The tunnel consists of two parallel tunnels, one for each direction of travel. Each tunnel is 7 m (23 ft) wide, and each has two lanes of road. The two tunnels are interconnected by a passage every 500 m (1,600 ft) for maintenance and emergency evacuation. The tunnel has forced
709:
278:), has been a bottleneck on the road due to its elevation of 2,194 m (7,198 ft) and limited traffic capacity. The new tunnel's average elevation at 1,790 m is 400 m lower than the existing
254:
ventilation to extract smoke and stale air and infuse fresh air. It has state-of-the-art monitoring and control systems for security. Built at a cost of ₹2,100 crore, citizens pay a toll to use the tunnel.
242:. Its construction started in 2011 and was completed in 2021. It is one of the longest tunnels in India, with a length of 8.45 km (5.25 mi). The tunnel reduces the distance between the cities of
679:
483:
504:
462:
271:
529:
768:
458:
267:
583:
748:
321:
282:'s elevation, making it less prone to avalanches. The tunnel has reduced the road distance between Banihal and Qazigund by 16 km (10 mile).
636:
687:
773:
604:
223:
371:
340:
132:
122:
227:
35:
429:
408:
665:
778:
454:
263:
239:
71:
788:
449:
783:
651:
311:
562:
411:
basis. It is built with an exhaust system to remove gas and bring in fresh air. It has 126 jet fans, 234
434:
250:
by 16 km. It also reduces the travel time between these cities from 6 hours to 5.5 hours.
537:
710:"8.5 km all-weather Qazigund-Banihal hi-tech tunnel likely to be operational in coming weeks"
301:
November 2019: Work progressing at slow pace; tunnel to be opened for traffic in March 2021.
182:
637:"CONCERN: 8 years on, work on Qazigund-Banihal tunnel far from over | Greater Kashmir"
439:
424:
279:
275:
762:
444:
325:
314:
412:
231:
618:
505:"J-K: 8.5 Km Qazigund-Banihal tunnel in final stage of construction, to open soon"
274:
in the year 2010) to four lanes. The existing road tunnel below the
Banihal pass (
219:
484:"All-weather tunnel linking Jammu and Srinagar to open soon. All you must know"
295:
May 2018: Boring of the entire 8.5 km tunnel was completed on 20 May 2018.
605:"Tube 1 of Banihal-Qazigund four-lane tunnel completed | Greater Kashmir"
235:
619:"Banihal-Qazigund road tunnel opening likely next year: NHAI - Kashmir Times"
541:
386:
373:
355:
342:
533:
262:
Construction of the tunnel started in 2011 along with the project to widen
243:
81:
749:"8.5 km all-weather Qazi Gund-Banihal tunnel to open for public in days"
680:"Opening of Qazigund-Banihal tunnel delayed from March end to April end"
724:"Auto News India, Car and Bikes News, Launch, Price, Features, Reviews"
91:
530:"NHAI in race to get crucial J&K tunnel ready ahead of avalanches"
723:
289:
As of
February 2017, the tunnel excavation was close to completion.
310:
July 2021: Tunnel could be inaugurated on the independence day by
286:
As of May 2016, 7.2 km of the 8.5 km had been excavated.
247:
44:
39:
304:
25 February 2021:Tunnel likely to open for traffic in April 2021
174:
292:
February 2018: Boring work of one tunnel had been completed.
666:"'Qazigund-Banihal tunnel being thrown open in March'"
307:
5 April 2021: opening delayed until end of April 2021.
222:
at elevation of 1,790 m (5,870 ft) in the
298:
Jan 2019:Tunnel may open for traffic by March 2020.
205:
197:
189:
169:
161:
156:
146:
138:
128:
118:
110:
102:
97:
87:
77:
62:
52:
31:
26:
368:and the Northern portal (end) of the tunnel is at
652:"Qazigund-Banihal tunnel to miss 5th deadline"
337:The Southern portal (end) of the tunnel is at
8:
21:
563:"Tunnels of Hope in Valley, Governance Now"
20:
475:
16:Road tunnel in Jammu and Kashmir, India
320:August 2021: Tunnel was opened by the
270:before all the national highways were
238:mountain range in lower Himalayas, on
650:Excelsior, Daily (24 November 2019).
415:and a firefighting system installed.
7:
322:Road Transport and Highways Minister
133:National Highways Authority of India
123:National Highways Authority of India
14:
769:Road tunnels in Jammu and Kashmir
430:Dr. Syama Prasad Mookerjee Tunnel
181:(4 Lanes total in Twin-Tube with
66:
43:
170:
1:
165:8.45 km (27,700 ft)
774:Road infrastructure in India
216:Banihal Qazigund Road Tunnel
201:1,790 m (5,870 ft)
22:Banihal Qazigund Road Tunnel
805:
193:70 km/h (43 mph)
728:Hindustan Times Auto News
465:of all national highways)
450:Pir Panjal Railway Tunnel
409:build–operate–transfer
407:The tunnel is made on
779:Road tunnels in India
209:7 metres (23 ft)
536:. PTI. 20 May 2018.
266:(which was known as
230:in India, below the
623:www.kashmirtimes.in
387:33.5646°N 75.1867°E
383: /
356:33.4895°N 75.1729°E
352: /
240:National Highway 44
151:Qazigund Toll Plaza
23:
435:Chattergala Tunnel
789:Anantnag district
584:"Tunnel openings"
228:Jammu and Kashmir
213:
212:
198:Highest elevation
36:Jammu and Kashmir
796:
753:
752:
745:
739:
738:
736:
734:
720:
714:
713:
706:
700:
699:
697:
695:
690:on 22 April 2021
686:. Archived from
676:
670:
669:
662:
656:
655:
647:
641:
640:
633:
627:
626:
615:
609:
608:
601:
595:
594:
592:
590:
580:
574:
573:
571:
569:
559:
553:
552:
550:
548:
526:
520:
519:
517:
515:
501:
495:
494:
492:
490:
480:
398:
397:
395:
394:
393:
392:33.5646; 75.1867
388:
384:
381:
380:
379:
376:
367:
366:
364:
363:
362:
361:33.4895; 75.1729
357:
353:
350:
349:
348:
345:
183:Dual carriageway
179:2 Lanes per Tube
172:
152:
70:
69:
58:
48:
47:
24:
804:
803:
799:
798:
797:
795:
794:
793:
784:Ramban district
759:
758:
757:
756:
747:
746:
742:
732:
730:
722:
721:
717:
708:
707:
703:
693:
691:
678:
677:
673:
664:
663:
659:
649:
648:
644:
635:
634:
630:
617:
616:
612:
603:
602:
598:
588:
586:
582:
581:
577:
567:
565:
561:
560:
556:
546:
544:
528:
527:
523:
513:
511:
503:
502:
498:
488:
486:
482:
481:
477:
472:
421:
405:
403:Safety measures
391:
389:
385:
382:
377:
374:
372:
370:
369:
360:
358:
354:
351:
346:
343:
341:
339:
338:
335:
260:
224:Union Territory
190:Operating speed
180:
150:
67:
56:
42:
17:
12:
11:
5:
802:
800:
792:
791:
786:
781:
776:
771:
761:
760:
755:
754:
740:
715:
701:
684:Kashmir Reader
671:
657:
642:
628:
610:
596:
575:
554:
521:
496:
474:
473:
471:
468:
467:
466:
452:
447:
442:
440:Zoji-la Tunnel
437:
432:
427:
425:Jawahar Tunnel
420:
417:
404:
401:
334:
331:
330:
329:
318:
312:Prime Minister
308:
305:
302:
299:
296:
293:
290:
287:
280:Jawahar tunnel
276:Jawahar tunnel
259:
256:
211:
210:
207:
203:
202:
199:
195:
194:
191:
187:
186:
177:
167:
166:
163:
159:
158:
154:
153:
148:
144:
143:
140:
136:
135:
130:
126:
125:
120:
116:
115:
112:
108:
107:
104:
100:
99:
95:
94:
89:
85:
84:
79:
75:
74:
64:
60:
59:
54:
50:
49:
33:
29:
28:
15:
13:
10:
9:
6:
4:
3:
2:
801:
790:
787:
785:
782:
780:
777:
775:
772:
770:
767:
766:
764:
750:
744:
741:
729:
725:
719:
716:
711:
705:
702:
689:
685:
681:
675:
672:
667:
661:
658:
653:
646:
643:
638:
632:
629:
624:
620:
614:
611:
606:
600:
597:
585:
579:
576:
564:
558:
555:
543:
539:
535:
531:
525:
522:
510:
506:
500:
497:
485:
479:
476:
469:
464:
460:
457:(former name
456:
453:
451:
448:
446:
445:Z-Morh Tunnel
443:
441:
438:
436:
433:
431:
428:
426:
423:
422:
418:
416:
414:
410:
402:
400:
396:
365:
332:
327:
326:Nitin Gadkari
323:
319:
316:
315:Narendra Modi
313:
309:
306:
303:
300:
297:
294:
291:
288:
285:
284:
283:
281:
277:
273:
269:
265:
257:
255:
251:
249:
245:
241:
237:
233:
229:
225:
221:
217:
208:
204:
200:
196:
192:
188:
184:
178:
176:
168:
164:
160:
155:
149:
145:
141:
137:
134:
131:
127:
124:
121:
117:
114:4 August 2021
113:
109:
105:
101:
96:
93:
90:
86:
83:
80:
76:
73:
65:
61:
55:
51:
46:
41:
37:
34:
30:
25:
19:
743:
731:. Retrieved
727:
718:
704:
692:. Retrieved
688:the original
683:
674:
660:
645:
631:
622:
613:
599:
587:. Retrieved
578:
566:. Retrieved
557:
545:. Retrieved
524:
512:. Retrieved
508:
499:
487:. Retrieved
478:
413:CCTV cameras
406:
336:
261:
258:Construction
252:
232:Banihal Pass
215:
214:
18:
568:19 February
463:renumbering
390: /
359: /
220:road tunnel
763:Categories
470:References
378:75°11′12″E
375:33°33′53″N
347:75°10′22″E
344:33°29′22″N
272:renumbered
236:Pir Panjal
142:Automotive
103:Work begun
542:0971-751X
534:The Hindu
157:Technical
98:Operation
733:5 August
694:22 April
547:8 August
514:5 August
509:ANI News
419:See also
333:Location
244:Srinagar
129:Operator
82:Qazigund
32:Location
27:Overview
589:4 March
489:10 June
461:before
234:in the
139:Traffic
92:Banihal
540:
162:Length
111:Opened
57:Active
53:Status
459:NH 1A
455:NH 44
268:NH 1A
264:NH 44
248:Jammu
218:is a
206:Width
175:lanes
119:Owner
78:Start
72:NH 44
63:Route
40:India
735:2021
696:2021
591:2017
570:2017
549:2021
538:ISSN
516:2021
491:2021
246:and
147:Toll
106:2011
226:of
173:of
171:No.
88:End
765::
726:.
682:.
621:.
532:.
507:.
399:.
324:,
38:,
751:.
737:.
712:.
698:.
668:.
654:.
639:.
625:.
607:.
593:.
572:.
551:.
518:.
493:.
328:.
317:.
185:)
Text is available under the Creative Commons Attribution-ShareAlike License. Additional terms may apply.