Varanasi Metro

Source šŸ“

1224: 31: 211:
There will be 26 stations including 20 underground stations and six elevated stations. The two corridors will have total length of 29.235 km consisting of 23.467 km underground, while 5.768 km elevated. The state government allocated 150 crores rupees in February 2019 for the ongoing
739:
will be a three-car unit train running on standard gauge track on Communication Based Train Control (CBTC) signalling technology with continuous automatic train control permitting an operational headway of 90 seconds.
1359: 263:(GoUP) with 50:50 equity partnerships. To maintain the financial viability of the project, additional grants have been proposed from the two governments in addition to their equity contribution. 728:
to BHU covers 19.35 km with an elevated stretch of 3.845 km and an underground stretch of 15.505 km. The second corridor consisting of 9.885 km length from Benia Bagh to
1145: 960: 1212: 724:
had been able to prepare the DPR. The DPR envisages two corridors with a total length of 29.235 km for the Varanasi Metro Rail project. The first corridor that spreads from
882: 1163: 1102: 1908: 1181: 938: 1060: 1317: 822: 1354: 1074: 1088: 1127: 841: 1918: 1205: 735:
According to the DPR, a maintenance depot for both the corridors had been proposed at Ganeshpur covering an area of 13.2 hectares of land. Metro in
1276: 999: 1263: 1190: 1198: 717: 686: 46: 1281: 705:
along with VDA officials. Through successive site visits, engineering surveys and review meetings/ discussions with the Commissioner,
1410: 916: 894: 693:. Varanasi Development Authority (VDA) is the nodal agency for preparation of this DPR for Varanasi Metro. For this purpose M/s 255:
17,227 Crores including taxes and duties. The project is envisaged to be undertaken as a joint venture (JV) project between the
525:
A total of 9 Metro stations (2 Elevated: 1.923 km; 7 Underground: 7.962 km) had been proposed for the Benia Bagh to
1913: 1775: 1228: 682: 260: 985: 1765: 1333: 1038: 287:
A total of 17 Metro stations had been planned (4 Elevated: 3.845 km; 13 Underground: 15.505 km) for the
1711: 1338: 1268: 1253: 697:, a Govt of India Undertaking, has been engaged for preparing the DPR. Work on preparation of DPR for Metro in 662: 504: 292: 280: 197: 1312: 1288: 1513: 1258: 1236: 689:(UPMRC) the responsibility of ā€˜Coordinatorā€™ for preparation of Detailed Project Report (DPR) for Metro in 1770: 1293: 673:
will be completed in two years. However, the date of the beginning of the project is yet to be decided.
1760: 1681: 316: 1796: 1475: 650: 256: 1676: 1021: 491: 862: 758:
Detailed Project Report (DPR) dropped due new metro rail policy. New DPR to be created by RITES.
1801: 1745: 1716: 1460: 407: 1696: 1655: 1534: 1529: 455: 420: 251:
The total estimated completion cost for construction of Varanasi Metro was estimated to be
1791: 1755: 1750: 1691: 1686: 1671: 1639: 1539: 1420: 1395: 1182:"UP Budget 2021-22: Yogi Adityanath govt proposes Rs 140 crore for development of Ayodhya" 732:
covers an elevated section of 1.923 km and an underground section of 7.962 km.
1089:"Kashi 1st Indian city to have Light Metro service | Lucknow News - Times of India" 917:"Varanasi Metro - Metro rail project awaits central govt's approval - - Metro Rail News" 1846: 1815: 1701: 1595: 1580: 1554: 1549: 1544: 895:"Varanasi Metro - Centre approves Varanasi Metro Rail Project plan - - Metro Rail News" 151: 196:. The proposed system consists of 2 corridors that span from BHEL (Tarna, Shivpur) to 1902: 1706: 1605: 1445: 1440: 1405: 1373: 220: 189: 60: 701:
commenced in May, 2015 involving series of site visits by LMRC team led by LMRC and
1851: 1830: 1610: 1590: 1559: 1498: 1455: 1450: 1430: 1425: 812: 228: 1876: 1871: 1861: 1600: 1585: 1508: 1503: 1465: 1435: 1415: 1400: 939:"Centre will approve Kanpur metro project soon: Venkaiah Naidu - Times of India" 817: 123: 1103:"Passenger load, lack of funds push Kashi Metro off the rails - Times of India" 1881: 1866: 1856: 1493: 1470: 1390: 232: 181: 74: 271:
Two corridors had been planned by Varanasi Development Authority (VDA) were:
1730: 223:
state government had planned to introduce a metro rail system in cities of
1624: 961:"Centre approves plan for Varanasi and Kanpur metro - The Economic Times" 736: 710: 706: 698: 690: 669:
will take about four years, while the second corridor from Benia Bagh to
224: 185: 56: 1022:"Detailed Project Report for Rail Based Mass Transit System in Varanasi" 1146:"Light Metro keeps hopes of modern transport alive for people of Kashi" 729: 670: 637: 526: 518: 201: 243:
for a detailed project including feasibility and financial viability.
239:
to conduct a traffic analysis. The government had planned to approach
1223: 721: 702: 694: 240: 236: 205: 204:(9.885 km). The feasibility study of the project was done by 193: 64: 1164:"DPR for rapid transit system in Varanasi to be reviewed in Sept" 1061:"DPRS returned, fate of Varanasi, Kanpur Metro projects in limbo" 883:
Kanpur, Varanasi metro rail projects could start by December 2016
235:. Government has hired an infrastructure development enterprise, 725: 666: 288: 276: 30: 1194: 842:"DPR of Varanasi Metro Rail Project approved - Times of India" 792:
Detailed Project Report (DPR) to be reviewed for metro rail.
709:
and VDA officials, Metro corridors have been finalised for
1075:"UP Metro Rail Corporation to come into being in December" 770:
Varanasi Metro Rail Project rejected due to lack of funds.
1039:"Varanasi Metro DPR formally presented to the Government" 764:
New DPR to be commissioned under 'New Metro Rail Policy'.
1128:"Budget allocation for preliminary work-Times of India" 1839: 1823: 1814: 1784: 1738: 1729: 1664: 1648: 1632: 1623: 1573: 1522: 1484: 1383: 1372: 1360:
Delhiā€“Sonipatā€“Panipat Regional Rapid Transit System
1347: 1326: 1302: 1246: 1235: 166: 158: 122: 114: 109: 101: 96: 88: 80: 70: 52: 42: 37: 23: 786:Metro rail found infeasible; light metro proposed. 863:"Varanasi Metro Rail Project - - Metro Rail News" 986:"Detailed project report for the Varanasi Metro" 776:In UP Budget 2019, CM Yogi Adityanath allocated 1206: 8: 1820: 1735: 1629: 1380: 1318:Delhiā€“Meerut Regional Rapid Transit System 1243: 1213: 1199: 1191: 29: 1355:Delhiā€“Alwar Regional Rapid Transit System 531: 297: 184:transit system proposed for the city of 1909:Proposed rapid transit in Uttar Pradesh 833: 1264:Hyderabad Multi-Modal Transport System 1000:"Metro in Varanasi a challenging task" 20: 7: 1041:. Lucknow Metro Rail Corporation Ltd 718:Uttar Pradesh Metro Rail Corporation 687:Uttar Pradesh Metro Rail Corporation 47:Uttar Pradesh Metro Rail Corporation 798:Uttar Pradesh government allocates 1277:Barabankiā€“Lucknow Suburban Railway 200:(19.35 km) and Benia Bagh to 14: 752:Detailed Project Report approved. 1919:Standard gauge railways in India 1222: 677:Detailed Project Report Findings 208:and was completed in June 2015. 1282:Lucknowā€“Kanpur Suburban Railway 118:29.235 km (18.166 mi) 1776:Thiruvananthapuram Light Metro 1: 212:metro projects in the state. 1229:Urban rail transit in India 683:Government of Uttar Pradesh 261:Government of Uttar Pradesh 1935: 1766:Kolkata Light Rail Transit 1334:Ahmedabad Suburban Railway 1313:Bengaluru Suburban Railway 716:Under the coordination of 517:Corridor 2: Benia Bagh to 170:90 km/h (56 mph) 162:35 km/h (22 mph) 802:100 crores for the metro. 28: 16:Light rail transit system 1712:Tiruchirappalli Monorail 1339:Nagpur broad-gauge Metro 1269:Kolkata Suburban Railway 1254:Chennai Suburban Railway 663:Banaras Hindu University 661:The first corridor from 505:Banaras Hindu University 281:Banaras Hindu University 198:Banaras Hindu University 1289:Mumbai Suburban Railway 713:city and DPR prepared. 1259:Delhi Suburban Railway 1914:Transport in Varanasi 1771:Kozhikode Light Metro 1294:Pune Suburban Railway 1761:Greater Nashik Metro 1682:Bhubaneswar Monorail 1063:. 16 September 2017. 685:(GoUP) had assigned 1797:Visakhapatnam Metro 1494:Bhoj Metro (Bhopal) 1476:Rapid Metro Gurgaon 1077:. 29 November 2017. 283:and (19.35 km) 257:Government of India 1677:Bengaluru Monorail 1168:The Times of India 1150:The Times of India 1132:The Times of India 1107:The Times of India 965:The Economic Times 919:. 8 September 2016 492:Tulsi Manas Mandir 89:Number of stations 1894: 1893: 1890: 1889: 1810: 1809: 1802:Uttarakhand Metro 1746:Chennai Metrolite 1725: 1724: 1717:Warangal Monorail 1619: 1618: 1514:Bhubaneswar Metro 1461:Navi Mumbai Metro 1368: 1367: 823:Delhiā€“Meerut RRTS 659: 658: 514: 513: 458:(Chitranjan Park) 408:Varanasi Junction 174: 173: 1926: 1821: 1736: 1697:Kolkata Monorail 1656:Chennai Monorail 1630: 1535:Coimbatore Metro 1530:Chandigarh Metro 1381: 1244: 1227: 1226: 1215: 1208: 1201: 1192: 1186: 1185: 1178: 1172: 1171: 1160: 1154: 1153: 1142: 1136: 1135: 1124: 1118: 1117: 1115: 1113: 1099: 1093: 1092: 1085: 1079: 1078: 1071: 1065: 1064: 1057: 1051: 1050: 1048: 1046: 1035: 1029: 1028: 1026: 1018: 1012: 1011: 1009: 1007: 1002:. Times of India 996: 990: 989: 982: 976: 975: 973: 971: 956: 950: 949: 947: 945: 935: 929: 928: 926: 924: 913: 907: 906: 904: 902: 891: 885: 880: 874: 873: 871: 869: 859: 853: 852: 850: 848: 838: 801: 779: 532: 456:Kashi Vishwanath 421:Kashi Vidyapeeth 298: 254: 154: 148: 146: 145: 141: 138: 130: 33: 21: 1934: 1933: 1929: 1928: 1927: 1925: 1924: 1923: 1899: 1898: 1895: 1886: 1835: 1806: 1792:Prayagraj Metro 1780: 1756:Gorakhpur Metro 1751:Delhi Metrolite 1721: 1692:Kanpur Monorail 1687:Indore Monorail 1672:Aizawl Monorail 1660: 1644: 1640:Mumbai Monorail 1615: 1569: 1540:Gorakhpur Metro 1518: 1486: 1480: 1421:Hyderabad Metro 1401:Bengaluru Metro 1396:Ahmedabad Metro 1375: 1364: 1343: 1322: 1306: 1304: 1298: 1238: 1231: 1221: 1219: 1189: 1180: 1179: 1175: 1162: 1161: 1157: 1144: 1143: 1139: 1126: 1125: 1121: 1111: 1109: 1101: 1100: 1096: 1087: 1086: 1082: 1073: 1072: 1068: 1059: 1058: 1054: 1044: 1042: 1037: 1036: 1032: 1024: 1020: 1019: 1015: 1005: 1003: 998: 997: 993: 984: 983: 979: 969: 967: 958: 957: 953: 943: 941: 937: 936: 932: 922: 920: 915: 914: 910: 900: 898: 893: 892: 888: 881: 877: 867: 865: 861: 860: 856: 846: 844: 840: 839: 835: 831: 809: 799: 790:September 2020: 777: 756:September 2017: 746: 679: 582:Kashi Bus Depot 521:(9.885 km) 269: 252: 249: 218: 150: 143: 139: 136: 134: 133:4 ft  132: 128: 81:Number of lines 17: 12: 11: 5: 1932: 1930: 1922: 1921: 1916: 1911: 1901: 1900: 1892: 1891: 1888: 1887: 1885: 1884: 1879: 1874: 1869: 1864: 1859: 1854: 1849: 1847:Bhavnagar Tram 1843: 1841: 1837: 1836: 1834: 1833: 1827: 1825: 1818: 1812: 1811: 1808: 1807: 1805: 1804: 1799: 1794: 1788: 1786: 1782: 1781: 1779: 1778: 1773: 1768: 1763: 1758: 1753: 1748: 1742: 1740: 1733: 1727: 1726: 1723: 1722: 1720: 1719: 1714: 1709: 1704: 1702:Patna Monorail 1699: 1694: 1689: 1684: 1679: 1674: 1668: 1666: 1662: 1661: 1659: 1658: 1652: 1650: 1646: 1645: 1643: 1642: 1636: 1634: 1627: 1621: 1620: 1617: 1616: 1614: 1613: 1608: 1603: 1598: 1596:Srinagar Metro 1593: 1588: 1583: 1581:Bareilly Metro 1577: 1575: 1571: 1570: 1568: 1567: 1565:Varanasi Metro 1562: 1557: 1555:Ludhiana Metro 1552: 1550:Jabalpur Metro 1547: 1545:Guwahati Metro 1542: 1537: 1532: 1526: 1524: 1520: 1519: 1517: 1516: 1511: 1506: 1501: 1496: 1490: 1488: 1482: 1481: 1479: 1478: 1473: 1468: 1463: 1458: 1453: 1448: 1443: 1438: 1433: 1428: 1423: 1418: 1413: 1408: 1403: 1398: 1393: 1387: 1385: 1378: 1370: 1369: 1366: 1365: 1363: 1362: 1357: 1351: 1349: 1345: 1344: 1342: 1341: 1336: 1330: 1328: 1324: 1323: 1321: 1320: 1315: 1309: 1307: 1300: 1299: 1297: 1296: 1291: 1286: 1285: 1284: 1279: 1271: 1266: 1261: 1256: 1250: 1248: 1241: 1233: 1232: 1220: 1218: 1217: 1210: 1203: 1195: 1188: 1187: 1173: 1155: 1137: 1119: 1094: 1080: 1066: 1052: 1030: 1013: 991: 977: 959:Sharma, Aman. 951: 930: 908: 886: 875: 854: 832: 830: 827: 826: 825: 820: 815: 808: 805: 804: 803: 796:February 2021: 793: 787: 781: 774:February 2019: 771: 765: 762:December 2017: 759: 753: 745: 744:Status updates 742: 678: 675: 657: 656: 653: 648: 644: 643: 640: 635: 631: 630: 627: 624: 620: 619: 616: 613: 609: 608: 605: 602: 598: 597: 594: 591: 587: 586: 583: 580: 576: 575: 572: 569: 565: 564: 561: 558: 554: 553: 550: 547: 543: 542: 541:Station level 539: 536: 523: 522: 512: 511: 508: 502: 498: 497: 494: 489: 485: 484: 481: 478: 474: 473: 470: 467: 463: 462: 459: 453: 449: 448: 445: 442: 438: 437: 434: 431: 427: 426: 423: 418: 414: 413: 410: 405: 401: 400: 397: 394: 390: 389: 386: 383: 379: 378: 375: 372: 368: 367: 364: 361: 357: 356: 353: 350: 346: 345: 342: 339: 335: 334: 331: 328: 324: 323: 320: 313: 309: 308: 307:Station level 305: 302: 285: 284: 268: 265: 259:(GoI) and the 248: 245: 217: 214: 178:Varanasi Metro 172: 171: 168: 164: 163: 160: 156: 155: 152:standard gauge 126: 120: 119: 116: 112: 111: 107: 106: 103: 99: 98: 94: 93: 90: 86: 85: 82: 78: 77: 72: 68: 67: 54: 50: 49: 44: 40: 39: 35: 34: 26: 25: 24:Varanasi Metro 15: 13: 10: 9: 6: 4: 3: 2: 1931: 1920: 1917: 1915: 1912: 1910: 1907: 1906: 1904: 1897: 1883: 1880: 1878: 1875: 1873: 1870: 1868: 1865: 1863: 1860: 1858: 1855: 1853: 1850: 1848: 1845: 1844: 1842: 1838: 1832: 1829: 1828: 1826: 1822: 1819: 1817: 1813: 1803: 1800: 1798: 1795: 1793: 1790: 1789: 1787: 1783: 1777: 1774: 1772: 1769: 1767: 1764: 1762: 1759: 1757: 1754: 1752: 1749: 1747: 1744: 1743: 1741: 1737: 1734: 1732: 1728: 1718: 1715: 1713: 1710: 1708: 1707:Pune Monorail 1705: 1703: 1700: 1698: 1695: 1693: 1690: 1688: 1685: 1683: 1680: 1678: 1675: 1673: 1670: 1669: 1667: 1663: 1657: 1654: 1653: 1651: 1647: 1641: 1638: 1637: 1635: 1631: 1628: 1626: 1622: 1612: 1609: 1607: 1606:Madurai Metro 1604: 1602: 1599: 1597: 1594: 1592: 1589: 1587: 1584: 1582: 1579: 1578: 1576: 1572: 1566: 1563: 1561: 1558: 1556: 1553: 1551: 1548: 1546: 1543: 1541: 1538: 1536: 1533: 1531: 1528: 1527: 1525: 1521: 1515: 1512: 1510: 1507: 1505: 1502: 1500: 1497: 1495: 1492: 1491: 1489: 1483: 1477: 1474: 1472: 1469: 1467: 1464: 1462: 1459: 1457: 1454: 1452: 1449: 1447: 1446:Lucknow Metro 1444: 1442: 1441:Kolkata Metro 1439: 1437: 1434: 1432: 1429: 1427: 1424: 1422: 1419: 1417: 1414: 1412: 1409: 1407: 1406:Chennai Metro 1404: 1402: 1399: 1397: 1394: 1392: 1389: 1388: 1386: 1382: 1379: 1377: 1371: 1361: 1358: 1356: 1353: 1352: 1350: 1346: 1340: 1337: 1335: 1332: 1331: 1329: 1325: 1319: 1316: 1314: 1311: 1310: 1308: 1301: 1295: 1292: 1290: 1287: 1283: 1280: 1278: 1275: 1274: 1272: 1270: 1267: 1265: 1262: 1260: 1257: 1255: 1252: 1251: 1249: 1245: 1242: 1240: 1234: 1230: 1225: 1216: 1211: 1209: 1204: 1202: 1197: 1196: 1193: 1183: 1177: 1174: 1169: 1165: 1159: 1156: 1151: 1147: 1141: 1138: 1133: 1129: 1123: 1120: 1108: 1104: 1098: 1095: 1090: 1084: 1081: 1076: 1070: 1067: 1062: 1056: 1053: 1040: 1034: 1031: 1023: 1017: 1014: 1001: 995: 992: 987: 981: 978: 966: 962: 955: 952: 940: 934: 931: 918: 912: 909: 897:. 24 May 2016 896: 890: 887: 884: 879: 876: 864: 858: 855: 843: 837: 834: 828: 824: 821: 819: 816: 814: 811: 810: 806: 797: 794: 791: 788: 785: 782: 775: 772: 769: 766: 763: 760: 757: 754: 751: 748: 747: 743: 741: 738: 733: 731: 727: 723: 720:(UPMRC), M/s 719: 714: 712: 708: 704: 700: 696: 692: 688: 684: 676: 674: 672: 668: 664: 654: 652: 651:Orderly Bazar 649: 646: 645: 641: 639: 636: 633: 632: 628: 625: 622: 621: 617: 614: 611: 610: 606: 603: 600: 599: 595: 592: 589: 588: 584: 581: 578: 577: 573: 571:Machodri Park 570: 567: 566: 562: 559: 556: 555: 551: 548: 545: 544: 540: 537: 534: 533: 530: 528: 520: 516: 515: 509: 506: 503: 500: 499: 495: 493: 490: 487: 486: 482: 480:Ratnakar Park 479: 476: 475: 471: 468: 465: 464: 460: 457: 454: 451: 450: 446: 443: 440: 439: 435: 432: 429: 428: 424: 422: 419: 416: 415: 411: 409: 406: 403: 402: 398: 395: 392: 391: 387: 384: 381: 380: 376: 373: 370: 369: 365: 362: 359: 358: 354: 352:Sangam Colony 351: 348: 347: 343: 340: 337: 336: 332: 329: 326: 325: 321: 318: 314: 311: 310: 306: 303: 300: 299: 296: 294: 290: 282: 278: 274: 273: 272: 266: 264: 262: 258: 246: 244: 242: 238: 234: 230: 226: 222: 221:Uttar Pradesh 215: 213: 209: 207: 203: 199: 195: 191: 190:Uttar Pradesh 187: 183: 179: 169: 165: 161: 159:Average speed 157: 153: 129:1,435 mm 127: 125: 121: 117: 115:System length 113: 108: 104: 100: 95: 92:26 (Proposed) 91: 87: 83: 79: 76: 73: 69: 66: 62: 61:Uttar Pradesh 58: 55: 51: 48: 45: 41: 36: 32: 27: 22: 19: 1896: 1852:Chennai Tram 1831:Kolkata Tram 1611:Trichy Metro 1591:Ranchi Metro 1564: 1560:Meerut Metro 1499:Indore Metro 1487:construction 1456:Nagpur Metro 1451:Mumbai Metro 1431:Kanpur Metro 1426:Jaipur Metro 1411:Chennai MRTS 1305:construction 1176: 1167: 1158: 1149: 1140: 1131: 1122: 1110:. Retrieved 1106: 1097: 1083: 1069: 1055: 1043:. Retrieved 1033: 1016: 1004:. Retrieved 994: 980: 968:. Retrieved 964: 954: 942:. Retrieved 933: 921:. Retrieved 911: 899:. Retrieved 889: 878: 866:. Retrieved 857: 845:. Retrieved 836: 813:Meerut Metro 795: 789: 784:August 2020: 783: 773: 767: 761: 755: 749: 734: 715: 680: 660: 655:Underground 642:Underground 629:Underground 596:Underground 585:Underground 574:Underground 563:Underground 552:Underground 524: 510:Underground 496:Underground 483:Underground 472:Underground 469:Bangali Tola 461:Underground 447:Underground 436:Underground 425:Underground 412:Underground 399:Underground 388:Underground 385:Collectorate 377:Underground 366:Underground 286: 275:Corridor 1: 270: 250: 219: 210: 177: 175: 102:Train length 84:2 (Proposed) 71:Transit type 18: 1877:Nashik Tram 1872:Mumbai Tram 1862:Kanpur Tram 1824:Operational 1633:Operational 1601:Thane Metro 1586:Jammu Metro 1509:Surat Metro 1504:Patna Metro 1466:Noida Metro 1436:Kochi Metro 1416:Delhi Metro 1384:Operational 1247:Operational 1045:12 December 818:Noida Metro 780:150 crores. 604:Punchkroshi 363:Gilat Bazar 124:Track gauge 1903:Categories 1882:Patna Tram 1867:Kochi Tram 1857:Delhi Tram 1471:Pune Metro 1391:Agra Metro 970:24 October 944:24 October 923:24 October 901:24 October 868:24 October 847:24 October 829:References 768:June 2018: 593:Jalalipura 549:Benia Bagh 529:corridor. 444:Benia Bagh 295:corridor. 182:light rail 75:Light rail 1731:Metrolite 1006:8 October 750:May 2016: 665:(BHU) to 618:Elevated 607:Elevated 538:Stations 433:Rathyatra 374:Bhojubeer 355:Elevated 344:Elevated 333:Elevated 322:Elevated 304:Stations 167:Top speed 110:Technical 105:3 coaches 97:Operation 1785:Proposed 1665:Proposed 1625:Monorail 1574:Proposed 1348:Proposed 1273:Lucknow 1237:Suburban 807:See Also 737:Varanasi 711:Varanasi 707:Varanasi 699:Varanasi 691:Varanasi 225:Varanasi 186:Varanasi 147: in 57:Varanasi 38:Overview 1840:Defunct 1739:Planned 1649:Planned 1523:Planned 1376:transit 1327:Planned 1112:24 June 730:Sarnath 671:Sarnath 638:Sarnath 626:Havelia 615:Ashapur 560:Kotwali 527:Sarnath 519:Sarnath 396:Nadesar 341:Shivpur 216:History 202:Sarnath 142:⁄ 535:S.No. 315:BHEL ( 301:S.No. 229:Meerut 53:Locale 1485:Under 1374:Rapid 1303:Under 1025:(PDF) 722:RITES 703:RITES 695:RITES 507:(BHU) 330:Tarna 317:Tarna 267:Route 241:RITES 237:RITES 206:RITES 194:India 180:is a 65:India 43:Owner 1816:Tram 1239:rail 1114:2018 1047:2016 1008:2016 972:2016 946:2016 925:2016 903:2016 870:2016 849:2016 726:BHEL 681:The 667:BHEL 289:BHEL 277:BHEL 247:Cost 233:Agra 231:and 176:The 293:BHU 291:to 279:to 1905:: 1166:. 1148:. 1130:. 1105:. 963:. 647:10 501:17 488:16 477:15 466:14 452:13 441:12 430:11 417:10 227:, 192:, 188:, 149:) 63:, 59:, 1214:e 1207:t 1200:v 1184:. 1170:. 1152:. 1134:. 1116:. 1091:. 1049:. 1027:. 1010:. 988:. 974:. 948:. 927:. 905:. 872:. 851:. 800:ā‚¹ 778:ā‚¹ 634:9 623:8 612:7 601:6 590:5 579:4 568:3 557:2 546:1 404:9 393:8 382:7 371:6 360:5 349:4 338:3 327:2 319:) 312:1 253:ā‚¹ 144:2 140:1 137:+ 135:8 131:(

Index


Uttar Pradesh Metro Rail Corporation
Varanasi
Uttar Pradesh
India
Light rail
Track gauge
standard gauge
light rail
Varanasi
Uttar Pradesh
India
Banaras Hindu University
Sarnath
RITES
Uttar Pradesh
Varanasi
Meerut
Agra
RITES
RITES
Government of India
Government of Uttar Pradesh
BHEL
Banaras Hindu University
BHEL
BHU
Tarna
Varanasi Junction
Kashi Vidyapeeth