33:
613:
641:
627:
40:
361:
A second phase is planned, for a 110-megawatt (150,000 hp) power station. In June 2011, the government announced it had awarded the $ 750 million Phase II project to Joule Africa, a UK-based company. This will entail a second dam and plant. Construction was set to begin in 2014 and continue on
335:
The dam has a maximum height of 87 metres (285 ft), a length of 400 metres (1,300 ft) at the crest and a volume of 2,500,000 cubic metres (88,000,000 cu ft). The volume of the
689:
328:, and did not restart until 2005. The project was completed and went online in 2009. Nearly a third of the dam's US$ 327 million cost ($ 103 million) was supplied by the
669:
324:
The site for the dam at
Bumbuna Falls was first identified in 1971, and construction was begun in 1975. Work was halted in May 1997, about 85% completed, due to the
332:. A 26 January 2005 report noted that 33 villages would be affected by the dam, although only one (of 16 households and 135 people) would require resettlement.
520:
358:
After completion, the project has been plagued with problems, and barely produces 10 megawatts (13,000 hp) or 25 megawatts (34,000 hp) as of 2013.
546:
32:
419:
679:
694:
371:
684:
465:
81:
487:
396:
664:
674:
586:
294:
502:
329:
646:
325:
280:
618:
483:
306:
265:
564:
550:
444:
423:
400:
352:
257:
225:
658:
503:"Bumbuna Hydropower Project: Resettlement Action Plan for the Reservoir and Dam Area"
318:
251:
445:"Bumbuna Hydroelectric Power Station, Tonkolili District, West Africa, Sierra Leone"
632:
310:
59:
640:
608:
298:
171:
96:
83:
626:
336:
547:"Sierra Leone's private sector rushes to fill the void as dam disappoints"
314:
466:"Bumbuna Hydroelectric Power Station, Tonkolili District, Sierra Leone"
302:
69:
565:"Hydroelectric Plants in Africa - Guinea, Liberia & Sierra Leone"
592:. Bumbuna Hydro Electric Environmental And Social Management Project
281:
https://web.archive.org/web/20140221061321/http://www.bumbuna.sl/
321:
dam, it supports a 50-megawatt (67,000 hp) power station.
158:
587:"Bumbuna Hydroelectric Power Project Completion Report"
521:"Why Sierra Leone's energy crisis just about got worse"
313:, and 350 kilometres (220 mi) from the capital of
397:"Sierra Leone's Hydro-Power Dam Lighting Up Freetown"
347:
10 cu ft) or 480,000,000 cubic metres (1.7
343:
10 cu ft), 428,000,000 cubic metres (1.51
264:
250:
242:
234:
224:
206:
201:
193:
185:
177:
167:
157:
152:
144:
136:
128:
120:
112:
75:
65:
55:
21:
355:, each rated for 25 megawatts (34,000 hp).
8:
690:Hydroelectric power stations in Sierra Leone
18:
545:Kimberly S. Johnson (11 September 2013).
317:, the main consumer. The country's first
339:created is 410,000,000 cubic metres (1.4
670:Energy infrastructure completed in 2009
382:
47:Location of Bumbuna Dam in Sierra Leone
501:Dr. Robert Zwahlen (26 January 2005).
372:Bumbuna II Hydroelectric Power Station
390:
388:
386:
230:3,920 km (1,510 sq mi)
7:
540:
538:
536:
534:
460:
458:
439:
437:
435:
433:
414:
412:
410:
420:"Bumbuna Hydroelectric Power Plant"
351:10 cu ft). There are two
163:Embankment, concrete-face rock-fill
39:
14:
488:United States Department of State
639:
625:
611:
395:Fid Thompson (9 February 2010).
256:2 x 25 MW (34,000 hp)
238:21 km (8.1 sq mi)
38:
31:
680:Northern Province, Sierra Leone
695:Infrastructure in Sierra Leone
519:Kemo Cham (25 February 2013).
220: m (361,000 acre⋅ft)
1:
685:Concrete-face rock-fill dams
295:concrete-face rock-fill dam
270:50 MW (67,000 hp)
711:
189:440 m (1,440 ft)
484:"Sierra Leone (11/15/11)"
274:
26:
470:renewable-technology.com
330:African Development Bank
97:9.0714944°N 11.7228972°W
647:Renewable energy portal
266:Installed capacity
181:88 m (289 ft)
129:Construction began
665:Dams completed in 2009
326:Sierra Leone Civil War
145:Construction cost
102:9.0714944; -11.7228972
362:until at least 2017.
159:Type of dam
675:Dams in Sierra Leone
449:power-technology.com
243:Commission date
619:Sierra Leone portal
226:Catchment area
207:Total capacity
93: /
307:Tonkolili District
194:Spillway type
551:The Africa Report
287:
286:
235:Surface area
153:Dam and spillways
137:Opening date
702:
649:
644:
643:
635:
630:
629:
621:
616:
615:
614:
602:
601:
599:
597:
591:
583:
577:
576:
574:
572:
561:
555:
554:
542:
529:
528:
525:africareview.com
516:
510:
509:
507:
498:
492:
491:
480:
474:
473:
462:
453:
452:
441:
428:
427:
424:Salini Impregilo
416:
405:
404:
401:Voice of America
392:
353:Francis turbines
350:
346:
342:
283:
216:
215:
108:
107:
105:
104:
103:
98:
94:
91:
90:
89:
86:
42:
41:
35:
19:
710:
709:
705:
704:
703:
701:
700:
699:
655:
654:
653:
652:
645:
638:
631:
624:
617:
612:
610:
605:
595:
593:
589:
585:
584:
580:
570:
568:
563:
562:
558:
544:
543:
532:
518:
517:
513:
505:
500:
499:
495:
482:
481:
477:
464:
463:
456:
443:
442:
431:
418:
417:
408:
394:
393:
384:
380:
368:
348:
344:
340:
279:
278:
213:
211:
148:US$ 327 million
101:
99:
95:
92:
87:
84:
82:
80:
79:
51:
50:
49:
48:
45:
44:
43:
17:
12:
11:
5:
708:
706:
698:
697:
692:
687:
682:
677:
672:
667:
657:
656:
651:
650:
636:
622:
607:
606:
604:
603:
578:
556:
530:
511:
493:
475:
454:
429:
406:
381:
379:
376:
375:
374:
367:
364:
285:
284:
272:
271:
268:
262:
261:
254:
248:
247:
244:
240:
239:
236:
232:
231:
228:
222:
221:
208:
204:
203:
199:
198:
195:
191:
190:
187:
183:
182:
179:
175:
174:
169:
165:
164:
161:
155:
154:
150:
149:
146:
142:
141:
138:
134:
133:
130:
126:
125:
122:
118:
117:
114:
110:
109:
77:
73:
72:
67:
63:
62:
57:
53:
52:
46:
37:
36:
30:
29:
28:
27:
24:
23:
16:Dam in Bumbuna
15:
13:
10:
9:
6:
4:
3:
2:
707:
696:
693:
691:
688:
686:
683:
681:
678:
676:
673:
671:
668:
666:
663:
662:
660:
648:
642:
637:
634:
628:
623:
620:
609:
588:
582:
579:
567:. IndustCards
566:
560:
557:
552:
548:
541:
539:
537:
535:
531:
526:
522:
515:
512:
504:
497:
494:
489:
485:
479:
476:
471:
467:
461:
459:
455:
450:
446:
440:
438:
436:
434:
430:
425:
421:
415:
413:
411:
407:
402:
398:
391:
389:
387:
383:
377:
373:
370:
369:
365:
363:
359:
356:
354:
338:
333:
331:
327:
322:
320:
319:hydroelectric
316:
312:
308:
304:
300:
296:
292:
282:
277:
273:
269:
267:
263:
259:
255:
253:
249:
245:
241:
237:
233:
229:
227:
223:
219:
209:
205:
200:
196:
192:
188:
184:
180:
176:
173:
170:
166:
162:
160:
156:
151:
147:
143:
139:
135:
131:
127:
123:
119:
115:
111:
106:
88:11°43′22.43″W
78:
74:
71:
68:
64:
61:
58:
54:
34:
25:
20:
633:Water portal
594:. Retrieved
581:
569:. Retrieved
559:
524:
514:
508:. p. I.
496:
478:
469:
448:
360:
357:
334:
323:
311:Sierra Leone
290:
288:
275:
217:
60:Sierra Leone
291:Bumbuna Dam
124:Operational
100: /
85:9°4′17.38″N
76:Coordinates
22:Bumbuna Dam
659:Categories
378:References
299:Seli River
197:Bell-mouth
172:Seli River
337:reservoir
202:Reservoir
596:25 March
571:25 March
366:See also
315:Freetown
252:Turbines
168:Impounds
66:Location
303:Bumbuna
297:on the
276:Website
258:Francis
113:Purpose
70:Bumbuna
56:Country
186:Length
178:Height
121:Status
590:(PDF)
506:(PDF)
301:near
293:is a
260:-type
116:Power
598:2014
573:2014
289:The
246:2009
140:2009
132:1979
305:in
210:445
661::
549:.
533:^
523:.
486:.
468:.
457:^
447:.
432:^
422:.
409:^
399:.
385:^
309:,
214:10
600:.
575:.
553:.
527:.
490:.
472:.
451:.
426:.
403:.
349:×
345:×
341:×
218:^
212:×
Text is available under the Creative Commons Attribution-ShareAlike License. Additional terms may apply.