was already in use, traffic had to be suspended three times a day to allow progress of the works. Initial blast yield was lower and then gradually increased in order to achieve optimum results while maintaining safety. Finally, noise and oscillations of the first tunnel tube and the oil pipeline were constantly monitored to detect any sign of damage. Rock blasting started on June 9, 2005 and lasted until August 15, 2005, with more than 220 charges fired. At each of those times, traffic through the first tunnel tube was suspended for safety reasons. The first tube of the tunnel, now carrying southbound traffic, is further characterized by the fact that it comprises three traffic lanes instead of standard two traffic lanes.
106: 28: 266: 35: 195:
Construction of the second tunnel tube was particularly complex due to proximity of the first tunnel tube excavated in five years earlier. Since axes of the two are merely 25 metres (82 ft) apart, and an oil pipeline runs nearby, blasting entailed special precautions. Since the first tunnel tube
191:
tunnels. The first, 1,115-metre (3,658 ft) tunnel tube of Veliki Gložac Tunnel was excavated by Spie Batignolles and Mediteran Union Tunnel on August 29, 2000, while the second, somewhat longer, tube was excavated by Viadukt and Hidroelektra on November 25, 2005.
183:. The construction works contract was cancelled in 2001, and the works were resumed by Viadukt and Hidroelektra in 2002 after a new contract was awarded to them. Similar timeline of events also went on in case of 626: 423: 528: 393: 636: 580: 63: 317: 401: 27: 631: 167:, tested Veliki Gložac Tunnel in 2008, when it achieved very good results—ranking among the four safest road tunnels in Europe. 621: 452: 365: 216:) and summer (ASDT) traffic volumes are attributed to the fact that the motorway carries substantial tourist traffic to 56: 343: 591: 205: 298: 144:. There are no other toll plazas related to use of the tunnel. Construction of the tunnel was completed by 133: 180: 397: 128:
route. It is 1,126 metres (3,694 ft) long and consists of two tunnel tubes. It is located between
184: 188: 156: 155:
European Tunnel Assessment Program (EuroTAP), a tunnel safety assessment program supported by the
149: 495: 321: 117: 370: 176: 105: 550: 396:[The 103rd session of the Government of the Republic of Croatia] (in Croatian). 209: 466: 265: 615: 141: 293: 221: 125: 137: 553:[Construction of the second tubes of Čardak and Veliki Gložac tunnels] 527:[The second Veliki Gložac tunnel tube excavated today] (in Croatian). 224:
resorts. The traffic count is performed using analysis of toll ticket sales.
78: 65: 428: 455:[Račan: We shall drive through Javorova Kosa Tunnel for Christmas] 524: 129: 461: 145: 498:[Veliki Gložac Tunnel on Rijeka - Zagreb motorway excavated]. 217: 104: 213: 164: 208:, operator of the A6 motorway and the tunnel, and published by 581:"Traffic counting on the roadways of Croatia in 2009 - digest" 160: 368:[Veliki Gložac Tunnel among the top four in Europe]. 320:[Tunnels] (in Croatian). Hidroelektra. Archived from 496:"Probijen tunel Veliki Gložac na autocesti Rijeka - Zagreb" 229: 627:
Buildings and structures in Primorje-Gorski Kotar County
453:"Račan: Tunelom Javorova Kosa provozat ćemo se za Božić" 551:"Izgradnja drugih cijevi tunela Čardak i Veliki Gložac" 489: 487: 281:
Between Bosiljevo 2 and Vrbovsko interchanges.
175:
Construction of Veliki Gložac Tunnel was started by
366:"Tunel Veliki Gložac među četiri najbolja u Europi" 94: 55: 50: 519: 517: 525:"Danas proboj druge cijevi tunela Veliki Gložac" 426:[Spie Batignolles leaves the tunnels]. 344:"Tunnel "Veliki Gložac" Rijeka-Zagreb highway" 256: 251: 246: 241: 236: 529:Ministry of Sea, Transport and Infrastructure 204:Traffic is regularly counted and reported by 8: 34: 16: 42:Location of Veliki Gložac Tunnel in Croatia 15: 637:Transport in Primorje-Gorski Kotar County 212:. Substantial variations between annual ( 394:"103. sjednica Vlade Republike Hrvatske" 226: 561:(in Croatian) (5). HUKA. September 2005 451:Mladen Jambrović (September 21, 2002). 309: 7: 494:Mladen Jambrović (August 30, 2000). 124:) is one of 13 tunnels found on the 231:Veliki Gložac Tunnel traffic volume 14: 424:"Spie Batignoles napustio tunele" 264: 163:and led by German motoring club 33: 26: 432:(in Croatian). January 30, 2002 400:. July 26, 2001. Archived from 1: 590:. May 1, 2010. Archived from 465:(in Croatian). Archived from 206:Autocesta Rijeka–Zagreb 142:closed toll collection system 277: 274: 136:interchanges. The tunnel is 272:3022 Bosiljevo 2 west 653: 632:Tunnels completed in 2000 99: 21: 622:Road tunnels in Croatia 299:List of longest tunnels 140:within the A6 motorway 79:45.382055°N 15.161819°E 121: 110: 398:Government of Croatia 181:Mediteran Union Tunel 108: 597:on February 21, 2011 126:Croatian A6 motorway 114:Veliki Gložac Tunnel 109:Veliki Gložac Tunnel 84:45.382055; 15.161819 17:Veliki Gložac Tunnel 531:. November 25, 2005 157:European Commission 122:Tunel Veliki Gložac 75: /  18: 111: 285: 284: 159:, coordinated by 103: 102: 644: 607: 606: 604: 602: 596: 585: 577: 571: 570: 568: 566: 556: 547: 541: 540: 538: 536: 521: 512: 511: 509: 507: 491: 482: 481: 479: 477: 471: 458: 448: 442: 441: 439: 437: 420: 414: 413: 411: 409: 404:on March 8, 2012 390: 384: 383: 381: 379: 374:. April 23, 2008 371:Poslovni dnevnik 362: 356: 355: 353: 351: 340: 334: 333: 331: 329: 324:on July 13, 2010 314: 268: 227: 177:Spie Batignolles 134:Bosiljevo 2 90: 89: 87: 86: 85: 80: 76: 73: 72: 71: 68: 37: 36: 30: 19: 652: 651: 647: 646: 645: 643: 642: 641: 612: 611: 610: 600: 598: 594: 583: 579: 578: 574: 564: 562: 554: 549: 548: 544: 534: 532: 523: 522: 515: 505: 503: 493: 492: 485: 475: 473: 472:on May 21, 2003 469: 456: 450: 449: 445: 435: 433: 422: 421: 417: 407: 405: 392: 391: 387: 377: 375: 364: 363: 359: 349: 347: 342: 341: 337: 327: 325: 316: 315: 311: 307: 290: 202: 173: 83: 81: 77: 74: 69: 66: 64: 62: 61: 46: 45: 44: 43: 40: 39: 38: 12: 11: 5: 650: 648: 640: 639: 634: 629: 624: 614: 613: 609: 608: 588:Hrvatske Ceste 572: 542: 513: 483: 443: 415: 385: 357: 335: 308: 306: 303: 302: 301: 296: 289: 286: 283: 282: 279: 276: 273: 270: 261: 260: 255: 250: 245: 240: 234: 233: 210:Hrvatske ceste 201: 200:Traffic volume 198: 172: 169: 101: 100: 97: 96: 92: 91: 59: 53: 52: 48: 47: 41: 32: 31: 25: 24: 23: 22: 13: 10: 9: 6: 4: 3: 2: 649: 638: 635: 633: 630: 628: 625: 623: 620: 619: 617: 593: 589: 582: 576: 573: 560: 552: 546: 543: 530: 526: 520: 518: 514: 502:(in Croatian) 501: 497: 490: 488: 484: 468: 464: 463: 454: 447: 444: 431: 430: 425: 419: 416: 403: 399: 395: 389: 386: 373: 372: 367: 361: 358: 345: 339: 336: 323: 319: 313: 310: 304: 300: 297: 295: 292: 291: 287: 280: 271: 267: 263: 262: 259: 254: 249: 244: 243:Counting site 239: 235: 232: 228: 225: 223: 219: 215: 211: 207: 199: 197: 193: 190: 186: 185:Javorova Kosa 182: 178: 170: 168: 166: 162: 158: 153: 151: 147: 143: 139: 135: 131: 127: 123: 119: 115: 107: 98: 93: 88: 60: 58: 54: 49: 29: 20: 599:. Retrieved 592:the original 587: 575: 563:. Retrieved 558: 545: 533:. Retrieved 504:. Retrieved 499: 474:. Retrieved 467:the original 460: 446: 434:. Retrieved 427: 418: 406:. Retrieved 402:the original 388: 376:. Retrieved 369: 360: 348:. Retrieved 338: 326:. Retrieved 322:the original 312: 257: 252: 247: 242: 237: 230: 222:Kvarner Gulf 203: 194: 174: 171:Construction 154: 150:Hidroelektra 113: 112: 565:October 10, 559:HUKA Bilten 535:October 10, 506:October 10, 436:October 10, 378:October 10, 350:October 10, 328:October 10, 294:A6 motorway 82: / 57:Coordinates 616:Categories 601:October 5, 476:October 9, 408:October 9, 305:References 70:15°09′43″E 67:45°22′55″N 429:Novi list 346:. Viadukt 189:Podvugleš 95:Route map 318:"Tuneli" 288:See also 130:Vrbovsko 118:Croatian 51:Overview 500:Vjesnik 462:Vjesnik 278:19,401 275:11,448 146:Viadukt 218:Istria 138:tolled 595:(PDF) 584:(PDF) 555:(PDF) 470:(PDF) 457:(PDF) 258:Notes 603:2010 567:2010 537:2010 508:2010 478:2010 438:2010 410:2010 380:2010 352:2010 330:2010 253:ASDT 248:AADT 238:Road 220:and 214:AADT 187:and 179:and 165:ADAC 148:and 132:and 269:A6 161:FIA 618:: 586:. 557:. 516:^ 486:^ 459:. 152:. 120:: 605:. 569:. 539:. 510:. 480:. 440:. 412:. 382:. 354:. 332:. 116:(

Index

Veliki Gložac Tunnel is located in Croatia
Coordinates
45°22′55″N 15°09′43″E / 45.382055°N 15.161819°E / 45.382055; 15.161819
Tunnel portal in a snow covered slope, variable traffic signs indicating traffic flow direction are visible at the tunnel entrance
Croatian
Croatian A6 motorway
Vrbovsko
Bosiljevo 2
tolled
closed toll collection system
Viadukt
Hidroelektra
European Commission
FIA
ADAC
Spie Batignolles
Mediteran Union Tunel
Javorova Kosa
Podvugleš
Autocesta Rijeka–Zagreb
Hrvatske ceste
AADT
Istria
Kvarner Gulf

A6 motorway
List of longest tunnels
"Tuneli"
the original
"Tunnel "Veliki Gložac" Rijeka-Zagreb highway"

Text is available under the Creative Commons Attribution-ShareAlike License. Additional terms may apply.