443:
29:
49:
553:
525:
953:
914:
539:
936:
882:
56:
632:
714:
434:
At full reservoir level of 105 m the reservoir of the dam has a surface area of 7.95 km and a total capacity of 97 mio. m³. The active capacity is 8 (12, 13 or 13,04) mio. m³.
639:
1028:
1003:
1018:
722:
422:
Valeira Dam is a 48 m tall (height above foundation) and 380 m long gravity dam with a crest altitude of 113 m. The volume of the dam is 220,000 m. The
511:, which can handle ships with the following maximum properties: 83 m in length, 11.40 m on the beam, 3.8 m load-draught and a cargo capacity of 2500 tons.
1043:
1023:
670:
573:
110:
855:
568:
451:
1033:
1013:
48:
404:
94:
442:
28:
1038:
604:
998:
484:) each in a dam powerhouse located on the right side of the dam. The turbine rotation is 115.4 rpm. The minimum
848:
796:
558:
977:
508:
496:
886:
681:
1008:
901:
891:
718:
677:
458:
400:
318:
185:
841:
896:
823:
864:
462:
356:
940:
906:
818:
813:
454:
972:
530:
773:
485:
477:
396:
366:
333:
98:
992:
410:
Construction of the dam began in 1971. The dam was completed in 1975. It is owned by
343:
945:
928:
544:
967:
833:
752:
426:
with 5 radial gates is part of the dam body (maximum discharge 18,000 m/s).
957:
918:
552:
481:
388:
349:
205:
923:
638:(in Portuguese). Rede Eléctrica Nacional, S.A. p. 29 (27). Archived from
520:
492:
125:
112:
538:
808:
488:
is 15.5 m, the maximum 31.5 m. Maximum flow per turbine is 360 m/s.
466:
423:
385:
202:
83:
33:
Valeira Dam downstream of the curve that follows the exceptionally tight
868:
441:
392:
215:
34:
395:, where the river forms the border line between the districts of
837:
457:
power plant was commissioned in 1976 (1975). It is operated by
470:
197:
469:. Its average annual generation is 610.7 (663, 748 or 801)
16:
Dam in municipality São João da
Pesqueira, Viseu District
365:
355:
342:
332:
324:
314:
306:
298:
290:
282:
277:
269:
261:
253:
245:
237:
229:
221:
211:
196:
191:
181:
173:
165:
157:
149:
141:
104:
89:
79:
71:
21:
633:"Hidroelectricidade em Portugal memória e desafio"
776:. Instituto Portuário e dos Transportes Marítimos
412:Companhia Portuguesa de Produção de Electricidade
177:Companhia Portuguesa de Produção de Electricidade
37:of the Douro River, known as Cachão da Valeira
849:
8:
753:"Valeira Hydroelectric Power Plant Portugal"
273:18,000 m/s (640,000 cu ft/s)
1029:Buildings and structures in Viseu District
856:
842:
834:
257:220,000 m (7,800,000 cu ft)
27:
18:
1004:Hydroelectric power stations in Portugal
1019:Energy infrastructure completed in 1975
585:
574:List of dams and reservoirs in Portugal
286:97,000,000 m (79,000 acre⋅ft)
747:
745:
743:
741:
739:
709:
707:
705:
703:
701:
627:
625:
623:
621:
599:
597:
595:
593:
591:
589:
294:8,000,000 m (6,500 acre⋅ft)
7:
665:
663:
661:
659:
403:. It is located in the municipality
302:7.95 km (3.07 sq mi)
63:Location of Valeira Dam in Portugal
55:
680:. pp. 41 (39). Archived from
569:List of power stations in Portugal
480:-generators with 82.4 (72) MW (80
14:
507:On the left side of the dam is a
951:
934:
912:
880:
551:
537:
523:
54:
47:
1044:Run-of-the-river power stations
1024:1975 establishments in Portugal
407:, in Viseu District, Portugal.
338:31.5 m (103 ft) (max)
491:The turbines were provided by
1:
476:The power station contains 3
715:"Valeira Informação Técnica"
238:Elevation at crest
824:GPX (secondary coordinates)
755:. Global Energy Observatory
671:"DECLARAÇÃO AMBIENTAL 2012"
607:. APA Barragens de Portugal
1060:
233:380 m (1,250 ft)
875:
819:GPX (primary coordinates)
794:Map all coordinates using
42:
26:
802:Download coordinates as:
310:105 m (344 ft)
241:113 m (371 ft)
222:Height (foundation)
1034:Dams on the Douro River
774:"waterway introduction"
559:Renewable energy portal
497:Brown, Boveri & Cie
357:Installed capacity
225:48 m (157 ft)
158:Construction began
1014:Dams completed in 1975
447:
381:
367:Annual generation
270:Spillway capacity
126:41.160500°N 7.374194°W
814:GPX (all coordinates)
445:
405:São João da Pesqueira
307:Normal elevation
249:6 m (20 ft)
198:Type of dam
95:São João da Pesqueira
719:Energias de Portugal
678:Energias de Portugal
495:, the generators by
325:Commission date
319:Energias de Portugal
291:Active capacity
186:Energias de Portugal
131:41.160500; -7.374194
382:Barragem da Valeira
283:Total capacity
122: /
75:Barragem da Valeira
865:Hydroelectric dams
463:nameplate capacity
461:. The plant has a
448:
262:Spillway type
246:Width (crest)
1039:Locks of Portugal
986:
985:
717:(in Portuguese).
676:(in Portuguese).
375:
374:
299:Surface area
192:Dam and spillways
166:Opening date
1051:
999:Dams in Portugal
956:
955:
954:
939:
938:
937:
917:
916:
915:
885:
884:
883:
858:
851:
844:
835:
785:
784:
782:
781:
770:
764:
763:
761:
760:
749:
734:
733:
731:
730:
721:. Archived from
711:
696:
695:
693:
692:
686:
675:
667:
654:
653:
651:
650:
644:
637:
629:
616:
615:
613:
612:
601:
561:
556:
555:
547:
542:
541:
533:
528:
527:
526:
452:run-of-the-river
137:
136:
134:
133:
132:
127:
123:
120:
119:
118:
115:
58:
57:
51:
31:
19:
1059:
1058:
1054:
1053:
1052:
1050:
1049:
1048:
989:
988:
987:
982:
952:
950:
935:
933:
913:
911:
887:Cuerda del Pozo
881:
879:
871:
862:
832:
831:
830:
829:
828:
789:
788:
779:
777:
772:
771:
767:
758:
756:
751:
750:
737:
728:
726:
713:
712:
699:
690:
688:
684:
673:
669:
668:
657:
648:
646:
642:
635:
631:
630:
619:
610:
608:
603:
602:
587:
582:
565:
564:
557:
550:
543:
536:
531:Portugal portal
529:
524:
522:
517:
505:
440:
432:
420:
254:Dam volume
130:
128:
124:
121:
116:
113:
111:
109:
108:
67:
66:
65:
64:
61:
60:
59:
38:
17:
12:
11:
5:
1057:
1055:
1047:
1046:
1041:
1036:
1031:
1026:
1021:
1016:
1011:
1006:
1001:
991:
990:
984:
983:
981:
980:
978:Crestuma–Lever
975:
970:
965:
960:
948:
943:
931:
926:
921:
909:
904:
899:
894:
889:
876:
873:
872:
863:
861:
860:
853:
846:
838:
827:
826:
821:
816:
811:
805:
799:
792:
791:
790:
787:
786:
765:
735:
697:
655:
617:
584:
583:
581:
578:
577:
576:
571:
563:
562:
548:
534:
519:
518:
516:
513:
504:
501:
486:hydraulic head
478:Kaplan turbine
439:
436:
431:
428:
419:
416:
373:
372:
369:
363:
362:
359:
353:
352:
346:
340:
339:
336:
334:Hydraulic head
330:
329:
326:
322:
321:
316:
312:
311:
308:
304:
303:
300:
296:
295:
292:
288:
287:
284:
280:
279:
275:
274:
271:
267:
266:
263:
259:
258:
255:
251:
250:
247:
243:
242:
239:
235:
234:
231:
227:
226:
223:
219:
218:
213:
209:
208:
200:
194:
193:
189:
188:
183:
179:
178:
175:
171:
170:
167:
163:
162:
159:
155:
154:
151:
147:
146:
143:
139:
138:
106:
102:
101:
99:Viseu District
91:
87:
86:
81:
77:
76:
73:
69:
68:
62:
53:
52:
46:
45:
44:
43:
40:
39:
32:
24:
23:
15:
13:
10:
9:
6:
4:
3:
2:
1056:
1045:
1042:
1040:
1037:
1035:
1032:
1030:
1027:
1025:
1022:
1020:
1017:
1015:
1012:
1010:
1007:
1005:
1002:
1000:
997:
996:
994:
979:
976:
974:
971:
969:
966:
964:
961:
959:
949:
947:
944:
942:
932:
930:
927:
925:
922:
920:
910:
908:
905:
903:
900:
898:
895:
893:
890:
888:
878:
877:
874:
870:
866:
859:
854:
852:
847:
845:
840:
839:
836:
825:
822:
820:
817:
815:
812:
810:
807:
806:
804:
803:
798:
797:OpenStreetMap
795:
775:
769:
766:
754:
748:
746:
744:
742:
740:
736:
725:on 2017-08-11
724:
720:
716:
710:
708:
706:
704:
702:
698:
687:on 2014-11-03
683:
679:
672:
666:
664:
662:
660:
656:
645:on 2021-06-27
641:
634:
628:
626:
624:
622:
618:
606:
605:"VALEIRA DAM"
600:
598:
596:
594:
592:
590:
586:
579:
575:
572:
570:
567:
566:
560:
554:
549:
546:
540:
535:
532:
521:
514:
512:
510:
502:
500:
498:
494:
489:
487:
483:
479:
474:
472:
468:
465:of 240 (216)
464:
460:
456:
455:hydroelectric
453:
444:
437:
435:
429:
427:
425:
417:
415:
413:
408:
406:
402:
398:
394:
390:
387:
383:
380:(Portuguese:
379:
370:
368:
364:
360:
358:
354:
351:
347:
345:
341:
337:
335:
331:
327:
323:
320:
317:
313:
309:
305:
301:
297:
293:
289:
285:
281:
276:
272:
268:
264:
260:
256:
252:
248:
244:
240:
236:
232:
228:
224:
220:
217:
214:
210:
207:
204:
201:
199:
195:
190:
187:
184:
180:
176:
172:
168:
164:
160:
156:
152:
148:
144:
140:
135:
107:
103:
100:
96:
93:municipality
92:
88:
85:
82:
78:
74:
72:Official name
70:
50:
41:
36:
30:
25:
20:
1009:Gravity dams
962:
801:
800:
793:
778:. Retrieved
768:
757:. Retrieved
727:. Retrieved
723:the original
689:. Retrieved
682:the original
647:. Retrieved
640:the original
609:. Retrieved
545:Water portal
506:
490:
475:
449:
433:
421:
411:
409:
377:
376:
348:3 x 82.4 MW
973:Carrapatelo
941:Aldeadávila
902:Villalcampo
892:Los Rábanos
446:Valeira Dam
438:Power plant
389:gravity dam
378:Valeira Dam
350:Kaplan-type
315:Operator(s)
206:gravity dam
182:Operator(s)
153:Operational
129: /
117:7°22′27.1″W
114:41°9′37.8″N
105:Coordinates
22:Valeira Dam
993:Categories
780:2015-02-11
759:2015-03-06
729:2015-03-06
691:2015-03-02
649:2015-03-02
611:2015-03-06
580:References
430:Reservoir
371:610.7 GWh
278:Reservoir
946:Saucelle
929:Bemposta
897:San José
515:See also
424:spillway
414:(CPPE).
401:Bragança
386:concrete
344:Turbines
265:Dam body
212:Impounds
203:Concrete
174:Owner(s)
90:Location
84:Portugal
963:Valeira
958:Pocinho
919:Miranda
867:on the
493:Kværner
391:on the
384:) is a
142:Purpose
80:Country
924:Picote
907:Castro
361:240 MW
230:Length
150:Status
968:Régua
869:Douro
685:(PDF)
674:(PDF)
643:(PDF)
636:(PDF)
397:Viseu
393:Douro
216:Douro
145:Power
35:gorge
509:lock
503:Lock
450:The
399:and
328:1976
169:1975
161:1971
809:KML
482:MVA
471:GWh
459:EDP
418:Dam
995::
738:^
700:^
658:^
620:^
588:^
499:.
473:.
467:MW
97:,
857:e
850:t
843:v
783:.
762:.
732:.
694:.
652:.
614:.
Text is available under the Creative Commons Attribution-ShareAlike License. Additional terms may apply.