annual production in excess of 370 ā€“ 420 GWh
695: 97: 680: 439: 507: 685: 447: 471: 648: 370:. At the height of 123 m (404 ft), Grančarevo dam is the tallest dam in the country. Its reservoir, 720: 499: 355: 136: 71: 347: 343: 197: 81: 527: 690: 316: 622: 700: 528:"Countries, regions, transboundary river basins (select "Bosnia and Herzegovina" and "Dams")" 427: 359: 339: 280: 451: 244: 371: 290: 674: 379: 375: 300: 132: 485: 374:, is the largest by volume in Bosnia and Herzegovina as well. The dam provides for 309: 493: 443: 597: 571: 652: 549: 461: 112: 99: 479: 59:
Location of Trebinje-1 Hydroelectric Power Station in Bosnia and Herzegovina
28: 367: 351: 187: 85: 552:(in Croatian). Electric Power Industry of the Republic of Serbian 306: 182: 51: 446:, was commissioned in 1968. The river TrebiŔnjca also powers 706:
Hydroelectric power stations in Bosnia and Herzegovina
442:, using TrebiŔnjica waters through compensation basin 626: 726:
TrebiŔnjica river damming and regulation controversy
450:
in Croatia, which receiving TrebiŔnjica waters from
315: 299: 289: 279: 271: 266: 258: 250: 240: 235: 227: 219: 211: 203: 193: 181: 176: 168: 150: 142: 128: 91: 77: 67: 21: 716:Lower Horizons Hydroelectric Power Stations System 731:Hydroelectric power stations in the Neretva basin 454:across the state border via derivation tunnel. 711:1968 establishments in Bosnia and Herzegovina 254:1,280,000,000 m (1,040,000 acreā‹…ft) 8: 430:, is 52 m with concentrated fall of 100 m. 262:1,082,000,000 m (877,000 acreā‹…ft) 27: 18: 366:type of facility with a large Grančarevo 696:Energy infrastructure completed in 1968 519: 508:Trebinje-2 Hydroelectric Power Station 336:Trebinje-1 Hydroelectric Power Station 332:Trebinje I Hydroelectric Power Station 267:Trebinje-1 Hydroelectric Power Station 33:Trebinje-1 Hydroelectric Power Station 22:Trebinje-1 Hydroelectric Power Station 448:Dubrovnik Hydroelectric Power Station 7: 550:"Hydroelectric power on TrebiÅ”njici" 440:Čapljina Hydroelectric Power Station 16:Dam in Gornje Grančarevo, Trebinje 14: 434:Čapljina and Dubrovnik facilities 492: 478: 464: 50: 43: 340:hydroelectric power plant (HPP) 681:Dams in Bosnia and Herzegovina 1: 472:Bosnia and Herzegovina portal 172:1968 (1975 expanded capacity) 438:Reversible (pumped-storage) 156:; 57 years ago 747: 602:www.elektroenergetika.info 576:www.elektroenergetika.info 295:104.5 m (343 ft) 215:439 m (1,440 ft) 325: 113:42.7339306Ā°N 18.4968250Ā°E 38: 26: 207:123 m (404 ft) 500:Renewable energy portal 350:in the municipality of 317:Installed capacity 223:4.6 m (15 ft) 151:Construction began 686:Dams completed in 1967 356:Bosnia and Herzegovina 231:27 m (89 ft) 137:Electricity generation 118:42.7339306; 18.4968250 72:Bosnia and Herzegovina 183:Type of dam 530:. United Nations FAO 358:. Trebinje-1 HPP is 272:Commission date 259:Active capacity 251:Total capacity 109: /  598:"EE SISTEMI - BIH" 364:dam toe powerhouse 220:Width (crest) 348:Gornje Grančarevo 344:TrebiÅ”njica River 329: 328: 228:Width (base) 198:TrebiÅ”njica River 177:Dam and spillways 169:Opening date 82:Gornje Grančarevo 738: 665: 664: 662: 660: 655:on 1 August 2013 651:. Archived from 645: 639: 638: 636: 634: 629:on 18 April 2017 625:. Archived from 619: 613: 612: 610: 608: 594: 588: 587: 585: 583: 568: 562: 561: 559: 557: 546: 540: 539: 537: 535: 524: 502: 497: 496: 488: 483: 482: 474: 469: 468: 467: 164: 162: 157: 124: 123: 121: 120: 119: 114: 110: 107: 106: 105: 102: 54: 53: 47: 31: 19: 746: 745: 741: 740: 739: 737: 736: 735: 671: 670: 669: 668: 658: 656: 649:"HE Trebinje I" 647: 646: 642: 632: 630: 621: 620: 616: 606: 604: 596: 595: 591: 581: 579: 570: 569: 565: 555: 553: 548: 547: 543: 533: 531: 526: 525: 521: 516: 498: 491: 484: 477: 470: 465: 463: 460: 452:Trebinjsko Lake 436: 423: 415: 406: 404:Characteristics 397: 388: 160: 158: 155: 117: 115: 111: 108: 103: 100: 98: 96: 95: 63: 62: 61: 60: 57: 56: 55: 34: 17: 12: 11: 5: 744: 742: 734: 733: 728: 723: 718: 713: 708: 703: 698: 693: 688: 683: 673: 672: 667: 666: 640: 614: 589: 563: 541: 518: 517: 515: 512: 511: 510: 504: 503: 489: 475: 459: 456: 435: 432: 422: 419: 414: 411: 405: 402: 396: 393: 387: 384: 327: 326: 323: 322: 319: 313: 312: 303: 297: 296: 293: 291:Hydraulic head 287: 286: 283: 277: 276: 273: 269: 268: 264: 263: 260: 256: 255: 252: 248: 247: 242: 238: 237: 233: 232: 229: 225: 224: 221: 217: 216: 213: 209: 208: 205: 201: 200: 195: 191: 190: 185: 179: 178: 174: 173: 170: 166: 165: 152: 148: 147: 144: 140: 139: 130: 126: 125: 93: 89: 88: 79: 75: 74: 69: 65: 64: 58: 49: 48: 42: 41: 40: 39: 36: 35: 32: 24: 23: 15: 13: 10: 9: 6: 4: 3: 2: 743: 732: 729: 727: 724: 722: 719: 717: 714: 712: 709: 707: 704: 702: 699: 697: 694: 692: 689: 687: 684: 682: 679: 678: 676: 654: 650: 644: 641: 628: 624: 618: 615: 603: 599: 593: 590: 577: 573: 567: 564: 551: 545: 542: 529: 523: 520: 513: 509: 506: 505: 501: 495: 490: 487: 481: 476: 473: 462: 457: 455: 453: 449: 445: 441: 433: 431: 429: 420: 418: 412: 410: 403: 401: 394: 392: 385: 383: 381: 380:hydroelectric 377: 376:flood control 373: 369: 365: 361: 357: 353: 349: 345: 341: 337: 333: 324: 320: 318: 314: 311: 308: 304: 302: 298: 294: 292: 288: 284: 282: 278: 274: 270: 265: 261: 257: 253: 249: 246: 243: 239: 234: 230: 226: 222: 218: 214: 210: 206: 202: 199: 196: 192: 189: 186: 184: 180: 175: 171: 167: 153: 149: 145: 141: 138: 134: 133:Flood control 131: 127: 122: 104:18Ā°29ā€²48.57ā€³E 94: 90: 87: 83: 80: 76: 73: 70: 66: 46: 37: 30: 25: 20: 657:. Retrieved 653:the original 643: 631:. Retrieved 627:the original 617: 605:. Retrieved 601: 592: 580:. Retrieved 578:(in Bosnian) 575: 566: 554:. Retrieved 544: 532:. Retrieved 522: 486:Water portal 437: 424: 421:Dam and lake 416: 407: 398: 389: 363: 360:accumulation 335: 331: 330: 310:Francis-type 285:Conventional 245:Bilećko Lake 101:42Ā°44ā€²2.15ā€³N 721:TrebiÅ”njica 444:Lake Vrutak 413:Power plant 372:Bileća Lake 305:2x54, 1x63 146:Operational 116: / 92:Coordinates 675:Categories 514:References 395:Substation 691:Arch dams 582:24 August 386:Reservoir 236:Reservoir 701:Trebinje 572:"HE BIH" 458:See also 368:arch dam 352:Trebinje 301:Turbines 194:Impounds 188:Arch dam 86:Trebinje 78:Location 659:7 April 633:7 April 342:on the 241:Creates 159: ( 129:Purpose 68:Country 607:7 June 556:27 May 534:27 May 321:180 MW 212:Length 204:Height 143:Status 623:"HET" 362:with 346:near 661:2017 635:2017 609:2024 584:2018 558:2014 536:2014 428:head 378:and 281:Type 275:1968 161:1967 154:1967 354:in 338:is 334:or 677:: 600:. 574:. 307:MW 135:, 84:, 663:. 637:. 611:. 586:. 560:. 538:. 163:)

Index


Trebinje-1 Hydroelectric Power Station is located in Bosnia and Herzegovina
Bosnia and Herzegovina
Gornje Grančarevo
Trebinje
42Ā°44ā€²2.15ā€³N 18Ā°29ā€²48.57ā€³E / 42.7339306Ā°N 18.4968250Ā°E / 42.7339306; 18.4968250
Flood control
Electricity generation
Type of dam
Arch dam
TrebiŔnjica River
Bilećko Lake
Type
Hydraulic head
Turbines
MW
Francis-type
Installed capacity
hydroelectric power plant (HPP)
TrebiŔnjica River
Gornje Grančarevo
Trebinje
Bosnia and Herzegovina
accumulation
arch dam
Bileća Lake
flood control
hydroelectric
head
Čapljina Hydroelectric Power Station