85:
as a terminus. The platform on the loop was also removed. The construction was initially planned to take six months but due to a number of delays, including one incident where among other things a charge exploded prematurely, the line wasn't officially opened until April 1897.
81:. During construction, when the line rejoined the original alignment at Clarence, a number of changes had to be made. The original up platform was removed and a new platform was erected a few hundred meters west. This platform is currently used by the 72:
The deviation started construction around July 1896 due to a sudden rise in traffic along the Western Line. It was longer than the original alignment but it eased the grades to 1 in 60 and stretched three miles from
145: 140: 150: 60:, with a ruling grade of 1 in 60. Along with a few crossing loops, it enabled much longer trains to use the line. After the construction of the 117: 41: 74: 53: 52:. It was constructed from 1896 to 1897 in an effort to ease the grades of the original alignment ( 1 in 33 ) from before 37: 78: 57: 61: 98:
has aspirations to extend the railway from Clarence to Newnes Junction, using the Dargans Deviation.
113: 95: 82: 45: 17: 134: 49: 27:Section of the original Main Western railway line 8: 146:Main Western railway line, New South Wales 141:Rail infrastructure in New South Wales 7: 25: 151:1897 establishments in Australia 36:was a section of the original 1: 110:Conquering the Blue Mountains 167: 38:Main Western railway line 108:Langdon, Mark (2006), 18:Dargans Deviation 1897 62:Ten Tunnels Deviation 64:, it was abandoned. 112:, Eveleigh Press, 119:978-1-876568-30-6 34:Dargans Deviation 16:(Redirected from 158: 122: 21: 166: 165: 161: 160: 159: 157: 156: 155: 131: 130: 129: 120: 107: 104: 102:Further reading 96:Zig Zag Railway 92: 90:Zig Zag Railway 83:Zig Zag Railway 75:Newnes Junction 70: 54:Newnes Junction 46:New South Wales 28: 23: 22: 15: 12: 11: 5: 164: 162: 154: 153: 148: 143: 133: 132: 128: 125: 124: 123: 118: 103: 100: 91: 88: 69: 66: 42:Blue Mountains 26: 24: 14: 13: 10: 9: 6: 4: 3: 2: 163: 152: 149: 147: 144: 142: 139: 138: 136: 126: 121: 115: 111: 106: 105: 101: 99: 97: 89: 87: 84: 80: 76: 67: 65: 63: 59: 55: 51: 47: 43: 39: 35: 30: 19: 109: 93: 71: 33: 31: 29: 135:Categories 127:References 50:Australia 40:over the 79:Clarence 58:Clarence 68:History 116:  114:ISBN 94:The 32:The 77:to 56:to 44:in 137:: 48:, 20:)

Index

Dargans Deviation 1897
Main Western railway line
Blue Mountains
New South Wales
Australia
Newnes Junction
Clarence
Ten Tunnels Deviation
Newnes Junction
Clarence
Zig Zag Railway
Zig Zag Railway
ISBN
978-1-876568-30-6
Categories
Rail infrastructure in New South Wales
Main Western railway line, New South Wales
1897 establishments in Australia

Text is available under the Creative Commons Attribution-ShareAlike License. Additional terms may apply.