Knowledge (XXG)

Vostochny Port (company)

Source 📝

638:
construction of the new station will allow the port to increase the volume of both railcars admitted with coal and dispatched emptied rolling stock. The railway infrastructure development is funded by "Managing Port Company", LLC and JSC "Vostochny Port". The volume of investment in the project is 5 billion Rubles. The federal infrastructure created for the development of the Nakhodka-Vostochnaya railway station will be provided to JSC "Russian Railways" free of charge. The throughput of the completed station will reach 39 million tonnes per year only for JSC "Vostochny Port" cargo, not including the cargo of other receivers that will also be able to use this new federal infrastructure. During the signing of the agreement between the rail
407:
construction began in 1975. The normative period for construction of the giant complex was 36 months, but the builders, working around the clock, completed it six months ahead of schedule. The coal complex was put into operation on December 28, 1978, in the presence of regional and All-Union officials, "shock-builders" and locals. The cargo ship "Constantine Petrovsky" moored to the new pier and minutes later a mass of coal poured into her hold. The completed facility, with a capacity of 6.24 million tonnes, became the largest and most technically equipped coal-loading terminal in the Soviet Union.
741:. A complex of medical services for patients of the city and neighboring towns is concentrated in one location. The hospital's premises were renovated, and modern endoscopic equipment was purchased and installed. The new polyclinic department has its own reception, two consulting rooms for doctors, a minor surgery room, a staff room, a medical procedure room for cytostatic agent dilution, and a day-patient department with 5 beds, which will be maximally used in two shifts. The department will function as a regional oncological center to serve the residents of neighboring cities and districts. 591:(an executive body of JSC "Vostochny Port") decided to start a large-scale investment project for the construction of JSC "Vostochny Port" coal complex phase 3 with its own funds, without inducing a financial burden on federal and regional budgets. Phase 3 is an expansion of the existing coal transshipment complex of JSC "Vostochny Port", and is a fully automated terminal for coal transshipment from railway transport to sea vessels with the services of coal storage and processing. 595:
artificial land territory stretching far into the bay have been constructed. The port's phase 3 will be equipped with the most productive modern equipment, which is imported from Japan: two tandem railcar dumpers for heavy haul gondola cars, which allow for the unloading of four 70-tonne railcars with coal in only 3 minutes, two stackers, and four reclaimers with a capacity of 3,500 tonnes per hour.
965: 25: 951: 422:, stretched far into the bay. A new complex storage yard had a capacity of 1 million tonnes of coal, which corresponds to a mountain twelve meters high and several hundred meters long. A huge concrete bunker for a railcar dumper was 22 meters in depth, which is the height of an eight-story building. Coal loading equipment was imported from Japan. 626:. The volume of investment in the project under the contract with the Far East development corporation will reach 17.2 billion Rubles with the prospect of creating 619 jobs. The port's privileges, received due to its residency in The Free Port of Vladivostok, will allow it to direct additional funds for development of the company. 719:. Effective social policy management and partnership relations with employees are important factors of the company's long-term and sustainable development. With its own infrastructure, the company provides medical services, development of corporate sports, cultural activities and spa treatment for employees and their children. 389:
issued decree No. 36 on the establishment of a new commercial seaport, "Vostochny Port". From this day on, the port in Wrangel Bay, having received an official certificate on its inception, was registered in all sailing directions and specified on navigation charts worldwide. That same year, its only
547:
The port's high capacity and speed of cargo handling are achieved due to the use of specialized equipment at every stage of operation. Coal unloading is carried out at the railcar discharge station, equipped with 2 tandem railcar dumpers, railcar thawing equipment with capacity of 80 gondola cars, a
695:
From 2012 to 2016 JSC "Vostochny Port" has spent 158 million Rubles on the execution of measures for environmental protection, 705 million Rubles on the modernization of equipment for environment protection and rational utilization of natural resources, and 105 million Rubles on the re-creation of
406:
The construction of the coal complex became an important chapter in the history of "Vostochny Port". The construction was supervised on the All-Union level. Leading Soviet specialists were in charge of the project with Japanese engineers involved in development of engineering documentation. Active
662:
A powerful dust-collecting system works around the clock in the area of railcar dumpers at the coal complex of JSC "Vostochny Port". The port has 21 air purification units and 8 local wastewater treatment units that are constantly functioning to purify water to a level of quality acceptable for
394:
started to operate. Construction of piers and technical facilities was carried out, along with housing development and construction of community service centers for employees who came from every part of the Soviet Union to participate in the Shock Construction Project. Eventually a new locality
594:
The project involves the construction of 4 storage facilities with a total capacity of 780 thousand tonnes, as well as 2 piers and the installation of high-tech equipment at the complex. At the moment, more than 19 billion Rubles of the planned 27 billion have been invested, and a pier and an
637:
and JSC "Vostochny Port" are jointly modernizing the public and non-public railways at Nakhodka-Vostochnaya railway station. The development program of JSC "Vostochny Port" includes the construction of a new non-public railway yard and large-scale development of a public railway station. The
332:. It is the largest coal terminal in Russia. In 2016, the company shipped 23.5 million tonnes of coal, which is about 30% of the Far East ports' cargo turnover and about 20% of the cargo turnover of all coal ports in Russia. The sole executive body of JSC "Vostochny Port" is 429:
The port's coal complex continued to expand in the nineties in New Russia. In 1996, the first facilities of phase 2 of the coal complex were put into operation. After it was put into operation and later modernized, the capacity of the coal complex has almost quadrupled.
726:, credit, and maternity benefits. Free training and qualification improvement is provided in the company's own education facility and at higher education institutions. According to a collective agreement, the port provides financial aid to its retired veterans. 658:
JSC "Vostochny Port" maintains a responsible environmental policy. The company's structure includes an Ecology Department with its own certified labs monitoring the state of water and air on the territory of the company as well as outside its borders.
509: 454:(over 70 tonnes) were unloaded in 2016. In November 2016, the transshipment complexes of JSC "Vostochny Port" reached a wintertime daily unloading record: 1,050 railcars were unloaded during the day, which is more than 70 thousand tonnes of coal. 527:
in September 2016, an agreement was signed to handle 2 million tonnes of coal per year produced by the coal company Kolmar, starting in 2017 after the commissioning of phase 3 of the JSC "Vostochny Port" coal complex.
425:
By 1989, Vostochny port's cargo turnover had reached 12 million tonnes per year, ranking it among the largest ports of the Soviet Union. In 1992, the commercial seaport "Vostochny Port" became a joint-stock company.
445:
In 2016, "Vostochny Port" made a record in yearly coal turnover among Russian ports, having handled 23.5 million tonnes of coal. The increase in annual cargo turnover was 779.5 thousand tonnes (3.4%). 324 thousand
499:
The cargo base of JSC "Vostochny Port", taking into account the port's increase in throughput capacity by 20 million tonnes, is ensured by contracts with major coal producers from various coal basins, including
649:
During the 2nd Economic Forum, JSC "Russian Railways" and JSC "Vostochny Port" signed an agreement on the enhancement of coal transportation technology, prioritizing the use of innovative heavy haul railcars.
598:
In September 2016, the construction of pier No. 51 of JSC "Vostochny Port" was accomplished as part of the phase 3 project. During the 2nd Eastern Economic Forum, the port was visited by a delegation of
516:, JSC “Sibuglemet”, “Promugolservis” LLC, JSC “Belovskaya Mine”, “Razrez Stepanovsky” LLC, “Razrez Bungursky Severny ” LLC, “Razrez Arshanovsky” LLC, “Razrez Kiyzassky” LLC, and “Razrez "Vostochny” LLC. 703:
on cooperation in environmental protection. In June 2017, during the visit of the State Duma of the Russian Federation Deputy Victoria Nikolaeva, a five-year bilateral agreement on cooperation in
418:
load discharge facility, the weight station and the central transfer point started to function. A powerful six-hundred-foot pier on seven piles of sheet metal, which was an innovation in
607:. The execution of the JSC "Vostochny Port" phase 3 investment project will ensure the timely and high-quality processing of permanently-growing coal cargo traffic that comes from the 567:
In 2016, a multi-phased magnetic coal system developed by the specialists of JSC "Vostochny Port" was installed. The system consists of 34 units of high-tech equipment, including 26
433:
The construction of phase 3 of the coal complex started in December 2012. For this purpose, all the necessary infrastructure of a modern high-tech coal port was constructed on 54
688:
are grown annually in specialized aqua culture facilities under contracts of JSC "Vostochny Port". All these sea animals are then released into the coastal waters of the
707:
was signed. The document assumes an increase in joint environmental protection activities, information exchange, and execution of joint environment-oriented projects.
891: 410:
Rail lines and dozens of conveyor lines to the piers were paved on its 40-hectare territory that stretches along the sea in taiga-covered hills. Huge machines (
386: 1003: 548:
windshield system with infrared heating, a drilling / ripping complex, conveyor equipment, and frozen coal crushing systems. Storing is performed by 4
363: 42: 933: 890:
Moskovskiy Komsomolets # Vladivostok (vlad.mk.ru), “Vostochny Port” Launches the New Investment Project in the Free Port Vladivostok”, 20.12.16,
619:
was informed of the execution of the phase 3 project. The government leader noted that it was a good time for the expansion of port capacities.
564:. Coal loading onto the ships is performed by 4 ship loaders (each has a capacity of 3 thousand tonnes per hour) and other auxiliary machinery. 993: 513: 339:
The harbor, which remains ice-free even in the most severe winters, and reaches depths of 22 meters in the fairway, allows large-capacity,
129: 194: 89: 108: 802: 767: 61: 878:
RIA PrimaMedia. “Dmitry Medvedev Wished Luck in the Construction of the Third Stage of “Vostochny Port” in Nakhodka”, 06.12.16,
615:, and it will increase cargo turnover with countries in the Asia-Pacific region. At the "Transport of Russia 2016" exhibition, 892:
http://vlad.mk.ru/articles/2016/12/20/vostochnyy-port-zapuskaet-novyy-investicionnyy-proekt-v-svobodnom-portu-vladivostok.html
68: 663:
fisheries. The analysis of air and water samples in the bay indicates the preservation of required environmental indicators.
600: 46: 587:, including a free-access coal terminal with a capacity of not less than 20 million tonnes per year. In the autumn of 2012, 914:
Russian Railways-Partner. “System Approach to Management by the Coal Ports of Russia”, 18.11.16, author – Marina Ermolenko.
866:
IA PortNews, “Assembly of the Large Transferring Machines of the Third Stage of “Vostochny Port” Was Completed”, 01.12.16,
902:
Gudok. “Modernization Project of the Coal Terminal of “Vostochny Port” JSC Got the Prime Minister Interested”, 05.12.16,
699:
In December 2016, JSC "Vostochny Port" and the administration of Nakhodkinsky district had signed a long-term, five-year
505: 75: 854:
IA PortNews, “Marubeni Corporation Shipped Two Tandem Car Dumpers for the Coal Terminal of “Vostochny Port”, 01.12.16,
371: 629:
The increase in the capacity of JSC "Vostochny Port" requires the simultaneous development of railroad throughput.
379: 57: 934:
http://nakhodka.info/news/society/pervichnoe_onkologicheskoe_otdelenie_otkryto_v_nakhodkinskoy_gorodskoy_bolnitse/
35: 608: 704: 623: 414:– storing coal to dump, and reclaimers – transporting it from storage to ships) moved through these hills. The 998: 634: 588: 333: 256: 612: 520: 923:
Russian Railways-Partner. “Sea ports. Innovations in Coal Handling”, 18.11.16, author – Marina Ermolenko.
419: 536:
JSC "Vostochny Port" uses equipment from world's leading manufacturers. During the years of the port's
378:
and Japan. Construction began in December 1970. In 1971, the construction of the port was declared an
729:
In November 2016, "Managing Port Company" LLC and JSC "Vostochny Port" funded the organization of an
689: 537: 400: 82: 583:, in the summer of 2012. He ordered the construction of an additional export infrastructure in the 139: 561: 462: 347: 803:
http://deita.ru/news/economy/11.12.2016/5177974-vostochnyy-port-v-noyabre-uvelichil-gruzooborot/
768:
https://www.kartoteka.ru/card/07706fb2c8a5cde95c1d5b7f5ae6f8e4/e33ec021023a1f28bc4be847b95e6fe0/
932:
Nakhodka Info. “Primary Oncological Department is Opened in Nakhodka City Hospital”, 29.11.16,
775: 501: 723: 630: 230: 696:
marine bioresources. 150 million Rubles is the total volume of planned investment in 2017.
788: 643: 616: 309: 293: 762: 760: 758: 756: 754: 738: 604: 580: 541: 451: 396: 305: 251: 715:
JSC "Vostochny Port" is part of the list of socially responsible organizations of the
987: 970: 956: 289: 544:
capable of handling Capesize-type vessels with a DWT of up to 180 thousand tonnes.
375: 801:
RIA Deita. “Vostochny Port” Increased the Freight Turnover in November, 11.12.16,
903: 524: 469: 350:
to enter for loading. The port is remote from residential and industrial areas.
321: 317: 128: 24: 946: 677: 297: 206: 964: 568: 557: 549: 278: 540:, stevedore reached 100% automation of operations. It is the only port in 734: 730: 700: 639: 584: 481: 450:
cars, including 158 thousand innovative ones and 190 thousand heavy-haul
367: 340: 313: 165: 681: 553: 489: 458: 447: 434: 415: 411: 814: 579:
A green light for investment projects in the port sector was given by
722:
Employees have a series of social benefits and financial privileges,
716: 685: 485: 282: 879: 642:
and JSC "Vostochny Port", the President of JSC "Russian Railways",
867: 855: 667: 571:
separators, 4 suspended magnets and 4 electromagnetic separators.
493: 477: 473: 344: 329: 325: 301: 218: 673: 391: 359: 286: 670:
to maintain environmental safety standards in its activities.
465:) and 23 Capesize-type vessels (100-180 thousand tonnes DWT). 18: 978: 316:. More than 99% of cargo is exported, primarily to countries 266: 622:
In December 2016, JSC "Vostochny Port" became a resident of
843: 666:
In 2016, JSC "Vostochny Port" spent more than 32 million
617:
Prime Minister of the Russian Federation Dmitry Medvedev
581:
the President of the Russian Federation, Vladimir Putin
646:, spoke favorably of the project's implementation. 601:
the Ministry of Transport of the Russian Federation
457:In 2016, the port handled 526 ships, including 235 262: 250: 240: 228: 216: 204: 192: 184: 172: 161: 153: 145: 135: 49:. Unsourced material may be challenged and removed. 374:and increase the turnover of goods between the 904:http://www.gudok.ru/infrastructure/?ID=1358129 692:, on the banks of which the port is located. 380:All-Union Komsomol shock construction project 8: 121: 842:Official web-site of “Vostochny Port” JSC, 815:"Vostochny Port starts handling containers" 358:In 1970 a decision was made to construct a 127: 120: 109:Learn how and when to remove this message 750: 300:of operations is 100%. The port's main 838: 836: 834: 784: 773: 461:-type vessels (50-100 thousand tonnes 7: 510:PJSC Kuzzbasskaya Toplivnaya Company 502:JSC Coal Company “Kuzbassrazrezugol” 47:adding citations to reliable sources 733:department in the city hospital of 711:Human resources and social policies 14: 1004:Companies based in Primorsky Krai 880:http://primamedia.ru/news/554082/ 468:The main export destinations are 149:Stevedoring, activity, coal ports 963: 949: 23: 868:http://portnews.ru/news/230545/ 856:http://portnews.ru/news/230546/ 34:needs additional citations for 236:$ 347 million (2017) 212:$ 124 million (2017) 200:$ 161 million (2017) 188:$ 247 million (2017) 1: 994:Transport companies of Russia 387:USSR Merchant Marine Ministry 224:$ 55 million (2017) 58:"Vostochny Port" company 654:Environmental Responsibility 635:"Managing Port Company", LLC 624:The Free Port of Vladivostok 589:"Managing Port Company" LLC 257:Port Management Company LLC 16:Russian stevedoring company 1020: 385:On February 28, 1974, the 318:in the Asia-Pacific region 437:of artificial territory. 126: 705:environmental protection 603:with Transport Minister 403:(the town of Pioneers). 296:equipment. The level of 246:1,700 people - 2016 year 844:http://www.vostport.ru/ 370:, to improve trade and 334:"Managing Port Company" 631:JSC "Russian Railways" 613:Trans-Siberian Railway 521:Eastern Economic Forum 395:appeared on a map of 341:Capesize-type vessels 320:which include mainly 690:Peter the Great Gulf 609:Baikal-Amur Mainline 575:Coal complex Phase 3 275:JSC "Vostochny Port" 122:JSC “Vostochny Port” 43:improve this article 267:www.vostport.ru/en/ 242:Number of employees 180:(managing director) 140:Joint Stock Company 123: 717:Russian Federation 684:and juvenile chum 514:JSC “Russian Coal” 372:economic relations 294:automated conveyor 285:, specialising in 783:Missing or empty 420:hydro engineering 304:is coal mined in 272: 271: 119: 118: 111: 93: 1011: 979:Official website 973: 968: 967: 959: 954: 953: 952: 936: 930: 924: 921: 915: 912: 906: 900: 894: 888: 882: 876: 870: 864: 858: 852: 846: 840: 829: 828: 826: 825: 811: 805: 799: 793: 792: 786: 781: 779: 771: 764: 724:social insurance 343:of 180 thousand 233: 221: 195:Operating income 178:Anatoliy Lazarev 131: 124: 114: 107: 103: 100: 94: 92: 51: 27: 19: 1019: 1018: 1014: 1013: 1012: 1010: 1009: 1008: 984: 983: 969: 962: 955: 950: 948: 945: 940: 939: 931: 927: 922: 918: 913: 909: 901: 897: 889: 885: 877: 873: 865: 861: 853: 849: 841: 832: 823: 821: 813: 812: 808: 800: 796: 782: 772: 766: 765: 752: 747: 713: 656: 577: 534: 519:During the 2nd 443: 401:Pervostroiteley 356: 310:Eastern Siberia 277:is the largest 243: 229: 217: 209: 197: 179: 175: 115: 104: 98: 95: 52: 50: 40: 28: 17: 12: 11: 5: 1017: 1015: 1007: 1006: 1001: 999:Coal in Russia 996: 986: 985: 982: 981: 975: 974: 960: 944: 943:External links 941: 938: 937: 925: 916: 907: 895: 883: 871: 859: 847: 830: 806: 794: 749: 748: 746: 743: 739:Primorsky Krai 712: 709: 655: 652: 644:Oleg Belozerov 605:Maksim Sokolov 576: 573: 542:Primorsky Krai 533: 530: 442: 439: 355: 352: 270: 269: 264: 260: 259: 254: 248: 247: 244: 241: 238: 237: 234: 226: 225: 222: 214: 213: 210: 205: 202: 201: 198: 193: 190: 189: 186: 182: 181: 176: 173: 170: 169: 163: 159: 158: 155: 151: 150: 147: 143: 142: 137: 133: 132: 117: 116: 31: 29: 22: 15: 13: 10: 9: 6: 4: 3: 2: 1016: 1005: 1002: 1000: 997: 995: 992: 991: 989: 980: 977: 976: 972: 971:Energy portal 966: 961: 958: 957:Russia portal 947: 942: 935: 929: 926: 920: 917: 911: 908: 905: 899: 896: 893: 887: 884: 881: 875: 872: 869: 863: 860: 857: 851: 848: 845: 839: 837: 835: 831: 820: 816: 810: 807: 804: 798: 795: 790: 777: 769: 763: 761: 759: 757: 755: 751: 744: 742: 740: 736: 732: 727: 725: 720: 718: 710: 708: 706: 702: 697: 693: 691: 687: 683: 679: 675: 671: 669: 664: 660: 653: 651: 647: 645: 641: 636: 632: 627: 625: 620: 618: 614: 610: 606: 602: 596: 592: 590: 586: 582: 574: 572: 570: 565: 563: 559: 555: 551: 545: 543: 539: 538:modernization 531: 529: 526: 522: 517: 515: 511: 507: 503: 497: 495: 491: 487: 483: 479: 475: 471: 466: 464: 460: 455: 453: 449: 440: 438: 436: 431: 427: 423: 421: 417: 413: 408: 404: 402: 398: 393: 388: 383: 381: 377: 373: 369: 365: 361: 353: 351: 349: 346: 342: 337: 335: 331: 327: 323: 319: 315: 311: 307: 303: 299: 295: 291: 290:transshipment 288: 284: 280: 276: 268: 265: 261: 258: 255: 253: 249: 245: 239: 235: 232: 227: 223: 220: 215: 211: 208: 203: 199: 196: 191: 187: 183: 177: 171: 167: 164: 160: 156: 152: 148: 144: 141: 138: 134: 130: 125: 113: 110: 102: 91: 88: 84: 81: 77: 74: 70: 67: 63: 60: –  59: 55: 54:Find sources: 48: 44: 38: 37: 32:This article 30: 26: 21: 20: 928: 919: 910: 898: 886: 874: 862: 850: 822:. Retrieved 818: 809: 797: 785:|title= 728: 721: 714: 698: 694: 672: 665: 661: 657: 648: 628: 621: 597: 593: 578: 566: 546: 535: 518: 498: 467: 456: 452:gondola cars 444: 432: 428: 424: 409: 405: 384: 376:Soviet Union 357: 338: 274: 273: 231:Total equity 219:Total assets 162:Headquarters 136:Company type 105: 96: 86: 79: 72: 65: 53: 41:Please help 36:verification 33: 731:oncological 525:Vladivostok 470:South Korea 441:Stevedoring 399:- the town 364:Wrangel Bay 322:South Korea 281:company in 279:stevedoring 988:Categories 824:2021-11-18 745:References 558:bulldozers 550:reclaimers 506:JSC “SUEK” 298:automation 207:Net income 174:Key people 69:newspapers 532:Equipment 492:(5%) and 397:Primorsky 99:June 2019 819:Portnews 776:cite web 735:Nakhodka 701:contract 682:scallops 678:trepangs 640:monopoly 585:Far East 569:magnetic 554:stackers 523:held in 482:Malaysia 435:hectares 412:stackers 368:Nakhodka 314:Far East 312:and the 166:Nakhodka 146:Industry 562:loaders 490:Vietnam 480:(11%), 476:(26%), 472:(41%), 459:Panamax 448:gondola 416:railcar 366:, near 362:in the 360:seaport 354:History 336:, LLC. 306:Kuzbass 263:Website 185:Revenue 154:Founded 83:scholar 686:salmon 668:Rubles 496:(2%). 488:(5%), 486:Taiwan 484:(7%), 345:tonnes 328:, and 292:using 283:Russia 252:Parent 168:Russia 85:  78:  71:  64:  56:  494:India 478:China 474:Japan 330:China 326:Japan 302:cargo 90:JSTOR 76:books 789:help 674:Kelp 611:and 560:and 552:, 2 392:pier 287:coal 157:1974 62:news 463:DWT 348:DWT 45:by 990:: 833:^ 817:. 780:: 778:}} 774:{{ 753:^ 737:, 680:, 676:, 633:, 556:, 512:, 508:, 504:, 382:. 324:, 308:, 827:. 791:) 787:( 770:. 112:) 106:( 101:) 97:( 87:· 80:· 73:· 66:· 39:.

Index


verification
improve this article
adding citations to reliable sources
"Vostochny Port" company
news
newspapers
books
scholar
JSTOR
Learn how and when to remove this message

Joint Stock Company
Nakhodka
Operating income
Net income
Total assets
Total equity
Parent
Port Management Company LLC
www.vostport.ru/en/
stevedoring
Russia
coal
transshipment
automated conveyor
automation
cargo
Kuzbass
Eastern Siberia

Text is available under the Creative Commons Attribution-ShareAlike License. Additional terms may apply.