Knowledge (XXG)

Enercon E-126

Source đź“ť

175: 167: 147:
or wind turbines of the 5-8 MW class. This approach is at least applied in the Netherlands. Examples for this trend are found for instance in the preliminary research for the "Wind farm de Drentse Monden" aiming at 300-450 MW with possibly 50-60 E-126/7.5 MW turbines, "Wind farm N33" aiming at >120 MW with possibly 15-40 E-126/7.5 MW turbines, "Wind farm Krammer" aiming at >100 MW with possibly 11-21 E-126/7.5 MW turbines, "Wind farm Wieringermeer" aiming 200-400 MW with possibly 60 or more 6+ MW turbines (in that case possibly Repower 6M/6.15MW).
94:
outset, didn't seem to be a massive change from the E-112, but rather an evolution of the model with a slightly higher hub height (135 m vs. 124 m) and a slightly larger rotor (127 m vs 112/114 m) with a new blade profile. For this new model, the sales were also slow, but sometime in 2011, Enercon increased the generator output from 6 MW to 7.58 MW. Sales then began to increase, with the first large-scale purchase of this wind turbine model was at
102: 19: 224:, a pending approval for the wind farm 'Le Mont des 4 Faux', consisting of an initial number of 52 Enercon E-126 7.58 MW wind turbines but in April 2012 reduced to a new variant of 47 turbines (deleting one 5-unit row in order to meet some ornithological concerns), is considered to be confirmed as such 47 turbines wind farm in 2012. This E-126 wind farm is situated between 74:
rotor diameter from 112m to 114m, for a slight benefit in efficiency. The turbine didn't sell well - only two 4.5 MW units exist as of today, which prompted Enercon to increase the generator output from 4.5 MW to 6 MW. However, while the generator power output increase did increase sales, by 2008 sales were essentially non-existent, due to two key factors:
146:
In June 2012, at least 147 Enercon E-126 windturbines were operating, in construction, or nearing final approval, 35 of them completed and operating. Furthermore, during 2010-2011, onshore wind farm projects still in their early design processes were considering wind turbines of the 2-3.5 MW class,
73:
The project had come about after Enercon decided to pursue a larger turbine than the 2MW E-66. For some time, Enercon worked on the E-112 project - a turbine with a generator output of 2.25x the 2MW E-66, with it eventually being available for sale sometime in 2002. Enercon then tweaked the E-112's
93:
Unfortunately for Enercon, the belief that the turbine's massive nameplate capacity would market itself to operators backfired, and it became a massive failure, with only 9 being ever installed, and this failure prompted Enercon to start tweaking the design. Enercon's new E-126 project, from the
199:
is planned to have 1,101 turbines covering 500 km, to generate 4,000 MW and an annual yield up to 12 TWh, making it one of the world's largest wind farms. Under construction in northern Sweden, it will contain a mix of Enercon E-126 7.58 MW wind turbines and Enercon E-101 3.05 MW wind
212:, part of which would consist of 38 Enercon E-126 7.58 MW wind turbines. An ultimate case for the highest Court of state by opponents was closed on 8 February 2012, confirming the government decision. In 2011 it was expected preparatory works would start before the summer of 2012. 126:
The weight of the foundation of the turbine tower is about 2,500 t, the tower itself 2,800 t, the machine housing 128 t, the generator 220 t, the rotor (including the blade) 364 t. The total weight is 6,012 tonnes exactly.
163:. This wind farm is capable, at max capacity, to supply 55,000 residences with pure wind energy. This wind farm, though, has one 6 MW unit, so this reduces the wind farm's peak capacity from 83.38 MW to 81.8 MW. 114:
There are three variants of the E-126, of which are: EP3 low-wind, EP4 mid-wind and EP8 high-wind models. For the sake of simplicity, this article focuses on the EP8 E-126. The power output of the generator was
123:
after technical revisions were performed in 2009. Since 2011 the E-126 is available as a 7.6 MW nameplate capacity. The E-126 incorporates power electronics and offers grid stabilising capabilities.
409: 200:
turbines, the exact number of each type to be determined by further studies. The pilot stage wind farm at Dragaliden was completed in 2010, generating 24 MW with 12 turbines.
675: 42:. With a hub height of 135 m (443 ft), rotor diameter of 126 m (413 ft) and a total height of 198 m (650 ft), the turbine can generate up to 283: 498: 441: 297: 416: 170:
Wind farm consisting of ten 7.58 MW and one 6 MW Enercon E-126 turbines in Estinnes, Belgium as seen on 20 July 2010, two months before completion.
475: 733: 760: 621: 634: 749: 50: 672: 353: 331: 693: 174: 166: 605: 495: 647: 135: 209: 81:
That Enercon was having to contend with ever-stiffening competition from fellow wind turbine builders, such as
577: 515: 383: 793: 457: 95: 196: 730: 229: 54: 78:
The fact that the wind turbines were extremely expensive to manufacture, transport and assemble,
435: 357: 327: 277: 269: 750:
Réunion publique d’information sur le projet éolien du Mont des4 faux à Ville-sur-Retourne
737: 697: 679: 609: 502: 159:
consisting entirely of Enercon E-126 turbines (11 turbines in total), was completed in
361: 323: 787: 461: 249: 101: 31: 62: 18: 602: 208:
The Netherlands government gave its final approval on 6 January 2011 for the '
225: 156: 651: 57:) for several years, until it was overtaken in 2014 by the Danish company 718: 298:"'We're not afraid of offshore, but we decided to put 150% into onshore'" 233: 179: 160: 45: 270:"Grenzenlose Windkraft? - Windkraftanlagen werden groĂź wie FernsehtĂĽrme" 105:
E-112, the predecessor to E-126. Note the different rotor blade profile.
183: 82: 39: 35: 581: 387: 454: 221: 216:
France: Wind Farm Le Mont des 4 Faux (Le Mont des 4 Faux Parc Éolien)
86: 65:
turbine. Their model number is a reference to their rotor diameter.
58: 648:"Panoramio - Photo of Estinnes wind farm. Enercon E-126 - 20JUL2009" 603:
Wind farm Estinnes Status & Real-time power output turbine nr.3
523: 237: 173: 165: 131: 100: 17: 682:
Sweden to build world's largest windfarm, Ordons News, April 2009
476:"World's Most Powerful Wind Turbine May Undergo High Winds Tests" 138:. The list price of one unit is $ 14 million plus install costs. 559: 776: 545: 98:
in Belgium, with 11 wind turbines ordered for installation.
635:
Belgium inaugurates wind farm with largest wind turbines
622:"Estinnes windturbinepark – 11 x Enercon E-126 - OliNo" 505:(based on public available www-info till June 2012) 496:
Summary of existing and planned E-126 wind turbines
240:. The project developer is the company Windvision. 130:The first turbine of this model was installed in 384:"Grid integration & Wind farm management" 8: 516:"Home - Windpark Drentse Monden Oostermoer" 282:: CS1 maint: numeric names: authors list ( 260: 440:: CS1 maint: archived copy as title ( 433: 275: 232:, at the southern side of the French 204:Netherlands: Windpark Noordoostpolder 155:In September 2010, the world's first 7: 334:from the original on 2 November 2016 186:, 10 October 2010, after completion. 520:Windpark Drentse Monden Oostermoer 14: 474:Richards, Jake (23 August 2013). 731:Le projet "Le Mont des 4 Faux" 1: 719:2011 Windpark Noordoostpolder 464:from official Enercon website 268:3sat.online (28 March 2012). 191:Sweden: Markbygden Wind Farm 151:Belgium: Estinnes wind farm 22:Enercon E-126 wind turbine. 810: 119:, but has been uprated to 34:model manufactured by the 736:20 September 2011 at the 560:"Home - WindPark Krammer" 354:"10 big wind turbines -" 324:"10 big wind turbines -" 210:Windpark Noordoostpolder 136:Rysumer Nacken Wind Park 49:of power, making it the 501:1 February 2014 at the 250:Record-holding turbines 87:Vestas Wind Systems A/S 187: 171: 106: 23: 177: 169: 104: 21: 678:8 March 2012 at the 673:Markbygden Wind Farm 197:Markbygden Wind Farm 51:largest wind turbine 608:18 May 2011 at the 390:on 11 February 2013 654:on 27 October 2018 526:on 9 November 2013 364:on 12 January 2014 188: 172: 107: 96:Estinnes wind farm 55:nameplate capacity 24: 460:1 August 2012 at 358:Windpower Monthly 328:Windpower Monthly 161:Estinnes, Belgium 53:in the world (by 801: 780: 779: 777:Official website 763: 758: 752: 747: 741: 728: 722: 716: 710: 709: 707: 705: 700:on 18 April 2013 696:. Archived from 692:Anton Berglund. 689: 683: 670: 664: 663: 661: 659: 650:. Archived from 644: 638: 637:30 November 2009 632: 626: 625: 618: 612: 600: 594: 593: 591: 589: 580:. Archived from 574: 568: 567: 564:WindPark Krammer 556: 550: 549: 542: 536: 535: 533: 531: 522:. Archived from 512: 506: 493: 487: 486: 484: 482: 471: 465: 452: 446: 445: 439: 431: 429: 427: 421: 415:. Archived from 414: 406: 400: 399: 397: 395: 386:. Archived from 380: 374: 373: 371: 369: 360:. Archived from 350: 344: 343: 341: 339: 330:. 26 July 2016. 320: 314: 313: 311: 309: 294: 288: 287: 281: 273: 265: 122: 118: 48: 809: 808: 804: 803: 802: 800: 799: 798: 784: 783: 775: 774: 771: 766: 759: 755: 748: 744: 738:Wayback Machine 729: 725: 717: 713: 703: 701: 691: 690: 686: 680:Wayback Machine 671: 667: 657: 655: 646: 645: 641: 633: 629: 620: 619: 615: 610:Wayback Machine 601: 597: 587: 585: 584:on 6 March 2016 576: 575: 571: 558: 557: 553: 544: 543: 539: 529: 527: 514: 513: 509: 503:Wayback Machine 494: 490: 480: 478: 473: 472: 468: 453: 449: 432: 425: 423: 422:on 24 July 2011 419: 412: 410:"Archived copy" 408: 407: 403: 393: 391: 382: 381: 377: 367: 365: 352: 351: 347: 337: 335: 322: 321: 317: 307: 305: 296: 295: 291: 274: 267: 266: 262: 258: 246: 218: 206: 193: 153: 144: 120: 116: 112: 71: 43: 12: 11: 5: 807: 805: 797: 796: 786: 785: 782: 781: 770: 769:External links 767: 765: 764: 753: 742: 723: 711: 684: 665: 639: 627: 613: 595: 569: 551: 546:"Windpark n33" 537: 507: 488: 466: 447: 401: 375: 345: 315: 289: 259: 257: 254: 253: 252: 245: 242: 217: 214: 205: 202: 192: 189: 152: 149: 143: 140: 132:Emden, Germany 111: 110:Specifications 108: 91: 90: 79: 70: 67: 30:is an onshore 13: 10: 9: 6: 4: 3: 2: 806: 795: 794:Wind turbines 792: 791: 789: 778: 773: 772: 768: 762: 757: 754: 751: 746: 743: 739: 735: 732: 727: 724: 720: 715: 712: 699: 695: 688: 685: 681: 677: 674: 669: 666: 653: 649: 643: 640: 636: 631: 628: 623: 617: 614: 611: 607: 604: 599: 596: 583: 579: 573: 570: 565: 561: 555: 552: 547: 541: 538: 525: 521: 517: 511: 508: 504: 500: 497: 492: 489: 477: 470: 467: 463: 462:archive.today 459: 456: 451: 448: 443: 437: 418: 411: 405: 402: 389: 385: 379: 376: 363: 359: 355: 349: 346: 333: 329: 325: 319: 316: 303: 299: 293: 290: 285: 279: 271: 264: 261: 255: 251: 248: 247: 243: 241: 239: 235: 231: 227: 223: 215: 213: 211: 203: 201: 198: 190: 185: 181: 176: 168: 164: 162: 158: 150: 148: 141: 139: 137: 133: 128: 124: 109: 103: 99: 97: 89:from Denmark. 88: 84: 80: 77: 76: 75: 68: 66: 64: 60: 56: 52: 47: 41: 37: 33: 29: 28:Enercon E-126 20: 16: 756: 745: 726: 714: 702:. Retrieved 698:the original 694:"DRAGALIDEN" 687: 668: 656:. Retrieved 652:the original 642: 630: 616: 598: 586:. Retrieved 582:the original 578:"Index of /" 572: 563: 554: 540: 528:. Retrieved 524:the original 519: 510: 491: 479:. Retrieved 469: 455:Enercon E126 450: 424:. Retrieved 417:the original 404: 392:. Retrieved 388:the original 378: 366:. Retrieved 362:the original 348: 336:. Retrieved 318: 306:. Retrieved 301: 292: 263: 219: 207: 194: 154: 145: 134:in 2007, at 129: 125: 113: 92: 72: 32:wind turbine 27: 25: 15: 761:Flyer (pdf) 704:23 February 481:23 February 394:23 February 368:23 February 338:23 February 308:23 February 61:with their 658:31 October 588:8 December 530:21 October 256:References 178:Wind farm 83:Senvion SE 226:Juniville 157:wind farm 46:megawatts 788:Category 740:(French) 734:Archived 676:Archived 606:Archived 499:Archived 458:Archived 436:cite web 332:Archived 302:Recharge 278:cite web 244:See also 234:Ardennes 230:Machault 180:Estinnes 63:V164-8.0 38:company 721:(Dutch) 304:. 2016 236:, near 184:Belgium 121:7.58 MW 69:History 40:Enercon 222:France 142:Market 59:Vestas 36:German 426:7 May 420:(PDF) 413:(PDF) 238:Reims 44:7.58 706:2017 660:2017 590:2019 532:2011 483:2017 442:link 428:2011 396:2017 370:2017 340:2017 310:2017 284:link 228:and 195:The 117:6 MW 85:and 26:The 220:In 790:: 562:. 518:. 438:}} 434:{{ 356:. 326:. 300:. 280:}} 276:{{ 182:, 708:. 662:. 624:. 592:. 566:. 548:. 534:. 485:. 444:) 430:. 398:. 372:. 342:. 312:. 286:) 272:.

Index


wind turbine
German
Enercon
megawatts
largest wind turbine
nameplate capacity
Vestas
V164-8.0
Senvion SE
Vestas Wind Systems A/S
Estinnes wind farm

Emden, Germany
Rysumer Nacken Wind Park
wind farm
Estinnes, Belgium


Estinnes
Belgium
Markbygden Wind Farm
Windpark Noordoostpolder
France
Juniville
Machault
Ardennes
Reims
Record-holding turbines
"Grenzenlose Windkraft? - Windkraftanlagen werden groĂź wie FernsehtĂĽrme"

Text is available under the Creative Commons Attribution-ShareAlike License. Additional terms may apply.

↑