Knowledge (XXG)

Glendoe Hydro Scheme

Source 📝

2127:
taken once the rock could be seen, and less than one percent was actually lined. The completed tunnel was carefully inspected by Hochtief, Pöyry, Jacobs and SSE before being signed off. After about 8 months of use, some 233 feet (71 m) of the tunnel collapsed and was blocked by the rock fall. Robert Galbraith QC was appointed by Hochtief and SSE to adjudicate in 2011, and decided that Hochtief were not to blame for the collapse. Rather than take the dispute to arbitration, where the issues would be judged by technically qualified, professional engineers, SSE chose to pursue the matter in court, where it would be decided on legal issues by judges who were not technically qualified.
2087:. While a Francis turbine can be brought online and offline more quickly, the slope of the ground between the reservoir and the turbine house meant that there were no suitable sites to build a surge shaft, and so the engineering needed to cope with pressure changes would have been complex. A Pelton turbine takes longer to bring online or offline, but deflectors can be used so that the turbine stops before the water flow does, which significantly reduces pressure surges. SSE decided that they could cope with the slower response time, as the benefits of the Pelton system's simplicity outweighed the complexity of the Francis system. They therefore chose to install an 2075:" after a competition by local schoolchildren. There is a drop of 1,970 feet (600 m) from the reservoir to the turbine house, and most of the headrace tunnel slopes uphill at a gradient of 12 per cent. The hard rock tunnel boring machine started at the bottom end in September 2006 and worked continuously for 16 months to reach the top on 7 January 2008, having cut through 4.675 miles (7.524 km) of rock. There is a second smaller cavern which houses the transformers next to the turbine house cavern, and the complex is accessed by a tunnel 0.8 miles (1.3 km) long, running from near the B862 road from Fort Augustus. 58: 2046:. The dam is 3,150 feet (960 m) long, and some 115 feet (35 m) high where it crosses the original course of the river, but much lower at the sides. It is a rock fill dam, with most of the rock coming from a quarry which was flooded as the reservoir filled with water. The upstream side is faced with concrete, while the downstream side is exposed rock. The dam cannot be seen from any of the houses and public roads in the area. 3824: 1638: 1606: 1565: 1506: 1492: 1281: 1254: 903: 695: 384: 315: 1499: 1295: 1044: 1003: 910: 750: 702: 472: 435: 3096: 1811: 1745: 1686: 1599: 1533: 1460: 1374: 1315: 1229: 1163: 1156: 1149: 1103: 1089: 1037: 989: 937: 930: 871: 845: 825: 784: 670: 643: 584: 358: 308: 1827: 1754: 1695: 1679: 1622: 1572: 1542: 1513: 1476: 1440: 1383: 1347: 1331: 1238: 1209: 1110: 1053: 1017: 946: 887: 852: 679: 627: 618: 568: 552: 442: 322: 1864: 1857: 1850: 1843: 1835: 1818: 1784: 1777: 1770: 1711: 1645: 1613: 1558: 1467: 1399: 1322: 1288: 1096: 1069: 1061: 895: 878: 687: 611: 576: 559: 479: 413: 406: 399: 392: 376: 342: 1791: 1725: 1718: 1659: 1652: 1579: 1433: 1406: 1354: 1130: 1010: 996: 969: 962: 805: 798: 791: 757: 743: 736: 525: 499: 2135:, who built a diversion tunnel around the rockfall by drill-and-blast. This was full-lined with 20 inches (500 mm) of waterproof concrete, and they also applied a 4-inch (100 mm) concrete lining to almost half of the rest of the tunnel. A downstream access tunnel was also built as part of the repair contract. Energy generation at the scheme restarted in August 2012. 1762: 1703: 1630: 1550: 1484: 1426: 1391: 1339: 1274: 1246: 1202: 1182: 954: 764: 716: 709: 650: 635: 591: 532: 506: 449: 366: 349: 1997:
scheme, and because the difference in levels between the top reservoir and Loch Ness was sufficient that it would be extremely costly to overcome the issues this would introduce. Once the choice of Glendoe was made in October 2001, an environmental statement was produced and the design was refined by May 2003. SSE then applied for planning consent under section 36 of the
65: 3836: 3046: 45: 1989:, who inherited most of the Hydro-Electric Board's assets when the electricity industry was privatised, reviewed all of the large schemes that the Board had considered, but which had not been built. Nearly all had been abandoned because of their environmental impact in areas which had a high amenity value, but the exception was Glendoe. 2005:
the landowners had been agreed, the design was kept flexible throughout the process. The turbine house might be above or below ground, the output of the scheme could be between 50 MW and 100 MW, while the dam could be constructed of rockfill or roller compacted concrete. A contract for the scheme was awarded to
2155:
of 600 m (2,000 ft), the highest of any hydro-electric scheme in the United Kingdom, and is thus ideally suited to generating large amounts of energy from the stored water in the reservoir, especially when combined with the relatively high annual rainfall in the area of around 2,000 mm
2138:
SSE issued proceedings seeking to recover £130 million in repair and reinstatement costs and £65 million in alleged loss of profit from Hochtief, but in December 2016 Hochtief was held by the Scottish Court of Session not to have been liable for the collapse, and that it was an operational risk to be
1945:
completed the scheme in 2009. It is operated by SSE and was opened on 29 June 2009 by Queen Elizabeth, accompanied by the Duke of Edinburgh. Part of the main headrace tunnel collapsed in August 2009, and remedial work was not completed until 2012, with generation restarting in April. SSE and Hochtief
2017:
was ordered from Herrenknecht, a start was made on the 28 miles (45 km) of roads needed to access the various sites where work was to be carried out, and a planning application was made to allow work camps to be constructed. These were built high up on the Glendoe plateau, and accommodated most
2012:
Before work could start on the main scheme, various enabling works had to be done. The bridge that carries the B862 road over the River Tarff near Fort Augustus had to be strengthened to cope with the weight of construction vehicles, and this work was done in five weeks starting on 21 November 2005.
2130:
The collapse occurred in the Conagleann Fault Zone, around 1.2 miles (2 km) from the top end of the tunnel. The fault was known from its appearance at surface level, but during tunnelling, the tunnel boring machine had passed through it, and SSE recorded that its existence was imperceptible. A
2004:
Although there were few objections to the scheme, and the local community was supportive, SSE did not know how long the planning consent process would take, and so began a design and build tendering process which ran concurrently. Because they could not undertake investigative work until deals with
1996:
scheme generating under 10 MW, to a huge pumped storage scheme. The smaller schemes were discarded because of the cost of transferring the water from the Glendoe plateau down to Loch Ness, while the pumped storage option was discarded because it would not qualify under the Renewable Obligation
2118:
In August 2009 the station was shut down and the headrace tunnel drained because of internal rock falls near the upper end of it. Although the equipment in the power station was not affected, Glendoe was unable to generate power until repairs were made. SSE reported that electricity generation was
2126:
Energy JV who were the design engineers for Hochtief recommended that a tunnel boring machine should be used to excavate the tunnel. This would give a much smoother finish to the walls of the tunnel, and only around 40 per cent would need to be lined. Decisions as to how much lining to apply were
2070:
The power station was constructed underground, in a cavern 125 by 59 feet (38 by 18 m) and 105 feet (32 m) high, excaved from solid rock by drill-and-blast. The cavern is 820 feet (250 m) below the surface, at a level where the tailrace to Loch Ness is almost horizontal. A 5.3-mile
2049:
The catchment for the reservoir is around 5.8 square miles (15 km) as it is fed by the upper reaches of the River Tarff, the Caochan Uilleim, and runoff from the A' Chraidhleag bog. Water is collected from another 23 square miles (60 km) by intakes constructed on numerous streams, and
2078:
For schemes between 50 MW and 100 MW, the tunnels would need to be a similar size, as making them smaller also makes building them more difficult. The cost of building either scheme is therefore similar, and SSE took the decision to go with the larger size, as it also has significant
2062:
technique. There are a further 2.5 miles (4 km) of 6.6-foot (2 m) diameter pipe to complete the network. Water is collected from at least 14 intakes which feed into the network. When full, the reservoir covers around 0.58 square miles (1.5 km) and its surface is at 2,070 feet
2097:
in his role as First Minister of Scotland initiated the filling of the reservoir on 1 September 2008. Hochtief completed the contract two months early, and the station had been generating power since January 2009 when a formal opening of the scheme took place on 29 June 2009, at which
2071:(8.5 km) tunnel connects the reservoir to Loch Ness, with the turbines about 1.2 miles (2 km) from the loch. Some of it was cut by drill-and-blast, but the majority was created by a 16-foot (5 m) diameter tunnel boring machine, 720 feet (220 m) long and named " 1946:
failed to agree on who was responsible for the cost of the failure, but SSE were awarded damages in 2018 in the court of appeal, despite an adjudication and the first court case finding that the cost was an operational risk to be borne by SSE.
2139:
borne by SSE. In an appeal decided in 2018, SSE were awarded more than £107 million in compensation. The judges hearing the appeal split 2-to-1 in SSE's favour. Hochtief subsequently appealed, and the case will be heard by the
2159:
At the time of its construction, it was the largest of Scotland's recent civil engineering projects, with Hochtief as the design and build contractor. The scheme is predicted to produce about 180 
2167:
of approximately 20 percent. This is based on the amount of water falling on the catchment in an average year, and is enough to provide approximately 5% of the electricity consumption of the city of
3867: 1977:
set an objective of increasing the proportion of electricity generated from renewable sources to 18 per cent by 2010, as part of their Scottish Climate Change Programme. The publication of the
269: 2050:
transporting the water to the reservoir by a network of underground pipes and tunnels. The main tunnel is 5.3 miles (8.5 km) long, of which 4.3 miles (7 km) were constructed by the
2874: 2861: 3030: 2922: 2122:
SSE employed Jacobs Gibb and Jacobs UK as their engineers, and the original designs were for a fully-lined tunnel constructed by drill-and-blast. However, during the tendering process,
2042:, marked the formal start of construction. They detonated an explosive charge, to begin the reshaping of the valley. A reservoir for the scheme was created by building a dam across the 2935: 3638: 3181: 3862: 3010: 2288: 262: 2948: 3084: 2418: 2605: 2469: 255: 57: 3303: 3572: 2906: 2870: 2502: 2318: 2857: 1958:
in the early 1960s brought to an end over two decades of expansion of conventional hydro-electricity in the Highlands of Scotland. Subsequently,
2067:. (AOD). Water is drawn down to a maximum of 20 feet (6 m) below this level when the power station is operating, on environmental grounds. 3247: 3050: 3022: 2693: 1978: 1955: 1935: 1927: 114: 2918: 2355: 3004: 2980: 2965: 2741: 2719: 2520: 3343: 2091:
six-jet vertical-axis Pelton turbine which can generate up to 100 MW, from a peak flow of 660 cubic feet per second (18.6 m/s).
3809: 3267: 2140: 3760: 3742: 3453: 3378: 3286: 2374: 3754: 3443: 3368: 3318: 2931: 3373: 3323: 3077: 2103: 1931: 3643: 3438: 3393: 3388: 1967: 3062: 2989: 3469: 3448: 3418: 3398: 3191: 3176: 2448: 3839: 2284: 3383: 3348: 3308: 3136: 3115: 2663: 157: 2944: 3827: 3433: 3403: 3363: 3353: 3070: 2801: 1981:
in 2001 made any new hydro-electric scheme eligible under the incentive, whereas previously only those under 10 
2043: 2039: 457: 2414: 3804: 3313: 3166: 3131: 289: 3707: 3689: 3552: 2775: 2465: 2164: 3633: 3648: 2009:
in December 2005, and they began producing the detailed designs and starting construction from January 2006.
3725: 3719: 3542: 3495: 3490: 3257: 1985: (MW) had qualified. This changed the financial incentives for building new hydro-electric plants, and 3777: 3582: 3562: 3333: 3141: 2031: 1959: 1903: 3683: 3587: 3628: 3607: 3567: 3485: 2597: 2051: 2014: 2883: 2498: 2314: 3713: 3695: 3602: 3201: 1998: 2976: 2733: 2689: 3547: 3532: 3527: 2351: 1974: 2715: 2516: 3783: 3612: 3537: 3252: 1919: 234: 102: 3186: 3000: 2961: 3262: 3237: 2898: 1993: 1907: 3592: 3557: 3338: 3221: 2737: 2378: 2107: 2080: 1963: 3577: 3413: 3242: 2152: 2064: 2035: 190: 92: 3856: 3211: 3206: 1934:(SSE) to reconsider a number of schemes that had been mothballed in the 1960s by the 1911: 3511: 2099: 2094: 2084: 3677: 3597: 3408: 3328: 3196: 2132: 2106:
officiated. The power station is operated remotely from SSE's control centre in
3057: 2902: 2444: 3428: 3171: 2088: 2027: 2667: 129: 116: 2055: 1915: 421: 2079:
operational benefits. Consideration was given to using a fully-pressurised
3045: 2805: 248: 3748: 3701: 3104: 2123: 2006: 1942: 1923: 240: 44: 3272: 3216: 2168: 1986: 17: 1926:. The change in financial incentives following the publication of the 3423: 3100: 2059: 2779: 2997:
Improvements in reservoir construction, operation and maintenance
1982: 3066: 2990:"Glendoe Hydroelectric Scheme, Optimisation and Dam Selection" 2932:"SSE Generation Ltd against Hochtief Solutions AG and Another" 2601: 2160: 2858:"Glendoe Tunnel – the collapse of reasonable skill and care?" 1992:
Various configurations were then considered, from a small
3023:"Tunnel repairs to begin on disaster-struck hydro scheme" 2919:"Supreme Court to rule on collapsed Glendoe hydro tunnel" 2734:"SSE Generation wins claim over Glendoe tunnel collapse" 2544: 2542: 2871:"Glendoe hydro scheme, the real monster of Loch Ness" 2481: 2479: 2018:
of the 750 workers who were employed on the project.
1938:, and plans for the Glendoe scheme were resurrected. 2716:"SSE loses £130m claim over Glendoe tunnel collapse" 3868:
Buildings and structures in Highland (council area)
3797: 3770: 3735: 3670: 3661: 3621: 3520: 3504: 3478: 3462: 3296: 3285: 3230: 3159: 3150: 3124: 1910:power is located in the Monadhliath Mountains near 233: 228: 220: 212: 189: 184: 176: 168: 163: 153: 145: 108: 98: 88: 80: 37: 3639:Lerwick District Heating and Energy Recovery Plant 2690:"Glendoe hydro electric scheme resumes operations" 2460: 2458: 2369: 2367: 2365: 2119:unlikely to proceed until at least April 2011. 2001:, and this was eventually granted in June 2005. 2958:Power from the Glens - 75th Anniversary edition 2778:. Scottish and Southern Energy. Archived from 2377:. Scottish and Southern Energy. Archived from 3078: 2163:of electricity per year, and to operate at a 263: 8: 2826: 2626: 2584: 2533: 2431: 2346: 2344: 2342: 2340: 2301: 2271: 2259: 2247: 2235: 2223: 2187: 64: 2466:"Loch Ness Hydro Tunnel Makes Breakthrough" 2285:"Strengthening Works To River Tarff Bridge" 3667: 3293: 3156: 3085: 3071: 3063: 383: 375: 297: 270: 256: 43: 34: 2884:"The Glendoe Tunnel Collapse in Scotland" 1954:The completion of several schemes by the 1834: 1826: 1060: 1052: 894: 886: 686: 678: 575: 567: 72:Location of Glendoe Reservoir in Highland 3863:Hydroelectric power stations in Scotland 3573:European Offshore Wind Deployment Centre 3202:Scottish Government (Energy Directorate) 2548: 2315:"Glendoe Hydro Electric Scheme – Energy" 2131:contract for repair work was awarded to 365: 357: 2650: 2638: 2572: 2523:from the original on 22 September 2023. 2421:from the original on 25 September 2023. 2409: 2407: 2405: 2180: 1761: 1753: 1702: 1694: 1629: 1621: 1549: 1541: 1483: 1475: 1390: 1382: 1338: 1330: 1245: 1237: 953: 945: 634: 626: 253: 27:Hydro-electric power scheme in Scotland 3248:North of Scotland Hydro-Electric Board 2951:from the original on 21 November 2023. 2838: 2762: 2519:. Power Technology. 16 November 2010. 2485: 2417:. German Tunnelling Committee (DAUB). 2331: 2211: 2199: 1956:North of Scotland Hydro-Electric Board 1936:North of Scotland Hydro-Electric Board 2938:from the original on 31 January 2023. 2722:from the original on 9 February 2022. 2560: 7: 3835: 3033:from the original on 3 January 2024. 3021:Wynne, Alexandra (21 January 2010). 3016:from the original on 3 January 2024. 2983:from the original on 20 August 2022. 2925:from the original on 5 January 2024. 2877:from the original on 5 January 2024. 2864:from the original on 4 October 2023. 2744:from the original on 9 February 2022 2291:from the original on 3 January 2024. 3810:Sustainable development in Scotland 3268:South of Scotland Electricity Board 2988:Seaton, Mike; Sawyer, John (2006). 2912:from the original on 29 April 2019. 2891:Rock Mechanics and Rock Engineering 2664:"Glendoe repair bulletin - Issue 5" 2505:from the original on 22 April 2021. 2468:. Tunnel Builder. 29 January 2008. 2287:. Highland Council. 19 April 2006. 2975:Reynolds, Patrick (22 June 2012). 2696:from the original on 27 April 2023 2666:. SSE. Summer 2011. Archived from 2608:from the original on 12 April 2018 2598:"Glendoe out of action until 2011" 2472:from the original on 3 March 2016. 2321:from the original on 24 June 2022. 1941:Construction started in 2006, and 749: 471: 25: 2945:"How much hydro to power Glasgow" 2934:. Scottish Courts and Tribunals. 2930:Lord Woolman (21 December 2016). 2869:Ellery, Simon (1 December 2008). 2451:from the original on 21 May 2023. 2358:from the original on 30 May 2014. 1810: 1744: 1685: 1637: 1605: 1598: 1564: 1532: 1505: 1491: 1459: 1373: 1314: 1280: 1253: 1228: 1162: 1155: 1148: 1102: 1088: 1036: 988: 936: 929: 902: 870: 844: 824: 783: 694: 669: 642: 583: 314: 307: 3834: 3823: 3822: 3094: 3044: 2943:MacKay, David (7 January 2008). 2856:Barrass, Rebecca (6 June 2018). 2354:. Gazetteer for Scotland. 2022. 2104:Prince Philip, Duke of Edinburgh 1966:in 1974, but both of these were 1862: 1855: 1848: 1841: 1833: 1825: 1816: 1809: 1789: 1782: 1775: 1768: 1760: 1752: 1743: 1723: 1716: 1709: 1701: 1693: 1684: 1678: 1677: 1657: 1650: 1643: 1636: 1628: 1620: 1611: 1604: 1597: 1577: 1571: 1570: 1563: 1556: 1548: 1540: 1531: 1521:Allt Rhuige an t-Sidhein intake 1512: 1511: 1504: 1498: 1497: 1490: 1482: 1474: 1465: 1458: 1439: 1438: 1431: 1424: 1404: 1397: 1389: 1381: 1372: 1352: 1346: 1345: 1337: 1329: 1320: 1313: 1294: 1293: 1286: 1279: 1272: 1252: 1244: 1236: 1227: 1208: 1207: 1200: 1180: 1161: 1154: 1147: 1128: 1109: 1108: 1101: 1094: 1087: 1077:Allt na Feithe Gobhlaich intake 1067: 1059: 1051: 1043: 1042: 1035: 1016: 1015: 1008: 1002: 1001: 994: 987: 967: 960: 952: 944: 935: 928: 909: 908: 901: 893: 885: 876: 869: 851: 850: 843: 823: 803: 796: 789: 782: 762: 755: 748: 741: 734: 714: 707: 701: 700: 693: 685: 677: 668: 648: 641: 633: 625: 617: 616: 609: 589: 582: 574: 566: 557: 551: 550: 530: 523: 504: 497: 477: 470: 447: 441: 440: 434: 433: 411: 404: 397: 390: 382: 374: 364: 356: 347: 340: 321: 320: 313: 306: 200:15 km (5.8 sq mi) 63: 56: 2517:"The Glendoe Hydro Power Plant" 2375:"Reservoir and Dam Information" 2352:"Glendoe Hydro Electric Scheme" 2058:. The rest was built using the 1863: 1856: 1849: 1842: 1817: 1783: 1776: 1769: 1710: 1644: 1612: 1557: 1466: 1398: 1321: 1287: 1095: 1068: 877: 610: 599:Intake + Loch Carn a' Chuilinn 558: 478: 412: 405: 398: 391: 341: 205:60 km (23 sq mi) 3029:. London: EMAP International. 2882:Hencher, S R (17 April 2019). 2718:. BBC News. 21 December 2016. 1962:was commissioned in 1968, and 1790: 1724: 1717: 1658: 1651: 1578: 1432: 1405: 1353: 1129: 1009: 995: 968: 961: 804: 797: 790: 756: 742: 735: 540:River Tarff + headrace tunnel 524: 498: 1: 3192:Office for Nuclear Regulation 3177:European Marine Energy Centre 3051:Glendoe hydro-electric scheme 2860:. Scottish Construction Now. 1425: 1273: 1201: 1181: 918:Allt na Feithe Glaise intake 763: 715: 708: 649: 590: 531: 505: 448: 348: 3116:Energy in the United Kingdom 2956:Reeves, Julian, ed. (2018). 2399:Ordnance Survey, 1:25000 map 1932:Scottish and Southern Energy 487:B862 bridge + power station 158:Scottish and Southern Energy 2917:Horgan, Rob (6 June 2018). 1733:Allt Uaine Mhachair intake 1362:Allt Creag Cromaich intake 3884: 2999:. London: Thomas Telford. 2903:10.1007/s00603-019-01812-w 2040:First Minister of Scotland 1799:Allt Coire an Eich intake 224:630 m (2,070 ft) 180:905 m (2,969 ft) 3818: 3805:Energy policy of Scotland 3167:Community Energy Scotland 3111: 1871: 1803: 1798: 1737: 1732: 1671: 1666: 1591: 1586: 1525: 1520: 1452: 1447: 1418: 1413: 1366: 1361: 1307: 1302: 1266: 1261: 1221: 1216: 1194: 1189: 1174: 1170: 1141: 1137: 1122: 1117: 1081: 1076: 1029: 1024: 981: 976: 922: 917: 863: 859: 837: 832: 817: 812: 776: 771: 728: 723: 662: 657: 603: 598: 544: 539: 517: 513: 491: 486: 464: 456: 427: 420: 334: 329: 300: 51: 42: 32:Dam in Scottish Highlands 2979:. Water Power Magazine. 2827:Seaton & Sawyer 2006 2534:Seaton & Sawyer 2006 2432:Seaton & Sawyer 2006 2302:Seaton & Sawyer 2006 2272:Seaton & Sawyer 2006 2260:Seaton & Sawyer 2006 2248:Seaton & Sawyer 2006 2236:Seaton & Sawyer 2006 2224:Seaton & Sawyer 2006 2188:Seaton & Sawyer 2006 3258:Scottish Hydro Electric 2692:. BBC. 29 August 2012. 2026:A ceremony attended by 1587:Caochan nan Sac intake 1118:River Tarff (far left) 235:Installed capacity 216:2 km (1.2 mi) 172:35 m (115 ft) 2921:. New Civil Engineer. 2641:, pp. 4034, 4047. 2445:"Glendoe hydro scheme" 2415:"Glendoe Hydro Scheme" 2054:method and lined with 2032:British prime minister 1968:pumped storage schemes 724:Uisg a' Chaime intake 3414:Moriston (Great Glen) 3053:at Wikimedia Commons 2873:. Construction News. 2804:. SSE. Archived from 2653:, pp. 4030–4040. 2015:tunnel boring machine 1979:Renewables Obligation 1928:Renewables Obligation 1414:Allt Tarsuinn intake 281:Hydro-Electric Scheme 221:Normal elevation 3379:Kinlochewe-Talladale 2604:. 11 November 2009. 1999:Electricity Act 1989 1900:Glendoe Hydro Scheme 1872:Allt Cam Bàn intake 84:Glendoe Hydro Scheme 3058:SSE Glendoe website 2063:(630 m) above 1975:Scottish Parliament 1217:Allt na Craidhleig 243:(max. planned) 213:Maximum length 191:Catchment area 126: /  3629:Dundee Incinerator 3349:Garry (Great Glen) 3253:Pelamis Wave Power 3027:New Civil Engineer 2782:on 25 October 2009 2776:"Project Overview" 2447:. SSE Renewables. 833:Glendoe Reservoir 460:+ tailrace tunnel 103:Scottish Highlands 3850: 3849: 3793: 3792: 3657: 3656: 3281: 3280: 3049:Media related to 3006:978-0-7277-3470-9 2977:"Glendoe returns" 2967:978-1-5272-2500-8 2740:. 10 April 2018. 2627:Lord Woolman 2016 2585:Lord Woolman 2016 2381:on 9 October 2009 2304:, pp. 12–13. 1896: 1895: 1892: 1891: 1667:Crom Allt intake 247: 246: 164:Dam and spillways 146:Opening date 38:Glendoe Reservoir 16:(Redirected from 3875: 3838: 3837: 3826: 3825: 3668: 3294: 3263:Scottish Nuclear 3238:Aquamarine Power 3157: 3137:Renewable energy 3099: 3098: 3097: 3087: 3080: 3073: 3064: 3048: 3034: 3017: 3015: 2994: 2984: 2971: 2952: 2939: 2926: 2913: 2911: 2888: 2878: 2865: 2842: 2836: 2830: 2824: 2818: 2817: 2815: 2813: 2798: 2792: 2791: 2789: 2787: 2772: 2766: 2760: 2754: 2753: 2751: 2749: 2730: 2724: 2723: 2712: 2706: 2705: 2703: 2701: 2686: 2680: 2679: 2677: 2675: 2660: 2654: 2648: 2642: 2636: 2630: 2624: 2618: 2617: 2615: 2613: 2594: 2588: 2582: 2576: 2570: 2564: 2558: 2552: 2546: 2537: 2531: 2525: 2524: 2513: 2507: 2506: 2501:. Herrenknecht. 2495: 2489: 2483: 2474: 2473: 2462: 2453: 2452: 2441: 2435: 2429: 2423: 2422: 2411: 2400: 2397: 2391: 2390: 2388: 2386: 2371: 2360: 2359: 2348: 2335: 2329: 2323: 2322: 2311: 2305: 2299: 2293: 2292: 2281: 2275: 2269: 2263: 2257: 2251: 2245: 2239: 2233: 2227: 2221: 2215: 2209: 2203: 2197: 2191: 2185: 2114:Station shutdown 1994:run-of-the-river 1866: 1865: 1859: 1858: 1852: 1851: 1845: 1844: 1837: 1836: 1829: 1828: 1820: 1819: 1813: 1812: 1793: 1792: 1786: 1785: 1779: 1778: 1772: 1771: 1764: 1763: 1756: 1755: 1747: 1746: 1727: 1726: 1720: 1719: 1713: 1712: 1705: 1704: 1697: 1696: 1688: 1687: 1681: 1680: 1661: 1660: 1654: 1653: 1647: 1646: 1640: 1639: 1632: 1631: 1624: 1623: 1615: 1614: 1608: 1607: 1601: 1600: 1581: 1580: 1574: 1573: 1567: 1566: 1560: 1559: 1552: 1551: 1544: 1543: 1535: 1534: 1515: 1514: 1508: 1507: 1501: 1500: 1494: 1493: 1486: 1485: 1478: 1477: 1469: 1468: 1462: 1461: 1442: 1441: 1435: 1434: 1428: 1427: 1408: 1407: 1401: 1400: 1393: 1392: 1385: 1384: 1376: 1375: 1356: 1355: 1349: 1348: 1341: 1340: 1333: 1332: 1324: 1323: 1317: 1316: 1297: 1296: 1290: 1289: 1283: 1282: 1276: 1275: 1262:Allt Mor intake 1256: 1255: 1248: 1247: 1240: 1239: 1231: 1230: 1211: 1210: 1204: 1203: 1190:tunnel/pipeline 1184: 1183: 1165: 1164: 1158: 1157: 1151: 1150: 1132: 1131: 1112: 1111: 1105: 1104: 1098: 1097: 1091: 1090: 1071: 1070: 1063: 1062: 1055: 1054: 1046: 1045: 1039: 1038: 1019: 1018: 1012: 1011: 1005: 1004: 998: 997: 991: 990: 971: 970: 964: 963: 956: 955: 948: 947: 939: 938: 932: 931: 912: 911: 905: 904: 897: 896: 889: 888: 880: 879: 873: 872: 854: 853: 847: 846: 827: 826: 813:Headrace tunnel 807: 806: 800: 799: 793: 792: 786: 785: 766: 765: 759: 758: 752: 751: 745: 744: 738: 737: 718: 717: 711: 710: 704: 703: 697: 696: 689: 688: 681: 680: 672: 671: 652: 651: 645: 644: 637: 636: 629: 628: 620: 619: 613: 612: 593: 592: 586: 585: 578: 577: 570: 569: 561: 560: 554: 553: 534: 533: 527: 526: 508: 507: 501: 500: 481: 480: 474: 473: 451: 450: 444: 443: 437: 436: 415: 414: 408: 407: 401: 400: 394: 393: 386: 385: 378: 377: 368: 367: 360: 359: 351: 350: 344: 343: 324: 323: 317: 316: 310: 309: 298: 272: 265: 258: 249: 141: 140: 138: 137: 136: 131: 130:57.093°N 4.556°W 127: 124: 123: 122: 119: 67: 66: 60: 47: 35: 21: 3883: 3882: 3878: 3877: 3876: 3874: 3873: 3872: 3853: 3852: 3851: 3846: 3814: 3789: 3766: 3731: 3663: 3653: 3617: 3516: 3500: 3474: 3458: 3288: 3277: 3226: 3222:John Wood Group 3152: 3146: 3120: 3107: 3095: 3093: 3091: 3042: 3037: 3020: 3013: 3007: 2992: 2987: 2974: 2968: 2955: 2942: 2929: 2916: 2909: 2886: 2881: 2868: 2855: 2851: 2846: 2845: 2837: 2833: 2825: 2821: 2811: 2809: 2808:on 6 March 2014 2802:"About Glendoe" 2800: 2799: 2795: 2785: 2783: 2774: 2773: 2769: 2761: 2757: 2747: 2745: 2738:BBC News Online 2732: 2731: 2727: 2714: 2713: 2709: 2699: 2697: 2688: 2687: 2683: 2673: 2671: 2662: 2661: 2657: 2649: 2645: 2637: 2633: 2625: 2621: 2611: 2609: 2596: 2595: 2591: 2587:, Paras 96-107. 2583: 2579: 2571: 2567: 2559: 2555: 2547: 2540: 2536:, pp. 7–8. 2532: 2528: 2515: 2514: 2510: 2497: 2496: 2492: 2484: 2477: 2464: 2463: 2456: 2443: 2442: 2438: 2430: 2426: 2413: 2412: 2403: 2398: 2394: 2384: 2382: 2373: 2372: 2363: 2350: 2349: 2338: 2330: 2326: 2313: 2312: 2308: 2300: 2296: 2283: 2282: 2278: 2270: 2266: 2258: 2254: 2246: 2242: 2234: 2230: 2226:, pp. 2–3. 2222: 2218: 2210: 2206: 2198: 2194: 2186: 2182: 2177: 2149: 2116: 2102:accompanied by 2100:Queen Elizabeth 2083:or a multi-jet 2081:Francis turbine 2052:drill-and-blast 2024: 1952: 1930:in 2001 caused 1867: 1860: 1853: 1846: 1839: 1838: 1831: 1830: 1821: 1814: 1794: 1787: 1780: 1773: 1766: 1765: 1758: 1757: 1748: 1728: 1721: 1714: 1707: 1706: 1699: 1698: 1689: 1682: 1662: 1655: 1648: 1641: 1634: 1633: 1626: 1625: 1616: 1609: 1602: 1582: 1575: 1568: 1561: 1554: 1553: 1546: 1545: 1536: 1516: 1509: 1502: 1495: 1488: 1487: 1480: 1479: 1470: 1463: 1443: 1436: 1429: 1409: 1402: 1395: 1394: 1387: 1386: 1377: 1357: 1350: 1343: 1342: 1335: 1334: 1325: 1318: 1298: 1291: 1284: 1277: 1257: 1250: 1249: 1242: 1241: 1232: 1212: 1205: 1185: 1166: 1159: 1152: 1133: 1113: 1106: 1099: 1092: 1072: 1065: 1064: 1057: 1056: 1047: 1040: 1020: 1013: 1006: 999: 992: 977:unnamed intake 972: 965: 958: 957: 950: 949: 940: 933: 913: 906: 899: 898: 891: 890: 881: 874: 855: 848: 828: 808: 801: 794: 787: 767: 760: 753: 746: 739: 719: 712: 705: 698: 691: 690: 683: 682: 673: 658:unnamed intake 653: 646: 639: 638: 631: 630: 621: 614: 594: 587: 580: 579: 572: 571: 562: 555: 535: 528: 509: 502: 482: 475: 452: 445: 438: 416: 409: 402: 395: 388: 387: 380: 379: 370: 369: 362: 361: 352: 345: 325: 318: 311: 292: 283: 282: 280: 276: 208: 204: 199: 134: 132: 128: 125: 120: 117: 115: 113: 112: 76: 75: 74: 73: 70: 69: 68: 33: 28: 23: 22: 15: 12: 11: 5: 3881: 3879: 3871: 3870: 3865: 3855: 3854: 3848: 3847: 3845: 3844: 3832: 3819: 3816: 3815: 3813: 3812: 3807: 3801: 3799: 3795: 3794: 3791: 3790: 3788: 3787: 3781: 3774: 3772: 3768: 3767: 3765: 3764: 3758: 3752: 3746: 3739: 3737: 3733: 3732: 3730: 3729: 3723: 3717: 3711: 3705: 3699: 3693: 3687: 3681: 3674: 3672: 3665: 3659: 3658: 3655: 3654: 3652: 3651: 3646: 3644:Steven's Croft 3641: 3636: 3631: 3625: 3623: 3619: 3618: 3616: 3615: 3610: 3605: 3600: 3595: 3590: 3585: 3580: 3575: 3570: 3565: 3560: 3555: 3553:Braes of Doune 3550: 3545: 3543:Beinn an Tuirc 3540: 3535: 3530: 3524: 3522: 3518: 3517: 3515: 3514: 3508: 3506: 3502: 3501: 3499: 3498: 3493: 3488: 3482: 3480: 3476: 3475: 3473: 3472: 3466: 3464: 3460: 3459: 3457: 3456: 3451: 3446: 3441: 3436: 3431: 3426: 3421: 3416: 3411: 3406: 3401: 3396: 3391: 3386: 3381: 3376: 3371: 3366: 3361: 3356: 3351: 3346: 3341: 3336: 3331: 3326: 3321: 3316: 3311: 3306: 3300: 3298: 3291: 3283: 3282: 3279: 3278: 3276: 3275: 3270: 3265: 3260: 3255: 3250: 3245: 3243:British Energy 3240: 3234: 3232: 3228: 3227: 3225: 3224: 3219: 3214: 3209: 3204: 3199: 3194: 3189: 3184: 3179: 3174: 3169: 3163: 3161: 3154: 3148: 3147: 3145: 3144: 3139: 3134: 3128: 3126: 3122: 3121: 3119: 3118: 3112: 3109: 3108: 3092: 3090: 3089: 3082: 3075: 3067: 3061: 3060: 3041: 3040:External links 3038: 3036: 3035: 3018: 3005: 2985: 2972: 2966: 2953: 2940: 2927: 2914: 2879: 2866: 2852: 2850: 2847: 2844: 2843: 2831: 2819: 2793: 2767: 2755: 2725: 2707: 2681: 2670:on 8 June 2012 2655: 2643: 2631: 2619: 2589: 2577: 2565: 2553: 2538: 2526: 2508: 2490: 2475: 2454: 2436: 2424: 2401: 2392: 2361: 2336: 2334:, p. 107. 2324: 2306: 2294: 2276: 2264: 2252: 2240: 2228: 2216: 2204: 2192: 2179: 2178: 2176: 2173: 2156:(79 in). 2153:hydraulic head 2151:Glendoe has a 2148: 2147:Scheme details 2145: 2115: 2112: 2085:Pelton turbine 2065:Ordnance datum 2036:Jack McConnell 2023: 2020: 2013:A refurbished 1951: 1948: 1908:hydro-electric 1894: 1893: 1890: 1889: 1887: 1885: 1883: 1881: 1879: 1877: 1874: 1873: 1870: 1868: 1861: 1854: 1847: 1840: 1832: 1824: 1823: 1822: 1815: 1808: 1806: 1804: 1801: 1800: 1797: 1795: 1788: 1781: 1774: 1767: 1759: 1751: 1750: 1749: 1742: 1740: 1738: 1735: 1734: 1731: 1729: 1722: 1715: 1708: 1700: 1692: 1691: 1690: 1683: 1676: 1674: 1672: 1669: 1668: 1665: 1663: 1656: 1649: 1642: 1635: 1627: 1619: 1618: 1617: 1610: 1603: 1596: 1594: 1592: 1589: 1588: 1585: 1583: 1576: 1569: 1562: 1555: 1547: 1539: 1538: 1537: 1530: 1528: 1526: 1523: 1522: 1519: 1517: 1510: 1503: 1496: 1489: 1481: 1473: 1472: 1471: 1464: 1457: 1455: 1453: 1450: 1449: 1446: 1444: 1437: 1430: 1423: 1421: 1419: 1416: 1415: 1412: 1410: 1403: 1396: 1388: 1380: 1379: 1378: 1371: 1369: 1367: 1364: 1363: 1360: 1358: 1351: 1344: 1336: 1328: 1327: 1326: 1319: 1312: 1310: 1308: 1305: 1304: 1301: 1299: 1292: 1285: 1278: 1271: 1269: 1267: 1264: 1263: 1260: 1258: 1251: 1243: 1235: 1234: 1233: 1226: 1224: 1222: 1219: 1218: 1215: 1213: 1206: 1199: 1197: 1195: 1192: 1191: 1188: 1186: 1179: 1177: 1175: 1172: 1171: 1169: 1167: 1160: 1153: 1146: 1144: 1142: 1139: 1138: 1136: 1134: 1127: 1125: 1123: 1120: 1119: 1116: 1114: 1107: 1100: 1093: 1086: 1084: 1082: 1079: 1078: 1075: 1073: 1066: 1058: 1050: 1049: 1048: 1041: 1034: 1032: 1030: 1027: 1026: 1025:Allt Breineag 1023: 1021: 1014: 1007: 1000: 993: 986: 984: 982: 979: 978: 975: 973: 966: 959: 951: 943: 942: 941: 934: 927: 925: 923: 920: 919: 916: 914: 907: 900: 892: 884: 883: 882: 875: 868: 866: 864: 861: 860: 858: 856: 849: 842: 840: 838: 835: 834: 831: 829: 822: 820: 818: 815: 814: 811: 809: 802: 795: 788: 781: 779: 777: 774: 773: 770: 768: 761: 754: 747: 740: 733: 731: 729: 726: 725: 722: 720: 713: 706: 699: 692: 684: 676: 675: 674: 667: 665: 663: 660: 659: 656: 654: 647: 640: 632: 624: 623: 622: 615: 608: 606: 604: 601: 600: 597: 595: 588: 581: 573: 565: 564: 563: 556: 549: 547: 545: 542: 541: 538: 536: 529: 522: 520: 518: 515: 514: 512: 510: 503: 496: 494: 492: 489: 488: 485: 483: 476: 469: 467: 465: 462: 461: 455: 453: 446: 439: 432: 430: 428: 425: 424: 419: 417: 410: 403: 396: 389: 381: 373: 372: 371: 363: 355: 354: 353: 346: 339: 337: 335: 332: 331: 328: 326: 319: 312: 305: 303: 301: 294: 293: 288: 285: 284: 278: 277: 275: 274: 267: 260: 252: 245: 244: 237: 231: 230: 226: 225: 222: 218: 217: 214: 210: 209: 207: 206: 201: 195: 193: 187: 186: 182: 181: 178: 174: 173: 170: 166: 165: 161: 160: 155: 151: 150: 147: 143: 142: 135:57.093; -4.556 110: 106: 105: 100: 96: 95: 93:United Kingdom 90: 86: 85: 82: 78: 77: 71: 62: 61: 55: 54: 53: 52: 49: 48: 40: 39: 31: 26: 24: 14: 13: 10: 9: 6: 4: 3: 2: 3880: 3869: 3866: 3864: 3861: 3860: 3858: 3843: 3842: 3833: 3831: 3830: 3821: 3820: 3817: 3811: 3808: 3806: 3803: 3802: 3800: 3796: 3785: 3782: 3779: 3776: 3775: 3773: 3769: 3762: 3759: 3756: 3753: 3750: 3747: 3744: 3741: 3740: 3738: 3734: 3727: 3724: 3721: 3718: 3715: 3712: 3709: 3706: 3703: 3700: 3697: 3694: 3691: 3688: 3685: 3682: 3679: 3676: 3675: 3673: 3669: 3666: 3660: 3650: 3647: 3645: 3642: 3640: 3637: 3635: 3632: 3630: 3627: 3626: 3624: 3620: 3614: 3611: 3609: 3606: 3604: 3601: 3599: 3596: 3594: 3591: 3589: 3586: 3584: 3581: 3579: 3576: 3574: 3571: 3569: 3566: 3564: 3561: 3559: 3556: 3554: 3551: 3549: 3546: 3544: 3541: 3539: 3536: 3534: 3531: 3529: 3526: 3525: 3523: 3519: 3513: 3510: 3509: 3507: 3503: 3497: 3494: 3492: 3489: 3487: 3484: 3483: 3481: 3477: 3471: 3468: 3467: 3465: 3461: 3455: 3452: 3450: 3447: 3445: 3442: 3440: 3437: 3435: 3432: 3430: 3427: 3425: 3424:Nostie Bridge 3422: 3420: 3417: 3415: 3412: 3410: 3407: 3405: 3402: 3400: 3397: 3395: 3392: 3390: 3387: 3385: 3382: 3380: 3377: 3375: 3372: 3370: 3367: 3365: 3362: 3360: 3357: 3355: 3352: 3350: 3347: 3345: 3342: 3340: 3337: 3335: 3332: 3330: 3327: 3325: 3322: 3320: 3317: 3315: 3312: 3310: 3307: 3305: 3304:Affric-Beauly 3302: 3301: 3299: 3295: 3292: 3290: 3284: 3274: 3271: 3269: 3266: 3264: 3261: 3259: 3256: 3254: 3251: 3249: 3246: 3244: 3241: 3239: 3236: 3235: 3233: 3229: 3223: 3220: 3218: 3215: 3213: 3210: 3208: 3207:ScottishPower 3205: 3203: 3200: 3198: 3195: 3193: 3190: 3188: 3187:National Grid 3185: 3183: 3180: 3178: 3175: 3173: 3170: 3168: 3165: 3164: 3162: 3158: 3155: 3153:organisations 3151:Companies and 3149: 3143: 3140: 3138: 3135: 3133: 3132:Nuclear power 3130: 3129: 3127: 3123: 3117: 3114: 3113: 3110: 3106: 3102: 3088: 3083: 3081: 3076: 3074: 3069: 3068: 3065: 3059: 3056: 3055: 3054: 3052: 3047: 3039: 3032: 3028: 3024: 3019: 3012: 3008: 3002: 2998: 2991: 2986: 2982: 2978: 2973: 2969: 2963: 2959: 2954: 2950: 2946: 2941: 2937: 2933: 2928: 2924: 2920: 2915: 2908: 2904: 2900: 2896: 2892: 2885: 2880: 2876: 2872: 2867: 2863: 2859: 2854: 2853: 2848: 2840: 2835: 2832: 2828: 2823: 2820: 2807: 2803: 2797: 2794: 2781: 2777: 2771: 2768: 2764: 2759: 2756: 2743: 2739: 2735: 2729: 2726: 2721: 2717: 2711: 2708: 2695: 2691: 2685: 2682: 2669: 2665: 2659: 2656: 2652: 2647: 2644: 2640: 2635: 2632: 2628: 2623: 2620: 2607: 2603: 2599: 2593: 2590: 2586: 2581: 2578: 2574: 2569: 2566: 2562: 2557: 2554: 2550: 2549:Reynolds 2012 2545: 2543: 2539: 2535: 2530: 2527: 2522: 2518: 2512: 2509: 2504: 2500: 2494: 2491: 2487: 2482: 2480: 2476: 2471: 2467: 2461: 2459: 2455: 2450: 2446: 2440: 2437: 2433: 2428: 2425: 2420: 2416: 2410: 2408: 2406: 2402: 2396: 2393: 2380: 2376: 2370: 2368: 2366: 2362: 2357: 2353: 2347: 2345: 2343: 2341: 2337: 2333: 2328: 2325: 2320: 2316: 2310: 2307: 2303: 2298: 2295: 2290: 2286: 2280: 2277: 2274:, p. 12. 2273: 2268: 2265: 2261: 2256: 2253: 2249: 2244: 2241: 2237: 2232: 2229: 2225: 2220: 2217: 2214:, p. 87. 2213: 2208: 2205: 2202:, p. 99. 2201: 2196: 2193: 2189: 2184: 2181: 2174: 2172: 2170: 2166: 2162: 2157: 2154: 2146: 2144: 2142: 2141:Supreme Court 2136: 2134: 2128: 2125: 2120: 2113: 2111: 2109: 2105: 2101: 2096: 2092: 2090: 2086: 2082: 2076: 2074: 2068: 2066: 2061: 2060:cut-and-cover 2057: 2053: 2047: 2045: 2041: 2037: 2033: 2029: 2021: 2019: 2016: 2010: 2008: 2002: 2000: 1995: 1990: 1988: 1984: 1980: 1976: 1973:In 2001, the 1971: 1969: 1965: 1961: 1957: 1949: 1947: 1944: 1939: 1937: 1933: 1929: 1925: 1921: 1917: 1913: 1912:Fort Augustus 1909: 1905: 1901: 1888: 1886: 1884: 1882: 1880: 1878: 1876: 1875: 1869: 1807: 1805: 1802: 1796: 1741: 1739: 1736: 1730: 1675: 1673: 1670: 1664: 1595: 1593: 1590: 1584: 1529: 1527: 1524: 1518: 1456: 1454: 1451: 1448:River Killin 1445: 1422: 1420: 1417: 1411: 1370: 1368: 1365: 1359: 1311: 1309: 1306: 1300: 1270: 1268: 1265: 1259: 1225: 1223: 1220: 1214: 1198: 1196: 1193: 1187: 1178: 1176: 1173: 1168: 1145: 1143: 1140: 1135: 1126: 1124: 1121: 1115: 1085: 1083: 1080: 1074: 1033: 1031: 1028: 1022: 985: 983: 980: 974: 926: 924: 921: 915: 867: 865: 862: 857: 841: 839: 836: 830: 821: 819: 816: 810: 780: 778: 775: 769: 732: 730: 727: 721: 666: 664: 661: 655: 607: 605: 602: 596: 548: 546: 543: 537: 521: 519: 516: 511: 495: 493: 490: 484: 468: 466: 463: 459: 454: 431: 429: 426: 423: 418: 338: 336: 333: 327: 304: 302: 299: 296: 295: 291: 287: 286: 273: 268: 266: 261: 259: 254: 251: 250: 242: 238: 236: 232: 229:Power Station 227: 223: 219: 215: 211: 202: 197: 196: 194: 192: 188: 183: 179: 175: 171: 167: 162: 159: 156: 152: 148: 144: 139: 111: 107: 104: 101: 97: 94: 91: 87: 83: 81:Official name 79: 59: 50: 46: 41: 36: 30: 19: 3840: 3828: 3761:Hunterston B 3743:Hunterston A 3583:Hadyard Hill 3512:Islay LIMPET 3358: 3287:Active power 3197:Scottish Gas 3043: 3026: 2996: 2957: 2894: 2890: 2849:Bibliography 2834: 2829:, p. 8. 2822: 2810:. Retrieved 2806:the original 2796: 2784:. Retrieved 2780:the original 2770: 2758: 2746:. Retrieved 2728: 2710: 2700:13 September 2698:. Retrieved 2684: 2674:29 September 2672:. Retrieved 2668:the original 2658: 2651:Hencher 2019 2646: 2639:Hencher 2019 2634: 2622: 2610:. Retrieved 2592: 2580: 2573:Barrass 2018 2568: 2556: 2529: 2511: 2493: 2439: 2434:, p. 9. 2427: 2395: 2383:. Retrieved 2379:the original 2327: 2317:. Hochtief. 2309: 2297: 2279: 2267: 2262:, p. 5. 2255: 2250:, p. 4. 2243: 2238:, p. 3. 2231: 2219: 2207: 2195: 2190:, p. 1. 2183: 2158: 2150: 2137: 2129: 2121: 2117: 2095:Alex Salmond 2093: 2077: 2072: 2069: 2048: 2025: 2022:Construction 2011: 2003: 1991: 1972: 1953: 1940: 1899: 1897: 772:Glendoe Dam 149:29 June 2009 29: 3771:Oil and gas 3755:Chapelcross 3662:Deactivated 3598:Kilgallioch 3568:Crystal Rig 3563:Cruach Mhòr 3479:Oil and gas 3444:Storr Lochs 3369:Kerry Falls 3319:Breadalbane 2839:MacKay 2008 2786:11 November 2763:Horgan 2018 2612:11 November 2486:Ellery 2008 2385:11 November 2332:Reeves 2018 2212:Reeves 2018 2200:Reeves 2018 2165:load factor 2133:BAM Nuttall 2044:River Tarff 1303:Allt Odhar 458:River Tarff 330:River Oich 133: / 109:Coordinates 3857:Categories 3708:Kincardine 3690:Portobello 3634:Greengairs 3603:Pates Hill 3374:Kilmelfort 3324:Chliostair 3172:EDF Energy 3142:Wind power 2629:, Para 13. 2561:Wynne 2010 2175:References 2073:Eliza Jane 2028:Tony Blair 1904:generation 198:Immediate: 118:57°05′35″N 3726:Longannet 3720:Cockenzie 3649:Westfield 3588:Hare Hill 3548:Black Law 3533:Arecleoch 3528:Ardrossan 3496:Stornoway 3491:Peterhead 3394:Loch Gair 3389:Loch Dubh 2499:"Glendoe" 2056:shotcrete 1983:Megawatts 1920:Highlands 1916:Loch Ness 422:Loch Ness 203:Attached: 185:Reservoir 121:4°33′22″W 3829:Category 3778:Inverkip 3749:Dounreay 3702:Braehead 3678:Pinkston 3664:stations 3613:Whitelee 3608:Seagreen 3538:Beatrice 3399:Lochaber 3344:Galloway 3334:Cruachan 3289:stations 3105:Scotland 3031:Archived 3011:Archived 2981:Archived 2949:Archived 2936:Archived 2923:Archived 2907:Archived 2875:Archived 2862:Archived 2748:11 April 2742:Archived 2720:Archived 2694:Archived 2606:Archived 2521:Archived 2503:Archived 2470:Archived 2449:Archived 2419:Archived 2356:Archived 2319:Archived 2289:Archived 2007:Hochtief 1960:Cruachan 1943:Hochtief 1924:Scotland 1914:, above 1902:for the 154:Owner(s) 99:Location 3841:Commons 3736:Nuclear 3704:(1980s) 3698:(1980s) 3680:(1960s) 3486:Lerwick 3470:Torness 3463:Nuclear 3449:Striven 3419:Mucomir 3359:Glendoe 3273:Wavegen 3231:Defunct 3160:Current 3125:Sectors 2960:. SSE. 2812:17 June 2169:Glasgow 2089:Andritz 1987:SSE plc 1950:History 1918:in the 279:Glendoe 89:Country 18:Glendoe 3786:(2011) 3780:(1988) 3763:(2022) 3757:(2004) 3751:(1994) 3745:(1990) 3728:(2016) 3722:(2013) 3716:(2000) 3714:Methil 3710:(1997) 3696:Barony 3692:(1977) 3686:(1976) 3593:Hywind 3454:Tummel 3384:Lanark 3339:Foyers 3101:Energy 3003:  2964:  2038:, the 2034:, and 2030:, the 1964:Foyers 290:Legend 177:Length 169:Height 3798:Other 3684:Yoker 3622:Other 3558:Clyde 3434:Shira 3409:Morar 3404:Lussa 3364:Inver 3354:Gisla 3329:Conon 3309:Arran 3297:Hydro 3182:FREDS 3014:(PDF) 2993:(PDF) 2910:(PDF) 2887:(PDF) 2124:Pöyry 2108:Perth 3784:Fife 3671:Coal 3578:Farr 3521:Wind 3505:Wave 3439:Sloy 3429:Shin 3001:ISBN 2962:ISBN 2814:2013 2788:2009 2750:2018 2702:2012 2676:2011 2614:2009 2387:2009 1898:The 239:100 3314:Awe 3217:SSE 3212:SGN 3103:in 2899:doi 2602:BBC 2161:GWh 1970:. 1922:of 1906:of 3859:: 3025:. 3009:. 2995:. 2947:. 2905:. 2897:. 2895:52 2893:. 2889:. 2736:. 2600:. 2541:^ 2478:^ 2457:^ 2404:^ 2364:^ 2339:^ 2171:. 2143:. 2110:. 241:MW 3086:e 3079:t 3072:v 2970:. 2901:: 2841:. 2816:. 2790:. 2765:. 2752:. 2704:. 2678:. 2616:. 2575:. 2563:. 2551:. 2488:. 2389:. 271:e 264:t 257:v 20:)

Index

Glendoe

Glendoe Hydro Scheme is located in Highland
United Kingdom
Scottish Highlands
57°05′35″N 4°33′22″W / 57.093°N 4.556°W / 57.093; -4.556
Scottish and Southern Energy
Catchment area
Installed capacity
MW
v
t
e
Legend
Loch Ness
River Tarff
generation
hydro-electric
Fort Augustus
Loch Ness
Highlands
Scotland
Renewables Obligation
Scottish and Southern Energy
North of Scotland Hydro-Electric Board
Hochtief
North of Scotland Hydro-Electric Board
Cruachan
Foyers
pumped storage schemes

Text is available under the Creative Commons Attribution-ShareAlike License. Additional terms may apply.