Knowledge (XXG)

Vevey–Chardonne–Mont Pèlerin funicular railway

Source 📝

31: 1097:
together with private enterprise cost just over CHF 4.8 million. During the work a replacement bus service was provided (as far as possible) to cover for the funicular journeys. The Golden Pass identity for the funicular, it is hoped, will give it more of a national and international naming and it is hoped will bring in more visitors through this branding. The new colours of the carriages will be applied to other funiculars in the Golden Pass Group as well as buses and trains, other than the Golden Pass Panoramic and Golden Pass Classic which they operate.
980: 898: 780: 727: 720: 713: 873: 612: 552: 510: 866: 496: 473: 841: 810: 756: 688: 663: 620: 545: 538: 503: 577: 1263: 738: 1096:
In the summer of 2009, the line was closed for major infrastructure work to be carried out and at the same time the two carriages refurbished and rebranded in "Golden Pass" livery. The work, which was completed by 25 September 2009, and which involved the technical services of the Golden Pass group
1070:. The line rises from 393 m (1,289 ft) at Vevey to 807 m (2,648 ft) at its summit, a total of 414 m (1,358 ft) over its 1,584 m (5,197 ft) length, with a maximum gradient of 54% (1 in 1.84). Construction was by the 168: 125: 958: 951: 84: 944: 1267: 586: 1293: 1160: 30: 1308: 1288: 269: 54: 1298: 1081: 1313: 1179: 1145: 216: 1066:
but is unusual in that it has three intermediate halts (Corseaux, Chardonne and la Baume). The lower station is located next to
562: 1106: 427: 1303: 1174: 1071: 1067: 634: 1085: 1077:
consortium. Nowadays, the line, which is electrically operated, is automatic, with a journey time of 10 minutes.
741: 1136:
Michel Grandguillaume, Gérald Hadorn, Jean Paillard, Jean-Louis Rochaix (1982), "Vevey–Chardonne–Mont-Pèlerin",
524: 380: 1198: 482: 1210: 1031: 333: 1232: 1120: 1154: 1141: 1245: 992: 519: 1024: 906: 1012: 1273: 979: 1282: 398: 1063: 765: 337: 227: 1035: 1008: 349: 344: 72: 591: 1105:
The lower terminus (Vevey-Funiculaire terminus) of the line is served by the
184: 170: 141: 127: 99: 86: 1000: 818: 789: 251: 449: 1262: 1140:(in French), Lausanne: Bureau vaudois d'adresses (BVA), pp. 237–242, 1074: 1016: 235: 1030:
The line was constructed in 1899 and opened the following year. It is a
422: 630: 1020: 822: 231: 1209: 59:
Compagnie du Chemin de fer funiculaire Vevey-Chardonne-Mont-Pèlerin
1004: 978: 457: 68: 997:
Chemin de fer funiculaire Vevey–Chardonne–Mont Pèlerin
16:
Funicular railway in the Canton of Vaud, Switzerland
1121:"The Vevey–Mont Pélerin Funicular Electric Railway" 397: 389: 379: 343: 329: 321: 316: 308: 289: 284: 276: 265: 257: 247: 242: 222: 212: 115: 78: 64: 50: 42: 37: 23: 1088:) company under their GoldenPass services banner. 989:Vevey–Chardonne–Mont Pèlerin funicular railway 24:Vevey–Chardonne–Mont Pèlerin funicular railway 952: 8: 1159:: CS1 maint: multiple names: authors list ( 959: 945: 435: 408: 1274:Funimag-article: VCP - Vevey Mont Pélerin 1080:The operating company became part of the 1294:Defunct railway companies of Switzerland 1199:"2050 Mont- Pèlerin - Chardonne - Vevey" 1084:in 2001 and is now marketed by the MOB ( 1206:Fahrplanfelder.ch, Tableaux-horaires.ch 1190: 1082:Transports Montreux-Vevey-Riviera (MVR) 410: 1268:Vevey–Chardonne–Mont Pèlerin funicular 1241: 1230: 1152: 20: 7: 1138:Crémaillères et funiculaires vaudois 619: 611: 1309:Metre gauge railways in Switzerland 737: 983:The lower station of the funicular 14: 1289:Funicular railways in Switzerland 1180:List of funiculars in Switzerland 1109:, specifically line 201 of VMCV. 270:Transports Montreux–Vevey–Riviera 55:Transports Montreux–Vevey–Riviera 1261: 897: 896: 871: 864: 839: 808: 779: 778: 754: 736: 726: 725: 719: 718: 712: 711: 686: 661: 618: 610: 575: 550: 543: 536: 508: 501: 494: 471: 29: 1299:Transport in the canton of Vaud 1007:, a town on the north shore of 872: 551: 509: 1: 865: 495: 472: 226:6 (including (La Baume, 1314:Railway lines opened in 1900 840: 809: 755: 687: 662: 544: 537: 502: 325:1,584 m (5,197 ft) 576: 1330: 1175:List of funicular railways 1068:Vevey-Funi railway station 393:807 m (2,648 ft) 1107:Riviera trolleybus system 1086:Montreux-Oberland Bernois 890: 858: 833: 802: 772: 763: 748: 734: 705: 680: 655: 602: 584: 569: 559: 530: 517: 488: 480: 465: 446: 438: 407: 28: 1225:Journal du Pays d'Enhaut 1125:The Engineering Magazine 1119:Bignami, Enrico (1902). 1015:, through the Chardonne 996: 984: 982: 142:46.468531°N 6.83598°E 1270:at Wikimedia Commons 1131:. New York: 363–372. 185:46.48182°N 6.83152°E 100:46.47540°N 6.83403°E 1208:(in French), 2022, 1003:which runs between 641:formerly Vevey-Plan 563:Vevey–Chexbres line 180: /  137: /  96: /  1304:Transport in Vevey 985: 147:46.468531; 6.83598 1266:Media related to 1240:Missing or empty 1227:. 1 October 2009. 977: 976: 973: 972: 969: 968: 933: 932: 645: 644: 390:Highest elevation 293:24 July 1900 190:46.48182; 6.83152 105:46.47540; 6.83403 1321: 1265: 1250: 1249: 1243: 1238: 1236: 1228: 1221: 1215: 1214: 1213: 1203: 1195: 1164: 1158: 1150: 1132: 1061: 1057: 1055: 1054: 1050: 1047: 1038: 961: 954: 947: 941: 900: 899: 875: 874: 868: 867: 843: 842: 812: 811: 782: 781: 758: 757: 740: 739: 729: 728: 722: 721: 715: 714: 690: 689: 665: 664: 631: 622: 621: 614: 613: 597: 594: 579: 578: 554: 553: 547: 546: 540: 539: 512: 511: 505: 504: 498: 497: 475: 474: 451: 436: 423: 409: 375: 371: 369: 368: 364: 361: 352: 330:Number of tracks 304: 302: 297: 213:Connecting lines 204: 203: 201: 200: 199: 197: 192: 191: 186: 181: 178: 177: 176: 173: 165:"Mont-Pèlerin" ( 161: 160: 158: 157: 156: 154: 149: 148: 143: 138: 135: 134: 133: 130: 122:"Vevey (funi)" ( 111: 110: 108: 107: 106: 101: 97: 94: 93: 92: 89: 33: 21: 1329: 1328: 1324: 1323: 1322: 1320: 1319: 1318: 1279: 1278: 1258: 1253: 1239: 1229: 1223: 1222: 1218: 1201: 1197: 1196: 1192: 1188: 1171: 1151: 1148: 1135: 1118: 1115: 1113:Further reading 1103: 1094: 1059: 1052: 1048: 1045: 1043: 1042:3 ft  1041: 1036: 965: 939: 913: 901: 886: 876: 869: 854: 844: 829: 813: 798: 793: 783: 768: 759: 744: 730: 723: 716: 701: 691: 676: 666: 651: 624: 623: 616: 615: 598: 592: 589: 580: 565: 555: 548: 541: 513: 506: 499: 476: 461: 460: 455: 453: 430: 414: 399:Maximum incline 381:Electrification 373: 366: 362: 359: 357: 356:3 ft  355: 350: 300: 298: 296:(124 years ago) 295: 294: 208: 195: 193: 189: 187: 183: 182: 179: 174: 171: 169: 167: 166: 152: 150: 146: 144: 140: 139: 136: 131: 128: 126: 124: 123: 104: 102: 98: 95: 90: 87: 85: 83: 82: 17: 12: 11: 5: 1327: 1325: 1317: 1316: 1311: 1306: 1301: 1296: 1291: 1281: 1280: 1277: 1276: 1271: 1257: 1256:External links 1254: 1252: 1251: 1216: 1189: 1187: 1184: 1183: 1182: 1177: 1170: 1167: 1166: 1165: 1146: 1133: 1114: 1111: 1102: 1099: 1093: 1090: 1013:canton of Vaud 975: 974: 971: 970: 967: 966: 964: 963: 956: 949: 940:This diagram: 938: 935: 934: 931: 930: 928: 926: 924: 922: 920: 918: 915: 914: 911: 909: 904: 902: 895: 893: 891: 888: 887: 884: 882: 879: 877: 870: 863: 861: 859: 856: 855: 852: 850: 847: 845: 838: 836: 834: 831: 830: 827: 825: 816: 814: 807: 805: 803: 800: 799: 796: 794: 788: 786: 784: 777: 775: 773: 770: 769: 764: 762: 760: 753: 751: 749: 746: 745: 735: 733: 731: 724: 717: 710: 708: 706: 703: 702: 699: 697: 694: 692: 685: 683: 681: 678: 677: 674: 672: 669: 667: 660: 658: 656: 653: 652: 649: 647: 643: 642: 638: 637: 627: 625: 617: 609: 608: 607: 605: 603: 600: 599: 585: 583: 581: 574: 572: 570: 567: 566: 561: 558: 556: 549: 542: 535: 533: 531: 528: 527: 516: 514: 507: 500: 493: 491: 489: 486: 485: 479: 477: 470: 468: 466: 463: 462: 448: 447: 445: 443: 441: 439: 432: 431: 426: 416: 415: 412: 405: 404: 401: 395: 394: 391: 387: 386: 383: 377: 376: 347: 341: 340: 331: 327: 326: 323: 319: 318: 314: 313: 310: 306: 305: 291: 287: 286: 282: 281: 278: 274: 273: 267: 263: 262: 259: 255: 254: 249: 245: 244: 240: 239: 224: 220: 219: 217:Vevey–Chexbres 214: 210: 209: 207: 206: 163: 119: 117: 113: 112: 80: 76: 75: 66: 62: 61: 57:(since 2001); 52: 48: 47: 44: 40: 39: 35: 34: 26: 25: 15: 13: 10: 9: 6: 4: 3: 2: 1326: 1315: 1312: 1310: 1307: 1305: 1302: 1300: 1297: 1295: 1292: 1290: 1287: 1286: 1284: 1275: 1272: 1269: 1264: 1260: 1259: 1255: 1247: 1234: 1226: 1220: 1217: 1212: 1207: 1200: 1194: 1191: 1185: 1181: 1178: 1176: 1173: 1172: 1168: 1162: 1156: 1149: 1147:2-88125-002-5 1143: 1139: 1134: 1130: 1126: 1122: 1117: 1116: 1112: 1110: 1108: 1100: 1098: 1092:Refurbishment 1091: 1089: 1087: 1083: 1078: 1076: 1073: 1069: 1065: 1064:passing point 1039: 1037:1,000 mm 1033: 1028: 1026: 1022: 1018: 1014: 1010: 1006: 1002: 998: 994: 990: 981: 962: 957: 955: 950: 948: 943: 942: 937: 936: 929: 927: 925: 923: 921: 919: 917: 916: 910: 908: 905: 903: 894: 892: 889: 883: 881:Mont-Pèlerin 880: 878: 862: 860: 857: 851: 848: 846: 837: 835: 832: 826: 824: 820: 817: 815: 806: 804: 801: 795: 791: 787: 785: 776: 774: 771: 767: 761: 752: 750: 747: 743: 732: 709: 707: 704: 698: 695: 693: 684: 682: 679: 673: 670: 668: 659: 657: 654: 648: 640: 639: 636: 633: 632: 628: 626: 606: 604: 601: 595: 588: 582: 573: 571: 568: 564: 557: 534: 532: 529: 526: 522: 521: 515: 492: 490: 487: 484: 478: 469: 467: 464: 459: 454:or length (m) 444: 442: 440: 437: 434: 433: 429: 425: 424: 421: 418: 417: 411: 406: 402: 400: 396: 392: 388: 384: 382: 378: 353: 351:1,000 mm 348: 346: 342: 339: 335: 332: 328: 324: 320: 315: 311: 307: 292: 288: 283: 279: 277:Rolling stock 275: 271: 268: 264: 260: 256: 253: 250: 246: 241: 237: 234:, Beau-Site, 233: 229: 225: 221: 218: 215: 211: 202: 164: 159: 121: 120: 118: 114: 109: 81: 77: 74: 70: 67: 63: 60: 56: 53: 49: 45: 41: 36: 32: 27: 22: 19: 1242:|title= 1224: 1219: 1205: 1193: 1137: 1128: 1124: 1104: 1095: 1079: 1032:single track 1029: 1025:Mont Pèlerin 999:; VCP) is a 988: 986: 907:Mont Pèlerin 766:passing loop 646:   520:Simplon line 518: 419: 385:from opening 338:passing loop 309:Enhancements 272:(short: MVR) 258:Route number 196:Mont-Pèlerin 153:Vevey (funi) 58: 46:in operation 18: 1060:metre gauge 1009:Lake Geneva 560:Vevey-Funi 374:metre gauge 345:Track gauge 322:Line length 266:Operator(s) 188: / 145: / 103: / 79:Coordinates 73:Switzerland 1283:Categories 1186:References 1072:Doppelmayr 696:Beau-Site 635:Vevey-Funi 301:1900-07-24 194: ( 172:46°28′55″N 151: ( 129:46°28′07″N 88:46°28′31″N 1233:cite news 1062:) with a 1017:vineyards 1001:funicular 849:La Baume 819:Chardonne 790:Chardonne 671:Corseaux 413:Route map 317:Technical 252:Funicular 228:Chardonne 175:6°49′53″E 132:6°50′10″E 91:6°50′03″E 1169:See also 1155:citation 1075:Von Roll 1056: in 525:Lausanne 370: in 236:Corseaux 223:Stations 38:Overview 1051:⁄ 1011:in the 365:⁄ 299: ( 285:History 243:Service 116:Termini 1144:  1101:Access 1021:Lavaux 993:French 912:1080 M 823:Jongny 792:Tunnel 596:  590:  458:metres 428:Legend 420: 290:Opened 232:Jongny 65:Locale 43:Status 1202:(PDF) 1005:Vevey 885:806 M 853:657 M 828:589 M 797:118 m 700:496 M 675:442 M 650:389 M 629: 483:Vevey 336:with 51:Owner 1246:help 1211:2050 1161:link 1142:ISBN 987:The 960:edit 953:talk 946:view 587:VMCV 450:elev 312:2014 261:2050 248:Type 69:Vaud 1034:of 1023:to 1019:of 742:A 9 593:201 523:to 481:to 456:in 452:(M) 403:54% 1285:: 1237:: 1235:}} 1231:{{ 1204:, 1157:}} 1153:{{ 1129:12 1127:. 1123:. 1058:) 1027:. 995:: 372:) 71:, 1248:) 1244:( 1163:) 1053:8 1049:3 1046:+ 1044:3 1040:( 991:( 821:- 367:8 363:3 360:+ 358:3 354:( 334:1 303:) 280:2 238:) 230:- 205:) 198:) 162:) 155:)

Index


Transports Montreux–Vevey–Riviera
Vaud
Switzerland
46°28′31″N 6°50′03″E / 46.47540°N 6.83403°E / 46.47540; 6.83403
46°28′07″N 6°50′10″E / 46.468531°N 6.83598°E / 46.468531; 6.83598 (Vevey (funi))
46°28′55″N 6°49′53″E / 46.48182°N 6.83152°E / 46.48182; 6.83152 (Mont-Pèlerin)
Vevey–Chexbres
Chardonne
Jongny
Corseaux
Funicular
Transports Montreux–Vevey–Riviera
1
passing loop
Track gauge
1,000 mm
Electrification
Maximum incline
Legend
metres
Vevey
Simplon line
Lausanne
Vevey–Chexbres line
VMCV
201
Vevey-Funi
A 9
passing loop

Text is available under the Creative Commons Attribution-ShareAlike License. Additional terms may apply.