Badger Hollow Solar Farm

Source 📝

390: 365: 29: 1019:
Schlömer S., T. Bruckner, L. Fulton, E. Hertwich, A. McKinnon, D. Perczyk, J. Roy, R. Schaeffer, R. Sims, P. Smith, and R. Wiser, 2014: Annex III: Technology-specific cost and performance parameters. In: Climate Change 2014: Mitigation of Climate Change. Contribution of Working Group III to the Fifth
275:
As part of project application materials, the facility was expected to require 17 full-time staff once constructed. The facility is eligible for the Federal Solar Investment Tax Credit (ITC). MG&E assumed that the facility would receive 30% of the ITC. The ITC would be normalized over the 30 year
397:
In 2023, Badger Hollow I and II generated 176 GWh combined, approximately 0.28% of the total electric power generated in Wisconsin (63,216 GWh) for that year. The facility had an approximate annual capacity factor of 13.2% in 2023. While presiding over the transfer of ownership stage, the PSC asked
1292: 299:
The procurement and construction of utility-scale solar has also been justified by some in Wisconsin due to electrical generation supply concerns when several large coal-fired plants in the state will be closed in the early 2020s. Those coal-fired plant closures have since been delayed to the mid
263:
The sites covers approximately 3500 acres, with between 2000 and 2200 acres used directly for the solar panel arrays. The facility is located in the Village of Cobb and in the towns of Mifflin, Eden, and Linden. It is located just south of Cobb and southeast of the nearby Montfort Wind Farm.
320:(PSC) on June 1, 2018. On April 18, 2019, the CPCN application to construct the facility was approved by the PSC. In its approval ruling, the PSC found that the project satisfied the requirements of Wisconsin Statute § 1.12 and 196.025(1), known as the Energy Priorities Law. 296:, the lifecycle emissions of electricity generated by utility-scale solar facilities is 48 gCO2eq/kWh (median value). By comparison, lifecycle emissions from electricity generated from coal and natural gas (combined-cycle plants) are 820 and 490 gCO2eq/kWh, respectively. 360:
Construction of Badger Hollow Phase I started in 2020 and finished in November 2021. The project was delayed to allow the developer more time in managing the acquisition of the solar panels which was impacted by federal government changes to trade tariffs.
1338: 272:. The total cost for this agreement was $ 1,299 per KW, or $ 194.8 million for the Badger Hollow component. In March, 2020, WE Energies and MG&E purchased and acquired the remaining 150 MW of the solar farm for approximately $ 194.9 million. 267:
On April 18, 2019, WPS and MG&E purchased and acquired 150 MW of the Badger Hollow solar farm and the electrical tie in line for approximately $ 389.7 million. This purchase also included the acquisition of the 150 MW
372:
A 5.7 mile, 138 kV generator tie line was constructed to connect Badger Hollow facility with the existing electric transmission system. The tie line cost $ 15.6 million and finished full construction in December 2021.
380:
as well as US government trade and tariff investigations into solar panel distributors and compliance on the sourcing of materials and labor to produce the panels. Phase 2 entered full operation in December 2023.
950:"Joint Application of Madison Gas and Electric Company and Wisconsin Electric Power Company for Approval to Acquire Ownership Interests in the Badger Hollow II Solar Electric Generating Facility - Final Decision" 1126: 906:"Application for a Certificate of Public Convenience and Necessity of Badger Hollow Solar Farm, LLC to Construct a Solar Electric Generation Facility, to be Located in Iowa County, Wisconsin - Final Decision" 1223: 1055: 928:"Joint Application of Madison Gas and Electric Company and Wisconsin Public Service Corporation for Approval to Acquire Ownership Interests in Solar Electric Generating Facilities - Final Decision" 1391: 323:
Major components of Badger Hollow include the PV panels, power conversion units (PCUs), collection lines, a collector substation, and an operations and maintenance (O&M) building.
292:
charged the Office of Sustainability and Clean Energy to achieve a goal that all electricity consumed in Wisconsin by 2050 be 100% carbon-free. According to analysis conducted by the
1317:"Joint Application of Madison Gas and Electric Company and Wisconsin Public Service Corporation for Approval to Acquire Ownership Interests in Solar Electric Generating Facilities" 313: 344:: Inverters and pad-mounted transformers convert the DC output to AC power and step up the power to a 34.5 kV voltage. The capacity of the PCUs is up to 300 MW AC. 1172: 1030: 293: 1020:
Assessment Report of the Intergovernmental Panel on Climate Change . Cambridge University Press, Cambridge, United Kingdom and New York, NY, USA.
317: 66: 1198: 245: 334:. The panels measure approximately 2 meters by 1 meter and are rated between 335 and 445 Watts (i.e. maximum output). The total 300:
2020s with major utility companies citing electricity reliability concerns and the delay in constructing new grid-scale solar.
1173:"Badger Hollow Network Upgrades project in service, connecting solar capacity to the grid | American Transmission Co" 1080:"Application for Certificate of Public Convenience and Necessity – Badger Hollow Solar Farm – Docket # 9697-CE-100" 398:
the owners to use an 18% capacity factor for their Electric Generation Expansion Analysis System (EGEAS) analysis.
241: 1247: 376:
Construction of Badger Hollow Phase 2 (remaining 150 MW) faced time delays and cost overruns due to impacts from
1268: 277: 249: 1362: 995: 269: 257: 108: 1316: 971: 194: 1150: 1079: 949: 927: 905: 878: 389: 364: 253: 972:"Press Release: Gov. Evers Signs Executive Order #38 Relating to Clean Energy in Wisconsin" 1101: 204: 28: 330:
The facility will consist of approximately 900,000 to 1,200,000 PV panels on single-axis
335: 214: 1385: 705: 405: 331: 156: 996:"Table A.III.2 | Emissions of selected electricity supply technologies gCO2eq/kWh)" 1224:"Labor, materials shortages blamed for $ 32M cost bump at Iowa County solar farm" 1269:"Wisconsin's largest solar park is now fully operational, featuring 830K panels" 1056:"Wisconsin coal plants to keep running amid reliability, supply chain concerns" 1127:"Tariffs blamed for delay in one of Wisconsin's first large-scale solar farms" 289: 81: 68: 309: 226: 377: 1031:"Carbon Dioxide Emissions From Electricity - World Nuclear Association" 244:
in Iowa County in southwestern, Wisconsin. Ownership is shared between
388: 363: 260:
utility-scale solar plant approved and constructed in Wisconsin.
356:
A 34.5 kV/138 kV power collector substation is located on site.
1199:"Council Post: The Impact Of Covid-19 On The PV Supply Chain" 213: 203: 193: 170: 162: 152: 147: 139: 127: 117: 107: 97: 60: 50: 42: 21: 368:Electrical Substation at Badger Hollow Solar Farm 1392:Photovoltaic power stations in the United States 350:Approximately 55 miles of lines with 15 feeders. 314:Certificate of Public Convenience and Necessity 308:Badger Hollow Solar Farm, LLC, an affiliate of 256:, with each utility owning 100 MW. It was the 254:Wisconsin Electric Power Company (WE Energies) 8: 1151:"Final Decision Signed ad Served 04-18-19" 246:Wisconsin Public Service Corporation (WPS) 18: 700: 400: 338:output rating of the facility is 408 MW. 870: 318:Public Services Commission of Wisconsin 276:life of the project as required by the 294:International Panel on Climate Change 288:Through an executive order, Governor 7: 900: 898: 896: 250:Madison Gas and Electric (MG&E) 879:"Minor Siting Adjustment Approval" 14: 242:solar photovoltaic energy station 16:Solar photovoltaic energy station 27: 393:A solar array at Badger Hollow 123:$ 390 (Project Estimate, 2018) 56:Towns of Eden, Mifflin, Linden 1: 1102:"Wisconsin Legislature: 1.12" 709:) Badger Hollow II Solar Farm 121:$ 422 Million (As of 1/14/23) 409:) Badger Hollow I Solar Farm 103:Phase 2 - Under Construction 215:Annual net output 1408: 1363:"Electricity Data Browser" 1339:"Electricity Data Browser" 1293:"Electricity Data Browser" 1267:Schulz, Joe (2024-01-05). 316:(CPCN) application to the 223: 179: 175: 38: 33:42°56'25.8"N 90°18'44.6"W 26: 1106:docs.legis.wisconsin.gov 238:Badger Hollow Solar Farm 22:Badger Hollow Solar Farm 1228:Wisconsin State Journal 1131:Wisconsin State Journal 1060:Wisconsin State Journal 195:Nameplate capacity 101:Phase 1 - Commissioned 394: 385:Electricity production 369: 184:Units operational 118:Construction cost 1035:www.world-nuclear.org 392: 367: 270:Two Creeks Solar Park 171:Power generation 82:42.94028°N 90.31222°W 1248:"MGE Solar Projects" 881:. September 30, 2021 205:Capacity factor 109:Commission date 711: 411: 312:, LLC, submitted a 87:42.94028; -90.31222 78: /  1197:Hackbarth, Joern. 976:State of Wisconsin 701: 401: 395: 370: 163:Solar tracker 1319:. August 10, 2018 863: 862: 837: 832: 819: 814: 809: 804: 799: 794: 789: 784: 779: 774: 769: 764: 699: 698: 673: 668: 655: 650: 645: 640: 635: 630: 625: 620: 615: 610: 605: 600: 587: 582: 577: 572: 567: 562: 557: 552: 547: 542: 537: 532: 519: 514: 509: 504: 499: 494: 489: 484: 479: 474: 469: 464: 234: 233: 1399: 1377: 1376: 1374: 1373: 1359: 1353: 1352: 1350: 1349: 1335: 1329: 1328: 1326: 1324: 1313: 1307: 1306: 1304: 1303: 1289: 1283: 1282: 1280: 1279: 1264: 1258: 1257: 1255: 1254: 1244: 1238: 1237: 1235: 1234: 1222:Hubbuch, Chris. 1219: 1213: 1212: 1210: 1209: 1194: 1188: 1187: 1185: 1184: 1169: 1163: 1162: 1160: 1158: 1153:. April 18, 2019 1147: 1141: 1140: 1138: 1137: 1125:Hubbuch, Chris. 1122: 1116: 1115: 1113: 1112: 1098: 1092: 1091: 1089: 1087: 1076: 1070: 1069: 1067: 1066: 1054:Hubbuch, Chris. 1051: 1045: 1044: 1042: 1041: 1027: 1021: 1017: 1011: 1010: 1008: 1006: 1000: 992: 986: 985: 983: 982: 968: 962: 961: 959: 957: 946: 940: 939: 937: 935: 930:. April 18, 2019 924: 918: 917: 915: 913: 908:. April 18, 2019 902: 891: 890: 888: 886: 875: 835: 830: 817: 812: 807: 802: 797: 792: 787: 782: 777: 772: 767: 762: 712: 671: 666: 653: 648: 643: 638: 633: 628: 623: 618: 613: 608: 603: 598: 585: 580: 575: 570: 565: 560: 555: 550: 545: 540: 535: 530: 517: 512: 507: 502: 497: 492: 487: 482: 477: 472: 467: 462: 412: 348:Collector Lines: 332:tracking systems 227:edit on Wikidata 189:Phase 2 - 150 MW 187:Phase 1 - 150 MW 148:Solar farm 93: 92: 90: 89: 88: 83: 79: 76: 75: 74: 71: 54:Village of Cobb 31: 19: 1407: 1406: 1402: 1401: 1400: 1398: 1397: 1396: 1382: 1381: 1380: 1371: 1369: 1361: 1360: 1356: 1347: 1345: 1337: 1336: 1332: 1322: 1320: 1315: 1314: 1310: 1301: 1299: 1291: 1290: 1286: 1277: 1275: 1266: 1265: 1261: 1252: 1250: 1246: 1245: 1241: 1232: 1230: 1221: 1220: 1216: 1207: 1205: 1196: 1195: 1191: 1182: 1180: 1171: 1170: 1166: 1156: 1154: 1149: 1148: 1144: 1135: 1133: 1124: 1123: 1119: 1110: 1108: 1100: 1099: 1095: 1085: 1083: 1078: 1077: 1073: 1064: 1062: 1053: 1052: 1048: 1039: 1037: 1029: 1028: 1024: 1018: 1014: 1004: 1002: 998: 994: 993: 989: 980: 978: 970: 969: 965: 955: 953: 952:. March 6, 2020 948: 947: 943: 933: 931: 926: 925: 921: 911: 909: 904: 903: 894: 884: 882: 877: 876: 872: 868: 754:Annual (Total) 454:Annual (Total) 387: 306: 286: 230: 188: 134: 132: 122: 102: 86: 84: 80: 77: 72: 69: 67: 65: 64: 55: 34: 17: 12: 11: 5: 1405: 1403: 1395: 1394: 1384: 1383: 1379: 1378: 1354: 1330: 1308: 1284: 1259: 1239: 1214: 1189: 1177:www.atcllc.com 1164: 1142: 1117: 1093: 1082:. June 1, 2018 1071: 1046: 1022: 1012: 987: 963: 941: 919: 892: 869: 867: 864: 861: 860: 858: 856: 854: 852: 850: 848: 846: 844: 842: 840: 838: 833: 828: 824: 823: 820: 815: 810: 805: 800: 795: 790: 785: 780: 775: 770: 765: 760: 756: 755: 752: 749: 746: 743: 740: 737: 734: 731: 728: 725: 722: 719: 716: 697: 696: 694: 692: 690: 688: 686: 684: 682: 680: 678: 676: 674: 669: 664: 660: 659: 656: 651: 646: 641: 636: 631: 626: 621: 616: 611: 606: 601: 596: 592: 591: 588: 583: 578: 573: 568: 563: 558: 553: 548: 543: 538: 533: 528: 524: 523: 520: 515: 510: 505: 500: 495: 490: 485: 480: 475: 470: 465: 460: 456: 455: 452: 449: 446: 443: 440: 437: 434: 431: 428: 425: 422: 419: 416: 386: 383: 358: 357: 351: 345: 339: 305: 302: 285: 282: 232: 231: 224: 221: 220: 219:176 GWh (2023) 217: 211: 210: 207: 201: 200: 197: 191: 190: 185: 181: 180: 177: 176: 173: 172: 168: 167: 164: 160: 159: 154: 150: 149: 145: 144: 141: 137: 136: 129: 125: 124: 119: 115: 114: 111: 105: 104: 99: 95: 94: 62: 58: 57: 52: 48: 47: 44: 40: 39: 36: 35: 32: 24: 23: 15: 13: 10: 9: 6: 4: 3: 2: 1404: 1393: 1390: 1389: 1387: 1368: 1364: 1358: 1355: 1344: 1340: 1334: 1331: 1318: 1312: 1309: 1298: 1294: 1288: 1285: 1274: 1270: 1263: 1260: 1249: 1243: 1240: 1229: 1225: 1218: 1215: 1204: 1200: 1193: 1190: 1178: 1174: 1168: 1165: 1152: 1146: 1143: 1132: 1128: 1121: 1118: 1107: 1103: 1097: 1094: 1081: 1075: 1072: 1061: 1057: 1050: 1047: 1036: 1032: 1026: 1023: 1016: 1013: 997: 991: 988: 977: 973: 967: 964: 951: 945: 942: 929: 923: 920: 907: 901: 899: 897: 893: 880: 874: 871: 865: 859: 857: 855: 853: 851: 849: 847: 845: 843: 841: 839: 834: 829: 826: 825: 821: 816: 811: 806: 801: 796: 791: 786: 781: 776: 771: 766: 761: 758: 757: 753: 750: 747: 744: 741: 738: 735: 732: 729: 726: 723: 720: 717: 714: 713: 710: 707: 704: 695: 693: 691: 689: 687: 685: 683: 681: 679: 677: 675: 670: 665: 662: 661: 657: 652: 647: 642: 637: 632: 627: 622: 617: 612: 607: 602: 597: 594: 593: 589: 584: 579: 574: 569: 564: 559: 554: 549: 544: 539: 534: 529: 526: 525: 521: 516: 511: 506: 501: 496: 491: 486: 481: 476: 471: 466: 461: 458: 457: 453: 450: 447: 444: 441: 438: 435: 432: 429: 426: 423: 420: 417: 414: 413: 410: 407: 404: 399: 391: 384: 382: 379: 374: 366: 362: 355: 352: 349: 346: 343: 340: 337: 333: 329: 326: 325: 324: 321: 319: 315: 311: 303: 301: 297: 295: 291: 283: 281: 279: 273: 271: 265: 261: 259: 255: 251: 247: 243: 239: 228: 222: 218: 216: 212: 208: 206: 202: 198: 196: 192: 186: 183: 182: 178: 174: 169: 165: 161: 158: 157:Flat-panel PV 155: 151: 146: 142: 138: 130: 126: 120: 116: 113:November 2021 112: 110: 106: 100: 96: 91: 63: 59: 53: 49: 45: 41: 37: 30: 25: 20: 1370:. Retrieved 1366: 1357: 1346:. Retrieved 1342: 1333: 1321:. Retrieved 1311: 1300:. Retrieved 1296: 1287: 1276:. Retrieved 1272: 1262: 1251:. Retrieved 1242: 1231:. Retrieved 1227: 1217: 1206:. Retrieved 1202: 1192: 1181:. Retrieved 1179:. 2022-01-14 1176: 1167: 1155:. Retrieved 1145: 1134:. Retrieved 1130: 1120: 1109:. Retrieved 1105: 1096: 1084:. Retrieved 1074: 1063:. Retrieved 1059: 1049: 1038:. Retrieved 1034: 1025: 1015: 1003:. Retrieved 990: 979:. Retrieved 975: 966: 954:. Retrieved 944: 932:. Retrieved 922: 910:. Retrieved 883:. Retrieved 873: 708: 703:Generation ( 702: 408: 403:Generation ( 402: 396: 375: 371: 359: 353: 347: 341: 327: 322: 307: 298: 287: 274: 266: 262: 240:is a 300 MW 237: 235: 209:13.2% (2023) 1367:www.eia.gov 1343:www.eia.gov 1323:January 14, 1297:www.eia.gov 1157:January 14, 1086:January 14, 1005:January 14, 956:January 14, 934:January 14, 912:January 14, 885:January 14, 354:Substation: 166:Single-axis 85: / 61:Coordinates 1372:2024-05-14 1348:2024-05-14 1302:2024-05-14 1278:2024-05-14 1253:2024-05-14 1233:2023-01-15 1208:2023-01-15 1183:2023-01-15 1136:2023-01-15 1111:2023-01-15 1065:2023-01-15 1040:2023-01-15 981:2023-01-15 866:References 290:Tony Evers 284:Background 73:90°18′44″W 70:42°56′25″N 310:Invenergy 140:Employees 1386:Category 658:174,544 590:197,465 378:COVID-19 131:MG&E 128:Owner(s) 51:Location 328:Panels: 304:History 43:Country 1203:Forbes 1001:. 2014 836:14,755 822:1,261 672:15,081 644:12,588 639:13,539 634:25,914 629:28,019 624:20,397 619:19,515 609:13,159 604:14,061 576:15,890 571:17,389 566:22,936 561:27,763 556:25,066 551:19,528 546:16,418 541:14,136 536:14,055 531:10,525 522:8,249 258:second 252:, and 199:300 MW 98:Status 999:(PDF) 831:5,319 827:2024 818:1,261 759:2023 715:Year 667:6,432 663:2024 654:4,651 649:8,548 614:7,511 599:6,642 595:2023 586:4,776 581:8,983 527:2022 518:3,094 513:5,155 459:2021 415:Year 225:[ 133:WEPCO 1325:2023 1159:2023 1088:2023 1007:2023 958:2023 936:2023 914:2023 887:2023 751:Dec 748:Nov 745:Oct 742:Sep 739:Aug 736:Jul 733:Jun 730:May 727:Apr 724:Mar 721:Feb 718:Jan 451:Dec 448:Nov 445:Oct 442:Sep 439:Aug 436:Jul 433:Jun 430:May 427:Apr 424:Mar 421:Feb 418:Jan 342:PCUs 236:The 153:Type 1273:WPR 706:MWh 406:MWh 278:IRS 135:WPS 46:USA 1388:: 1365:. 1341:. 1295:. 1271:. 1226:. 1201:. 1175:. 1129:. 1104:. 1058:. 1033:. 974:. 895:^ 813:-- 808:-- 803:-- 798:-- 793:-- 788:-- 783:-- 778:-- 773:-- 768:-- 763:-- 508:-- 503:-- 498:-- 493:-- 488:-- 483:-- 478:-- 473:-- 468:-- 463:-- 336:DC 280:. 248:, 143:17 1375:. 1351:. 1327:. 1305:. 1281:. 1256:. 1236:. 1211:. 1186:. 1161:. 1139:. 1114:. 1090:. 1068:. 1043:. 1009:. 984:. 960:. 938:. 916:. 889:. 229:]

Index


42°56′25″N 90°18′44″W / 42.94028°N 90.31222°W / 42.94028; -90.31222
Commission date
Flat-panel PV
Nameplate capacity
Capacity factor
Annual net output
edit on Wikidata
solar photovoltaic energy station
Wisconsin Public Service Corporation (WPS)
Madison Gas and Electric (MG&E)
Wisconsin Electric Power Company (WE Energies)
second
Two Creeks Solar Park
IRS
Tony Evers
International Panel on Climate Change
Invenergy
Certificate of Public Convenience and Necessity
Public Services Commission of Wisconsin
tracking systems
DC

COVID-19

MWh
MWh
"Minor Siting Adjustment Approval"

Text is available under the Creative Commons Attribution-ShareAlike License. Additional terms may apply.