Knowledge (XXG)

Maharashtra State Electricity Distribution Company Limited

Source ЁЯУЭ

439:
the erection and commissioning of 586 sub-stations, 52351 circuit kilometers of HT lines, 58,629 distribution transformers besides augmentation of the existing network. MSEB had erected 1846 sub-stations during its lifetime, whereas MSEDCL aims to construct 586 sub-stations in just 2 years. A leap forward in the direction of infrastructure development. The project is being implemented on a total turn-key basis and through 119 DPRs. Orders of about Rs. 9189 crore has already been placed on various agencies. Earlier capital investment for infrastructure development was a paltry sum of Rs. 200 to 300 crore per year. The new infrastructure with augmentation and renovation of the distribution network will revolutionize the quality and reliability of supply.
561:
is arranged for which a reliability charge is levied upon the local consumers. Beginning in Pune, the model was implemented in Navi Mumbai, Thane, Pen and Baramati. Of late MSEDCL itself filed a petition before the MERC for implementing Zero Load Shedding Model at all the Headquarters of Revenue Divisions - Nagpur, Amravati, Navi Mumbai, Pune and Aurangabad. The MERC approved the proposal and the model was implemented at these headquarters from December 2009. MSEDCL has planned to extend it further to district headquarters, taluka headquarters and so on.
552:
trendsetter in the power distribution sector of the Country. Its later Distribution franchisee attempts for Aurangabad Urban I & II Divisions of Aurangabad Urban Circle (M/s GTL Private Limited) and Gandhibag, Civil Lines, and Mahal Divisions of Nagpur Urban Circle (given to M/s Spanco & later M/s Essel group) miserably failed after a few years of operation and MSEDCL has to take over these areas after facing huge loss of revenue from these two Metro Cities. Recently the company has appointed Distribution Franchisees for Malegaon town.
448:
implemented Single Phasing Scheme in some parts of Maharashtra. Currently rural areas face 8.30 to 11 hours of load shedding a day which is decided by MERC. However, the load shedding hours have been almost halved in about 24,461 villages that have been covered so far under these schemes. The load shedding duration of these villages has come down to 2.00 to 5.45 hours which is on par with urban areas. The project cost of these schemes is Rs. 3233 crores.
38: 457:
and has spent Rs. 443 crore so for. Connections to 905541 BPL households have been released and 4243 villages electrified under the scheme. BPL families are provided with 1.5 point power connections at a nominal charge of Rs.15/- each and the villages are electrified as per the new definition under this scheme.
517:
MSEDCL has decided to replace all the meters which have been in service for the last 10 years and more under the mass meter replacement program. It is planned to replace all the electromechanical meters with static ones. A process has already been initiated for purchasing about 30 lakh meters for the
465:
R-APDRP is a flagship scheme sponsored by Govt. of India and financed by the Power Finance Corporation of India (PFC). There are 134 towns having population of more than 30,000 as per the 2001 census selected in Maharashtra under this scheme. The scheme is being implemented in two phases тАУ Part-A and
447:
MSEDCL has been implementing long-term Load Management schemes to reduce load shedding. Feeder separation is one such long-term scheme in which agriculture feeders are carved out. This not only helps load management but also strengthens the infrastructure and reduces technical losses. MSEDCL has also
438:
MSEDCL's existing network handles a load of about 30,000 MW. By 2030, there will be an addition of another 10,000 MW in the system. With a view to cater to future load, provide quality, reliable energy supply, and reduce losses MSEDCL formulated Rs. 11000 crore infrastructure plan. The plan envisages
560:
Zero Load Shedding Model is being implemented at certain places with the active participation of local citizens through consumer groups and peoples representatives. The mechanism is extremely transparent and is prior approved by the Regulator. In this model, a costly power to the extent of shortfall
456:
This is a flagship scheme of Govt. of India. There are 4,709 villages and 13,44,087 identified BPL households targeted to be electrified under this scheme. MSEDCL had prepared proposals for 34 schemes costing Rs. 829 crore for 33 districts of Maharashtra. Maharashtra has been implementing the scheme
483:
Energisation of Agricultural Pumps: Maharashtra has a record number, highest as compared to any state, of agricultural pumps energized so far. The number is about 30 lakhs. Earlier, there used to be a long list of pending applications and the farmers used to wait for years together for supply. The
372:
MSEDCL supplies electricity to a total of 28.4 million consumers across the categories all over Maharashtra. There are about 20.7 million Domestic Residential (72.4%), 4 million Agricultural (16%), 1.7 million commercial (7%), and 0.346million industrial consumers (1.8 0%) in MSEDCL who fetch an
363:
Of these, Mahavitaran is responsible for the distribution of electricity throughout the state by buying power from either MahaGenco, Captive Power Plants, or from other State Electricity Boards and Private sector power generation companies. The 'MSEB Holding Company' was created to hold all the
474:
Ltd has been awarded the Part 'A' contract for the remaining 35 towns. On completion of Part-A, the works under Part-B which include renovation and modernization of distribution network, load bifurcation, load balancing, aerial bunched conductoring, HVDS, capacitor bank, etc. will be taken up.
551:
Bhiwandi, a power loom city, had typical problems like rampant theft and non-payment. MSEDCL opted for an input-based franchisee model for electricity distribution. It has handed over Bhiwandi Circle to M/S Torrent Power on 26 January 2007. This experiment proved to be very successful and a
508:
For many consumers, meters were installed in hard-to-access places, making theft easy to conceal. MSEDCL, therefore, decided to shift all meters to the front of buildings to make them as conspicuous as possible. This project is currently in progress on a large scale.
484:
issue was addressed in a proper perspective by MSEDCL. Nowadays about 1 lakh agricultural pumps are energized every year. MSEDCL, in a year or two, would be in a position to grant agricultural connections on-demand on par with other categories of consumers.
326:
was looking after Generation, Transmission & Distribution of Electricity in the State of Maharashtra. But with the enactment of the Electricity Act 2003 of the Government of India, MSEB was unbundled into 4 Companies on 6 June 2005 viz.
55: 534:
MSEDCL plans to install high-quality meters at all necessary system points, including interconnecting points. Feeder metering of all 10,240 feeders in complete and again, photo reading of these feeder meters are taken.
381:
MSEDCL operates through a network of offices consisting of a Corporate Office in Mumbai, 4 Regional Offices (Konkan, Pune, Aurangabad & Nagpur), 16 Zonal Offices, 44 Circle Offices, and 145 Divisional Offices.
373:
Annual Revenue of about Rs.500 million. The consumption share of Residential Consumers is 19.03%, Commercial Consumers is 7.35%, Industrial Consumers is 42%, Agricultural Consumers is 25.13% and others is 6.49%.
429:
To overcome the power crisis and improve consumer services MSEDCL made an in-depth study involving sub-division-wise research of distribution networks and planned ambitious projects. They include :
887: 500:
This is being implemented on regular basis. MSEDCL has established 50 flying squads functioning under Security and Enforcement department to detect and handle power theft cases quickly.
628: 866: 815: 102: 590: 74: 412:
It has 2680 sub-stations & Switching Stations with 49,000 MVA of transformation capacity, 10,334 HV feeders, and several thousand circuit km of HT and LT lines.
81: 917: 912: 795: 570: 897: 88: 922: 861: 621: 805: 790: 303: 70: 409:
Sub-stations and Distribution Transformers spread over 3.08 lakh km geographical area of Maharashtra covering 41,928 villages and 457 towns.
390:
MSEDCL's sources of power include thermal, hydro, gas, and non-conventional sources like solar, wind, bagasse, etc. apart from hydropower of the
466:
Part-B. Creation of IT infrastructure and allied works are included in Part-A for which a turnkey contract for 95 towns has been awarded to M/s.
902: 669: 614: 543:
There are total 2,84,633 Distribution Transformer Centers(DTCs) in operation, out of which about 1.51 Lakh DTCs have already been metered.
800: 749: 323: 291: 159: 95: 907: 830: 820: 729: 714: 121: 144: 694: 295: 699: 892: 825: 769: 704: 659: 59: 764: 215: 759: 754: 734: 719: 679: 394:. Thermal power constitutes the major share which it gets from Mahagenco projects, Central Sector projects, and RGPPL. 856: 744: 739: 724: 709: 391: 48: 774: 255: 169: 835: 641: 684: 664: 674: 341:
Mahapareshan (рдорд╣рд╛рдкрд╛рд░реЗрд╖рдг) or Mahatransco (Maharashtra State Electricity Transmission Company Limited (
211: 591:"Spanco, Essel deal for Nagpur's power franchise almost through | Nagpur News - Times of India" 262: 187: 606: 595: 311: 467: 284:
Mahavitaran or Mahadiscom or MSEDCL (Maharashtra State Electricity Distribution Company Limited)
492:
In 5 years, MSEDCL reduced distribution losses from 35% to 20% through various drives such as:
298:). MSEDCL distributes electricity to the entire state of Maharashtra except for some parts of 294:. It is the largest electricity distribution utility in India (2nd largest in the World after 471: 334:
Mahanirmiti (рдорд╣рд╛рдирд┐рд░реНрдорд┐рддреА) or Mahagenco (Maharashtra State Power Generation Company Limited (
518:
purpose. This is a huge project which will definitely lead to increase in metered sales.
200:
307,713 km (118,809 sq mi) 457 Cities & 41,095 Villages of Maharashtra
526:
MSEDCL has undertaken accurate energy accounting through various methods such as :
637: 250: 881: 689: 402:
In terms of infrastructure, MSEDCL operates a vast far-flung network comprising
645: 348: 225: 37: 840: 461:
Restructured тАУ Accelerated Power Development & Reforms Programme (R-APDRP)
352: 307: 287: 155: 143: 27:
Wholly owned subsidiary of the Maharashtra State Electricity Board (MSEB)
17: 475:
Distribution loss in R-APDRP towns is targeted to be reduced to 15%.
356: 342: 335: 299: 610: 31: 355:(Maharashtra State Electricity Distribution Company Limited ( 275: 71:"Maharashtra State Electricity Distribution Company Limited" 406:
33 kV, 22 kV & 11 kV transmission lines,
811:
Maharashtra State Electricity Distribution Company Limited
135:
Maharashtra State Electricity Distribution Company Limited
888:
Electric power distribution network operators in India
867:
Indian states ranking by households having electricity
571:
Maharashtra Electricity Regulatory Commission (MERC)
849: 783: 652: 271: 261: 249: 239: 231: 221: 204: 194: 183: 175: 165: 150: 62:. Unsourced material may be challenged and removed. 816:Maharashtra State Electricity Transmission Company 421:MSEDCL has a workforce of about 54,546 employees. 690:Ghatghar Pumped Storage Hydroelectric Power Plant 452:Rajiv Gandhi Gramin Vidhutikarn Yojana (RGGVY) 796:Maharashtra Electricity Regulatory Commission 622: 235:Rs. 84,000 Crore ($ 11.2 Billion) for 2018-19 8: 134: 862:States of India by installed power capacity 806:Maharashtra State Power Generation Company 791:Brihanmumbai Electric Supply and Transport 695:RattanIndia Amravati Thermal Power Project 629: 615: 607: 324:Maharashtra State Electricity Board (MSEB) 304:Brihanmumbai Electric Supply and Transport 142: 133: 122:Learn how and when to remove this message 700:RattanIndia Nashik Thermal Power Station 582: 670:Chandrapur Super Thermal Power Station 479:Major achievements post restructuring 7: 918:Indian companies established in 2005 913:Energy companies established in 2005 60:adding citations to reliable sources 898:State electricity agencies of India 801:Maharashtra State Electricity Board 750:Solapur Super Thermal Power Station 292:Maharashtra State Electricity Board 160:Maharashtra State Electricity Board 923:2005 establishments in Maharashtra 831:Power System Operation Corporation 821:Nuclear Power Corporation of India 25: 730:Mauda Super Thermal Power Station 715:Khaparkheda Thermal Power Station 364:stakes in these three companies. 312:Adani Electricity Mumbai Limited 179:6 June 2005 (Carved out of MSEB) 36: 47:needs additional citations for 826:PowerGrid Corporation of India 770:Uran Gas Turbine Power Station 705:Jaitapur Nuclear Power Project 660:Bhusawal Thermal Power Station 513:Mass meter replacement project 314:are electricity distributors. 1: 903:State agencies of Maharashtra 765:Trombay Thermal Power Station 760:Tiroda Thermal Power Station 755:Tarapur Atomic Power Station 735:Nashik Thermal Power Station 720:Koradi Thermal Power Station 680:Dahanu Thermal Power Station 331:MSEB Holding Company Limited 857:Electricity sector in India 745:Parli Thermal Power Station 740:Paras Thermal Power Station 725:Koyna Hydroelectric Project 710:JSW Ratnagiri Power Station 392:Koyna Hydroelectric Project 939: 417:Human resource development 908:Companies based in Mumbai 775:Wardha Warora Power Plant 256:Government of Maharashtra 141: 556:Zero load shedding model 170:Electricity distribution 836:Ratnagiri Gas and Power 547:Distribution franchisee 685:Dhariwal Power Station 665:Butibori Power Project 377:Organisation structure 893:Energy in Maharashtra 154:State Government PSU 675:Dabhol Power Station 56:improve this article 468:Larsen & Toubro 286:is a wholly-owned 241:Number of employees 188:Mumbai, Maharashtra 138: 596:The Times of India 425:Important projects 875: 874: 522:Energy accounting 281: 280: 132: 131: 124: 106: 16:(Redirected from 930: 631: 624: 617: 608: 601: 600: 587: 496:Anti theft drive 386:Sources of power 146: 139: 127: 120: 116: 113: 107: 105: 64: 40: 32: 21: 938: 937: 933: 932: 931: 929: 928: 927: 878: 877: 876: 871: 845: 779: 648: 635: 605: 604: 599:. 26 July 2012. 589: 588: 584: 579: 567: 558: 549: 541: 532: 530:Feeder metering 524: 515: 506: 498: 490: 481: 470:Ltd. while M/s 463: 454: 445: 443:Load management 436: 427: 419: 400: 388: 379: 370: 320: 242: 207: 197: 136: 128: 117: 111: 108: 65: 63: 53: 41: 28: 23: 22: 15: 12: 11: 5: 936: 934: 926: 925: 920: 915: 910: 905: 900: 895: 890: 880: 879: 873: 872: 870: 869: 864: 859: 853: 851: 850:Related topics 847: 846: 844: 843: 838: 833: 828: 823: 818: 813: 808: 803: 798: 793: 787: 785: 781: 780: 778: 777: 772: 767: 762: 757: 752: 747: 742: 737: 732: 727: 722: 717: 712: 707: 702: 697: 692: 687: 682: 677: 672: 667: 662: 656: 654: 653:Power stations 650: 649: 638:Power stations 636: 634: 633: 626: 619: 611: 603: 602: 581: 580: 578: 575: 574: 573: 566: 563: 557: 554: 548: 545: 540: 537: 531: 528: 523: 520: 514: 511: 505: 504:Meter shifting 502: 497: 494: 489: 488:Loss reduction 486: 480: 477: 462: 459: 453: 450: 444: 441: 435: 432: 426: 423: 418: 415: 414: 413: 410: 407: 399: 398:Infrastructure 396: 387: 384: 378: 375: 369: 366: 361: 360: 351:(рдорд╣рд╛рд╡рд┐рддрд░рдг) or 346: 339: 332: 322:The erstwhile 319: 316: 279: 278: 273: 269: 268: 265: 259: 258: 253: 247: 246: 243: 240: 237: 236: 233: 229: 228: 223: 219: 218: 212:Lokesh Chandra 208: 205: 202: 201: 198: 195: 192: 191: 185: 181: 180: 177: 173: 172: 167: 163: 162: 152: 148: 147: 130: 129: 44: 42: 35: 26: 24: 14: 13: 10: 9: 6: 4: 3: 2: 935: 924: 921: 919: 916: 914: 911: 909: 906: 904: 901: 899: 896: 894: 891: 889: 886: 885: 883: 868: 865: 863: 860: 858: 855: 854: 852: 848: 842: 839: 837: 834: 832: 829: 827: 824: 822: 819: 817: 814: 812: 809: 807: 804: 802: 799: 797: 794: 792: 789: 788: 786: 784:Organizations 782: 776: 773: 771: 768: 766: 763: 761: 758: 756: 753: 751: 748: 746: 743: 741: 738: 736: 733: 731: 728: 726: 723: 721: 718: 716: 713: 711: 708: 706: 703: 701: 698: 696: 693: 691: 688: 686: 683: 681: 678: 676: 673: 671: 668: 666: 663: 661: 658: 657: 655: 651: 647: 643: 642:organizations 639: 632: 627: 625: 620: 618: 613: 612: 609: 598: 597: 592: 586: 583: 576: 572: 569: 568: 564: 562: 555: 553: 546: 544: 538: 536: 529: 527: 521: 519: 512: 510: 503: 501: 495: 493: 487: 485: 478: 476: 473: 469: 460: 458: 451: 449: 442: 440: 433: 431: 424: 422: 416: 411: 408: 405: 404: 403: 397: 395: 393: 385: 383: 376: 374: 367: 365: 358: 354: 350: 347: 344: 340: 337: 333: 330: 329: 328: 325: 317: 315: 313: 309: 305: 301: 297: 293: 289: 285: 277: 274: 270: 266: 264: 260: 257: 254: 252: 248: 244: 238: 234: 230: 227: 224: 220: 217: 213: 209: 203: 199: 193: 189: 186: 182: 178: 174: 171: 168: 164: 161: 157: 153: 149: 145: 140: 126: 123: 115: 104: 101: 97: 94: 90: 87: 83: 80: 76: 73: тАУ  72: 68: 67:Find sources: 61: 57: 51: 50: 45:This article 43: 39: 34: 33: 30: 19: 810: 594: 585: 559: 550: 542: 539:DTC metering 533: 525: 516: 507: 499: 491: 482: 464: 455: 446: 437: 428: 420: 401: 389: 380: 371: 362: 321: 283: 282: 245:55700 (2022) 184:Headquarters 151:Company type 118: 109: 99: 92: 85: 78: 66: 54:Please help 49:verification 46: 29: 646:Maharashtra 349:Mahavitaran 302:city where 226:Electricity 196:Area served 882:Categories 841:Tata Power 577:References 434:Infra-plan 353:Mahadiscom 308:Tata Power 288:subsidiary 206:Key people 156:Subsidiary 82:newspapers 368:Customers 276:Home Page 263:Divisions 565:See also 222:Products 166:Industry 137:рдорд╣рд╛рд╡рд┐рддрд░рдг 112:May 2015 318:History 290:of the 272:Website 232:Revenue 190:, India 176:Founded 96:scholar 472:Spanco 357:MSEDCL 343:MSETCL 336:MSPGCL 300:Mumbai 251:Parent 210:Shri. 98:  91:  84:  77:  69:  18:MSEDCL 103:JSTOR 89:books 640:and 310:and 296:SGCC 75:news 644:of 267:140 216:IAS 158:of 58:by 884:: 593:. 359:)) 345:)) 338:)) 306:, 214:, 630:e 623:t 616:v 125:) 119:( 114:) 110:( 100:┬╖ 93:┬╖ 86:┬╖ 79:┬╖ 52:. 20:)

Index

MSEDCL

verification
improve this article
adding citations to reliable sources
"Maharashtra State Electricity Distribution Company Limited"
news
newspapers
books
scholar
JSTOR
Learn how and when to remove this message

Subsidiary
Maharashtra State Electricity Board
Electricity distribution
Mumbai, Maharashtra
Lokesh Chandra
IAS
Electricity
Parent
Government of Maharashtra
Divisions
Home Page
subsidiary
Maharashtra State Electricity Board
SGCC
Mumbai
Brihanmumbai Electric Supply and Transport
Tata Power

Text is available under the Creative Commons Attribution-ShareAlike License. Additional terms may apply.

тЖС