22:
215:
201:
184:
The
Superintendent of the SEC, Luis Avila Bravo, said "we are making charges for not maintaining the equipment in good condition, which ultimately represents a threat to the power system security as well as for problems in applying the procedures used to restore the supply of power ".
188:
Avila added that companies now have 15 days to respond to the charges, after which the SEC may determine sanctions, and possible fines of up to 10,000 AWU (approx. $ 9M US) although the final amount will depend on the merits of each investigation.
45:
that occurred on 24 September 2011, approximately between 20:30 and 21:45 local time (23:30 and 00:45 UTC respectively), although the time of reinstatement varied geographically. It mainly affected the regions from
378:
257:
327:
288:
901:
386:
265:
150:
On 6 December 2011, the Chile regulatory authority
Superintendency of Electricity and Fuels (SEC) determined that the cause of the blackout was an electrical
473:
576:
549:
506:
678:
496:
68:
611:
544:
295:
891:
642:
554:
683:
673:
650:
466:
87:), was later determined to be equipment failure at an electrical substation. In particular, it began with a single phase
655:
441:
233:
668:
632:
170:. SEC also determined that the time needed to restore power was prolonged by both procedural and equipment issues.
92:
74:
173:
As a result of the investigation, SEC has assessed charges against the following four power companies; Transelec,
688:
637:
595:
872:
459:
825:
815:
853:
830:
820:
722:
521:
21:
896:
848:
787:
526:
155:
414:
134:, halted production temporarily and later, with power from generators, resumed at one-third capacity.
810:
792:
382:
59:
752:
727:
714:
561:
332:
228:
99:. The blackout interrupted mobile phone service and forced the evacuation of thousands of rail and
95:, Minister of Energy, noted a computer system malfunction and "oscillation problems" affecting two
77:
that operate independently. In the blackout, the
Central Interconnected System (SIC) collapsed.
30:
769:
131:
80:
Prior to the blackout, 5 transmission lines had been removed from service for maintenance.
742:
732:
693:
167:
737:
624:
337:
163:
127:
442:"SEC formula cargos contra TRANSELEC, ENDESA, COLBĂN y CHILECTRA por el blackout del "24S""
119:
was looted, and a youth was wounded during a confrontation between the looters and police.
482:
47:
142:
mine had lost power but continued operations using generators until power was restored.
516:
511:
501:
178:
174:
159:
138:, Chile's state-owned copper mining company, reported that its Andina division and the
55:
84:
885:
660:
328:"Widespread power blackout darkens much of Chile; subway riders evacuated in capital"
220:
151:
100:
88:
206:
112:
51:
42:
802:
586:
139:
96:
536:
253:
196:
54:, where the blackout was total, but it also reportedly partially affected the
706:
214:
116:
108:
26:
603:
104:
761:
419:
135:
62:
regions. The blackout affected approximately nine million
Chileans.
261:
123:
451:
20:
779:
455:
408:
406:
404:
840:
83:
The cause of the blackout, which started at 20:30 local time (
322:
320:
318:
316:
258:"Corte de luz afecta desde la Tercera a la Octava RegiĂłn"
415:"UPDATE 4-Power blackout hits Chile, halts copper mines"
126:
mines, of which Chile is the world's top producer. The
839:
801:
778:
760:
751:
705:
623:
594:
585:
535:
489:
413:Avila, Moises; Gardner, Simon (24 September 2011).
162:, and the subsequent malfunction of the associated
25:The residential neighborhood of Los Navegantes, in
373:
371:
369:
107:, the capital city. It also delayed a concert by
379:"Blackout plunges Chile's capital into darkness"
154:in a 220 Kilovolt capacitor bank at the Ancoa
122:The outage affected operations at a number of
467:
8:
757:
591:
474:
460:
452:
359:
357:
355:
289:"Comunicado del CDEC SIC "ApagĂłn del SIC""
287:Ricke Muñoz, Eduardo (24 September 2011).
166:equipment that should have prevented the
577:Sistema Interconectado del Norte Grande
245:
902:September 2011 events in South America
7:
385:. 24 September 2011. Archived from
14:
213:
199:
550:Sistema Eléctrico de Magallanes
507:Compañia General de Eletrecidad
555:Sistema Interconectado Central
497:Celulosa Arauco y ConstituciĂłn
1:
234:Electricity sector in Chile
75:electrical interconnections
918:
545:Sistema Eléctrico de Aysén
870:
873:Category:Energy in Chile
93:Rodrigo Ălvarez Zenteno
892:Power outages in Chile
522:GeotĂ©rmia del PacĂfico
34:
33:) during the blackout.
256:(24 September 2011).
156:electrical substation
24:
527:Geotérmica del Norte
383:Agence France-Presse
268:on 25 September 2011
158:which is located in
389:on 24 November 2012
340:. 24 September 2011
333:The Washington Post
229:2010 Chile blackout
39:2011 Chile blackout
444:. 6 December 2011.
301:on 13 January 2012
35:
16:Major power outage
879:
878:
866:
865:
862:
861:
803:Natural gas-fired
181:, and Chilectra.
168:cascading failure
115:A supermarket in
72:
909:
758:
719:
698:
665:
647:
616:
608:
592:
571:
564:
476:
469:
462:
453:
446:
445:
438:
432:
431:
429:
427:
410:
399:
398:
396:
394:
375:
364:
361:
350:
349:
347:
345:
338:Associated Press
324:
311:
310:
308:
306:
300:
294:. Archived from
293:
284:
278:
277:
275:
273:
264:. Archived from
250:
223:
218:
217:
209:
204:
203:
202:
164:protective relay
128:Los Bronces mine
66:
31:O'Higgins Region
917:
916:
912:
911:
910:
908:
907:
906:
882:
881:
880:
875:
858:
835:
797:
774:
747:
717:
701:
696:
663:
645:
619:
614:
606:
581:
567:
559:
531:
485:
483:Energy in Chile
480:
450:
449:
440:
439:
435:
425:
423:
412:
411:
402:
392:
390:
377:
376:
367:
362:
353:
343:
341:
326:
325:
314:
304:
302:
298:
291:
286:
285:
281:
271:
269:
252:
251:
247:
242:
219:
212:
205:
200:
198:
195:
148:
17:
12:
11:
5:
915:
913:
905:
904:
899:
894:
884:
883:
877:
876:
871:
868:
867:
864:
863:
860:
859:
857:
856:
851:
845:
843:
837:
836:
834:
833:
828:
823:
818:
813:
807:
805:
799:
798:
796:
795:
790:
784:
782:
776:
775:
773:
772:
766:
764:
755:
749:
748:
746:
745:
740:
735:
730:
725:
720:
711:
709:
703:
702:
700:
699:
691:
686:
681:
676:
671:
666:
658:
653:
648:
640:
635:
629:
627:
621:
620:
618:
617:
609:
600:
598:
589:
583:
582:
580:
579:
574:
573:
572:
569:September 2011
565:
552:
547:
541:
539:
533:
532:
530:
529:
524:
519:
514:
509:
504:
499:
493:
491:
487:
486:
481:
479:
478:
471:
464:
456:
448:
447:
433:
400:
365:
351:
312:
279:
244:
243:
241:
238:
237:
236:
231:
225:
224:
210:
194:
191:
175:Endesa (Chile)
160:Linares, Chile
147:
144:
132:Anglo American
130:, operated by
103:passengers in
15:
13:
10:
9:
6:
4:
3:
2:
914:
903:
900:
898:
897:2011 in Chile
895:
893:
890:
889:
887:
874:
869:
855:
852:
850:
847:
846:
844:
842:
838:
832:
829:
827:
824:
822:
819:
817:
814:
812:
809:
808:
806:
804:
800:
794:
791:
789:
786:
785:
783:
781:
777:
771:
768:
767:
765:
763:
762:Biofuel-fired
759:
756:
754:
750:
744:
741:
739:
736:
734:
731:
729:
726:
724:
721:
716:
713:
712:
710:
708:
704:
695:
692:
690:
687:
685:
682:
680:
677:
675:
672:
670:
667:
662:
659:
657:
654:
652:
649:
644:
641:
639:
636:
634:
631:
630:
628:
626:
625:Hydroelectric
622:
613:
610:
605:
602:
601:
599:
597:
593:
590:
588:
584:
578:
575:
570:
566:
563:
558:
557:
556:
553:
551:
548:
546:
543:
542:
540:
538:
534:
528:
525:
523:
520:
518:
515:
513:
510:
508:
505:
503:
500:
498:
495:
494:
492:
488:
484:
477:
472:
470:
465:
463:
458:
457:
454:
443:
437:
434:
422:
421:
416:
409:
407:
405:
401:
388:
384:
380:
374:
372:
370:
366:
360:
358:
356:
352:
339:
335:
334:
329:
323:
321:
319:
317:
313:
297:
290:
283:
280:
267:
263:
259:
255:
249:
246:
239:
235:
232:
230:
227:
226:
222:
221:Energy portal
216:
211:
208:
197:
192:
190:
186:
182:
180:
176:
171:
169:
165:
161:
157:
153:
152:short circuit
146:Investigation
145:
143:
141:
137:
133:
129:
125:
120:
118:
114:
110:
106:
102:
101:rapid transit
98:
94:
90:
89:short circuit
86:
81:
78:
76:
70:
63:
61:
57:
53:
49:
44:
40:
32:
28:
23:
19:
587:Power plants
568:
436:
426:25 September
424:. Retrieved
418:
393:25 September
391:. Retrieved
387:the original
344:25 September
342:. Retrieved
331:
305:24 September
303:. Retrieved
296:the original
282:
272:25 September
270:. Retrieved
266:the original
248:
207:Chile portal
187:
183:
172:
149:
121:
113:Ricky Martin
82:
79:
64:
43:power outage
41:was a major
38:
36:
18:
854:Antilhue II
826:Nueva Renca
821:Nehuenco II
816:Nehuenco 9B
612:Maria Elena
560:Blackouts:
537:Power grids
502:ColbĂșn S.A.
179:ColbĂșn S.A.
140:El Teniente
97:power lines
886:Categories
849:Antilhue I
831:San Isidro
780:Coal-fired
723:El ArrayĂĄn
718:(proposed)
707:Wind farms
697:(proposed)
679:Pilmaiquén
664:(proposed)
661:HidroAysén
643:Chivilingo
638:Chapiquiña
596:Geothermal
562:March 2010
254:La Tercera
240:References
65:Chile has
841:Oil-fired
728:San Pedro
694:San Pedro
684:Pullinque
674:Pehuenche
646:(defunct)
615:(planned)
607:(planned)
490:Companies
117:Quilicura
85:UTCâ03:00
27:Pichilemu
811:Nehuenco
793:Ventanas
788:Guacolda
770:Valdivia
604:Tolhuaca
193:See also
105:Santiago
48:Coquimbo
753:Thermal
743:Totoral
733:Talinay
656:El Toro
420:Reuters
363:cccecec
136:CODELCO
111:singer
60:BĂo BĂo
56:Atacama
738:Taltal
715:Chiloé
669:Pangue
651:ColbĂșn
633:Antuco
517:Endesa
262:COPESA
124:copper
689:Ralco
512:Copec
299:(PDF)
292:(PDF)
71:]
67:[
52:Maule
428:2011
395:2011
346:2011
307:2011
274:2011
58:and
37:The
109:pop
91:.
50:to
888::
417:.
403:^
381:.
368:^
354:^
336:.
330:.
315:^
260:.
177:,
73:4
69:es
475:e
468:t
461:v
430:.
397:.
348:.
309:.
276:.
29:(
Text is available under the Creative Commons Attribution-ShareAlike License. Additional terms may apply.