1224:
31:
211:
There will be 26 stations including 20 underground stations and six elevated stations. The two corridors will have total length of 29.235 km consisting of 23.467 km underground, while 5.768 km elevated. The state government allocated 150 crores rupees in
February 2019 for the ongoing
739:
will be a three-car unit train running on standard gauge track on
Communication Based Train Control (CBTC) signalling technology with continuous automatic train control permitting an operational headway of 90 seconds.
1359:
263:(GoUP) with 50:50 equity partnerships. To maintain the financial viability of the project, additional grants have been proposed from the two governments in addition to their equity contribution.
728:
to BHU covers 19.35 km with an elevated stretch of 3.845 km and an underground stretch of 15.505 km. The second corridor consisting of 9.885 km length from Benia Bagh to
1145:
960:
1212:
724:
had been able to prepare the DPR. The DPR envisages two corridors with a total length of 29.235 km for the
Varanasi Metro Rail project. The first corridor that spreads from
882:
1163:
1102:
1908:
1181:
938:
1060:
1317:
822:
1354:
1074:
1088:
1127:
841:
1918:
1205:
735:
According to the DPR, a maintenance depot for both the corridors had been proposed at
Ganeshpur covering an area of 13.2 hectares of land. Metro in
1276:
999:
1263:
1190:
1198:
717:
686:
46:
1281:
705:
along with VDA officials. Through successive site visits, engineering surveys and review meetings/ discussions with the
Commissioner,
1410:
916:
894:
693:. Varanasi Development Authority (VDA) is the nodal agency for preparation of this DPR for Varanasi Metro. For this purpose M/s
255:
17,227 Crores including taxes and duties. The project is envisaged to be undertaken as a joint venture (JV) project between the
525:
A total of 9 Metro stations (2 Elevated: 1.923 km; 7 Underground: 7.962 km) had been proposed for the Benia Bagh to
1913:
1775:
1228:
682:
260:
985:
1765:
1333:
1038:
287:
A total of 17 Metro stations had been planned (4 Elevated: 3.845 km; 13 Underground: 15.505 km) for the
1711:
1338:
1268:
1253:
697:, a Govt of India Undertaking, has been engaged for preparing the DPR. Work on preparation of DPR for Metro in
662:
504:
292:
280:
197:
1312:
1288:
1513:
1258:
1236:
689:(UPMRC) the responsibility of āCoordinatorā for preparation of Detailed Project Report (DPR) for Metro in
1770:
1293:
673:
will be completed in two years. However, the date of the beginning of the project is yet to be decided.
1760:
1681:
316:
1796:
1475:
650:
256:
1676:
1021:
491:
862:
758:
Detailed
Project Report (DPR) dropped due new metro rail policy. New DPR to be created by RITES.
1801:
1745:
1716:
1460:
407:
1696:
1655:
1534:
1529:
455:
420:
251:
The total estimated completion cost for construction of
Varanasi Metro was estimated to be
1791:
1755:
1750:
1691:
1686:
1671:
1639:
1539:
1420:
1395:
1182:"UP Budget 2021-22: Yogi Adityanath govt proposes Rs 140 crore for development of Ayodhya"
732:
covers an elevated section of 1.923 km and an underground section of 7.962 km.
1089:"Kashi 1st Indian city to have Light Metro service | Lucknow News - Times of India"
917:"Varanasi Metro - Metro rail project awaits central govt's approval - - Metro Rail News"
1846:
1815:
1701:
1595:
1580:
1554:
1549:
1544:
895:"Varanasi Metro - Centre approves Varanasi Metro Rail Project plan - - Metro Rail News"
151:
196:. The proposed system consists of 2 corridors that span from BHEL (Tarna, Shivpur) to
1902:
1706:
1605:
1445:
1440:
1405:
1373:
220:
189:
60:
701:
commenced in May, 2015 involving series of site visits by LMRC team led by LMRC and
1851:
1830:
1610:
1590:
1559:
1498:
1455:
1450:
1430:
1425:
812:
228:
1876:
1871:
1861:
1600:
1585:
1508:
1503:
1465:
1435:
1415:
1400:
939:"Centre will approve Kanpur metro project soon: Venkaiah Naidu - Times of India"
817:
123:
1103:"Passenger load, lack of funds push Kashi Metro off the rails - Times of India"
1881:
1866:
1856:
1493:
1470:
1390:
232:
181:
74:
271:
Two corridors had been planned by
Varanasi Development Authority (VDA) were:
1730:
223:
state government had planned to introduce a metro rail system in cities of
1624:
961:"Centre approves plan for Varanasi and Kanpur metro - The Economic Times"
736:
710:
706:
698:
690:
669:
will take about four years, while the second corridor from Benia Bagh to
224:
185:
56:
1022:"Detailed Project Report for Rail Based Mass Transit System in Varanasi"
1146:"Light Metro keeps hopes of modern transport alive for people of Kashi"
729:
670:
637:
526:
518:
201:
243:
for a detailed project including feasibility and financial viability.
239:
to conduct a traffic analysis. The government had planned to approach
1223:
721:
702:
694:
240:
236:
205:
204:(9.885 km). The feasibility study of the project was done by
193:
64:
1164:"DPR for rapid transit system in Varanasi to be reviewed in Sept"
1061:"DPRS returned, fate of Varanasi, Kanpur Metro projects in limbo"
883:
Kanpur, Varanasi metro rail projects could start by
December 2016
235:. Government has hired an infrastructure development enterprise,
725:
666:
288:
276:
30:
1194:
842:"DPR of Varanasi Metro Rail Project approved - Times of India"
792:
Detailed
Project Report (DPR) to be reviewed for metro rail.
709:
and VDA officials, Metro corridors have been finalised for
1075:"UP Metro Rail Corporation to come into being in December"
770:
Varanasi Metro Rail Project rejected due to lack of funds.
1039:"Varanasi Metro DPR formally presented to the Government"
764:
New DPR to be commissioned under 'New Metro Rail Policy'.
1128:"Budget allocation for preliminary work-Times of India"
1839:
1823:
1814:
1784:
1738:
1729:
1664:
1648:
1632:
1623:
1573:
1522:
1484:
1383:
1372:
1360:
DelhiāSonipatāPanipat Regional Rapid Transit System
1347:
1326:
1302:
1246:
1235:
166:
158:
122:
114:
109:
101:
96:
88:
80:
70:
52:
42:
37:
23:
786:Metro rail found infeasible; light metro proposed.
863:"Varanasi Metro Rail Project - - Metro Rail News"
986:"Detailed project report for the Varanasi Metro"
776:In UP Budget 2019, CM Yogi Adityanath allocated
1206:
8:
1820:
1735:
1629:
1380:
1318:DelhiāMeerut Regional Rapid Transit System
1243:
1213:
1199:
1191:
29:
1355:DelhiāAlwar Regional Rapid Transit System
531:
297:
184:transit system proposed for the city of
1909:Proposed rapid transit in Uttar Pradesh
833:
1264:Hyderabad Multi-Modal Transport System
1000:"Metro in Varanasi a challenging task"
20:
7:
1041:. Lucknow Metro Rail Corporation Ltd
718:Uttar Pradesh Metro Rail Corporation
687:Uttar Pradesh Metro Rail Corporation
47:Uttar Pradesh Metro Rail Corporation
798:Uttar Pradesh government allocates
1277:BarabankiāLucknow Suburban Railway
200:(19.35 km) and Benia Bagh to
14:
752:Detailed Project Report approved.
1919:Standard gauge railways in India
1222:
677:Detailed Project Report Findings
208:and was completed in June 2015.
1282:LucknowāKanpur Suburban Railway
118:29.235 km (18.166 mi)
1776:Thiruvananthapuram Light Metro
1:
212:metro projects in the state.
1229:Urban rail transit in India
683:Government of Uttar Pradesh
261:Government of Uttar Pradesh
1935:
1766:Kolkata Light Rail Transit
1334:Ahmedabad Suburban Railway
1313:Bengaluru Suburban Railway
716:Under the coordination of
517:Corridor 2: Benia Bagh to
170:90 km/h (56 mph)
162:35 km/h (22 mph)
802:100 crores for the metro.
28:
16:Light rail transit system
1712:Tiruchirappalli Monorail
1339:Nagpur broad-gauge Metro
1269:Kolkata Suburban Railway
1254:Chennai Suburban Railway
663:Banaras Hindu University
661:The first corridor from
505:Banaras Hindu University
281:Banaras Hindu University
198:Banaras Hindu University
1289:Mumbai Suburban Railway
713:city and DPR prepared.
1259:Delhi Suburban Railway
1914:Transport in Varanasi
1771:Kozhikode Light Metro
1294:Pune Suburban Railway
1761:Greater Nashik Metro
1682:Bhubaneswar Monorail
1063:. 16 September 2017.
685:(GoUP) had assigned
1797:Visakhapatnam Metro
1494:Bhoj Metro (Bhopal)
1476:Rapid Metro Gurgaon
1077:. 29 November 2017.
283:and (19.35 km)
257:Government of India
1677:Bengaluru Monorail
1168:The Times of India
1150:The Times of India
1132:The Times of India
1107:The Times of India
965:The Economic Times
919:. 8 September 2016
492:Tulsi Manas Mandir
89:Number of stations
1894:
1893:
1890:
1889:
1810:
1809:
1802:Uttarakhand Metro
1746:Chennai Metrolite
1725:
1724:
1717:Warangal Monorail
1619:
1618:
1514:Bhubaneswar Metro
1461:Navi Mumbai Metro
1368:
1367:
823:DelhiāMeerut RRTS
659:
658:
514:
513:
458:(Chitranjan Park)
408:Varanasi Junction
174:
173:
1926:
1821:
1736:
1697:Kolkata Monorail
1656:Chennai Monorail
1630:
1535:Coimbatore Metro
1530:Chandigarh Metro
1381:
1244:
1227:
1226:
1215:
1208:
1201:
1192:
1186:
1185:
1178:
1172:
1171:
1160:
1154:
1153:
1142:
1136:
1135:
1124:
1118:
1117:
1115:
1113:
1099:
1093:
1092:
1085:
1079:
1078:
1071:
1065:
1064:
1057:
1051:
1050:
1048:
1046:
1035:
1029:
1028:
1026:
1018:
1012:
1011:
1009:
1007:
1002:. Times of India
996:
990:
989:
982:
976:
975:
973:
971:
956:
950:
949:
947:
945:
935:
929:
928:
926:
924:
913:
907:
906:
904:
902:
891:
885:
880:
874:
873:
871:
869:
859:
853:
852:
850:
848:
838:
801:
779:
532:
456:Kashi Vishwanath
421:Kashi Vidyapeeth
298:
254:
154:
148:
146:
145:
141:
138:
130:
33:
21:
1934:
1933:
1929:
1928:
1927:
1925:
1924:
1923:
1899:
1898:
1895:
1886:
1835:
1806:
1792:Prayagraj Metro
1780:
1756:Gorakhpur Metro
1751:Delhi Metrolite
1721:
1692:Kanpur Monorail
1687:Indore Monorail
1672:Aizawl Monorail
1660:
1644:
1640:Mumbai Monorail
1615:
1569:
1540:Gorakhpur Metro
1518:
1486:
1480:
1421:Hyderabad Metro
1401:Bengaluru Metro
1396:Ahmedabad Metro
1375:
1364:
1343:
1322:
1306:
1304:
1298:
1238:
1231:
1221:
1219:
1189:
1180:
1179:
1175:
1162:
1161:
1157:
1144:
1143:
1139:
1126:
1125:
1121:
1111:
1109:
1101:
1100:
1096:
1087:
1086:
1082:
1073:
1072:
1068:
1059:
1058:
1054:
1044:
1042:
1037:
1036:
1032:
1024:
1020:
1019:
1015:
1005:
1003:
998:
997:
993:
984:
983:
979:
969:
967:
958:
957:
953:
943:
941:
937:
936:
932:
922:
920:
915:
914:
910:
900:
898:
893:
892:
888:
881:
877:
867:
865:
861:
860:
856:
846:
844:
840:
839:
835:
831:
809:
799:
790:September 2020:
777:
756:September 2017:
746:
679:
582:Kashi Bus Depot
521:(9.885 km)
269:
252:
249:
218:
150:
143:
139:
136:
134:
133:4 ft
132:
128:
81:Number of lines
17:
12:
11:
5:
1932:
1930:
1922:
1921:
1916:
1911:
1901:
1900:
1892:
1891:
1888:
1887:
1885:
1884:
1879:
1874:
1869:
1864:
1859:
1854:
1849:
1847:Bhavnagar Tram
1843:
1841:
1837:
1836:
1834:
1833:
1827:
1825:
1818:
1812:
1811:
1808:
1807:
1805:
1804:
1799:
1794:
1788:
1786:
1782:
1781:
1779:
1778:
1773:
1768:
1763:
1758:
1753:
1748:
1742:
1740:
1733:
1727:
1726:
1723:
1722:
1720:
1719:
1714:
1709:
1704:
1702:Patna Monorail
1699:
1694:
1689:
1684:
1679:
1674:
1668:
1666:
1662:
1661:
1659:
1658:
1652:
1650:
1646:
1645:
1643:
1642:
1636:
1634:
1627:
1621:
1620:
1617:
1616:
1614:
1613:
1608:
1603:
1598:
1596:Srinagar Metro
1593:
1588:
1583:
1581:Bareilly Metro
1577:
1575:
1571:
1570:
1568:
1567:
1565:Varanasi Metro
1562:
1557:
1555:Ludhiana Metro
1552:
1550:Jabalpur Metro
1547:
1545:Guwahati Metro
1542:
1537:
1532:
1526:
1524:
1520:
1519:
1517:
1516:
1511:
1506:
1501:
1496:
1490:
1488:
1482:
1481:
1479:
1478:
1473:
1468:
1463:
1458:
1453:
1448:
1443:
1438:
1433:
1428:
1423:
1418:
1413:
1408:
1403:
1398:
1393:
1387:
1385:
1378:
1370:
1369:
1366:
1365:
1363:
1362:
1357:
1351:
1349:
1345:
1344:
1342:
1341:
1336:
1330:
1328:
1324:
1323:
1321:
1320:
1315:
1309:
1307:
1300:
1299:
1297:
1296:
1291:
1286:
1285:
1284:
1279:
1271:
1266:
1261:
1256:
1250:
1248:
1241:
1233:
1232:
1220:
1218:
1217:
1210:
1203:
1195:
1188:
1187:
1173:
1155:
1137:
1119:
1094:
1080:
1066:
1052:
1030:
1013:
991:
977:
959:Sharma, Aman.
951:
930:
908:
886:
875:
854:
832:
830:
827:
826:
825:
820:
815:
808:
805:
804:
803:
796:February 2021:
793:
787:
781:
774:February 2019:
771:
765:
762:December 2017:
759:
753:
745:
744:Status updates
742:
678:
675:
657:
656:
653:
648:
644:
643:
640:
635:
631:
630:
627:
624:
620:
619:
616:
613:
609:
608:
605:
602:
598:
597:
594:
591:
587:
586:
583:
580:
576:
575:
572:
569:
565:
564:
561:
558:
554:
553:
550:
547:
543:
542:
541:Station level
539:
536:
523:
522:
512:
511:
508:
502:
498:
497:
494:
489:
485:
484:
481:
478:
474:
473:
470:
467:
463:
462:
459:
453:
449:
448:
445:
442:
438:
437:
434:
431:
427:
426:
423:
418:
414:
413:
410:
405:
401:
400:
397:
394:
390:
389:
386:
383:
379:
378:
375:
372:
368:
367:
364:
361:
357:
356:
353:
350:
346:
345:
342:
339:
335:
334:
331:
328:
324:
323:
320:
313:
309:
308:
307:Station level
305:
302:
285:
284:
268:
265:
259:(GoI) and the
248:
245:
217:
214:
178:Varanasi Metro
172:
171:
168:
164:
163:
160:
156:
155:
152:standard gauge
126:
120:
119:
116:
112:
111:
107:
106:
103:
99:
98:
94:
93:
90:
86:
85:
82:
78:
77:
72:
68:
67:
54:
50:
49:
44:
40:
39:
35:
34:
26:
25:
24:Varanasi Metro
15:
13:
10:
9:
6:
4:
3:
2:
1931:
1920:
1917:
1915:
1912:
1910:
1907:
1906:
1904:
1897:
1883:
1880:
1878:
1875:
1873:
1870:
1868:
1865:
1863:
1860:
1858:
1855:
1853:
1850:
1848:
1845:
1844:
1842:
1838:
1832:
1829:
1828:
1826:
1822:
1819:
1817:
1813:
1803:
1800:
1798:
1795:
1793:
1790:
1789:
1787:
1783:
1777:
1774:
1772:
1769:
1767:
1764:
1762:
1759:
1757:
1754:
1752:
1749:
1747:
1744:
1743:
1741:
1737:
1734:
1732:
1728:
1718:
1715:
1713:
1710:
1708:
1707:Pune Monorail
1705:
1703:
1700:
1698:
1695:
1693:
1690:
1688:
1685:
1683:
1680:
1678:
1675:
1673:
1670:
1669:
1667:
1663:
1657:
1654:
1653:
1651:
1647:
1641:
1638:
1637:
1635:
1631:
1628:
1626:
1622:
1612:
1609:
1607:
1606:Madurai Metro
1604:
1602:
1599:
1597:
1594:
1592:
1589:
1587:
1584:
1582:
1579:
1578:
1576:
1572:
1566:
1563:
1561:
1558:
1556:
1553:
1551:
1548:
1546:
1543:
1541:
1538:
1536:
1533:
1531:
1528:
1527:
1525:
1521:
1515:
1512:
1510:
1507:
1505:
1502:
1500:
1497:
1495:
1492:
1491:
1489:
1483:
1477:
1474:
1472:
1469:
1467:
1464:
1462:
1459:
1457:
1454:
1452:
1449:
1447:
1446:Lucknow Metro
1444:
1442:
1441:Kolkata Metro
1439:
1437:
1434:
1432:
1429:
1427:
1424:
1422:
1419:
1417:
1414:
1412:
1409:
1407:
1406:Chennai Metro
1404:
1402:
1399:
1397:
1394:
1392:
1389:
1388:
1386:
1382:
1379:
1377:
1371:
1361:
1358:
1356:
1353:
1352:
1350:
1346:
1340:
1337:
1335:
1332:
1331:
1329:
1325:
1319:
1316:
1314:
1311:
1310:
1308:
1301:
1295:
1292:
1290:
1287:
1283:
1280:
1278:
1275:
1274:
1272:
1270:
1267:
1265:
1262:
1260:
1257:
1255:
1252:
1251:
1249:
1245:
1242:
1240:
1234:
1230:
1225:
1216:
1211:
1209:
1204:
1202:
1197:
1196:
1193:
1183:
1177:
1174:
1169:
1165:
1159:
1156:
1151:
1147:
1141:
1138:
1133:
1129:
1123:
1120:
1108:
1104:
1098:
1095:
1090:
1084:
1081:
1076:
1070:
1067:
1062:
1056:
1053:
1040:
1034:
1031:
1023:
1017:
1014:
1001:
995:
992:
987:
981:
978:
966:
962:
955:
952:
940:
934:
931:
918:
912:
909:
897:. 24 May 2016
896:
890:
887:
884:
879:
876:
864:
858:
855:
843:
837:
834:
828:
824:
821:
819:
816:
814:
811:
810:
806:
797:
794:
791:
788:
785:
782:
775:
772:
769:
766:
763:
760:
757:
754:
751:
748:
747:
743:
741:
738:
733:
731:
727:
723:
720:(UPMRC), M/s
719:
714:
712:
708:
704:
700:
696:
692:
688:
684:
676:
674:
672:
668:
664:
654:
652:
651:Orderly Bazar
649:
646:
645:
641:
639:
636:
633:
632:
628:
625:
622:
621:
617:
614:
611:
610:
606:
603:
600:
599:
595:
592:
589:
588:
584:
581:
578:
577:
573:
571:Machodri Park
570:
567:
566:
562:
559:
556:
555:
551:
548:
545:
544:
540:
537:
534:
533:
530:
528:
520:
516:
515:
509:
506:
503:
500:
499:
495:
493:
490:
487:
486:
482:
480:Ratnakar Park
479:
476:
475:
471:
468:
465:
464:
460:
457:
454:
451:
450:
446:
443:
440:
439:
435:
432:
429:
428:
424:
422:
419:
416:
415:
411:
409:
406:
403:
402:
398:
395:
392:
391:
387:
384:
381:
380:
376:
373:
370:
369:
365:
362:
359:
358:
354:
352:Sangam Colony
351:
348:
347:
343:
340:
337:
336:
332:
329:
326:
325:
321:
318:
314:
311:
310:
306:
303:
300:
299:
296:
294:
290:
282:
278:
274:
273:
272:
266:
264:
262:
258:
246:
244:
242:
238:
234:
230:
226:
222:
221:Uttar Pradesh
215:
213:
209:
207:
203:
199:
195:
191:
190:Uttar Pradesh
187:
183:
179:
169:
165:
161:
159:Average speed
157:
153:
129:1,435 mm
127:
125:
121:
117:
115:System length
113:
108:
104:
100:
95:
92:26 (Proposed)
91:
87:
83:
79:
76:
73:
69:
66:
62:
61:Uttar Pradesh
58:
55:
51:
48:
45:
41:
36:
32:
27:
22:
19:
1896:
1852:Chennai Tram
1831:Kolkata Tram
1611:Trichy Metro
1591:Ranchi Metro
1564:
1560:Meerut Metro
1499:Indore Metro
1487:construction
1456:Nagpur Metro
1451:Mumbai Metro
1431:Kanpur Metro
1426:Jaipur Metro
1411:Chennai MRTS
1305:construction
1176:
1167:
1158:
1149:
1140:
1131:
1122:
1110:. Retrieved
1106:
1097:
1083:
1069:
1055:
1043:. Retrieved
1033:
1016:
1004:. Retrieved
994:
980:
968:. Retrieved
964:
954:
942:. Retrieved
933:
921:. Retrieved
911:
899:. Retrieved
889:
878:
866:. Retrieved
857:
845:. Retrieved
836:
813:Meerut Metro
795:
789:
784:August 2020:
783:
773:
767:
761:
755:
749:
734:
715:
680:
660:
655:Underground
642:Underground
629:Underground
596:Underground
585:Underground
574:Underground
563:Underground
552:Underground
524:
510:Underground
496:Underground
483:Underground
472:Underground
469:Bangali Tola
461:Underground
447:Underground
436:Underground
425:Underground
412:Underground
399:Underground
388:Underground
385:Collectorate
377:Underground
366:Underground
286:
275:Corridor 1:
270:
250:
219:
210:
177:
175:
102:Train length
84:2 (Proposed)
71:Transit type
18:
1877:Nashik Tram
1872:Mumbai Tram
1862:Kanpur Tram
1824:Operational
1633:Operational
1601:Thane Metro
1586:Jammu Metro
1509:Surat Metro
1504:Patna Metro
1466:Noida Metro
1436:Kochi Metro
1416:Delhi Metro
1384:Operational
1247:Operational
1045:12 December
818:Noida Metro
780:150 crores.
604:Punchkroshi
363:Gilat Bazar
124:Track gauge
1903:Categories
1882:Patna Tram
1867:Kochi Tram
1857:Delhi Tram
1471:Pune Metro
1391:Agra Metro
970:24 October
944:24 October
923:24 October
901:24 October
868:24 October
847:24 October
829:References
768:June 2018:
593:Jalalipura
549:Benia Bagh
529:corridor.
444:Benia Bagh
295:corridor.
182:light rail
75:Light rail
1731:Metrolite
1006:8 October
750:May 2016:
665:(BHU) to
618:Elevated
607:Elevated
538:Stations
433:Rathyatra
374:Bhojubeer
355:Elevated
344:Elevated
333:Elevated
322:Elevated
304:Stations
167:Top speed
110:Technical
105:3 coaches
97:Operation
1785:Proposed
1665:Proposed
1625:Monorail
1574:Proposed
1348:Proposed
1273:Lucknow
1237:Suburban
807:See Also
737:Varanasi
711:Varanasi
707:Varanasi
699:Varanasi
691:Varanasi
225:Varanasi
186:Varanasi
147: in
57:Varanasi
38:Overview
1840:Defunct
1739:Planned
1649:Planned
1523:Planned
1376:transit
1327:Planned
1112:24 June
730:Sarnath
671:Sarnath
638:Sarnath
626:Havelia
615:Ashapur
560:Kotwali
527:Sarnath
519:Sarnath
396:Nadesar
341:Shivpur
216:History
202:Sarnath
142:⁄
535:S.No.
315:BHEL (
301:S.No.
229:Meerut
53:Locale
1485:Under
1374:Rapid
1303:Under
1025:(PDF)
722:RITES
703:RITES
695:RITES
507:(BHU)
330:Tarna
317:Tarna
267:Route
241:RITES
237:RITES
206:RITES
194:India
180:is a
65:India
43:Owner
1816:Tram
1239:rail
1114:2018
1047:2016
1008:2016
972:2016
946:2016
925:2016
903:2016
870:2016
849:2016
726:BHEL
681:The
667:BHEL
289:BHEL
277:BHEL
247:Cost
233:Agra
231:and
176:The
293:BHU
291:to
279:to
1905::
1166:.
1148:.
1130:.
1105:.
963:.
647:10
501:17
488:16
477:15
466:14
452:13
441:12
430:11
417:10
227:,
192:,
188:,
149:)
63:,
59:,
1214:e
1207:t
1200:v
1184:.
1170:.
1152:.
1134:.
1116:.
1091:.
1049:.
1027:.
1010:.
988:.
974:.
948:.
927:.
905:.
872:.
851:.
800:ā¹
778:ā¹
634:9
623:8
612:7
601:6
590:5
579:4
568:3
557:2
546:1
404:9
393:8
382:7
371:6
360:5
349:4
338:3
327:2
319:)
312:1
253:ā¹
144:2
140:1
137:+
135:8
131:(
Text is available under the Creative Commons Attribution-ShareAlike License. Additional terms may apply.