528: 514: 131: 542: 25: 406:
The Netherlands government gave its final approval for the project on 6 January 2011. The following year (8 February 2012), a ruling by the Council of State on an appeal brought before them by opponents of the wind park confirmed the government decision. Construction of access roads began in May
415:
began in June 2012 with expansion of the 110 kV transport network in order to connect the wind farm. A stone guided dam with a flora and fauna area was constructed, which serves as a shipping lane to safely divert shipping around the wind farm. Subsequently, the construction activity started on
499:
The Zuidwester wind farm comprises 12 Enercon E-126 turbines with a combined capacity of 90 MW. As in the northern parts of the Noordoostpolder, the turbines are right next to the dike. The operator of the wind farm is RWE. The first turbines were installed in 2015, and Zuidwester came on stream in
490:
The majority of the onshore wind turbines are operated by NOP Agrowind. There are 26 wind turbines of type Enercon E-126, which have a nominal output of 7.5 MW each. The combined capacity of the turbines is 195 MW. Each turbine is next to the Westermeerdijk (Western Sea Dike) or the Noordermeerdijk
438:
Before the wind park was completed there were 55 older wind turbines in the same area: 50 along the Westermeerdijk and another 5 on and near the Zuidermeerdijk. The new wind farm generates significantly more energy than the previous wind farm, thanks to improved wind turbine technology. One new
482:. A total of 48 wind turbines of type Siemens 3.0DD-108 (capacity of 3 MW each) have been placed in water depths of 3–7 meters. The combined capacity of the turbines is 144 MW. Construction of the offshore work began in 2014, with commissioning carried out in two phases in 2015 and 2016. 435:, 7.5 MW), for a combined generating capacity of 429 megawatts. The wind farm produces 1.4 TWh of electricity annually, enough to provide electricity to some 400,000 households. This is roughly the number of households in the two adjacent provinces of Flevoland and Friesland. 386:. Upon completion in 2017, it was the largest wind farm in the Netherlands, and as of 2019 it is still one of the largest. Owner-operators are members of the Koepel Windenergie Noordoostpolder, a partnership of more than 100 agricultural entrepreneurs from the 439:
onshore wind turbine provides as much electricity as the previous 50 Westermeerdijk wind turbines put together. The older wind turbines were dismantled once the new farm was completed.
677: 491:(Northern Sea Dike) in close proximity to the near-shore turbines. The first turbine was commissioned in August 2014 and the wind farm was completed in 2016. 42: 672: 352: 175: 562: 89: 61: 108: 68: 46: 557: 75: 57: 635: 35: 682: 547: 223: 82: 617: 606: 527: 519: 334: 318: 595: 478:
The Westermeerwind wind farm is a near-shore facility off the coast of the municipality of
479: 387: 159: 533: 130: 666: 432: 327: 428: 541: 431:
have been erected; 48 are sited near-shore (Siemens, 3 MW) and 38 onshore (
383: 145: 24: 509: 424: 408: 155: 657: 581: 190: 177: 379: 375: 254: 163: 361: 323: 412: 391: 420: 395: 18: 16:
Onshore and near-shore wind farm in Flevoland, the Netherlands
427:
on the western side of the North East Polder. A total of 86
607:
Windpark Noordoostpolder: Wind farm facts & figures
348: 343: 333: 289: 281: 273: 265: 253: 248: 240: 232: 222: 214: 206: 169: 151: 141: 123: 49:. Unsourced material may be challenged and removed. 591: 589: 8: 244:Koepel Windenergie Nordoostpolder and Innogy 644:, 27 May 2014. Retrieved 11 September 2014. 596:Windpark Noordoostpolder: Wind farm history 658:Windpark Noordoostpolder (project website) 582:Windpark Noordoostpolder (project website) 120: 109:Learn how and when to remove this message 394:, a subsidiary of German energy company 574: 353:Related media on Commons 416:shore in 2013 and near shore in 2014. 678:Buildings and structures in Flevoland 619:Westermeerwind Wind Farm, Netherlands 7: 637:Enercon to supply 90MW Dutch project 47:adding citations to reliable sources 563:Renewable energy in the Netherlands 419:The wind farm is located along the 388:North East Polder (Noordoostpolder) 14: 540: 526: 512: 129: 23: 285:8 km (3.1 sq mi) 34:needs additional citations for 1: 673:Wind farms in the Netherlands 626:, retrieved 12 September 2014 558:Wind power in the Netherlands 374:is an onshore and near-shore 274:Distance from shore 308:38 x 7.5 MW (onshore) 306:48 x 3 MW (near-shore) 699: 269:3–6 m (10–20 ft) 266:Max. water depth 58:"Windpark Noordoostpolder" 358: 298: 294: 277:0.5 km (0.3 mi) 137: 128: 372:Windpark Noordoostpolder 315:Make and model 124:Windpark Noordoostpolder 548:Renewable energy portal 335:Nameplate capacity 215:Construction began 303:Units operational 233:Construction cost 290:Power generation 259:Near-shore (Siemens) 453: Westermeerwind 310:86 turbines in total 224:Commission date 43:improve this article 344:External links 187: /  520:Netherlands portal 460: NOP Agrowind 319:Siemens Wind Power 642:Windpower Monthly 369: 368: 261:Onshore (Enercon) 160:North East Polder 119: 118: 111: 93: 690: 645: 633: 627: 624:Power Technology 615: 609: 604: 598: 593: 584: 579: 550: 545: 544: 536: 531: 530: 522: 517: 516: 515: 468: 467: Zuidwester 466: 461: 459: 454: 452: 362:edit on Wikidata 202: 201: 199: 198: 197: 192: 191:52.721°N 5.583°E 188: 185: 184: 183: 180: 133: 121: 114: 107: 103: 100: 94: 92: 51: 27: 19: 698: 697: 693: 692: 691: 689: 688: 687: 683:Noordoostpolder 663: 662: 654: 649: 648: 634: 630: 616: 612: 605: 601: 594: 587: 580: 576: 571: 554: 553: 546: 539: 532: 525: 518: 513: 511: 506: 497: 488: 480:Noordoostpolder 476: 471: 470: 469: 464: 463: 462: 457: 456: 455: 450: 449: 445: 404: 365: 322: 309: 307: 260: 249:Wind farm 236:1 billion euros 195: 193: 189: 186: 181: 178: 176: 174: 173: 115: 104: 98: 95: 52: 50: 40: 28: 17: 12: 11: 5: 696: 694: 686: 685: 680: 675: 665: 664: 661: 660: 653: 652:External links 650: 647: 646: 628: 610: 599: 585: 573: 572: 570: 567: 566: 565: 560: 552: 551: 537: 534:Weather portal 523: 508: 507: 505: 502: 496: 493: 487: 484: 475: 474:Westermeerwind 472: 448: 447: 446: 444: 441: 403: 400: 367: 366: 359: 356: 355: 350: 346: 345: 341: 340: 337: 331: 330: 316: 312: 311: 304: 300: 299: 296: 295: 292: 291: 287: 286: 283: 282:Site area 279: 278: 275: 271: 270: 267: 263: 262: 257: 251: 250: 246: 245: 242: 238: 237: 234: 230: 229: 226: 220: 219: 216: 212: 211: 208: 204: 203: 171: 167: 166: 153: 149: 148: 143: 139: 138: 135: 134: 126: 125: 117: 116: 31: 29: 22: 15: 13: 10: 9: 6: 4: 3: 2: 695: 684: 681: 679: 676: 674: 671: 670: 668: 659: 656: 655: 651: 643: 639: 638: 632: 629: 625: 621: 620: 614: 611: 608: 603: 600: 597: 592: 590: 586: 583: 578: 575: 568: 564: 561: 559: 556: 555: 549: 543: 538: 535: 529: 524: 521: 510: 503: 501: 494: 492: 485: 483: 481: 473: 442: 440: 436: 434: 433:Enercon E-126 430: 429:wind turbines 426: 422: 417: 414: 410: 401: 399: 397: 393: 389: 385: 381: 377: 373: 363: 357: 354: 351: 347: 342: 338: 336: 332: 329: 325: 320: 317: 314: 313: 305: 302: 301: 297: 293: 288: 284: 280: 276: 272: 268: 264: 258: 256: 252: 247: 243: 239: 235: 231: 227: 225: 221: 217: 213: 209: 205: 200: 196:52.721; 5.583 172: 168: 165: 161: 157: 154: 150: 147: 144: 140: 136: 132: 127: 122: 113: 110: 102: 91: 88: 84: 81: 77: 74: 70: 67: 63: 60: –  59: 55: 54:Find sources: 48: 44: 38: 37: 32:This article 30: 26: 21: 20: 641: 636: 631: 623: 618: 613: 602: 577: 498: 489: 486:NOP Agrowind 477: 437: 418: 405: 371: 370: 105: 96: 86: 79: 72: 65: 53: 41:Please help 36:verification 33: 384:Netherlands 339:429 MW 321:: 3.0DD-108 210:Operational 194: / 170:Coordinates 146:Netherlands 99:August 2012 667:Categories 569:References 495:Zuidwester 443:Wind farms 425:IJsselmeer 409:power grid 407:2012, and 179:52°43′16″N 156:IJsselmeer 69:newspapers 411:operator 380:Flevoland 376:wind farm 182:5°34′59″E 164:Flevoland 504:See also 402:Planning 241:Owner(s) 152:Location 423:of the 349:Commons 324:Enercon 142:Country 83:scholar 500:2017. 465:  458:  451:  413:TenneT 392:Innogy 390:, and 382:, the 207:Status 85:  78:  71:  64:  56:  421:dikes 360:[ 328:E-126 90:JSTOR 76:books 255:Type 228:2017 218:2012 62:news 396:RWE 378:in 45:by 669:: 640:. 622:, 588:^ 398:. 326:: 162:, 158:, 364:] 112:) 106:( 101:) 97:( 87:· 80:· 73:· 66:· 39:.

Index


verification
improve this article
adding citations to reliable sources
"Windpark Noordoostpolder"
news
newspapers
books
scholar
JSTOR
Learn how and when to remove this message

Netherlands
IJsselmeer
North East Polder
Flevoland
52°43′16″N 5°34′59″E / 52.721°N 5.583°E / 52.721; 5.583
Commission date
Type
Siemens Wind Power
Enercon
E-126
Nameplate capacity
Related media on Commons
edit on Wikidata
wind farm
Flevoland
Netherlands
North East Polder (Noordoostpolder)
Innogy

Text is available under the Creative Commons Attribution-ShareAlike License. Additional terms may apply.