At maximum output the three 21 MW turbines pass a total of 500 cubic metres per second (18,000 cu ft/s) of water. Between August and November the water flowing in the river generally exceeds this value allowing the plant to operate at full capacity and the excess water to pass over the
336:
project on the river and was completed in 2014. The existing weir was refurbished with the previous 2 metres (6.6 ft) height maintained. In 1927, the previous hydroelectric power station was commissioned. It was refurbished in 1992 and had an installed capacity of 600 kW.
504: 489: 341:
weir. During the dry season (December to July) the electricity generated is reduced to about a third of the maximum output as the flow of water is limited to the 150–200 cubic metres per second (5,300–7,100 cu ft/s) released from the
519: 328:
capable of generating 62.3 MW. The current power station replaced an older one built in the 1920s. Construction of the new power station began in October 2009 and was financed by the
554: 539: 333: 544: 101: 438: 44: 559: 520:
Africa - WAPP APL 2 - OMVS Felou Hydroelectric Project : P094916 - Implementation Status Results Report : Sequence 15 (English)
574: 505:
Africa - Additional Financing for the Felou Hydroelectric West African Power Pool (WAPP) Second Adaptable Program Loan (APL2) Project
490:
Africa - Additional Financing for the Felou Hydroelectric West African Power Pool (WAPP) Second Adaptable Program Loan (APL2) Project
252: 549: 28: 411: 395: 348:
The total estimated cost is 241 million US dollars. The construction of the plant was completed in 2014.
579: 569: 442: 321: 201: 283: 470:(in French). Organisation Pour la Mise en Valeur du Fleuve Senegal (O.M.V.S.). February 2006 247: 464: 309: 564: 317: 293: 259: 533: 405: 342: 325: 269: 381: 89: 389: 367: 357: 329: 116: 103: 417: 375: 465:"Etude des Impacts Environnementaux du Projet D'aménagement de Félou" 439:"Mali's Felou hydroelectric dam to be inaugurated by 4 presidents" 275: 79: 188: 234:
Owner: Société de Gestion de l'Energie de Manantali (SOGEM)
292: 282: 268: 258: 246: 238: 228: 223: 215: 207: 197: 187: 182: 174: 156: 148: 140: 132: 95: 85: 75: 67: 21: 51: 8: 288:62.3 MW (83,500 hp) (max. planned) 441:. Xinhua. 17 December 2013. Archived from 27: 18: 334:Senegal River Basin Development Authority 316:) is a hydroelectric installation at the 555:Energy infrastructure completed in 2014 522:(Report). World Bank. 24 December 2014. 492:(Report). World Bank. 2009. p. 35. 430: 507:(Report). World Bank. 2009. p. 2. 298:320–350 GWh (1,200–1,300 TJ) 7: 540:Hydroelectric power stations in Mali 14: 314:Centrale hydroélectrique de Félou 388: 374: 360: 50: 43: 545:Run-of-the-river power stations 211:2 m (6 ft 7 in) 59:Location of Félou Weir in Mali 1: 178:242 million US dollars (est.) 560:2014 establishments in Mali 162:; 97 years ago 596: 412:Gouina Hydroelectric Plant 219:945 m (3,100 ft) 575:Dams on the Senegal River 306:Félou Hydroelectric Plant 71:Félou Hydroelectric Plant 38: 26: 264:13.8 m (45 ft) 396:Renewable energy portal 284:Installed capacity 149:Construction began 550:Dams completed in 1927 324:in Mali. It has three 294:Annual generation 175:Construction cost 189:Type of dam 117:14.35361°N 11.34528°W 239:Commission date 445:on February 3, 2015 122:14.35361; -11.34528 113: /  16:Dam in Kayes Region 332:. It is the third 302: 301: 183:Dam and spillways 157:Opening date 587: 524: 523: 516: 510: 508: 501: 495: 493: 486: 480: 479: 477: 475: 469: 461: 455: 454: 452: 450: 435: 398: 393: 392: 384: 379: 378: 370: 365: 364: 363: 253:Run-of-the-river 170: 168: 163: 128: 127: 125: 124: 123: 118: 114: 111: 110: 109: 106: 54: 53: 47: 31: 19: 595: 594: 590: 589: 588: 586: 585: 584: 530: 529: 528: 527: 518: 517: 513: 503: 502: 498: 488: 487: 483: 473: 471: 467: 463: 462: 458: 448: 446: 437: 436: 432: 427: 402: 401: 394: 387: 380: 373: 366: 361: 359: 354: 233: 232:Operator: ESKOM 166: 164: 161: 121: 119: 115: 112: 107: 104: 102: 100: 99: 63: 62: 61: 60: 57: 56: 55: 34: 17: 12: 11: 5: 593: 591: 583: 582: 577: 572: 567: 562: 557: 552: 547: 542: 532: 531: 526: 525: 511: 496: 481: 456: 429: 428: 426: 423: 422: 421: 415: 409: 400: 399: 385: 371: 356: 355: 353: 350: 326:water turbines 300: 299: 296: 290: 289: 286: 280: 279: 272: 266: 265: 262: 260:Hydraulic head 256: 255: 250: 244: 243: 240: 236: 235: 230: 226: 225: 221: 220: 217: 213: 212: 209: 205: 204: 199: 195: 194: 191: 185: 184: 180: 179: 176: 172: 171: 158: 154: 153: 150: 146: 145: 142: 138: 137: 134: 130: 129: 97: 93: 92: 87: 83: 82: 77: 73: 72: 69: 65: 64: 58: 49: 48: 42: 41: 40: 39: 36: 35: 32: 24: 23: 15: 13: 10: 9: 6: 4: 3: 2: 592: 581: 578: 576: 573: 571: 568: 566: 563: 561: 558: 556: 553: 551: 548: 546: 543: 541: 538: 537: 535: 521: 515: 512: 506: 500: 497: 491: 485: 482: 466: 460: 457: 444: 440: 434: 431: 424: 419: 416: 413: 410: 407: 406:Manantali Dam 404: 403: 397: 391: 386: 383: 377: 372: 369: 358: 351: 349: 346: 344: 343:Manantali Dam 338: 335: 331: 327: 323: 322:Sénégal River 319: 315: 311: 307: 297: 295: 291: 287: 285: 281: 277: 273: 271: 267: 263: 261: 257: 254: 251: 249: 245: 241: 237: 231: 227: 224:Power Station 222: 218: 214: 210: 206: 203: 202:Sénégal River 200: 196: 192: 190: 186: 181: 177: 173: 159: 155: 151: 147: 143: 139: 135: 131: 126: 98: 94: 91: 88: 84: 81: 78: 74: 70: 68:Official name 66: 46: 37: 33:Plant in 2014 30: 25: 20: 580:Kayes Region 570:Dams in Mali 514: 499: 484: 472:. Retrieved 459: 447:. Retrieved 443:the original 433: 420:– downstream 382:Water portal 347: 339: 313: 305: 303: 90:Kayes Region 368:Mali portal 318:Félou Falls 229:Operator(s) 144:Operational 120: / 96:Coordinates 534:Categories 425:References 414:– upstream 408:– upstream 330:World Bank 108:11°20′43″W 105:14°21′13″N 22:Félou Weir 474:2 January 449:2 January 418:Diama Dam 278:bulb-type 352:See also 270:Turbines 198:Impounds 86:Location 320:on the 274:3 x 21 165: ( 133:Purpose 76:Country 310:French 216:Length 208:Height 141:Status 565:Weirs 468:(PDF) 136:Power 476:2015 451:2015 304:The 248:Type 242:2014 193:Weir 167:1927 160:1927 152:2009 80:Mali 536:: 345:. 312:: 276:MW 509:. 494:. 478:. 453:. 308:( 169:)

Index


Félou Hydroelectric Plant is located in Mali
Mali
Kayes Region
14°21′13″N 11°20′43″W / 14.35361°N 11.34528°W / 14.35361; -11.34528
Type of dam
Sénégal River
Type
Run-of-the-river
Hydraulic head
Turbines
MW
Installed capacity
Annual generation
French
Félou Falls
Sénégal River
water turbines
World Bank
Senegal River Basin Development Authority
Manantali Dam
Mali portal
icon
Water portal
icon
Renewable energy portal
Manantali Dam
Gouina Hydroelectric Plant
Diama Dam
"Mali's Felou hydroelectric dam to be inaugurated by 4 presidents"

Text is available under the Creative Commons Attribution-ShareAlike License. Additional terms may apply.