Knowledge (XXG)

Enercon

Source đź“ť

361:
transmission train.) The hub with the rotor blades connects directly to the rotor of the ring generator (direct drive). The rotor unit rotates on a front and rear main bearing about a fixed axis. The speed of the rotor is transmitted directly to the high-pole synchronous generator, where the rotor rotates in the stator, differently. The Enercon generator has no permanent magnets, allowing the company to not rely on rare-earth metals. However, the direct connection also causes grid losses. Rotation speed and the mechanical load changes over the service life are lower than geared systems. Rotation speed varies from 18 to 45 revolutions per minute (RPM) for the E-33 and 5-11.7 RPM for the E-126 depending on wind speed, while a geared generator has a speed of about 1500 RPM at rated power. Thus the large Enercon generators lead to high tower head masses, and construction and logistical challenges. In 2022, the first integrated box-shaped nacelles with inverter and transformer reduced logistics - all previous Enercon turbines had power systems in the tower base.
1265: 1253: 1381: 1359: 1337: 1325: 1301: 1179: 1241: 1163: 1151: 1194: 25: 1229: 1313: 342: 1289: 1277: 1209: 2788: 2812: 334: 2776: 2800: 150: 365:
has coloured green rings above the foundation, which get brighter from bottom to top. On islands such as Borkum, the gradation is blue. The NCS grading is intended to better integrate the plant towers into the horizon. The rotor blades were the only ones on the market with blade tips similar to the winglets on aircraft.
364:
Most Enercon systems are visually distinct from systems of other manufacturers. Their nacelles have been drop-shaped since 1995/1996. This unique design was developed by British architect Norman Foster, who also designed the dome of the Berlin Reichstag. In Germany and many other countries, the tower
360:
Enercon wind turbines have some special technical features compared to turbines of most other manufacturers. Characteristic is the gearless propulsion concept, which Enercon pioneered since 1993. The first generation of gearless turbines was the E-40/500 kW series. (Earlier Enercon designs had a
329:
As of December 2017, Enercon had installed more than 26,300 wind turbines, with a power generating capacity exceeding 43 GW. The most-often installed model is the E-40, which pioneered the gearbox-less design in 1993. As of July 2011, Enercon has a market share of 7.2% world-wide (fifth-highest)
1103:, Enercon did not challenge the validity of the US patent but argued that their technology was not affected. The ITC decided that the patent covered the technology in question and banned Enercon turbines from the US market until 2010. Later, a cross patent agreement was made with the competitor 1380: 1139:) which is used to deliver wind turbine blades made by Enercon via rail to customers. During the time Enercon part-owned the rail line, the company undertook large scale investments in its infrastructure In 2020 Enercon sold its rail ventures To Hermann Bettels GmbH. 376:
wind farm (consisting of eleven E-126 turbines) in Belgium. Although the E-126 turbine was initially developed with a power rating of 6 MW, it has since been upgraded to 7.5 MW. The E-82 turbine was also upgraded and is available in 2, 2.3, and 3 MW versions.
69:, is a useful starting point for translations, but translators must revise errors as necessary and confirm that the translation is accurate, rather than simply copy-pasting machine-translated text into the English Knowledge (XXG). 1252: 380:
Currently Enercon does not offer or supply wind turbines to offshore projects and has at times expressed skepticism about offshore wind parks. Enercon was rumored to have been ready to supply turbines to Germany's
1358: 1264: 79: 1387: 1365: 2869: 2672: 2318: 1586: 1336: 1162: 55: 1100: 1208: 1136: 2844: 1766: 2859: 1228: 89:
Do not translate text that appears unreliable or low-quality. If possible, verify the text with references provided in the foreign-language article.
2585: 97: 1654: 1444: 2368: 1702: 1632: 1439:
Simon, Hermann: Hidden Champions of the 21st Century : Success Strategies of unknown World Market Leaders. London: Springer, 2009.-
2854: 2231: 2605: 2590: 1405: 1979: 1324: 1193: 1240: 1178: 397:
Note: wind turbine designations with a "*" mean the turbine either temporarily unavailable, or has been taken off sale permanently.
2265: 1150: 1456: 2131: 2102: 2076: 1300: 2423: 382: 1734: 2849: 2682: 110:
Content in this edit is translated from the existing German Knowledge (XXG) article at ]; see its history for attribution.
2533: 1219: 2714: 2692: 2465: 2181: 2538: 2470: 2739: 2488: 1605: 1559: 1410: 1312: 2158: 1533: 1482: 2759: 2361: 2203: 2032: 1792: 1200: 1108: 105: 2054: 1093:
Enercon was prohibited from exporting their wind turbines to the US until 2010 due to alleged infringement of
126: 1944: 1922: 1587:"Enercon installs turbine with power converter systems in its 'E-nacelle', rather than tower base | Recharge" 1288: 2818: 1858: 1836: 1814: 1132: 2864: 2754: 2749: 2513: 2337: 74: 2804: 1276: 2548: 2543: 2508: 2493: 2460: 2403: 2398: 1369: 1343: 372:
turbines (successor of the E-112) were installed at sites throughout Germany and Belgium, including the
2304: 2595: 2498: 2408: 2393: 2319:"LOK Report - Enercon: Hermann Bettels GmbH & Co. KG ĂĽbernimmt ENERCON-Bahngesellschaft e.g.o.o." 1116: 2792: 2744: 2702: 2577: 2503: 2455: 2413: 2354: 1908: 1894: 1880: 1658: 170: 2811: 923: 2528: 1131:
From 2008 to 2020, Enercon was part owner of a railway company, that among other things owns the
2287: 1709: 341: 2780: 2435: 1440: 1390:...and in October of 2011, two months right after completion. With each turbine producing 7.58 101: 2624: 2253: 1104: 2257: 2734: 2729: 2687: 2341: 1986: 1107:, the successor of Kenetech, after similar claims of Enercon against GE. According to a 2709: 2697: 2646: 1460: 322:. In June 2010, Enercon announced that they would be setting up Irish headquarters in 294:
in Germany since the mid-1990s. Enercon has production facilities in Germany (Aurich,
2838: 2823: 2677: 2518: 2224: 2135: 2106: 2080: 1420: 1258:
Enercon E-48 in the Wind Farm near the Medieval village of Tocco da Casauria in Italy
875: 386: 369: 291: 2719: 2480: 2418: 1741: 1120: 283: 233: 195: 119: 333: 1680: 2560: 688:
Prototype developed 1995, no longer available - replaced by E-70, E-82 and E-92
1111:
employee detailed information concerning Enercon was passed on to Kenetech via
664:
Prototype installed in 1998 - replaced by E-48, henceforth no longer available
2724: 2555: 2385: 2377: 2225:"In the matter of certain variable speed wind turbines and components thereof" 1415: 1095: 2565: 2447: 299: 2775: 1793:"More MW/t, the offshore imperative.(megawatt thermal)(Enercon (Germany))" 149: 2631: 2430: 2261: 1767:"'We're not afraid of offshore, but we decided to put 150% into onshore'" 1391: 1215: 1185: 373: 345: 319: 2641: 2618: 1112: 287: 212: 108:
to the source of your translation. A model attribution edit summary is
37: 1609: 1563: 2656: 2651: 2636: 2523: 1537: 1486: 349: 323: 315: 311: 303: 279: 206: 2182:"Enercon vs. International Trade Commission and Zond Energy Systems" 1169: 443:
Developed in 2007, but unknown whether it's still being produced.
307: 295: 160: 66: 2350: 2334: 2014: 18: 2346: 1633:"Enercon errichtet grösstes Windrad der Welt bei Magdeburg" 815:
Direct drive - two prototypes installed in France in 2017
78:
to this template: there are already 1,848 articles in the
1394:, the total energy output of Estinnes Windpark is 83.4MW. 1980:"Enercon Wind Energy Converters: Technology and Service" 1234:
Brown meets green: Enercon wind turbines at oil refinery
1172:, Enercon's only offshore wind turbine installed to date 973:
Based on a different platform to other Enercon turbines
917:
Based on a different platform to other Enercon turbines
516:
Gearless direct-drive, discontinued due to "low demand"
262: 1270:
Wind farm with 3 Enercon E-48 in Stella, Liguria, Italy
62: 2665: 2604: 2576: 2479: 2446: 2384: 2305:"Enercon baut eigenen Bahnhof – Ostfriesen-Zeitung" 2055:"The Wind Power: Database (Enercon E-112, 6000 kW)" 2033:"The Wind Power: Database (Enercon E-112, 4500 kW)" 257: 247: 239: 229: 219: 201: 191: 176: 166: 156: 58:
a machine-translated version of the German article.
2157: 1703:"ENERCON Wind Energy Converters, Product Overview" 1137:de:Eisenbahninfrastrukturgesellschaft Aurich-Emden 950:13 Installed in Eemshaven port in the Netherlands 491:Developed and installed 1988, no longer available 1945:"The Wind Power: Database (Enercon E-40, 600 kW)" 1923:"The Wind Power: Database (Enercon E-40, 500 kW)" 1342:A weaker Enercon E-126 - EP4 low-wind model - at 1119:against Enercon was the forwarding of details of 2870:Multinational companies headquartered in Germany 2260:[Treachery among friends] (in German). 1909:"Enercon E-32 / 300 - 300,00 kW - Wind turbine" 1895:"Enercon E-33 / 300 - 300,00 kW - Wind turbine" 1881:"Enercon E-30 / 330 - 330,00 kW - Wind turbine" 104:accompanying your translation by providing an 49:Click for important translation instructions. 36:expand this article with text translated from 2362: 2126: 2124: 1681:"The Wind Power Database: Estinnes Wind Farm" 1528: 1526: 1524: 8: 1522: 1520: 1518: 1516: 1514: 1512: 1510: 1508: 1506: 1504: 1101:United States International Trade Commission 142: 16:Wind turbine manufacturer in Aurich, Germany 1974: 1972: 1970: 1968: 1966: 1964: 1962: 1631:dpa (Deutsche Presse-Agentur) (July 2002). 541:Geared turbines, replaced by E-30 DD model 2369: 2355: 2347: 567:First gearless drive, no longer available 148: 141: 1859:"The Wind Power: Database (Enercon E-17)" 1837:"The Wind Power: Database (Enercon E-16)" 1815:"The Wind Power: Database (Enercon E-15)" 572:5879 total (1887 original, 3992 revised) 2202:Space Daily Staff Writers (April 2008). 399: 340: 332: 278:is a wind turbine manufacturer based in 2009: 2007: 1591:Recharge | Latest renewable energy news 1457:"55 IT and wind jobs created in Tralee" 1432: 1146: 840:Replaced by E-126, no longer available 1123:'s generator technology to a US firm. 677:1.5 MW, 1.8 MW, 2.0 MW 406:Rated Power Output (based on variant) 83: 1047:Based on Lagerwey's turbine platform 945:Based on Lagerwey's turbine platform 7: 2799: 1022:Prototype installed, Number unknown 467:Developed 1984, no longer available 2232:U.S. International Trade Commission 2204:"The Greening of Patent Litigation" 2268:from the original on 20 April 2010 1406:List of wind turbine manufacturers 1077:2 (3 more to be built in Germany) 710:57, 58, 64, 70, 74.5, 84, 98, 113 680:15.66, 15.70, 18.66, 18.70, 20.70 521:660, 576 (Original), 84 (revised) 14: 1372:in July 2011 before completion... 892:Prototype developed October 2007 2845:Engineering companies of Germany 2810: 2798: 2787: 2786: 2774: 2288:"Echelon Rapport, EU Parliament" 1379: 1357: 1335: 1323: 1311: 1299: 1287: 1275: 1263: 1251: 1239: 1227: 1207: 1192: 1177: 1161: 1149: 23: 2860:Companies based in Lower Saxony 383:Alpha Ventus offshore wind farm 790:Prototype installed June 2011 385:and to a near-shore park near 114:You may also add the template 1: 2683:Blade element momentum theory 1072:Based on Lagerwey's platform 337:Enercon Headquarter in Aurich 2673:2020s in wind power research 1740:. March 2009. Archived from 1156:E-10 at Neumayer Station III 998:Designed for low-wind sites 2693:Energy return on investment 1657:(in German). Archived from 1585:Ferry, Tim (7 April 2022). 1459:. June 2010. Archived from 1246:E-32 on the North Sea coast 964:35.138 (EP3), 40.138 (EP3) 127:Knowledge (XXG):Translation 86:will aid in categorization. 2886: 2855:Wind turbine manufacturers 1099:. In a dispute before the 61:Machine translation, like 2768: 2740:Variable renewable energy 1411:Renewable energy industry 1115:. The aim of the alleged 640:Prototype developed 2006 556:500 kW, 600 kW 147: 116:{{Translated|de|Enercon}} 38:the corresponding article 2760:Wind resource assessment 2159:"Enercon raises the bar" 1655:"REpower Systems SE: 5M" 1218:'s Ecotech centre, with 1201:Green Park Business Park 412:Rotor Diameter (meters) 2258:"Verrat unter Freunden" 908:35.126 EP3, 40.126 EP3 613:50, 55, 56, 60, 65, 76 532:1.32, 3.32, 1.33, 3.33 243:Aloys Wobben Foundation 125:For more guidance, see 2755:Wind profile power law 2750:Wind power forecasting 1708:. 2011. Archived from 1562:. 2011. Archived from 1536:. 2011. Archived from 1485:. 2011. Archived from 1133:Abelitz–Aurich railway 352: 338: 330:and 59.2% in Germany. 2850:Wind power in Germany 2781:Wind power portal 1604:Enercon (July 2002). 1483:"Enercon at a Glance" 1096:U.S. patent 5,083,039 970:81, 111, 131, or 160 897:95 as of autumn 2016 344: 336: 98:copyright attribution 2586:Consulting companies 2394:Airborne wind energy 1747:on 28 September 2011 1661:on 28 September 2011 1534:"Enercon Chronology" 1117:industrial espionage 729:20.82, 23.82, 30.82 543:1st generation E-33 415:Hub Height (meters) 2815:Additional portals: 2745:Virtual power plant 2578:Wind power industry 2456:Lists of wind farms 2340:21 May 2015 at the 2335:Enercon's home page 2256:(30 October 1999). 1612:on 9 September 2015 1606:"Annular generator" 1044:126, 132, 143, 155 389:but did not do so. 368:In 2008, the first 249:Number of employees 171:Wind power industry 144: 2083:on 23 October 2021 1370:Estinnes Wind Farm 785:99, 124, 135, 149 726:2 MW, 2.3 MW, 3MW 353: 339: 290:. It has been the 106:interlanguage link 2832: 2831: 2424:on public display 1445:978-0-387-98147-5 1351:Estinnes windfarm 1222:below the nacelle 1081: 1080: 978:300+ (Estimated) 760:84, 98, 108, 138 459:0.55.15, 0.55.16 424:Number installed 273: 272: 138: 137: 50: 46: 2877: 2819:Renewable energy 2814: 2802: 2801: 2790: 2789: 2779: 2778: 2625:GE Offshore Wind 2371: 2364: 2357: 2348: 2322: 2321: 2315: 2309: 2308: 2301: 2295: 2294: 2292: 2284: 2278: 2277: 2275: 2273: 2250: 2244: 2243: 2241: 2239: 2229: 2221: 2215: 2214: 2212: 2210: 2199: 2193: 2192: 2190: 2188: 2178: 2172: 2171: 2169: 2167: 2161: 2154: 2148: 2147: 2145: 2143: 2134:. Archived from 2128: 2119: 2118: 2116: 2114: 2105:. Archived from 2099: 2093: 2092: 2090: 2088: 2079:. Archived from 2073: 2067: 2066: 2064: 2062: 2057:. September 2010 2051: 2045: 2044: 2042: 2040: 2035:. September 2010 2029: 2023: 2022: 2011: 2002: 2001: 1999: 1997: 1991: 1985:. Archived from 1984: 1976: 1957: 1956: 1954: 1952: 1947:. September 2010 1941: 1935: 1934: 1932: 1930: 1925:. September 2010 1919: 1913: 1912: 1905: 1899: 1898: 1891: 1885: 1884: 1877: 1871: 1870: 1868: 1866: 1861:. September 2010 1855: 1849: 1848: 1846: 1844: 1839:. September 2010 1833: 1827: 1826: 1824: 1822: 1817:. September 2010 1811: 1805: 1804: 1802: 1800: 1789: 1783: 1782: 1780: 1778: 1763: 1757: 1756: 1754: 1752: 1746: 1739: 1731: 1725: 1724: 1722: 1720: 1714: 1707: 1699: 1693: 1692: 1690: 1688: 1677: 1671: 1670: 1668: 1666: 1651: 1645: 1644: 1642: 1640: 1628: 1622: 1621: 1619: 1617: 1608:. Archived from 1601: 1595: 1594: 1582: 1576: 1575: 1573: 1571: 1556: 1550: 1549: 1547: 1545: 1530: 1499: 1498: 1496: 1494: 1479: 1473: 1472: 1470: 1468: 1463:on 28 March 2012 1453: 1447: 1437: 1383: 1361: 1339: 1327: 1315: 1303: 1291: 1279: 1267: 1255: 1243: 1231: 1220:observation deck 1211: 1196: 1184:Second E-112 at 1181: 1165: 1153: 1105:General Electric 1098: 1007:E-141 EP4 4.2MW 983:E-126 EP4 4.2MW 914:86, 116, or 135 880:6.0 MW, 7.58 MW 735:78, 84, 98, 108 529:100-300 kW 504:300-330 kW 400: 269: 266: 264: 187: 185: 152: 145: 117: 111: 85: 84:|topic= 82:, and specifying 67:Google Translate 48: 44: 27: 26: 19: 2885: 2884: 2880: 2879: 2878: 2876: 2875: 2874: 2835: 2834: 2833: 2828: 2773: 2764: 2735:Tip-speed ratio 2730:Net energy gain 2688:Capacity factor 2661: 2600: 2572: 2475: 2461:Community-owned 2442: 2380: 2375: 2342:Wayback Machine 2331: 2326: 2325: 2317: 2316: 2312: 2303: 2302: 2298: 2290: 2286: 2285: 2281: 2271: 2269: 2264:(Zeit Online). 2252: 2251: 2247: 2237: 2235: 2234:. November 1996 2227: 2223: 2222: 2218: 2208: 2206: 2201: 2200: 2196: 2186: 2184: 2180: 2179: 2175: 2165: 2163: 2162:. 14 April 2017 2156: 2155: 2151: 2141: 2139: 2130: 2129: 2122: 2112: 2110: 2109:on 21 June 2023 2101: 2100: 2096: 2086: 2084: 2075: 2074: 2070: 2060: 2058: 2053: 2052: 2048: 2038: 2036: 2031: 2030: 2026: 2013: 2012: 2005: 1995: 1993: 1989: 1982: 1978: 1977: 1960: 1950: 1948: 1943: 1942: 1938: 1928: 1926: 1921: 1920: 1916: 1907: 1906: 1902: 1893: 1892: 1888: 1879: 1878: 1874: 1864: 1862: 1857: 1856: 1852: 1842: 1840: 1835: 1834: 1830: 1820: 1818: 1813: 1812: 1808: 1798: 1796: 1791: 1790: 1786: 1776: 1774: 1765: 1764: 1760: 1750: 1748: 1744: 1737: 1733: 1732: 1728: 1718: 1716: 1712: 1705: 1701: 1700: 1696: 1686: 1684: 1679: 1678: 1674: 1664: 1662: 1653: 1652: 1648: 1638: 1636: 1630: 1629: 1625: 1615: 1613: 1603: 1602: 1598: 1584: 1583: 1579: 1569: 1567: 1560:"Market Shares" 1558: 1557: 1553: 1543: 1541: 1532: 1531: 1502: 1492: 1490: 1489:on 22 July 2015 1481: 1480: 1476: 1466: 1464: 1455: 1454: 1450: 1438: 1434: 1429: 1402: 1397: 1396: 1395: 1389: 1384: 1375: 1374: 1373: 1368:The 11 turbine 1367: 1362: 1353: 1346: 1340: 1331: 1328: 1319: 1316: 1307: 1304: 1295: 1292: 1283: 1280: 1271: 1268: 1259: 1256: 1247: 1244: 1235: 1232: 1223: 1212: 1203: 1197: 1188: 1182: 1173: 1166: 1157: 1154: 1145: 1129: 1094: 1091: 1086: 883:60.126, 76.126 856:25.115, 30.115 853:2.5 MW, 3.0 MW 831:60.114, 45.114 789: 764: 542: 538:34, 35, 41, 47 483:0.8.17, 0.8.18 435:0.3.10, 0.3.12 395: 358: 261: 250: 222: 215: 209: 183: 181: 134: 133: 132: 115: 109: 51: 45:(November 2018) 28: 24: 17: 12: 11: 5: 2883: 2881: 2873: 2872: 2867: 2862: 2857: 2852: 2847: 2837: 2836: 2830: 2829: 2827: 2826: 2821: 2816: 2808: 2796: 2784: 2769: 2766: 2765: 2763: 2762: 2757: 2752: 2747: 2742: 2737: 2732: 2727: 2722: 2717: 2712: 2710:Energy subsidy 2707: 2706: 2705: 2698:Energy storage 2695: 2690: 2685: 2680: 2675: 2669: 2667: 2663: 2662: 2660: 2659: 2654: 2649: 2647:Siemens Gamesa 2644: 2639: 2634: 2629: 2628: 2627: 2616: 2610: 2608: 2602: 2601: 2599: 2598: 2593: 2588: 2582: 2580: 2574: 2573: 2571: 2570: 2569: 2568: 2563: 2553: 2552: 2551: 2546: 2536: 2534:Unconventional 2531: 2526: 2521: 2516: 2511: 2506: 2501: 2499:Crosswind kite 2496: 2491: 2485: 2483: 2477: 2476: 2474: 2473: 2468: 2466:Offshore farms 2463: 2458: 2452: 2450: 2444: 2443: 2441: 2440: 2439: 2438: 2428: 2427: 2426: 2416: 2411: 2406: 2401: 2396: 2390: 2388: 2382: 2381: 2376: 2374: 2373: 2366: 2359: 2351: 2345: 2344: 2330: 2329:External links 2327: 2324: 2323: 2310: 2296: 2279: 2254:Schröm, Oliver 2245: 2216: 2194: 2173: 2149: 2138:on 26 May 2019 2120: 2094: 2068: 2046: 2024: 2019:www.enercon.de 2003: 1992:on 26 May 2012 1958: 1936: 1914: 1900: 1886: 1872: 1850: 1828: 1806: 1784: 1758: 1726: 1715:on 16 May 2011 1694: 1672: 1646: 1623: 1596: 1577: 1566:on 21 May 2015 1551: 1540:on 21 May 2015 1500: 1474: 1448: 1431: 1430: 1428: 1425: 1424: 1423: 1418: 1413: 1408: 1401: 1398: 1386: 1385: 1378: 1377: 1376: 1364: 1363: 1356: 1355: 1354: 1352: 1349: 1348: 1347: 1341: 1334: 1332: 1329: 1322: 1320: 1317: 1310: 1308: 1305: 1298: 1296: 1293: 1286: 1284: 1281: 1274: 1272: 1269: 1262: 1260: 1257: 1250: 1248: 1245: 1238: 1236: 1233: 1226: 1224: 1213: 1206: 1204: 1198: 1191: 1189: 1183: 1176: 1174: 1167: 1160: 1158: 1155: 1148: 1144: 1141: 1128: 1127:Other ventures 1125: 1090: 1089:Patent dispute 1087: 1085: 1082: 1079: 1078: 1075: 1073: 1070: 1067: 1064: 1061: 1058: 1054: 1053: 1050: 1048: 1045: 1042: 1039: 1036: 1033: 1029: 1028: 1025: 1023: 1020: 1017: 1014: 1011: 1008: 1004: 1003: 1001: 999: 996: 993: 990: 987: 984: 980: 979: 976: 974: 971: 968: 965: 962: 956: 952: 951: 948: 946: 943: 942:109, 120, 132 940: 937: 934: 931: 927: 926: 920: 918: 915: 912: 909: 906: 903: 899: 898: 895: 893: 890: 887: 884: 881: 878: 872: 871: 868: 866: 863: 860: 857: 854: 851: 847: 846: 843: 841: 838: 835: 834:112 & 114 832: 829: 826: 822: 821: 818: 816: 813: 810: 807: 804: 801: 797: 796: 793: 791: 786: 783: 781: 778: 775: 771: 770: 767: 765: 761: 758: 755: 752: 749: 745: 744: 741: 739: 736: 733: 730: 727: 724: 720: 719: 716: 714: 711: 708: 705: 702: 699: 695: 694: 691: 689: 686: 684: 681: 678: 675: 671: 670: 667: 665: 662: 660: 657: 654: 651: 647: 646: 643: 641: 638: 635: 632: 629: 626: 622: 621: 618: 616: 614: 611: 608: 605: 602: 598: 597: 594: 592: 590: 587: 584: 581: 578: 574: 573: 570: 568: 565: 563: 560: 557: 554: 550: 549: 546: 544: 539: 536: 533: 530: 527: 523: 522: 519: 517: 514: 511: 508: 505: 502: 498: 497: 494: 492: 489: 487: 484: 481: 478: 474: 473: 470: 468: 465: 463: 460: 457: 454: 450: 449: 446: 444: 441: 439: 436: 433: 430: 426: 425: 422: 419: 416: 413: 410: 407: 404: 394: 391: 357: 354: 271: 270: 259: 255: 254: 251: 248: 245: 244: 241: 237: 236: 231: 227: 226: 223: 220: 217: 216: 211: 205: 203: 199: 198: 193: 189: 188: 178: 174: 173: 168: 164: 163: 158: 154: 153: 136: 135: 131: 130: 123: 112: 90: 87: 75:adding a topic 70: 59: 52: 33: 32: 31: 29: 22: 15: 13: 10: 9: 6: 4: 3: 2: 2882: 2871: 2868: 2866: 2865:German brands 2863: 2861: 2858: 2856: 2853: 2851: 2848: 2846: 2843: 2842: 2840: 2825: 2822: 2820: 2817: 2813: 2809: 2807: 2806: 2797: 2795: 2794: 2785: 2783: 2782: 2777: 2771: 2770: 2767: 2761: 2758: 2756: 2753: 2751: 2748: 2746: 2743: 2741: 2738: 2736: 2733: 2731: 2728: 2726: 2723: 2721: 2718: 2716: 2713: 2711: 2708: 2704: 2701: 2700: 2699: 2696: 2694: 2691: 2689: 2686: 2684: 2681: 2679: 2676: 2674: 2671: 2670: 2668: 2664: 2658: 2655: 2653: 2650: 2648: 2645: 2643: 2640: 2638: 2635: 2633: 2630: 2626: 2622: 2621: 2620: 2617: 2615: 2612: 2611: 2609: 2607: 2606:Manufacturers 2603: 2597: 2594: 2592: 2591:Manufacturers 2589: 2587: 2584: 2583: 2581: 2579: 2575: 2567: 2564: 2562: 2559: 2558: 2557: 2554: 2550: 2547: 2545: 2542: 2541: 2540: 2539:Vertical-axis 2537: 2535: 2532: 2530: 2527: 2525: 2522: 2520: 2519:Pitch bearing 2517: 2515: 2512: 2510: 2507: 2505: 2502: 2500: 2497: 2495: 2492: 2490: 2487: 2486: 2484: 2482: 2481:Wind turbines 2478: 2472: 2471:Onshore farms 2469: 2467: 2464: 2462: 2459: 2457: 2454: 2453: 2451: 2449: 2445: 2437: 2434: 2433: 2432: 2429: 2425: 2422: 2421: 2420: 2417: 2415: 2412: 2410: 2409:Land vehicles 2407: 2405: 2402: 2400: 2397: 2395: 2392: 2391: 2389: 2387: 2383: 2379: 2372: 2367: 2365: 2360: 2358: 2353: 2352: 2349: 2343: 2339: 2336: 2333: 2332: 2328: 2320: 2314: 2311: 2306: 2300: 2297: 2289: 2283: 2280: 2267: 2263: 2259: 2255: 2249: 2246: 2233: 2226: 2220: 2217: 2205: 2198: 2195: 2183: 2177: 2174: 2160: 2153: 2150: 2137: 2133: 2127: 2125: 2121: 2108: 2104: 2098: 2095: 2082: 2078: 2072: 2069: 2056: 2050: 2047: 2034: 2028: 2025: 2020: 2016: 2010: 2008: 2004: 1988: 1981: 1975: 1973: 1971: 1969: 1967: 1965: 1963: 1959: 1946: 1940: 1937: 1924: 1918: 1915: 1910: 1904: 1901: 1896: 1890: 1887: 1882: 1876: 1873: 1860: 1854: 1851: 1838: 1832: 1829: 1816: 1810: 1807: 1794: 1788: 1785: 1772: 1768: 1762: 1759: 1743: 1736: 1730: 1727: 1711: 1704: 1698: 1695: 1682: 1676: 1673: 1660: 1656: 1650: 1647: 1634: 1627: 1624: 1611: 1607: 1600: 1597: 1592: 1588: 1581: 1578: 1565: 1561: 1555: 1552: 1539: 1535: 1529: 1527: 1525: 1523: 1521: 1519: 1517: 1515: 1513: 1511: 1509: 1507: 1505: 1501: 1488: 1484: 1478: 1475: 1462: 1458: 1452: 1449: 1446: 1442: 1436: 1433: 1426: 1422: 1421:Enercon E-126 1419: 1417: 1414: 1412: 1409: 1407: 1404: 1403: 1399: 1393: 1388: 1382: 1371: 1366: 1360: 1350: 1345: 1338: 1333: 1330:Enercon E-126 1326: 1321: 1318:Enercon E-101 1314: 1309: 1302: 1297: 1290: 1285: 1282:Enercon E-112 1278: 1273: 1266: 1261: 1254: 1249: 1242: 1237: 1230: 1225: 1221: 1217: 1210: 1205: 1202: 1195: 1190: 1187: 1180: 1175: 1171: 1168:E-112 at Ems 1164: 1159: 1152: 1147: 1142: 1140: 1138: 1134: 1126: 1124: 1122: 1118: 1114: 1110: 1106: 1102: 1097: 1088: 1083: 1076: 1074: 1071: 1068: 1065: 1062: 1059: 1056: 1055: 1051: 1049: 1046: 1043: 1040: 1038:50.147 (EP5) 1037: 1034: 1031: 1030: 1026: 1024: 1021: 1018: 1015: 1013:42.141 (EP4) 1012: 1009: 1006: 1005: 1002: 1000: 997: 994: 991: 989:42.126 (EP4) 988: 985: 982: 981: 977: 975: 972: 969: 966: 963: 961: 958:3.5MW, 4.0MW 957: 954: 953: 949: 947: 944: 941: 938: 936:47.136 (EP5) 935: 932: 929: 928: 925: 921: 919: 916: 913: 910: 907: 904: 901: 900: 896: 894: 891: 888: 885: 882: 879: 877: 874: 873: 869: 867: 865:Direct drive 864: 861: 858: 855: 852: 849: 848: 844: 842: 839: 836: 833: 830: 828:4.5 MW, 6 MW 827: 824: 823: 819: 817: 814: 811: 808: 806:24.103 (EP2) 805: 802: 799: 798: 794: 792: 787: 784: 782: 779: 776: 773: 772: 768: 766: 762: 759: 756: 753: 750: 747: 746: 742: 740: 738:Direct drive 737: 734: 731: 728: 725: 722: 721: 717: 715: 713:Direct drive 712: 709: 706: 704:20.71, 23.71 703: 700: 697: 696: 692: 690: 687: 685: 682: 679: 676: 673: 672: 668: 666: 663: 661: 658: 655: 652: 649: 648: 644: 642: 639: 636: 633: 630: 627: 624: 623: 619: 617: 615: 612: 609: 606: 603: 600: 599: 595: 593: 591: 588: 585: 582: 579: 576: 575: 571: 569: 566: 564: 561: 558: 555: 552: 551: 547: 545: 540: 537: 534: 531: 528: 525: 524: 520: 518: 515: 512: 509: 506: 503: 500: 499: 495: 493: 490: 488: 485: 482: 479: 476: 475: 471: 469: 466: 464: 461: 458: 455: 452: 451: 447: 445: 442: 440: 437: 434: 431: 428: 427: 423: 420: 417: 414: 411: 408: 405: 403:Model Number 402: 401: 398: 392: 390: 388: 387:Wilhelmshaven 384: 378: 375: 371: 366: 362: 355: 351: 347: 343: 335: 331: 327: 325: 321: 317: 313: 309: 305: 301: 297: 293: 292:market leader 289: 285: 281: 277: 268: 260: 256: 252: 246: 242: 238: 235: 234:Wind turbines 232: 228: 224: 218: 214: 208: 204: 200: 197: 194: 190: 179: 175: 172: 169: 165: 162: 159: 155: 151: 146: 140: 128: 124: 121: 113: 107: 103: 99: 95: 91: 88: 81: 80:main category 77: 76: 71: 68: 64: 60: 57: 54: 53: 47: 41: 39: 34:You can help 30: 21: 20: 2803: 2791: 2772: 2720:Hybrid power 2613: 2489:Aerodynamics 2313: 2299: 2282: 2270:. Retrieved 2248: 2236:. Retrieved 2219: 2207:. Retrieved 2197: 2185:. Retrieved 2176: 2164:. Retrieved 2152: 2140:. Retrieved 2136:the original 2111:. Retrieved 2107:the original 2097: 2085:. Retrieved 2081:the original 2071: 2059:. Retrieved 2049: 2037:. Retrieved 2027: 2018: 1994:. Retrieved 1987:the original 1949:. Retrieved 1939: 1927:. Retrieved 1917: 1903: 1889: 1875: 1863:. Retrieved 1853: 1841:. Retrieved 1831: 1819:. Retrieved 1809: 1797:. Retrieved 1795:. March 2011 1787: 1775:. Retrieved 1770: 1761: 1749:. Retrieved 1742:the original 1729: 1717:. Retrieved 1710:the original 1697: 1685:. Retrieved 1675: 1663:. Retrieved 1659:the original 1649: 1637:. Retrieved 1626: 1614:. Retrieved 1610:the original 1599: 1590: 1580: 1568:. Retrieved 1564:the original 1554: 1542:. Retrieved 1538:the original 1491:. Retrieved 1487:the original 1477: 1465:. Retrieved 1461:the original 1451: 1435: 1306:Enercon E-82 1294:Enercon E-82 1130: 1092: 959: 924:Kirch Muslow 905:3.5 MW, 4.0 788:Direct drive 763:Direct drive 701:2.0 MW, 2.3 683:66 & 70 628:800 kW 604:800 kW 580:900 kW 396: 379: 367: 363: 359: 356:Technologies 328: 284:Lower Saxony 276:Enercon GmbH 275: 274: 202:Headquarters 196:Aloys Wobben 157:Company type 143:Enercon GmbH 139: 102:edit summary 93: 73: 43: 35: 2166:22 December 2103:"E-138 EP3" 1777:23 February 1735:"Windblatt" 1635:(in German) 1019:129 or 159 559:5.40, 6.44 480:80 kW 477:E-17/E-18* 456:55 kW 432:30 kW 429:E-10/E-12* 2839:Categories 2725:Laddermill 2678:Betz's law 2623:including 2556:Yaw system 2448:Wind farms 2399:By country 2386:Wind power 2378:Wind power 2142:25 October 2113:25 October 2087:25 October 1427:References 1416:Wind power 1057:E-160 EP5 1032:E-147 EP5 955:E-138 EP3 930:E-136 EP5 902:E-126 EP3 812:98 or 138 800:E-103 EP2 653:1 MW 421:Source(s) 221:Key people 1069:120, 166 862:92.5-149 837:108, 124 562:40, 44.5 535:32, 33.4 526:E-32/33* 453:E-15/16* 409:Variants 300:Magdeburg 225:Udo Bauer 120:talk page 72:Consider 40:in German 2793:Category 2666:Concepts 2632:Goldwind 2596:Software 2549:Darrieus 2544:Savonius 2509:Floating 2494:Airborne 2436:panemone 2431:Windmill 2419:Turbines 2414:Offshore 2338:Archived 2266:Archived 2262:Die Zeit 1771:Recharge 1400:See also 1216:Swaffham 1214:E-66 at 1199:E-70 at 1186:Cuxhaven 803:2.35 MW 751:2.35 MW 393:Turbines 374:Estinnes 348:leaving 346:E-Ship 1 320:Portugal 265:.enercon 230:Products 167:Industry 96:provide 2805:Commons 2642:Senvion 2619:GE Wind 2614:Enercon 2561:bearing 2514:Nacelle 2404:History 2209:15 July 2187:15 July 2061:15 July 2039:15 July 1996:15 July 1951:15 July 1929:15 July 1865:15 July 1843:15 July 1821:15 July 1799:15 July 1773:. 2016 1751:15 July 1719:15 July 1687:15 July 1665:15 July 1639:15 July 1616:15 July 1570:15 July 1544:15 July 1493:15 July 1467:15 July 1344:Holdorf 1143:Gallery 1135:, (via 1113:ECHELON 1063:46.160 1010:4.2 MW 986:4.2 MW 933:4.65MW 922:1 near 825:E-112* 795:~1500 769:~ 250 637:60, 73 589:45, 55 510:30, 33 288:Germany 258:Website 253:~18,000 213:Germany 192:Founder 182: ( 177:Founded 118:to the 100:in the 42:. 2824:Energy 2657:Vestas 2652:Suzlon 2637:Nordex 2524:QBlade 2504:Design 2132:"Home" 2077:"Home" 2015:"Home" 1683:. 2011 1443:  1121:Wobben 1084:Issues 1060:4.6MW 960:4.2MW 850:E-115 774:E-101 754:24.92 674:E-66* 656:10.58 650:E-58* 501:E-30* 486:17/18 462:15/16 418:Notes 350:Dieppe 324:Tralee 316:Turkey 312:Canada 304:Brazil 280:Aurich 207:Aurich 2566:drive 2529:Small 2291:(PDF) 2272:4 May 2238:8 May 2228:(PDF) 1990:(PDF) 1983:(PDF) 1745:(PDF) 1738:(PDF) 1713:(PDF) 1706:(PDF) 1170:Emden 1027:TBA 876:E-126 777:3 MW 748:E-92 743:3146 723:E-82 718:4360 698:E-70 693:2486 645:1240 634:52.9 631:8.53 625:E-53 620:1878 607:8.48 601:E-48 583:9.44 577:E-44 553:E-40 507:3.30 370:E-126 308:India 296:Emden 240:Owner 63:DeepL 2715:HVDC 2703:grid 2274:2008 2240:2017 2211:2011 2189:2011 2168:2017 2144:2018 2115:2018 2089:2018 2063:2011 2041:2011 1998:2011 1953:2011 1931:2011 1867:2011 1845:2011 1823:2011 1801:2011 1779:2017 1753:2011 1721:2011 1689:2011 1667:2011 1641:2011 1618:2011 1572:2011 1546:2011 1495:2011 1469:2011 1441:ISBN 1066:160 1041:147 1035:5MW 1016:141 995:135 992:126 967:138 939:136 911:126 889:135 886:126 859:115 809:103 780:101 669:225 596:563 496:158 318:and 298:and 184:1984 180:1984 161:GmbH 94:must 92:You 56:View 1109:NSA 870:? 820:2 757:92 732:82 707:71 659:58 610:48 586:45 548:? 513:50 472:46 438:10 302:), 267:.de 263:www 65:or 2841:: 2230:. 2123:^ 2017:. 2006:^ 1961:^ 1769:. 1589:. 1503:^ 1392:MW 1052:2 845:9 448:3 326:. 314:, 310:, 306:, 286:, 282:, 210:, 2370:e 2363:t 2356:v 2307:. 2293:. 2276:. 2242:. 2213:. 2191:. 2170:. 2146:. 2117:. 2091:. 2065:. 2043:. 2021:. 2000:. 1955:. 1933:. 1911:. 1897:. 1883:. 1869:. 1847:. 1825:. 1803:. 1781:. 1755:. 1723:. 1691:. 1669:. 1643:. 1620:. 1593:. 1574:. 1548:. 1497:. 1471:. 186:) 129:. 122:.

Index

the corresponding article
View
DeepL
Google Translate
adding a topic
main category
copyright attribution
edit summary
interlanguage link
talk page
Knowledge (XXG):Translation

GmbH
Wind power industry
Aloys Wobben
Aurich
Germany
Wind turbines
www.enercon.de
Aurich
Lower Saxony
Germany
market leader
Emden
Magdeburg
Brazil
India
Canada
Turkey
Portugal

Text is available under the Creative Commons Attribution-ShareAlike License. Additional terms may apply.

↑